Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full...

15
Consultation on the Implementation plan Terminal Advisory Group 9 October 2013 Claire Hamoniau

Transcript of Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full...

Page 1: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

Consultation on the Implementation plan

Terminal Advisory Group 9 October 2013

Claire Hamoniau

Page 2: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

Results of the consultation

8 answers were received 4 railway undertakings 1 combined transport operator 3 ports

They mainly concern lines and terminals to include in the Corridor

2

Page 3: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

Changes following the consultation (1)

1. Characteristics of RFC2

Addition on the map of all bottlenecks which were described in the Implentation Plan:Ottignies/Auvelais/Namur, Aubange, Metz, Nancy and Lyon

Page 4: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

Changes following the consultation (2)

2. Transport market study

A few changes of the results of the study were requested

The Management Board sub-contracted the study to external consultants in order for results to be impartial. It is therefore not possible to change the results of the study

The only changes concern:

The identification of Ghent as a major industrial center and rail user

the removal of data on charging (rail freight rates between countries and freight rates between different modes), as results were inconsistent

4

Page 5: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

Changes following the consultation (3)

3. Objectives of the Corridor

Train Performance Management (TPM) : role of RUs

They play an essential role in the TPM (working groups & bilateral meetings)

European Performance Regime (EPR)

TPM will test EPR, as it can help to improve the data quality of the information coming out of TIS, which is used for TPM

In the short/medium term: no plan to implement the financial part of EPR

5

Page 6: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

Changes following the consultation (4)

4. Investissements

Planning of ERTMS deployment (level, baseline, supervision type)

These data are included in the IP & a has since described these data Level 1 version 2.3.0d full supervision, except :

Saint Louis – Bâle : level 1, baseline 3, limited supervision

Namur-Athus via Libramont will be level 2 version 2.3.0d full supervision

Antwerp – Rotterdam is likely to be equiped with level 2 version 2.3.0d full supervision

Dates at which national systems stop overlapping with ERTMS Only dates for which decisions have been taken are indicated in the IP

Other investments No requests made for further investments except one (electrification of a line in a port) which will not be taken into consideration as not socioeconomically profitable

Page 7: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

Corridor lines (1)

Requests for additional lines Nancy–Reding (via Blainville/Luneville): added (Jan 2015, TT2016)

Lille-Arras via Seclin-Ostricourt-Corbehem/Don Sainghin-Lens/Seclin-Dourges-Lens: added (Jan 2015, TT2016)

Somain-Valenciennes: not added

Last kilometre to the Port of Calais: not added, the line stops where the owner is not RFF

Paris-Lyon: not added

Ambérieu-Vénissieux: added (Ambérieu-Lyon as diversionary line)

Aulnoye-Quevy-Belgium (Mechelen): not added

Connexion to the port of Zeebrugge: not added but CEF regulation is expected to address this point

Lines of the port of Antwerp: added as connecting lines

Athus – Luxembourg: added for 2013, as diversionary line

7

Page 8: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

Corridor lines (2) Phase 3: extension at the latest in November 2016

based on market studies

taking into consideration existing passenger and freight transport

8

RFC 2 maps are subject to the ExBo approval and to the adoption of the CEF regulation

Page 9: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

Terminals

Terminals added Antwerp Main Hub Vénissieux (FR) Basel SBB RB

Terminals not added

Antwerp-Schijnpoort (no activity other than driver change) Antwerp-Zandvliet (same as DP world terminal) Chatelet, BE (no activity)

Other

• Eurotunnel Terminal deleted • Basel terminal: change of name • Meerhout terminal deleted

9

Page 10: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

RFC 2 terminals in the Netherlands

10

Terminal City Country Road Rail Sea IWWPernis Combi Terminal Rotterdam Netherlands X X X

CdMR Terminal Rotterdam Netherlands X X X XRotterdam Maasvlakte Rotterdam Netherlands X X X

ECT Delta Terminal Rotterdam Netherlands X X XRotterdam RSC Rotterdam Netherlands X X X

Moerdijk Rotterdam Netherlands X XKijfhoek Rotterdam Netherlands X

Port of Vlissingen / Sloehaven Vlissingen Netherlands X X X

Page 11: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

RFC 2 terminals in Belgium

11

Terminal City Country Road Rail Sea IWWAntwerpen Cirkeldyck (MSC home terminal) Antwerp Belgium X X X X

Antwerpen Zomerweg Antwerp Belgium X X XAntwerpen Gateway DP world terminal Antwerp Belgium X X X X

Hupac Terminal Antwerpen Antwerp Belgium X X XCombinant Antwerp Belgium X X

Antwerpen ATO Antwerp Belgium X X XNoordzee Terminal PSA Antwerp Belgium X X X X

Europa Terminal PSA Antwerp Belgium X X X XSHIPIT multimodal platform 1616

(under construction)Antwerp Belgium X X X X

Mexico Natie N.V Antwerp Belgium X X XDeurganck PSA Antwerp Belgium X X X X

Delwaide Dock Terminal (DP World) Antwerp Belgium X X X XAntwerpen-Noord Antwerp Belgium X

Antwerpen-Main Hub Antwerp Belgium X XTerminal Container Athus Athus Belgium X X

Brussels Terminal intermodal Brussels Belgium X X XCharleroi Logistics centre (Dry Port Charleroi) Charleroi Belgium X X

Gent container terminal Ghent Belgium X X X XGand port maritime Ghent Belgium X X

IPG Intermodaal Platform Gent Ghent Belgium X X X XPort de Ghlin Ghlin Belgium X X XKinkempois Kinkempois Belgium X

La Louvière Garocentre (Port Autonome du Centre et de l'Ouest)

La Louvière Belgium X X X

L.A.R/ delcaterminal Lauwe Belgium X XLiège Logistique Intermodal Liège Belgium X X

Liège Trilogiport (under construction) Liège Belgium X X XLiège Container Terminal (Renory) Liège Belgium X X X

Monceau sur Sambre Monceau sur Sambre Belgium XDry Port Mouscron-Lille Mouscron Belgium X X

Dry Port Muizen Muizen Belgium X XPort Autonome de Namur Namur Belgium X X X

Ardenne Logistics Neufchâteau Belgium X X

Page 12: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

RFC 2 terminals in France

12

Terminal City Country Road Rail Sea IWWAmbérieu Ambérieu France X

Aulnoye-Aymeries Aulnoye-Aymeries France XBadan Badan France X

Blainville Blainville France XBonneuil-sur-Marne Bonneuil-sur-Marne France X X X

Bourg-en-Bresse Bourg-en-Bresse France XPort de Calais Calais France X X XCalais Fréthun Calais France X

Chalindrey Chalindrey France X XChâlons-en-Champagne Châlons-en-Champagne France X

Aproport CHALON Chalon-sur-Saône France X X XColmar-Neufbrisach Colmar France X X X

Delta 3 Dourges France X X XDunkerque (Grande Synthe) Dunkerque France X

Port de Dunkerque Dunkerque France X X X XPort de Nancy/Frouard Frouard France X X X

Gennevilliers Gennevilliers France X X XGevrey Gevrey France X X

Hausbergen Hausbergen France XIs sur Tille Is sur Tille France XLe Bourget Le Bourget France XLérouville Lérouville France X

Port fluvial de Lille Lille France X X XLyon Port Edouard Herriot (Lyon terminal 2) Lyon France X X X

Mâcon Mâcon France X X XMetz port Metz France X X X

Metz-Sablon Metz-Sablon France XMulhouse-Nord Mulhouse-Nord France X

Mulhouse [Ottmarsheim] Mulhouse France X X XChampigneulles (Nancy) Nancy France X X

Noisy-le-Sec Noisy-le-Sec France X XTechnoport Pagny sur Saône France X X X

Perrigny Perrigny France XProuvy (Valenciennes) Prouvy France X X X

Reims Reims France XSaint Germain au Mont d'Or Saint Germain au Mont d'Or France X

Sibelin Sibelin France XSomain Somain France X

Port Autonome de Strasbourg Strasbourg France X X XTergnier Tergnier France X

Thionville Thionville France XPorts de Thionville-Illange et Metz Nord Thionville France X X X

Valenton Naviland Valenton France X XValenton Novatrans Valenton France X X

Valenton T3M Valenton France X XValenton Décor Valenton France X X

Vénissieux Naviland Vénissieux France X XVénissieux Novatrans Vénissieux France X X

Woippy Woippy France X

Page 13: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

RFC 2 terminals in Luxembourg

13

Terminal City Country Road Rail Sea IWWBelval-Usines Belval-Usines Luxembourg XBettembourg Bettembourg Luxembourg X XDifferdange Differdange Luxembourg XEsch/Alzette Esch/Alzette Luxembourg XLuxembourg Luxembourg Luxembourg X

Port de Mertert / Luxport S.A. Mertert Luxembourg X X XPétange Pétange Luxembourg X

Page 14: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

RFC 2 terminals in Switzerland

14

Terminal City Country Road Rail Sea IWWBasel Birsfelden Hafen Basel Switzerland X X

Frenkendorf-Füllinsdorf Basel Switzerland X XBasel Kleinhüningen Hafen Basel Switzerland X X X

Basel Auhafen Basel Switzerland X X XBasel CT Basel Switzerland X

Basel SBB RB Basel Switzerland X

Page 15: Terminal Advisory Group 9 October 2013 - Med · 2017. 8. 25. · Level 1 version 2.3.0d full supervision, except : Saint Louis – Bâle : level 1, baseline 3, limited supervision

15/20 15/23 © RFC 2

Contacts Head Office 9, place de la Gare L-1616 Luxemburg Permanent Team Office 13, Avenue Fonsny B-1060 Brussels www.rfc2.eu

The sole responsibility of this publication lies with the author. The European Union is not responsible for any use that may be made of the information contained there in.

ACF