TENTATIVE FIVE YEAR WORK PROGRAMFISCAL YEARS 2020-2024
FLORIDA DEPARTMENT OF TRANSPORTATION - DISTRICT ONE
POLK COUNTYBARTOW OPERATIONS
BARTOW MATERIALS
MISSION STATEMENTThe Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.
Zachary Burch Gov. Affairs & Comm. Manager Southwest Area Office 10041 Daniels Parkway Fort Myers, FL 33913 (239) 225-1950
Brian Rick Gov. Affairs & Comm. Manager District 1 Headquarters 801 North Broadway Avenue Bartow, FL 33830 (863) 519-2828
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 1 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
ACBR ADVANCE CONSTRUCTION (BRT)
ACBZ ADVANCE CONSTRUCTION (BRTZ)
ACCM ADVANCE CONSTRUCTION (CM)
ACFP AC FREIGHT PROG (NFP)
ACID ADV CONSTRUCTION SAFETY (HSID)
ACNP ADVANCE CONSTRUCTION NHPP
ACSA ADVANCE CONSTRUCTION (SA)
ACSS ADVANCE CONSTRUCTION (SS,HSP)
ACSU ADVANCE CONSTRUCTION (SU)
BNDS BOND - STATE
BNIR INTRASTATE R/W & BRIDGE BONDS
BRRP STATE BRIDGE REPAIR & REHAB
BRTZ FED BRIDGE REPL - OFF SYSTEM
CM CONGESTION MITIGATION - AQ
D UNRESTRICTED STATE PRIMARY
DDR DISTRICT DEDICATED REVENUE
DI ST. - S/W INTER/INTRASTATE HWY
DIH STATE IN-HOUSE PRODUCT SUPPORT
DIS STRATEGIC INTERMODAL SYSTEM
DITS STATEWIDE ITS - STATE 100%.
DPTO STATE - PTO
DS STATE PRIMARY HIGHWAYS & PTO
DU STATE PRIMARY/FEDERAL REIMB
EB EQUITY BONUS
FAA FEDERAL AVIATION ADMIN
FCO PRIMARY/FIXED CAPITAL OUTLAY
FTA FEDERAL TRANSIT ADMINISTRATION
FTAT FHWA TRANSFER TO FTA (NON-BUD)
GFSA GF STPBG ANY AREA
GMR GROWTH MANAGEMENT FOR SIS
CURRENTLY REPORTED ACTIVE FUND CODES
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 2 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
HSP SAFETY (HIWAY SAFETY PROGRAM)
LF LOCAL FUNDS
NHPP IM, BRDG REPL, NATNL HWY-MAP21
NHRE NAT HWY PERFORM - RESURFACING
PKOH TURNPIKE INDIRECT COSTS
PL METRO PLAN (85% FA; 15% OTHER)
RHH RAIL HIGHWAY X-INGS - HAZARD
SA STP, ANY AREA
SIWR 2015 SB2514A-STRATEGIC INT SYS
SL STP, AREAS <= 200K
SR2T SAFE ROUTES - TRANSFER
STED 2012 SB1998-STRATEGIC ECON COR
SU STP, URBAN AREAS > 200K
TALT TRANSPORTATION ALTS- ANY AREA
TALU TRANSPORTATION ALTS- >200K
TLWR 2015 SB2514A-TRAIL NETWORK
TRIP TRANS REGIONAL INCENTIVE PROGM
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 3 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FLP: INTERMODAL
FPN : 4370591 Project/Location : BARTOW MUNICIPAL APT INSTALL NEW AND RELOCATE EXISTING RAIL LINES
Desc: AVIATION REVENUE/OPERATIONAL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $600,000 $0 $0 $0 $0CAP LF $600,000 $0 $0 $0 $0Project Total: $1,200,000 $0 $0 $0 $0
FPN : 4388361 Project/Location : LAKELAND LINDER REG ARPT SITE PREP/UTILITY INSTALL @ INTERMODAL CENTER
Desc: AVIATION CAPACITY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DDR $1,000 $0 $0 $0 $0CAP DPTO $1,399,000 $0 $0 $0 $0CAP LF $1,400,000 $0 $0 $0 $0Project Total: $2,800,000 $0 $0 $0 $0
FPN : 4443171 Project/Location : LAKELAND LINDER REGIONAL AIRPORT INTERMODAL CARGO WAREHOUSE
Desc: AVIATION REVENUE/OPERATIONAL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DDR $1,788,473 $532,050 $0 $0 $0CAP DPTO $40,959 $0 $0 $0 $0CAP LF $1,829,432 $532,050 $0 $0 $0Project Total: $3,658,864 $1,064,100 $0 $0 $0
FLP: INTERMODAL TOTAL 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
$7,658,864 $1,064,100 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 4 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FLP: TRANSIT
FPN : 4402791 Project/Location : BUS STOP IMPROVEMENTS AT VARIOUS LOCATIONS (HAINES CITY)
Desc: PUBLIC TRANSPORTATION SHELTER Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP FTAT $231,037 $0 $0 $0 $0CAP SU $231,037 $0 $0 $0 $0Project Total: $462,074 $0 $0 $0 $0
FPN : 4407571 Project/Location : LAKELAND AREA MASS TRANSIT FOR WH AND LKLD BLOCK GRANT OPER ASSISTANCE
Desc: OPERATING FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DDR $5,199 $5,472 $1,578,066 $0 $0OPS DPTO $1,426,141 $1,497,448 $0 $1,661,090 $1,739,818OPS LF $1,431,340 $1,502,920 $1,578,066 $1,661,090 $1,739,818Project Total: $2,862,680 $3,005,840 $3,156,132 $3,322,180 $3,479,636
FPN : 4101491 Project/Location : LAMTD FTA SECT 5307 CAPITAL ASSIST LKLD UZA
Desc: CAPITAL FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP FTA $638,412 $640,085 $652,877 $620,313 $610,140CAP LF $159,603 $160,021 $163,219 $155,078 $152,535Project Total: $798,015 $800,106 $816,096 $775,391 $762,675
FPN : 4101492 Project/Location : LAMTD FTA SECT 5307 OPERATING ASSIST LKLD UZA
Desc: OPERATING FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS FTA $1,915,235 $1,920,254 $1,958,630 $1,860,938 $1,830,420OPS LF $1,915,235 $1,920,254 $1,958,630 $1,860,938 $1,830,420Project Total: $3,830,470 $3,840,508 $3,917,260 $3,721,876 $3,660,840
FPN : 4101501 Project/Location : LAMTD FTA SECTION 5307 CAPITAL ASSISTANCE WINTER HAVEN UZA
Desc: CAPITAL FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP FTA $515,092 $513,607 $536,840 $468,034 $444,752CAP LF $128,773 $128,402 $134,210 $117,009 $111,188Project Total: $643,865 $642,009 $671,050 $585,043 $555,940
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 5 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4101502 Project/Location : LAMTD FTA SECTION 5307 OPERATING ASSISTANCE WINTER HAVEN UZA
Desc: OPERATING FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS FTA $1,545,276 $1,540,821 $1,610,520 $1,404,104 $1,334,257OPS LF $1,545,276 $1,540,821 $1,610,520 $1,404,104 $1,334,257Project Total: $3,090,552 $3,081,642 $3,221,040 $2,808,208 $2,668,514
FPN : 4140631 Project/Location : LAKELAND AREA MASS TRANSIT (LAMTD)-OPERATING ASSISTANCE - CORRIDOR
Desc: URBAN CORRIDOR IMPROVEMENTS Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DPTO $818,945 $818,945 $795,083 $795,083 $795,083OPS LF $818,945 $818,945 $795,083 $795,083 $795,083Project Total: $1,637,890 $1,637,890 $1,590,166 $1,590,166 $1,590,166
FPN : 4357711 Project/Location : LAMTD/LKND-WH UZA FTA SECTION 5339 CAPITAL ASSISTANCE
Desc: CAPITAL FOR FIXED ROUTE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP FTA $480,121 $480,787 $449,094 $405,402 $512,162CAP LF $120,030 $120,197 $112,274 $101,351 $128,041Project Total: $600,151 $600,984 $561,368 $506,753 $640,203
FPN : 4402581 Project/Location : LAKELAND AREA MASS TRANSIT DISTRICT FTA SEC 5311 OPERATING ASSISTANCE
Desc: OPERATING/ADMIN. ASSISTANCE Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DU $800,575 $800,575 $800,575 $913,000 $838,938OPS LF $800,575 $800,575 $800,575 $913,000 $838,938Project Total: $1,601,150 $1,601,150 $1,601,150 $1,826,000 $1,677,876
FPN : 4101161 Project/Location : POLK COUNTY TPO TRANSIT PLANNING - FTA SECTION 5305 (D)
Desc: MODAL SYSTEMS PLANNING Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PLN DPTO $14,381 $14,656 $14,656 $14,656 $14,656PLN DU $115,046 $117,245 $117,245 $117,245 $117,245PLN LF $14,381 $14,656 $14,656 $14,656 $14,656Project Total: $143,808 $146,557 $146,557 $146,557 $146,557
FLP: TRANSIT TOTAL 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
$15,670,655 $15,356,686 $15,680,819 $15,282,174 $15,182,407
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 6 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FLP:AVIATION
FPN : 4399441 Project/Location : BARTOW MUNICIPAL AIRPORT T-HANGARS
Desc: AVIATION REVENUE/OPERATIONAL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $0 $0 $0 $0 $994,176CAP LF $0 $0 $0 $0 $248,544Project Total: $0 $0 $0 $0 $1,242,720
FPN : 4402261 Project/Location : BARTOW MUNICIPAL AIRPORT - IMPROVE AIRPORT DRAINAGE
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $27,600 $0 $0 $0 $0CAP FAA $496,800 $0 $0 $0 $0CAP LF $27,600 $0 $0 $0 $0Project Total: $552,000 $0 $0 $0 $0
FPN : 4409281 Project/Location : BARTOW MUNICIPAL AIRPORT REHAB RUNWAY 9R/27L
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DDR $0 $0 $0 $0 $915,471CAP DPTO $0 $0 $0 $300,000 $1,484,529CAP LF $0 $0 $0 $75,000 $600,000Project Total: $0 $0 $0 $375,000 $3,000,000
FPN : 4418511 Project/Location : BARTOW MUNICIPAL AIRPORT REHABILITATE TAXIWAY C
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $0 $27,000 $0 $0 $0CAP FAA $0 $486,000 $0 $0 $0CAP LF $0 $27,000 $0 $0 $0Project Total: $0 $540,000 $0 $0 $0
FPN : 4418521 Project/Location : BARTOW MUNICIPAL AIRPORT REHABILITATE RUNWAY 5-23
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DDR $0 $0 $70,560 $0 $0CAP FAA $0 $0 $1,270,080 $0 $0CAP LF $0 $0 $70,560 $0 $0Project Total: $0 $0 $1,411,200 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 7 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4418691 Project/Location : LAKE WALES ARPT T-HANGARS
Desc: AVIATION REVENUE/OPERATIONAL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DDR $0 $0 $842,500 $0 $0CAP LF $0 $0 $134,000 $0 $0Project Total: $0 $0 $976,500 $0 $0
FPN : 4446161 Project/Location : LAKE WALES MUNICIPAL ARPT EAST APRON EXPANSION & TAXILANE
Desc: AVIATION SAFETY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $0 $0 $0 $98,400 $700,000CAP LF $0 $0 $0 $24,600 $175,000Project Total: $0 $0 $0 $123,000 $875,000
FPN : 4446171 Project/Location : LAKE WALES MUNICIPAL ARPT EAST APRON REHABILITATION
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $30,000 $0 $0 $0 $0CAP FAA $540,000 $0 $0 $0 $0CAP LF $30,000 $0 $0 $0 $0Project Total: $600,000 $0 $0 $0 $0
FPN : 4446191 Project/Location : LAKE WALES MUNICIPAL ARPT MASTER PLAN
Desc: AVIATION CAPACITY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $0 $11,670 $0 $0 $0CAP FAA $0 $210,060 $0 $0 $0CAP LF $0 $11,670 $0 $0 $0Project Total: $0 $233,400 $0 $0 $0
FPN : 4446751 Project/Location : LAKE WALES MUNICIPAL ARPT FUEL FARM
Desc: AVIATION REVENUE/OPERATIONAL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $400,000 $200,000 $0 $0 $0CAP LF $100,000 $50,000 $0 $0 $0Project Total: $500,000 $250,000 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 8 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4416801 Project/Location : LAKELAND LINDER REGIONAL AIRPORT REHABILITATE TAXIWAYS A, B AND C
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $158,092 $0 $0 $0 $0CAP FAA $2,845,665 $0 $0 $0 $0CAP LF $158,092 $0 $0 $0 $0Project Total: $3,161,849 $0 $0 $0 $0
FPN : 4416831 Project/Location : LAKELAND LINDER REGIONAL AIRPORT REHABILITATE RUNWAY 9/27
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $0 $445,481 $0 $0 $0CAP FAA $0 $8,018,663 $0 $0 $0CAP LF $0 $445,481 $0 $0 $0Project Total: $0 $8,909,625 $0 $0 $0
FPN : 4416841 Project/Location : LAKELAND LINDER REGIONAL AIRPORT CONTRUCT PARALLEL RUNWAY 9R/27L
Desc: AVIATION CAPACITY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DDR $0 $0 $0 $125,000 $0CAP FAA $0 $0 $0 $2,250,000 $0CAP LF $0 $0 $0 $125,000 $0Project Total: $0 $0 $0 $2,500,000 $0
FPN : 4313701 Project/Location : LAL EXTEND RW 9-27 TW A & P, ENVIRONMENTAL ASSESSMENT
Desc: AVIATION CAPACITY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $0 $501,250 $0 $0 $0CAP FAA $0 $9,022,500 $0 $0 $0CAP LF $0 $501,250 $0 $0 $0Project Total: $0 $10,025,000 $0 $0 $0
FPN : 4417861 Project/Location : WINTER HAVEN ARPT TAXIWAY BRAVO LIGHTING
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $52,000 $0 $0 $0 $0CAP FAA $585,000 $0 $0 $0 $0CAP LF $13,000 $0 $0 $0 $0Project Total: $650,000 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 9 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4417871 Project/Location : WINTER HAVEN ARPT TAXIWAY E EXTENSION
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DPTO $80,000 $0 $0 $0 $0CAP FAA $900,000 $0 $0 $0 $0CAP LF $20,000 $0 $0 $0 $0Project Total: $1,000,000 $0 $0 $0 $0
FPN : 4417881 Project/Location : WINTER HAVEN ARPT TAXIWAY A, A2, A3 AND SOUTH APRON
Desc: AVIATION PRESERVATION PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CAP DDR $0 $0 $119,775 $0 $0CAP DPTO $0 $18,824 $0 $0 $0CAP FAA $0 $211,770 $0 $0 $0CAP LF $0 $4,706 $29,944 $0 $0Project Total: $0 $235,300 $149,719 $0 $0
FLP:AVIATION TOTAL 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
$6,463,849 $20,193,325 $2,537,419 $2,998,000 $5,117,720
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 10 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FLP:RAIL
FPN : 4366561 Project/Location : NEW YORK AVENUE PEDESTRIAN OVERPASS
Desc: RAIL CAPACITY PROJECT Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
ENV TRIP $25,000 $0 $0 $0 $50,000ROW DIH $0 $50,923 $0 $0 $0Project Total: $25,000 $50,923 $0 $0 $50,000
FPN : 4365601 Project/Location : RECKER HIGHWAY CONSTRUCT A BRIDGE SPANNING THE CSX RR TRACK IN POLK CO
Desc: RAIL CAPACITY PROJECT Project Length : 0.696 Begin Mile Post : 6.429 End Mile Post: 7.125Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DS $0 $0 $0 $63,055 $0CST GMR $0 $0 $0 $21,163,442 $0CST DIH $0 $0 $0 $11,110 $0ENV DIS $25,000 $0 $0 $200,000 $0ROW DIS $0 $131,127 $0 $0 $0ROW DIH $170,465 $0 $0 $0 $0ROW SIWR $0 $2,209,187 $0 $0 $0ROW TRIP $345,277 $3,585,920 $0 $0 $0RRU DDR $0 $0 $600,000 $750,000 $0RRU DIS $0 $0 $600,000 $600,000 $0Project Total: $540,742 $5,926,234 $1,200,000 $22,787,607 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 11 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4365591 Project/Location : SR 60 GRADE SEPARATION OVER CSX RAILROAD
Desc: RAIL CAPACITY PROJECT Project Length : 1.196 Begin Mile Post : 24.849 End Mile Post: 26.045Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DIS $0 $0 $0 $0 $19,999,999CST GMR $0 $0 $0 $0 $20,451,606CST DDR $0 $0 $0 $0 $4,792,216ENV DIS $0 $0 $75,000 $0 $0ROW GMR $1,276,000 $0 $0 $0 $0RRU DIS $0 $600,000 $0 $0 $0RRU DDR $0 $0 $0 $0 $2,722,556Project Total: $1,276,000 $600,000 $75,000 $0 $47,966,377
FLP:RAIL TOTAL 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
$1,841,742 $6,577,157 $1,275,000 $22,787,607 $48,016,377
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 12 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
HIGHWAYS
FPN : 4382661 Project/Location : ARIANA ST SIDEWALK FROM S. WABASH AVE TO LOTUS AVE
Desc: SIDEWALK Project Length : 0.740 Begin Mile Post : 0.380 End Mile Post: 1.120Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSU $1,584,158 $0 $0 $0 $0Project Total: $1,584,158 $0 $0 $0 $0
FPN : 4402761 Project/Location : AVENUE C SW FROM FIFTH STREET SW TO FIRST STREET S
Desc: BIKE PATH/TRAIL Project Length : 0.329 Begin Mile Post : 0.000 End Mile Post: 0.329Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $1,442,866 $0 $0 $0 $0Project Total: $1,442,866 $0 $0 $0 $0
FPN : 4419061 Project/Location : AVE K NE COMPLETE ST FROM E. LAKE SILVER DR TO E LAKE MARTHA DR
Desc: BIKE LANE/SIDEWALK Project Length : 0.035 Begin Mile Post : 0.000 End Mile Post: 0.035Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $692,000 $0 $0 $0Project Total: $0 $692,000 $0 $0 $0
FPN : 4424011 Project/Location : BROADWAY BLVD TRAIL SR559 FROM LAKESHORE DR TO COMMONWEALTH AVE (SR33)
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $900,727 $0 $0 $0CST TALU $0 $171,684 $0 $0 $0Project Total: $0 $1,072,411 $0 $0 $0
FPN : 4440511 Project/Location : BUS PULL-OFF AT OLD COMBEE RD AND AT N. SOCRUM LOOP RD
Desc: TRANSIT IMPROVEMENT Project Length : 0.002 Begin Mile Post : 0.000 End Mile Post: 0.002Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $64,500 $0 $0 $0Project Total: $0 $64,500 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 13 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4402781 Project/Location : CR 655 (RIFLE RANGE) FROM 12TH ST EAST TO DOLLY BEN CT
Desc: LIGHTING Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $849,247 $0 $0 $0Project Total: $0 $849,247 $0 $0 $0
FPN : 4403191 Project/Location : CENTRAL LAKELAND SIGNAL PRIORITIZATION @ VARIOUS LOCATIONS
Desc: ITS COMMUNICATION SYSTEM Project Length : 7.690 Begin Mile Post : 0.747 End Mile Post: 28.693Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $0 $401,906 $0 $0Project Total: $0 $0 $401,906 $0 $0
FPN : 4414811 Project/Location : CRYSTAL LAKE ELEMENTARY
Desc: SIDEWALK Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SR2T $0 $0 $489,763 $0 $0Project Total: $0 $0 $489,763 $0 $0
FPN : 4394411 Project/Location : COUNTYLINE RD OVER PEACE RIVER BRIDGE #160101
Desc: BRIDGE REPLACEMENT Project Length : 0.058 Begin Mile Post : 1.217 End Mile Post: 1.275Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST LF $0 $0 $0 $2,433,374 $0CST ACBR $0 $0 $0 $2,645,472 $0ENV ACBR $0 $0 $11,250 $18,750 $0ENV LF $0 $0 $3,750 $6,250 $0PE LF $175,000 $0 $0 $0 $0PE ACBR $535,000 $0 $0 $0 $0
RRU LF $0 $0 $0 $300,000 $0Project Total: $710,000 $0 $15,000 $5,403,846 $0
FPN : 1976204 Project/Location : CITY OF LAKELAND LEASE OF FIBER OPTIC NETWORK
Desc: TRAFFIC CONTROL DEVICES/SYSTEMProject Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS SL $20,278 $20,278 $20,278 $20,278 $20,278Project Total: $20,278 $20,278 $20,278 $20,278 $20,278
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 14 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4136471 Project/Location : DUNDEE TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 1.065 Begin Mile Post : 28.850 End Mile Post: 29.915Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DDR $24,303 $24,939 $25,619 $26,346 $27,117Project Total: $24,303 $24,939 $25,619 $26,346 $27,117
FPN : 4350941 Project/Location : DAVENPORT COMPLETE STREET PHASE I AND PHASE II
Desc: SIDEWALK Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST TALU $0 $0 $239,433 $0 $0CST SU $0 $0 $444,921 $0 $0ENV SU $0 $0 $100,000 $0 $0ENV TALU $0 $25,000 $0 $0 $0Project Total: $0 $25,000 $784,354 $0 $0
FPN : 4403561 Project/Location : EDGEWOOD DRIVE N FROM US 98 TO 9TH STREET NE
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $0 $677,054 $0 $0Project Total: $0 $0 $677,054 $0 $0
FPN : 4406031 Project/Location : FORT FRASER TRAIL EX FROM SR 540(WINTER LAKE RD) TO SR 659(COMBEE RD)
Desc: BIKE PATH/TRAIL Project Length : 0.940 Begin Mile Post : 3.410 End Mile Post: 4.350Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST TLWR $0 $2,000,000 $0 $0 $0Project Total: $0 $2,000,000 $0 $0 $0
FPN : 4301855 Project/Location : FGT I-4 AT SR 33 INTERCHANGE MODIFICATION
Desc: INTERCHANGE - ADD LANES Project Length : 0.650 Begin Mile Post : 12.032 End Mile Post: 12.682Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DIH $5,130 $0 $0 $0 $0RRU DDR $0 $5,000,000 $0 $0 $0RRU DI $0 $5,000,000 $0 $0 $0Project Total: $5,130 $10,000,000 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 15 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4402721 Project/Location : FORT FRASER TRAIL OVER SR 60
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PDE SU $259,291 $0 $0 $0 $0PDE TALT $216,844 $0 $0 $0 $0PDE TALU $318,865 $0 $0 $0 $0Project Total: $795,000 $0 $0 $0 $0
FPN : 4136511 Project/Location : HAINES CITY TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 1.270 Begin Mile Post : 21.500 End Mile Post: 22.770Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DDR $77,896 $79,930 $82,121 $84,446 $86,918Project Total: $77,896 $79,930 $82,121 $84,446 $86,918
FPN : 4424131 Project/Location : HAINES CITY TRAIL PH II GRACE AVE TO CR544 & RIDGE SCENIC
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $0 $0 $1,819,196 $0ENV SU $0 $0 $50,000 $200,000 $0PE SU $0 $339,659 $0 $0 $0
Project Total: $0 $339,659 $50,000 $2,019,196 $0
FPN : 4438511 Project/Location : HURRICANE IRMA SR 60 WEST OF SR 37 ROADWAY REPAIR
Desc: EMERGENCY OPERATIONS Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DS $231,099 $0 $0 $0 $0Project Total: $231,099 $0 $0 $0 $0
FPN : 4442751 Project/Location : INWOOD ELEMENTARY - SRTS
Desc: SIDEWALK Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SR2T $0 $0 $0 $419,707 $0CST SA $0 $0 $0 $1,000 $0PE SA $0 $1,000 $0 $0 $0PE SR2T $0 $59,443 $0 $0 $0
Project Total: $0 $60,443 $0 $420,707 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 16 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4418891 Project/Location : I-4 (SR 400) US 98 (SR 35) SR 33
Desc: RESURFACING Project Length : 5.210 Begin Mile Post : 6.890 End Mile Post: 12.100Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACNP $0 $13,627,401 $0 $0 $0CST SA $0 $1,113,713 $0 $0 $0ENV DDR $30,000 $50,000 $0 $0 $0Project Total: $30,000 $14,791,114 $0 $0 $0
FPN : 4402751 Project/Location : INWOOD MULTI-USE PATH FROM AVENUE S TO W LAKE CANNON DRIVE
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $1,341,033 $0 $0 $0 $0CST TALT $4,969 $0 $0 $0 $0Project Total: $1,346,002 $0 $0 $0 $0
FPN : 2012103 Project/Location : I-4 (SR 400) FROM W OF US 27 (SR 25) TO E OF CR 532
Desc: ADD LANES & RECONSTRUCT Project Length : 4.022 Begin Mile Post : 28.000 End Mile Post: 32.022Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
ROW SA $5,348,439 $0 $0 $0 $0Project Total: $5,348,439 $0 $0 $0 $0
FPN : 2012153 Project/Location : I-4 AT SR 557
Desc: INTERCHANGE IMPROVEMENT Project Length : 1.111 Begin Mile Post : 21.767 End Mile Post: 22.878Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACNP $73,191,805 $0 $0 $0 $0ENV ACNP $300,000 $0 $0 $0 $0PE DI $928,540 $0 $0 $0 $0
RRU ACNP $4,500,000 $0 $0 $0 $0Project Total: $78,920,345 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 17 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 2012178 Project/Location : I-4 AT CSX RAILROAD
Desc: BRIDGE REPLACEMENT Project Length : 0.004 Begin Mile Post : 4.887 End Mile Post: 4.891Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACNP $0 $25,507,066 $0 $0 $0CST DI $0 $25,000 $0 $0 $0CST SA $0 $52,650 $0 $0 $0ENV SIWR $0 $50,000 $0 $0 $0RRU SIWR $2,000,000 $0 $0 $0 $0RRU STED $2,000,000 $3,000,000 $0 $0 $0RRU LF $0 $1,000,000 $0 $0 $0RRU DDR $0 $500,000 $0 $0 $0Project Total: $4,000,000 $30,134,716 $0 $0 $0
FPN : 4402411 Project/Location : I-4 (SR 400) AT SR 557 (OLD GRADE ROAD)
Desc: LANDSCAPING Project Length : 0.700 Begin Mile Post : 22.070 End Mile Post: 22.770Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DIH $0 $0 $21,620 $0 $0CST DDR $0 $0 $807,919 $0 $0PE DDR $160,000 $0 $0 $0 $0PE DIH $5,000 $0 $0 $0 $0
Project Total: $165,000 $0 $829,539 $0 $0
FPN : 4301853 Project/Location : I-4 AT SR 33 INTERCHANGE MODIFICATION
Desc: INTERCHANGE - ADD LANES Project Length : 1.939 Begin Mile Post : 11.450 End Mile Post: 13.389Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
ENV DDR $0 $50,000 $0 $0 $0ENV SU $1,400,000 $0 $0 $0 $0ROW DI $5,097,835 $0 $0 $0 $0Project Total: $6,497,835 $50,000 $0 $0 $0
FPN : 4313761 Project/Location : I-4 (SR 400) FROM SR 33 TO CR 557 (OLD GRADE RD)
Desc: RESURFACING Project Length : 10.094 Begin Mile Post : 12.132 End Mile Post: 22.226Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACNP $0 $30,094,869 $0 $0 $0ENV DDR $30,000 $100,000 $0 $0 $0Project Total: $30,000 $30,194,869 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 18 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4442091 Project/Location : JOSEPHINE ST S/W FROM CENTRAL AVE TO WESTGATE-CENTRAL TRL
Desc: SIDEWALK Project Length : 0.099 Begin Mile Post : 0.000 End Mile Post: 0.099Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $0 $0 $381,000 $0PE SU $51,000 $0 $0 $0 $0
Project Total: $51,000 $0 $0 $381,000 $0
FPN : 4351091 Project/Location : LAKE HOWARD DR FROM AVE D SW TO 15TH ST SW
Desc: BIKE PATH/TRAIL Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $0 $106,251 $0 $0CST TALU $0 $0 $322,274 $0 $0Project Total: $0 $0 $428,525 $0 $0
FPN : 4371071 Project/Location : LAKELAND TMC OPS FUND CITY WIDE
Desc: OTHER ITS Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DS $159,000 $159,000 $159,000 $159,000 $159,000Project Total: $159,000 $159,000 $159,000 $159,000 $159,000
FPN : 4136531 Project/Location : LAKE WALES TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 1.017 Begin Mile Post : 18.968 End Mile Post: 19.985Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DDR $68,425 $70,213 $72,137 $74,183 $76,356Project Total: $68,425 $70,213 $72,137 $74,183 $76,356
FPN : 4136541 Project/Location : LAKELAND TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 4.770 Begin Mile Post : 23.830 End Mile Post: 28.600Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DDR $0 $0 $665,127 $683,896 $703,907OPS DITS $655,125 $676,750 $0 $0 $0Project Total: $655,125 $676,750 $665,127 $683,896 $703,907
FPN : 4382671 Project/Location : MAIN STREET PATHWAYS FROM INTERLACHEN PKWY TO LONGFELLOW BLVD
Desc: BIKE PATH/TRAIL Project Length : 0.490 Begin Mile Post : 0.430 End Mile Post: 0.920Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSU $856,111 $0 $0 $0 $0Project Total: $856,111 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 19 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4416791 Project/Location : N CRYSTAL LAKE DR FROM WILLOW POINT DR TO LONGFELLOW BLVD
Desc: SIDEWALK Project Length : 0.284 Begin Mile Post : 0.000 End Mile Post: 0.284Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $260,000 $0 $0 $0Project Total: $0 $260,000 $0 $0 $0
FPN : 4421072 Project/Location : POLK COUNTY COMMUNICATIONS FROM POLK TMC TO US 17
Desc: ITS COMMUNICATION SYSTEM Project Length : 1.030 Begin Mile Post : 0.000 End Mile Post: 1.030Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SA $0 $488,592 $0 $0 $0Project Total: $0 $488,592 $0 $0 $0
FPN : 4125301 Project/Location : POLK TPO IDENTIFIED OPERATIONAL IMPROVEMENTS - FUNDING
Desc: TRAFFIC OPS IMPROVEMENT Project Length : Begin Mile Post : End Mile Post: Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $643,084 $44,551 $1,406,941 $2,015,252 $2,102,798Project Total: $643,084 $44,551 $1,406,941 $2,015,252 $2,102,798
FPN : 4126751 Project/Location : POLK COUNTY TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 12.175 Begin Mile Post : 2.300 End Mile Post: 14.475Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DDR $376,420 $415,241 $972,321 $0 $1,029,020OPS DITS $545,930 $531,184 $0 $1,239,748 $0Project Total: $922,350 $946,425 $972,321 $1,239,748 $1,029,020
FPN : 4365203 Project/Location : ROADSIDE IMPROVEMENT FOR POLK PKWY MP 0-8
Desc: GUARDRAIL Project Length : Begin Mile Post : End Mile Post: Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $147,528 $0 $0 $0 $0Project Total: $147,528 $0 $0 $0 $0
FPN : 4301851 Project/Location : SR 33 FROM OLD COMBEE RD TO N OF TOMKOW RD
Desc: PD&E/EMO STUDY Project Length : Begin Mile Post : End Mile Post: Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PE LF $0 $0 $300,000 $0 $0Project Total: $0 $0 $300,000 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 20 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4365692 Project/Location : SR 546 MEMORIAL BLVD FROM CHESTNUT RD TO BRUNNELL PKWY
Desc: LANDSCAPING Project Length : 0.852 Begin Mile Post : 1.483 End Mile Post: 2.335Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $153,900 $0 $0 $0 $0CST DIH $2,052 $0 $0 $0 $0PE DIH $2,000 $0 $0 $0 $0
Project Total: $157,952 $0 $0 $0 $0
FPN : 4366721 Project/Location : SR35/700(US98) FROM WEST DAUGHTERY ROAD TO NORTH OF WEST SOCRUM RD
Desc: PD&E/EMO STUDY Project Length : 3.382 Begin Mile Post : 5.623 End Mile Post: 9.005Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PDE SU $1,550,000 $0 $0 $0 $0Project Total: $1,550,000 $0 $0 $0 $0
FPN : 4301854 Project/Location : SR 33 FROM OLD COMBEE RD TO S OF FIRSTPARK BLVD S
Desc: ADD LANES & REHABILITATE PVMNTProject Length : 2.525 Begin Mile Post : 4.990 End Mile Post: 7.518Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
ENV DDR $0 $0 $370,000 $0 $0Project Total: $0 $0 $370,000 $0 $0
FPN : 4394351 Project/Location : SR 37 FROM MANATEE CNTY LINE TO SR 674
Desc: RESURFACING Project Length : 4.645 Begin Mile Post : 0.000 End Mile Post: 4.645Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DIH $30,780 $0 $0 $0 $0CST DDR $3,674,685 $0 $0 $0 $0ENV DDR $25,000 $0 $0 $0 $0Project Total: $3,730,465 $0 $0 $0 $0
FPN : 4394361 Project/Location : SR 37 FROM IMPERIAL BLVD TO GLENDALE ST
Desc: RESURFACING Project Length : 0.431 Begin Mile Post : 25.745 End Mile Post: 26.176Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSS $0 $136,705 $0 $0 $0CST DDR $0 $2,809,012 $0 $0 $0CST DIH $0 $31,590 $0 $0 $0ENV DDR $20,000 $100,000 $0 $0 $0Project Total: $20,000 $3,077,307 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 21 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4394371 Project/Location : SR 60 FROM TIGER LAKE RD TO CR 630
Desc: RESURFACING Project Length : 6.306 Begin Mile Post : 12.369 End Mile Post: 18.675Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $9,646,526 $0 $0 $0 $0CST NHRE $1,675,825 $0 $0 $0 $0CST SA $30,780 $0 $0 $0 $0ENV DDR $200,000 $0 $0 $0 $0Project Total: $11,553,131 $0 $0 $0 $0
FPN : 4394391 Project/Location : SR 540 FROM DECASTRO RD TO JIM KEENE BLVD
Desc: RESURFACING Project Length : 2.852 Begin Mile Post : 3.424 End Mile Post: 6.276Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $2,669,102 $0 $0 $0CST SA $0 $7,448,434 $0 $0 $0Project Total: $0 $10,117,536 $0 $0 $0
FPN : 4380131 Project/Location : SR 572 FROM DRANE FIELD RD TO PIPKIN CREEK RD
Desc: RESURFACING Project Length : 1.934 Begin Mile Post : 2.739 End Mile Post: 4.674Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $0 $6,909,117 $0CST DIH $0 $0 $0 $33,330 $0ENV DDR $10,000 $0 $0 $50,000 $0Project Total: $10,000 $0 $0 $6,992,447 $0
FPN : 4380271 Project/Location : SR 563 FROM S OF BEAKER ROAD TO FOREST PARK STREET
Desc: RESURFACING Project Length : 2.321 Begin Mile Post : 6.136 End Mile Post: 8.458Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $0 $11,382,975 $0CST DIH $0 $0 $0 $55,550 $0ENV DDR $0 $40,000 $0 $100,000 $0PE DIH $100,000 $0 $0 $0 $0
Project Total: $100,000 $40,000 $0 $11,538,525 $0
FPN : 4382651 Project/Location : SOUTH LAKE SILVER DR FROM 5TH STREET NW TO SR 549(1ST STREET) N
Desc: SIDEWALK Project Length : 0.330 Begin Mile Post : 0.000 End Mile Post: 0.330Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSU $978,138 $0 $0 $0 $0Project Total: $978,138 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 22 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4402732 Project/Location : SR 544 (LUCERNE PARK) FROM AVENUE T NW TO LUCERNE LOOP RD
Desc: PD&E/EMO STUDY Project Length : 0.076 Begin Mile Post : 3.681 End Mile Post: 3.757Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PE DDR $0 $0 $0 $5,865,000 $0Project Total: $0 $0 $0 $5,865,000 $0
FPN : 4402733 Project/Location : SR 544 (LUCERNE PARK) FROM LUCERNE LOOP RD TO SR 17
Desc: PD&E/EMO STUDY Project Length : 0.076 Begin Mile Post : 3.681 End Mile Post: 3.757Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PE DDR $0 $0 $0 $0 $7,015,000Project Total: $0 $0 $0 $0 $7,015,000
FPN : 4402742 Project/Location : SR 659 (COMBEE RD) FROM US 98 TO N CRYSTAL LAKE DRIVE
Desc: PD&E/EMO STUDY Project Length : 0.513 Begin Mile Post : 0.000 End Mile Post: 0.513Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PE DDR $2,750,000 $0 $0 $0 $0PE DIH $5,000 $0 $0 $0 $0
Project Total: $2,755,000 $0 $0 $0 $0
FPN : 4398261 Project/Location : SR 555 / SOUTH OF SPIRIT LAKE / NORTH OF SPIRIT LAKE
Desc: INTERSECTION IMPROVEMENT Project Length : 0.388 Begin Mile Post : 22.914 End Mile Post: 23.302Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACNP $0 $0 $3,106,234 $0 $0CST DDR $0 $0 $4,862,525 $0 $0CST DIH $0 $0 $54,050 $0 $0ENV DDR $0 $0 $150,000 $0 $0RRU DDR $0 $75,000 $0 $0 $0Project Total: $0 $75,000 $8,172,809 $0 $0
FPN : 4106662 Project/Location : SR 542 FROM 1ST STREET TO BUCKEYE LOOP RD
Desc: ADD LANES & RECONSTRUCT Project Length : 2.305 Begin Mile Post : 0.380 End Mile Post: 2.685Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
INC DDR $850,000 $0 $0 $0 $0Project Total: $850,000 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 23 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4106663 Project/Location : SR 542 FROM BUCKEYE LOOP ROAD TO US 27
Desc: ADD LANES & RECONSTRUCT Project Length : 3.951 Begin Mile Post : 2.476 End Mile Post: 6.427Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $2,186,671 $0 $0 $0 $0CST GFSA $4,405,621 $0 $0 $0 $0CST LF $76,950 $0 $0 $0 $0CST SA $40,341,410 $0 $0 $0 $0CST SU $1,539,000 $0 $0 $0 $0ENV DDR $50,000 $0 $0 $0 $0ENV DS $340,000 $0 $0 $0 $0ROW DS $1,650,153 $0 $0 $0 $0RRU DS $1,519,560 $0 $0 $0 $0RRU LF $6,700,822 $0 $0 $0 $0Project Total: $58,810,187 $0 $0 $0 $0
FPN : 4106664 Project/Location : SR 542 FROM 1ST STREET TO BUCKEYE LOOP ROAD
Desc: LANDSCAPING Project Length : 2.476 Begin Mile Post : 0.000 End Mile Post: 2.476Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $238,713 $0 $0 $0CST DIH $0 $33,693 $0 $0 $0Project Total: $0 $272,406 $0 $0 $0
FPN : 4419761 Project/Location : SR 33 AT SR 559
Desc: RIGID PAVEMENT RECONSTRUCTION Project Length : 0.119 Begin Mile Post : 14.392 End Mile Post: 14.511Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PE DDR $0 $0 $0 $1,200,000 $0PE DIH $0 $0 $0 $10,000 $0
Project Total: $0 $0 $0 $1,210,000 $0
FPN : 4404441 Project/Location : SR 33 (LAKELAND HILLS) FROM PARKVIEW PLACE TO GRANADA STREET
Desc: FLEXIBLE PAVEMENT RECONSTRUCT.Project Length : 0.504 Begin Mile Post : 1.275 End Mile Post: 1.779Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $0 $0 $2,616,605CST SU $0 $0 $0 $0 $3,387,697ENV SA $50,000 $0 $0 $0 $0Project Total: $50,000 $0 $0 $0 $6,004,302
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 24 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4403471 Project/Location : SR 17 (SCENIC HWY) FROM EAST CENTRAL PARK TO LAKE MARIE PARK
Desc: BIKE PATH/TRAIL Project Length : 1.080 Begin Mile Post : 27.458 End Mile Post: 28.538Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $313,609 $0 $0 $0CST SU $0 $237,061 $0 $0 $0Project Total: $0 $550,670 $0 $0 $0
FPN : 4403491 Project/Location : SR 549 (FIRST STREET) FROM CENTRAL AVENUE TO AVENUE O
Desc: SIDEWALK Project Length : 1.037 Begin Mile Post : 1.251 End Mile Post: 2.288Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $0 $1,043,750 $0CST SU $0 $0 $0 $2,600,841 $0ENV SU $0 $25,000 $0 $50,000 $0ROW SU $0 $345,930 $0 $0 $0ROW DIH $0 $165,465 $0 $0 $0Project Total: $0 $536,395 $0 $3,694,591 $0
FPN : 4406721 Project/Location : SR 600 (US 92) AT SR 559 (MAIN STREET)
Desc: INTERSECTION IMPROVEMENT Project Length : 0.252 Begin Mile Post : 10.554 End Mile Post: 10.806Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SA $0 $0 $10,810 $0 $0CST ACSS $0 $200,975 $16,215 $0 $0CST DDR $0 $12,305 $0 $0 $0ENV DDR $0 $20,000 $75,000 $0 $0Project Total: $0 $233,280 $102,025 $0 $0
FPN : 4406731 Project/Location : SR 559 AT CR 557A/CAMP GILEAD DRIVE
Desc: ROUNDABOUT Project Length : 0.001 Begin Mile Post : 8.236 End Mile Post: 8.237Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSS $0 $0 $2,545,771 $0 $0CST DS $0 $0 $22,619 $0 $0CST SA $0 $0 $21,620 $0 $0ENV DDR $0 $10,000 $40,000 $0 $0INC ACSS $0 $0 $0 $75,000 $0Project Total: $0 $10,000 $2,630,010 $75,000 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 25 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4406841 Project/Location : SR 33 FROM VICTORIA BOULEVARD TO N FLORIDA AVENUE
Desc: INTERSECTION IMPROVEMENT Project Length : 0.504 Begin Mile Post : 3.094 End Mile Post: 3.598Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSS $0 $0 $342,656 $0 $0CST DS $0 $0 $4,481 $0 $0CST SA $0 $0 $21,620 $0 $0Project Total: $0 $0 $368,757 $0 $0
FPN : 4444841 Project/Location : SR 60 FROM W OF CAPPS RD TO E OF RATTLESNAKE RD
Desc: RESURFACING Project Length : 3.331 Begin Mile Post : 2.914 End Mile Post: 6.245Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $6,222,166 $0 $0CST DIH $0 $0 $10,810 $0 $0CST DS $0 $0 $1,079,080 $0 $0PE DIH $0 $10,000 $0 $0 $0
Project Total: $0 $10,000 $7,312,056 $0 $0
FPN : 4442901 Project/Location : SR 572(DRANE FIELD RD) AT DON EMERSON DR
Desc: ROUNDABOUT Project Length : 0.363 Begin Mile Post : 2.829 End Mile Post: 3.192Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $1,669,000 $0 $0 $0ENV DDR $0 $100,000 $0 $0 $0Project Total: $0 $1,769,000 $0 $0 $0
FPN : 4443131 Project/Location : SR17 FROM RAINBOW BLVD TO CROOKED LAKE DR
Desc: RESURFACING Project Length : 0.770 Begin Mile Post : 11.930 End Mile Post: 12.700Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $0 $1,237,034 $0CST DIH $0 $0 $0 $66,660 $0CST DS $0 $0 $0 $146,408 $0PE DIH $10,000 $0 $0 $0 $0
Project Total: $10,000 $0 $0 $1,450,102 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 26 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4440501 Project/Location : SR 540 FROM US 17(SR35) TO E OF 1ST STREET
Desc: INTERSECTION IMPROVEMENT Project Length : 0.769 Begin Mile Post : 0.000 End Mile Post: 27.814Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST LF $0 $0 $378,350 $0 $0CST DIH $0 $0 $34,707 $0 $0CST DS $0 $0 $1,187,293 $0 $0
ROW DS $142,161 $0 $0 $0 $0ROW DIH $25,462 $0 $0 $0 $0ROW DDR $1,801,333 $0 $0 $0 $0Project Total: $1,968,956 $0 $1,600,350 $0 $0
FPN : 4446271 Project/Location : SR 37 FROM ARIANA ST TO LIME ST - PILOT STUDY
Desc: MISCELLANEOUS STRUCTURE Project Length : 1.007 Begin Mile Post : 27.428 End Mile Post: 28.435Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $828,860 $0 $0 $0 $0CST DIH $10,000 $0 $0 $0 $0Project Total: $838,860 $0 $0 $0 $0
FPN : 4446351 Project/Location : SR 655 FROM S OF WALLACE MANOR TO N OF 24TH STREET
Desc: RESURFACING Project Length : 0.236 Begin Mile Post : 1.760 End Mile Post: 1.996Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $0 $372,581 $0CST DIH $0 $0 $0 $1,111 $0Project Total: $0 $0 $0 $373,692 $0
FPN : 4446431 Project/Location : SR60 OVER PEACE RIVER PAINTING
Desc: BRIDGE-REPAIR/REHABILITATION Project Length : 0.110 Begin Mile Post : 15.526 End Mile Post: 15.636Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST BRRP $0 $0 $0 $0 $640,935CST DIH $0 $0 $0 $0 $11,440PE DIH $0 $0 $0 $10,000 $0PE BRRP $0 $0 $0 $60,000 $0
Project Total: $0 $0 $0 $70,000 $652,375
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 27 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4446821 Project/Location : SR 600 FROM W OF 9TH ST TO 17TH ST
Desc: FLEXIBLE PAVEMENT RECONSTRUCT.Project Length : 0.596 Begin Mile Post : 22.460 End Mile Post: 22.770Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DIH $0 $0 $0 $0 $1,144CST DS $0 $0 $0 $0 $2,693,635PE DIH $1,000 $0 $0 $0 $0
Project Total: $1,000 $0 $0 $0 $2,694,779
FPN : 4447791 Project/Location : SR37 SIDEWALKS FROM CARTER ROAD TO FITZGERALD ROAD
Desc: SIDEWALK Project Length : 2.000 Begin Mile Post : 20.497 End Mile Post: 22.497Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $1,171,989 $0 $0 $0Project Total: $0 $1,171,989 $0 $0 $0
FPN : 4449061 Project/Location : SR572 (DRANE FIELD ROAD) AT WARING ROAD
Desc: ROUNDABOUT Project Length : 0.300 Begin Mile Post : 3.787 End Mile Post: 4.087Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $0 $0 $1,658,353CST DIH $0 $0 $0 $0 $25,253Project Total: $0 $0 $0 $0 $1,683,606
FPN : 4403582 Project/Location : TENOROC TRL SEGMENT 1 FROM LAKE CRAGO DR TO SR 33 AT OLD COMBEE ROAD
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST TLWR $0 $0 $0 $0 $1,259,579Project Total: $0 $0 $0 $0 $1,259,579
FPN : 4402771 Project/Location : THREE PARKS TRAIL E (NEW JERSEY RD)FROM TURTLE ROCK DR TO GLENDALE ST
Desc: BIKE PATH/TRAIL Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSU $471,776 $0 $0 $0 $0Project Total: $471,776 $0 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 28 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4418441 Project/Location : THREE PARKS TRAIL W FROM CLEVELAND HEIGHTS BLVD TO WESTOVER ST
Desc: BIKE PATH/TRAIL Project Length : 0.033 Begin Mile Post : 0.000 End Mile Post: 0.033Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $0 $306,200 $0 $0PE SU $43,200 $0 $0 $0 $0
Project Total: $43,200 $0 $306,200 $0 $0
FPN : 4424041 Project/Location : US 17/92 (LAKE ALFRED) @ E POMELO STREET (SR 557)
Desc: PD&E/EMO STUDY Project Length : 0.200 Begin Mile Post : 15.604 End Mile Post: 15.804Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PDE DDR $0 $0 $0 $749,999 $0PDE DIH $0 $0 $0 $50,000 $0Project Total: $0 $0 $0 $799,999 $0
FPN : 4421151 Project/Location : US 27 AT FLORENCE VILLA GROVE RD
Desc: LIGHTING Project Length : 0.500 Begin Mile Post : 29.946 End Mile Post: 30.446Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSS $0 $264,593 $0 $0 $0CST SA $0 $5,265 $0 $0 $0PE ACID $100,000 $0 $0 $0 $0
Project Total: $100,000 $269,858 $0 $0 $0
FPN : 4421161 Project/Location : US 27 AT POLO PARK
Desc: LIGHTING Project Length : 0.500 Begin Mile Post : 31.085 End Mile Post: 31.585Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSS $0 $312,967 $0 $0 $0CST SA $0 $5,265 $0 $0 $0PE ACID $100,000 $0 $0 $0 $0
Project Total: $100,000 $318,232 $0 $0 $0
FPN : 4421171 Project/Location : US 27 AT SANDMINE ROAD
Desc: LIGHTING Project Length : 0.500 Begin Mile Post : 29.194 End Mile Post: 29.694Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACSS $0 $378,708 $0 $0 $0CST SA $0 $5,265 $0 $0 $0PE ACID $100,000 $0 $0 $0 $0
Project Total: $100,000 $383,973 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 29 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4423331 Project/Location : US 17/92 SIDEWALK FROM S. OF HINSON AVE TO JOHNSON AVE
Desc: SIDEWALK Project Length : 0.500 Begin Mile Post : 0.000 End Mile Post: 0.500Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $0 $1,083,724 $0 $0Project Total: $0 $0 $1,083,724 $0 $0
FPN : 4419831 Project/Location : US 92 (SR 600) FROM FISH HATCHERY ROAD TO REYNOLDS RD
Desc: RESURFACING Project Length : 0.505 Begin Mile Post : 3.845 End Mile Post: 4.350Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $0 $2,241,619 $0CST DIH $0 $0 $0 $33,330 $0RRU DDR $0 $0 $50,000 $0 $0Project Total: $0 $0 $50,000 $2,274,949 $0
FPN : 4420961 Project/Location : US 17 COMMUNICATIONS FROM MLK JR BLVD TO VAN FLEET DR
Desc: ITS COMMUNICATION SYSTEM Project Length : 0.869 Begin Mile Post : 0.000 End Mile Post: 17.918Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $123,728 $0 $0 $0CST DITS $0 $394,875 $0 $0 $0CST DIH $0 $5,265 $0 $0 $0PE DIH $5,000 $0 $0 $0 $0PE DITS $100,000 $0 $0 $0 $0
RRU DDR $30,000 $0 $0 $0 $0Project Total: $135,000 $523,868 $0 $0 $0
FPN : 4421071 Project/Location : US 17 COMMUNICATIONS ERNEST SMITH BLVD TO SPIRIT LAKE RD
Desc: ITS COMMUNICATION SYSTEM Project Length : 3.250 Begin Mile Post : 19.893 End Mile Post: 23.143Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $236,925 $0 $0 $0CST DIH $0 $63,180 $0 $0 $0CST DITS $0 $1,053,000 $0 $0 $0PE DITS $75,000 $0 $0 $0 $0
RRU DDR $30,000 $0 $0 $0 $0Project Total: $105,000 $1,353,105 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 30 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4403391 Project/Location : US 17 (SR 555) FROM SR 544 (HAVENDALE) TO BRIGHAM RD
Desc: BIKE PATH/TRAIL Project Length : 1.425 Begin Mile Post : 30.637 End Mile Post: 32.062Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $12,396 $0 $0CST SU $0 $0 $871,942 $0 $0ENV SU $0 $25,000 $100,000 $0 $0Project Total: $0 $25,000 $984,338 $0 $0
FPN : 4415531 Project/Location : US 27 (SR25) FROM BLUE HERON BAY TO HOLLY HILL CUTOFF
Desc: RESURFACING Project Length : 3.020 Begin Mile Post : 16.140 End Mile Post: 19.160Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $6,983,630 $0 $0CST DIH $0 $0 $54,050 $0 $0CST DS $0 $0 $757,286 $0 $0ENV DDR $0 $25,000 $75,000 $0 $0Project Total: $0 $25,000 $7,869,966 $0 $0
FPN : 4415561 Project/Location : US 92 (SR 517) FROM US 92 (SR 600) TO SR 546
Desc: RESURFACING Project Length : 0.912 Begin Mile Post : 0.000 End Mile Post: 0.912Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DIH $0 $0 $74,560 $0 $0CST DDR $0 $0 $2,552,043 $0 $0ENV DDR $0 $25,000 $50,000 $0 $0Project Total: $0 $25,000 $2,676,603 $0 $0
FPN : 4443931 Project/Location : US 92(SR 600) FROM EAST OF SR 570 TO FLEA MARKET ENTRANCE
Desc: DRAINAGE IMPROVEMENTS Project Length : 0.362 Begin Mile Post : 7.934 End Mile Post: 8.296Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $181,717 $0 $0 $0CST DIH $0 $63,180 $0 $0 $0CST DS $0 $670,468 $0 $0 $0Project Total: $0 $915,365 $0 $0 $0
FPN : 4192432 Project/Location : US 27 (SR 25) FROM HIGHLANDS COUNTY LINE TO CR 630A
Desc: ADD LANES & RECONSTRUCT Project Length : 8.612 Begin Mile Post : 0.000 End Mile Post: 8.612Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
ENV ACFP $0 $350,000 $0 $50,000 $100,000ROW ACFP $0 $995,693 $2,570,968 $0 $0RRU ACNP $0 $0 $0 $0 $400,000Project Total: $0 $1,345,693 $2,570,968 $50,000 $500,000
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 31 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4192433 Project/Location : US 27 FROM CR 630A TO PRESIDENTS DRIVE
Desc: ADD LANES & RECONSTRUCT Project Length : 5.026 Begin Mile Post : 8.612 End Mile Post: 13.638Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
ENV ACFP $0 $600,000 $0 $0 $70,000ROW ACFP $0 $4,131,441 $1,963,630 $0 $0Project Total: $0 $4,731,441 $1,963,630 $0 $70,000
FPN : 4192434 Project/Location : US 27 AT SR 60
Desc: INTERCHANGE - ADD LANES Project Length : 0.883 Begin Mile Post : 0.000 End Mile Post: 18.816Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST ACNP $45,236,930 $0 $0 $0 $0CST DDR $5,990,190 $0 $0 $0 $0CST SA $51,300 $0 $0 $0 $0ENV SIWR $161,528 $0 $0 $0 $0ENV DI $338,472 $0 $0 $0 $0ROW BNIR $2,026,482 $0 $0 $0 $0RRU DDR $1,575,076 $0 $0 $0 $0Project Total: $55,379,978 $0 $0 $0 $0
FPN : 1975624 Project/Location : US 98 (SR 35/SR 700) FROM EDGEWOOD DR TO E MAIN STREET
Desc: ADD LANES & RECONSTRUCT Project Length : 3.033 Begin Mile Post : 9.189 End Mile Post: 12.222Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PE LF $200,000 $0 $0 $0 $0PE DS $1,241,078 $0 $0 $0 $0
ROW DS $0 $0 $894,104 $0 $0ROW DDR $0 $0 $268,322 $4,431,705 $3,682,313ROW DIH $0 $0 $101,296 $0 $0Project Total: $1,441,078 $0 $1,263,722 $4,431,705 $3,682,313
FPN : 4313512 Project/Location : US 17/92 HINSON AVE FROM SR 17 (10TH STREET) TO 17TH STREET
Desc: ADD LANES & RECONSTRUCT Project Length : 0.310 Begin Mile Post : 22.460 End Mile Post: 22.770Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PE DDR $0 $1,350,000 $0 $0 $0PE DIH $0 $25,000 $0 $0 $0
Project Total: $0 $1,375,000 $0 $0 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 32 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4335582 Project/Location : US 92 FROM COUNTY LINE RD TO WABASH AVE
Desc: ADD LANES & RECONSTRUCT Project Length : 4.131 Begin Mile Post : 0.000 End Mile Post: 4.131Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
ENV DDR $0 $0 $0 $0 $40,000PE DDR $78,000 $0 $0 $0 $0PE LF $85,000 $0 $0 $0 $0
ROW SA $0 $0 $0 $152,329 $406,210ROW DDR $0 $0 $0 $3,259,647 $8,487,710ROW DIH $0 $0 $0 $0 $0Project Total: $163,000 $0 $0 $3,411,976 $8,933,920
FPN : 4336571 Project/Location : US 27 (SR 25) AT SR 60 INTERCHANGE
Desc: LANDSCAPING Project Length : 0.105 Begin Mile Post : 0.040 End Mile Post: 0.145Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $365,049 $0 $0CST DIH $0 $0 $10,810 $0 $0Project Total: $0 $0 $375,859 $0 $0
FPN : 4348862 Project/Location : US 98 (PEACE RIVER-FT MEADE) AT BRIDGE NO 0064(JOHN SINGLETARY BRIDGE)
Desc: BRIDGE REPLACEMENT Project Length : 0.510 Begin Mile Post : 0.966 End Mile Post: 1.476Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
ROW DDR $0 $181,393 $0 $0 $0ROW DIH $0 $54,024 $0 $0 $0Project Total: $0 $235,417 $0 $0 $0
FPN : 4366731 Project/Location : US 98 (SR35/700) FROM N OF WEST SOCRUM LOOP RD TO SR 471
Desc: PD&E/EMO STUDY Project Length : 7.531 Begin Mile Post : 9.005 End Mile Post: 16.536Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PDE DDR $0 $1,400,000 $0 $0 $0PDE DIH $0 $20,000 $0 $0 $0Project Total: $0 $1,420,000 $0 $0 $0
FPN : 4365602 Project/Location : US 92 FROM RECKER HWY TO KELLY LANE
Desc: INTERSECTION IMPROVEMENT Project Length : 0.220 Begin Mile Post : 9.180 End Mile Post: 9.400Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST DDR $0 $0 $0 $338,849 $0CST DIH $0 $0 $0 $5,555 $0Project Total: $0 $0 $0 $344,404 $0
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 33 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
FPN : 4371081 Project/Location : WINTER HAVEN TMC OPS CITY WIDE
Desc: OTHER ITS Project Length : 0.001 Begin Mile Post : 0.000 End Mile Post: 0.001Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DS $43,500 $43,500 $43,500 $43,500 $43,500Project Total: $43,500 $43,500 $43,500 $43,500 $43,500
FPN : 4136561 Project/Location : WINTER HAVEN TRAFFIC SIGNALS REIMBURSEMENT
Desc: TRAFFIC SIGNALS Project Length : 2.317 Begin Mile Post : 27.760 End Mile Post: 30.640Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
OPS DDR $169,922 $174,356 $179,131 $184,185 $189,573Project Total: $169,922 $174,356 $179,131 $184,185 $189,573
FPN : 4418471 Project/Location : WABASH AVE FROM ARIANA ST TO HICKORY ST
Desc: BIKE PATH/TRAIL Project Length : 1.300 Begin Mile Post : 0.000 End Mile Post: 1.300Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
CST SU $0 $2,116,363 $0 $0 $0CST TALT $0 $60,637 $0 $0 $0Project Total: $0 $2,177,000 $0 $0 $0
HIGHWAYS TOTAL 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
$246,367,117 $126,250,028 $47,303,333 $55,337,973 $36,934,341
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 34 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT
TRANSPORTATION PLANNING
FPN : 4393132 Project/Location : POLK COUNTY MPO FY 2018/2019-2019/2020 UPWP
Desc: TRANSPORTATION PLANNING Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PLN PL $897,120 $0 $0 $0 $0Project Total: $897,120 $0 $0 $0 $0
FPN : 4393133 Project/Location : POLK COUNTY MPO FY 2020/2021-2021/2022 UPWP
Desc: TRANSPORTATION PLANNING Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PLN PL $0 $696,882 $696,882 $0 $0Project Total: $0 $696,882 $696,882 $0 $0
FPN : 4393134 Project/Location : POLK COUNTY MPO FY 2022/2023-2023/2024 UPWP
Desc: TRANSPORTATION PLANNING Project Length : 0.000 Begin Mile Post : 0.000 End Mile Post: 0.000Comments :
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
PLN PL $0 $0 $0 $696,882 $0Project Total: $0 $0 $0 $696,882 $0
TRANSPORTATION PLANNING TOTAL 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024
$897,120 $696,882 $696,882 $696,882 $0
POLK COUNTY TOTALS
Phase Fund 2019/ 2020 2020/ 2021 2021/ 2022 2022/ 2023 2023/ 2024 Total
COUNTY Total : $278,899,347 $170,138,178 $67,493,453 $97,102,636 $105,250,845 $718,884,459
PHASE CODES
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
Page: 35 Run Date:11/19/2018 SnapShot Date: 11/14/2018
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1 TENTATIVE WORK PROGRAM REPORT
July 1, 2019 Through June 30, 2024 POLK COUNTY
DRAFT