January 2003 Robert F. Heile, Appairent Slide 1 doc.: IEEE 802.15- 03/056r0 Submiss ion TG3a Project Timeline Jan03 Session #22 Complete TRD, Selection Criteria Doc, and Downselect Procedure Doc Mar03 Session #23 Proposals should be heard, criteria doc amended as needed May03 Session #24 Second round of proposals heard We should spend part of this session discussing proposals presented, answering technical questions/concerns (i.e. put the diehard engineers in a room and let them verbally duke it out). Spend time on conference calls discussing proposals to let everyone get comfortable (before and after this session). Criteria doc amended as needed Jul03 Session #25 Final round of presentations. Voting must occur here --start drafting process. Sep03 Session #26 proposals for draft improvements should be entertained at this time (i.e. now that we know the realm of the game, let the games begin) Nov03 Session #27 complete drafting process…seek approval to go to WG Letter Ballot

description

TG3a Project Timeline. Jan03 Session #22 Complete TRD, Selection Criteria Doc, and Downselect Procedure Doc Mar03 Session #23 Proposals should be heard, criteria doc amended as needed May03 Session #24 Second round of proposals heard - PowerPoint PPT Presentation

Transcript of TG3a Project Timeline

Page 1: TG3a Project Timeline

January 2003

Robert F. Heile, AppairentSlide 1

doc.: IEEE 802.15-03/056r0

Submission

TG3a Project Timeline

• Jan03 Session #22– Complete TRD, Selection Criteria Doc, and Downselect Procedure Doc

• Mar03 Session #23– Proposals should be heard, criteria doc amended as needed

• May03 Session #24– Second round of proposals heard – We should spend part of this session discussing proposals presented, answering technical

questions/concerns (i.e. put the diehard engineers in a room and let them verbally duke it out).

– Spend time on conference calls discussing proposals to let everyone get comfortable (before and after this session).

– Criteria doc amended as needed

• Jul03 Session #25– Final round of presentations. Voting must occur here --start drafting process.

• Sep03 Session #26– proposals for draft improvements should be entertained at this time (i.e. now that we know

the realm of the game, let the games begin)

• Nov03 Session #27– complete drafting process…seek approval to go to WG Letter Ballot

Page 2: TG3a Project Timeline

January 2003

Robert F. Heile, AppairentSlide 2

doc.: IEEE 802.15-03/056r0

Submission

TG3a Timeline

2003

J J A S O N D J F M A M J J DJ F M A M A S O N

Downselect

2002

CFA

D

PAR

DraftProject Definition