Tgag Lines

download Tgag Lines

of 1

Transcript of Tgag Lines

  • 8/18/2019 Tgag Lines

    1/1

    TGAG LINES

    1. Operational uptime

    2. a well defined process and fully integrated asset management solution will manage the risk

    and complexity associated with assets

    3. improving productivity

    4. collaborate to succeed

    5. head to clouds

    6. maintaining capital discipline

    7. maximising recovery

    8. for true risk reduction, we have to look deeper

    9. worldwide focus

    10. strong roots

    11. a vibrant service

    12. pioneering service

    13. crude service

    14. optimum performance

    15. temperature accuracy with no long term drift

    16. precise performance that aces the test time

    17. we consider the pros and cons of volumetric flow measurement

    18. an insider ’s guide to installed gain as a control value sizing criterion

    19. meet your quality requirements and ensure compliance with requirement

    20. even the most rigorous driving requirement will bend challenge

    21. mechanical pipeline connectors provide effective emergency solutions for operators

    22. because there is no time for unexpected down time

    23. we’re changing the mind sets

    24. we’re doing what’s never done before again 

    25. understanding your challenges

    26. little to fear, and much to gain