Test Case Template

75
NV MMIS Takeover Quality Center Test Case Template 05/13/2022 document.xls Page 1 of 75 Test Name Description MMIS Takeover Core Subject (Autofills) System (High-Level Aggregation) i.e. MMIS Takeover Component (Application or how Requirements are Grouped) i.e. Core or Provider Sub-component Requirement grouping within Component Requirement Title (As it is added in Quality Center) Step Number

Transcript of Test Case Template

Page 1: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 1 of 50

Test Name Description Step Number

MMIS Takeover Core

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 2: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 2 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 3: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 3 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 4: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 4 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 5: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 5 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 6: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 6 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 7: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 7 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 8: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 8 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 9: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 9 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 10: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 10 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 11: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 11 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 12: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 12 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 13: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 13 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 14: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 14 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 15: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 15 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 16: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 16 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 17: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 17 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 18: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 18 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 19: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 19 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 20: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 20 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 21: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 21 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 22: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 22 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 23: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 23 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 24: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 24 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 25: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 25 of 50

Test Name Description Step NumberSubject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

A1
QC takes column B C and D and creates the folder structure in the tool at load time
G1
Describe the business action that will be executed
Page 26: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 26 of 50

MMIS Takeover Core

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 27: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 27 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 28: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 28 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 29: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 29 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 30: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 30 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 31: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 31 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 32: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 32 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 33: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 33 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 34: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 34 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 35: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 35 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 36: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 36 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 37: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 37 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 38: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 38 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 39: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 39 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 40: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 40 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 41: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 41 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 42: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 42 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 43: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 43 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 44: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 44 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 45: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 45 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 46: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 46 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 47: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 47 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 48: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 48 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 49: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 49 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.
Page 50: Test Case Template

NV MMIS Takeover Quality Center Test Case Template 04/08/2023

document.xls Page 50 of 50

Subject(Autofills)

System(High-Level

Aggregation) i.e. MMIS Takeover

Component(Application or how Requirements are

Grouped) i.e. Core or Provider Portal

Sub-componentRequirement grouping

within Component

Requirement Title(As it is added in Quality

Center)

Step Description Expected Result Plan Approved

A1
QC takes column B C and D and creates the folder structure in the tool at load time
I1
Precisely define the action(s) in this step, matching those actions to Expected Result(s)
K1
Set to Y if this has been subjected to a peer group review and approval process This defaults to N if no value is selected.