Testing 4G Ahead of the Curve

12
Testing 4G Ahead of the Curve Automation, is it even an option?

description

Testing 4G Ahead of the Curve. Automation, is it even an option?. 4G Technical Benefits. Source: Motorola. 4G Technical Benefits. Source: Motorola. 4G Business Benefits. Expanded Services + New Services + Less Cost = More Revenue The Next Chapter in the War for subscribers. - PowerPoint PPT Presentation

Transcript of Testing 4G Ahead of the Curve

Page 1: Testing 4G Ahead of the Curve

Testing 4G Ahead of the Curve

Automation, is it even an option?

Page 2: Testing 4G Ahead of the Curve

4G Technical Benefits

Source: Motorola

Page 3: Testing 4G Ahead of the Curve

4G Technical Benefits

Source: Motorola

Page 4: Testing 4G Ahead of the Curve

4G Business Benefits

Expanded Services + New Services + Less Cost

= More Revenue

The Next Chapter in the

War for subscribers

Page 5: Testing 4G Ahead of the Curve

Companies already in Trials

Page 6: Testing 4G Ahead of the Curve

4G is Complex

Source: Kineto Wireless

Page 7: Testing 4G Ahead of the Curve

4G is Another Layer

Source: Alcatel-Lucent, Fibresystems.org

Page 8: Testing 4G Ahead of the Curve

4G Complexity is Daunting

Page 9: Testing 4G Ahead of the Curve

New Technology Equals Churn

• New Devices / Standards - Daily

• High Feature Velocity

• Rapid bug fix releases

This makes an already challenging problem quite frustrating

Page 10: Testing 4G Ahead of the Curve

Test Area:– Formfactors / Design

– FPGA

– Processors

– Display

– Keypad

– Touchscreen

– Camera

– Microphone

– Battery and Charger

– Data Cables (Video, USB)

– Headset

– Headset Bluetooth

– Lamp

– Storage

– Data Card (removable)

• Radio Interface (RF)

physics & controlEn-/Decoding

Throughput

• IR

• Bluetooth

• WiFi

• FM Radio

• GPS

• Additional keys for e.g.

• Loudness

• Camera

• Switch on/off

• Sensors (if applicable)

Hardware and Interfaces Software and Interfaces• Platform Capabilities

– Operating System (S60, Windows Mobile etc)

– Platform SDK

• Security• Audio

• Quality

• Codecs

• Voice recording

• Speech recognition (Voice dialling)

• Video• Quality

• Codecs

• Video recording

• Content and File Management

• DRM

• File Manager

• Data transfer via BT, IR, USB

• Graphics

• Applications without network interaction– Music

– Gaming

– Java

– Phonebook

– Calendar

– Clock / Alarm / Worldclock

– Editor

– Document viewer

– Caculator

– Currency converter

– GPS

– Radio FM

• Applications with network interaction– Mobile TV

– SMS

– MMS

– Download, upload files, pictures, videos

– Interactive gaming

– Calendar synchronisation

– Email

– Push to talk

– Web browsing

– WAP

– Call Register (in / out / missed)

– VoIP

– IPv6

• Application Interactions – With and without network interaction)

• Application running from Memory Card• Flight Mode

• Concurrency e.g.– Mobile TV and incoming call– Write SMS and incoming call– Receive SMS/MMS during Call– Receive call while any of the applications is running– Video Conference and MMS– Streaming service and incoming/outgoing call– Upload data and and incoming/outgoing call– ...

Layer 2/3 Protocol Testing (Network Signaling) GSM/GPRS/EDGE UMTS/HSPA LTE (example follows)

• Module Testing

• HW/SW Integration• System Integration

2G/3G Mobility IntraRAT-Handover InterRAT-Handover

Protocol Conformance Testing ( ->GCF)

• Services e.g.– Supported Bearers

• SIP / IMS applications (as VoIP !!)

• MBMS (as Mobile TV)

• Different Qos/QCI (=QoS class Identifier in LTE)– Bearers in parallel– Supplementary services (CLIP/CLIR...)– Location Based Services

• Throughput measurements• Performace Testing• IODT• IOT• Drive / Field tests• Type Approval

Page 11: Testing 4G Ahead of the Curve

Testing Ahead of 4G

• 4G is another order magnitude on top of the existing infrastructure

• Profitability and company viability on the line.

• Unbelievable Technology Churn

• Less ability to test manually

• Script based testing is failing

Page 12: Testing 4G Ahead of the Curve

Will Your 4G be on Time?

Can you take a feature test and get it into regression before you release the product or service?

Can you run a full regression suite on a new service, new device feature, or a device software update in less than a week? In two days?

No? Better hope your competitor can’t