Terramin General Update · Tailings Storage Facility Surface area remains at approximately

14
Terramin General Update Matt Daniel – Environment and Community Superintendent Angas Zinc Mine 1

Transcript of Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Page 1: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Terramin General Update

Matt Daniel – Environment and Community Superintendent Angas Zinc Mine

1

Page 2: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Angas Zinc Mine Ongoing management of site – weed control and revegetation

During the quarter observed a family of White-browed Babblers, first seen on site in 7 years

Picture shows a Little Eagle, taken on AZM (M.Ankor)

Hydrostor - progress Compressed Air Energy Storage

Presentation tonight

Page 3: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Terramin Update

Appointed new CEO – Richard Taylor

Bachelors of Economics and Law – University of Newcastle

Master of Laws – ANU

Master of Business Administration – Cambridge

Member of Australian Institute of Company Directors

Panaust Asia

Managing Director, copper gold mine, Laos

MMG (Oxiana)

Asia and Country Manager

Sepon copper/gold mine, Laos

Department of Foreign Affairs and Trade

World Bank – Sustainable Energy, Oil, Gas and Mining

Page 4: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Terramin - Projects Bird in Hand / Angas Processing Facility

Beginning to receive feedback from DEM on BIH ML Proposal

Draft AZM MPL being reviewed externally prior to the draft being lodged with DEM

Still waiting on DEM approval to begin Managed Aquifer Recharge drilling at BIH

Tala Hamza

Mining lease application being reviewed by government agencies

Completion of mining lease application ready to be submitted subject to joint resolution of the Tala Hamza partners

Continued engagement with the Algerian regulator and government.

Page 5: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Quarterly Environment Report

Matt Daniel – Environment and Community Superintendent

5

Page 6: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Activities over Q1

Annual Compliance report submitted in March

Continued drafting of MPL for Angas Processing Facility

Updated stormwater design for MPL – AECOM Slight catchment change

Page 7: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Angas Zinc Mine – Quarterly Environment Report

No non-compliances against lease Conditions for Quarter 1, 2018

Correction to QER

No non-compliance against PM10 Outcome Measurable Criteria

Review: “PM10 dust levels collected from the HiVol PM10 sampler located at the visitors viewing area (Figure 44 - same location as the HiVol sampler), will be sampled over a 24hour period every six days as per AS, 3580.9.3:2003 standards. Data will demonstrate compliance with NEPM 1998 criteria of <50 micrograms/m3 per 24 hour period with <5 days exceedances per year.”

Terramin still conducted investigation as to why

Page 8: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Angas Zinc Mine – Quarterly Environment Report

17th March 2018 - Saturday

PM10 measured 55ug/m3 over 24 hours

Unusual - Investigation showed wind direction towards operational area all day, not away from operational area

No activities being undertaken at AZM

No southerlys, south-westerlys, or south-easterlys

65km/hr onsite

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%N

NE

EW

NW

0-5 5-10 10-15 15-20 20-25 25-30 30-35 35-40 40-45 >50

Page 9: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Tailings Storage Facility Surface area remains at approximately <5000m2

Water level is approximately 67.68m RL (compliance is 74.2m RL)

Seepage drains remain lowest they’ve been in last 2 years – approx. ≈ 1L/min

Cadmium spike in TSF B and D reviewed by ATC Williams and unrelated to TSF

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

Jan-

2016

Mar

-201

6

May

-201

6

Jul-

2016

Sep-

2016

Nov

-201

6

Jan-

2017

Mar

-201

7

May

-201

7

Jul-

2017

Sep-

2017

Nov

-201

7

Jan-

2018

Flow

Rat

e (L

itre

s/m

inut

e)

TSF Drain Flow Rates

Drain 1 Drain 2 Drain 3 Drain 4 Drain 5 Total Flow (L/min)

Page 10: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Closure Plan Fact Sheets

Up in Visitor’s Viewing Platform at AZM

Copies available for Community Access areas (actions outstanding from last meeting)

See Matt after meeting to obtain a set

Page 11: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Questions?

Page 12: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Hydrostor A-CAES System Basics

Page 13: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Terramin Zinc Mine A-CAES System

Page 14: Terramin General Update · Tailings Storage Facility Surface area remains at approximately

Benefits for Australia

Fossil Plant Replacement

• Repurpose decommissioned thermal plants and defer remediation costs

• Re-use of existing interconnection and infrastructure• Synchronous generation for reliability, without emissions

Transmission Deferral

• Non-wires alternatives to defer grid network investment• Alleviates grid congestion during peak periods• Locatable reliable power for critical areas and infrastructure

Renewable Integration

• Provide dispatchable, base loaded renewables• Optimize solar/wind project economics through time-shifting • Reduce curtailment

Mines / Large Industrial

• Ability to eliminate fuel costs & logistics (off-grid)• Improve reliability and reduce electricity grid charges (on-grid)• Re-use legacy mining infrastructure

14