Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with...

23
IMPORTANT NOTE BID DOCUMENT HAS BEEN DISPLAYED TO UNDERSTAND THE REQUIREMENT ONLY. PARTIES INTERESTED TO PARTICIPATE AGAINST THIS TENDER SHALL HAVE TO PURCHASE THE TENDER DOCUMENTS FROM ANY OF OIL’S DESIGNATED OFFICES GIVEN BELOW. BID DOCUMENTS (NON- TRANSFERABLE) CAN BE PURCHASED TILL ONE DAY PRIOR TO THE RESPECTIVE BID CLOSING DATE ON PAYMENT OF TENDER FEE (NON-REFUNDABLE) OF US$ 100.00 OR RS. 4,500.00 (EXCEPTING PSUS AND SSI UNITS) FROM: ______________________________________________________________________ (A) HEAD - MATERIALS, OIL INDIA LIMITED, P.O. DULIAJAN, ASSAM - 786602 (B) HEAD - CALCUTTA BRANCH, OIL INDIA LIMITED, 4-INDIA EXCHANGE PLACE, KOLKATA - 700001 (C) SENIOR ADVISER (CONTRACT & PURCHASE), OIL INDIA LIMITED PLOT NO.19, SECTOR - 16A NOIDA - 201301 ______________________________________________________________________ PROOF OF PURCHASE OF TENDER DOCUMENTS MUST BE SUBMITTED ALONG WITH THE OFFER, FAILING WHICH OFFERS WILL BE TREATED AS UNSOLICITED.

Transcript of Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with...

Page 1: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

IMPORTANT NOTE

BID DOCUMENT HAS BEEN DISPLAYED TO UNDERSTAND THE REQUIREMENT ONLY. PARTIES INTERESTED TO PARTICIPATE AGAINST THIS TENDER SHALL HAVE TO PURCHASE THE TENDER DOCUMENTS FROM ANY OF OIL’S DESIGNATED OFFICES GIVEN BELOW. BID DOCUMENTS (NON- TRANSFERABLE) CAN BE PURCHASED TILL ONE DAY PRIOR TO THE RESPECTIVE BID CLOSING DATE ON PAYMENT OF TENDER FEE (NON-REFUNDABLE) OF US$ 100.00 OR RS. 4,500.00 (EXCEPTING PSUS AND SSI UNITS) FROM: ______________________________________________________________________

(A) HEAD - MATERIALS, OIL INDIA LIMITED, P.O. DULIAJAN, ASSAM - 786602 (B) HEAD - CALCUTTA BRANCH, OIL INDIA LIMITED, 4-INDIA EXCHANGE PLACE, KOLKATA - 700001 (C) SENIOR ADVISER (CONTRACT & PURCHASE), OIL INDIA LIMITED PLOT NO.19, SECTOR - 16A NOIDA - 201301

______________________________________________________________________ PROOF OF PURCHASE OF TENDER DOCUMENTS MUST BE SUBMITTED ALONG WITH THE OFFER, FAILING WHICH OFFERS WILL BE TREATED AS UNSOLICITED.

Page 2: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

1

Page : 1/22

Oil India Limited (A Govt. of India Enterprise)

P.O. Duliajan – 786602, Assam Fax No. +91-374-2800533, E-mail : [email protected]

Tender No. & Date : DFD7987P08/09 02.02.2008 Tender Fee : INR 4,500.00 OR USD 100.00 Bid Security Amount : INR 125,000.00 OR USD 3,100.00 (or equivalent amount in any currency) Bidding Type : Two Bid Bid Closing on : 23.04.2008 at 13:00 hrs. (IST) Bid Opening on : 23.04.2008 at 13:00 hrs. (IST) Performance Guarantee : Applicable OIL INDIA LIMITED invites Global Tenders for items detailed below : Item No. / Mat. Code

Material Description QTY. UOM

10 OC000509

SUPPLY & COMMISSIONING OF MOBILE AIR POLLUTION MONITORING UNIT ON TATA SAFARI DICOR LX 4X2 DIESEL AC UNDER BUY BACK POLICY AND AS PER THE DETAILED SPECIFICATION, BRC/BEC AND OTHER TERMS AND CONDITIONS VIDE ENCLOSED ANNEXURE I, II, & III RESPECTIVELY.

1 No.

Special Notes : 1.0 Bids are invited under Single Stage Two Bid System. Bidders shall quote accordingly under

Single Stage Two Bid System. Bidder not complying with submission procedure mentioned in General Terms & Conditions of Global Tender (MM/GLOBAL/01/2005) will be rejected.

2.0 Bid Rejection Criteria (BRC)/Bid Evaluation Criteria (BEC) vide Annexure II shall be

applicable to this Tender. 3.0 Technical Check-List and Commercial Check-list vide Annexure III should be filled-up and

submitted along with the offer. 4.0 The quotation must submitted in triplicate and accompany relevant original catalogue,

literature, and drawing illustrating all components failing which the offer will be liable for rejection.

Page 3: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

2

5.0 Payment : Payment shall be released as follows:

i) 80 % of the order value shall be paid against dispatch / shipment of the goods.

ii) Balance 20 % of the order value along with the commissioning charges shall be paid after successful commissioning and acceptance of the item by OIL.

OIL may also consider 100 % payment against shipment / despatch document provided bidder agree to pay the interest for 20 % of order value and also submit Bank Guarantee equivalent to 20 % of the order value in addition to the Performance Security of 10 %.

Any offer not complying with the above shall be loaded at one percent above the prevailing Bank rate (CC rate) of State Bank of India for evaluation purpose.

6.0 To ascertain the substantial reponsiveness of the bid OIL reserves the right to ask the bidder

for clarification in respect of clauses covered under BRC also and such clarifications fulfilling the BRC clauses in toto must be received on or before the deadline given by the company, failing which the offer will be summarily rejected.

7.0 The items covered by this enquiry shall be used by Oil India Limited in the PEL/ML areas

which are issued/renewed after 01/04/99 and hence Nil Customs Duty during import will be applicable. Indigenous bidder shall be eligible for Deemed Export Benefit against this purchase. Details of Deemed Export are furnished vide Addendum to MM/GLOBAL/01/2005 enclosed.

8.0 If any of the clauses in the BRC/BEC contradict with other clauses of NIT elsewhere, then the

clauses in the BRC will prevail. 9.0 Bid Security Clause No. 9.8.2 (under Exemption of Bid Security) of Section A of the General

Terms & Conditions for Global Tender (Refer Document No. MM/GLOBAL/01/2005) stands deleted.

10.0 For other terms and conditions please refer our General Terms & Conditions for Global

Tender MM/GLOBAL/01/2005 enclosed.

Contd..Page-3

Page 4: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

3

ANNEXURE- I SPECIFICATION OF MOBILE AIR POLLUTION MONITORING UNIT - Item1 : The System should includes the following items: A. Mobile Van of TATA Safari with modification/Alteration for incorporating analysers etc. B. Standard 19" Air Conditioned Double Bay Instrument Rack. C. Meteorological Parameter Monitoring equipment. D. External Cable 50 meters for use with external power supply. E. Sampling system. F. PC based Data Acquisition System consisting of a) Data Logger b) Laptop PC c) Software for Data Acquisition. G. Calibration gas Cylinders for Carbon monoxide & Methane ( One Each ) Details of all the above items are as under : A. Mobile Van is based on TATA Safari Dicor LX 4X2 Diesel AC with modification /alteration and to mount/fit the following analysers /equipments in Standard 19" Air Conditioned Double Bay Instrument Rack with anti-vibration mounts on the floor of the Van.

a) OXIDES OF SULFUR AND HYDROGEN SULFIDE ANALYSER b) OXIDES OF NITROGEN ANALYSER c) CARBON MONOXIDE ANALYSER d) HYDROCARBON ANALYSER e) SUSPENDED PARTICULATE MATTER ANALYSER f) ZERO AIR GENERATOR & HYDROGEN GENERATOR g) DATA ACQUISITION SYSTEM h) METEOLOGICAL PARAMETER MONITORING i) PORTABLE CALIBRATION SYSTEM MODEL VE 3M j) SAMPLING SYSTEM.

Specifications of the Vehicle: -TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per

factory supply. -Colour Siver Grey (metallic) Modification/Alteration of the Vehicle: -Necessary modifications like cut-outs & flanges on roof for Sample inlet, Dust inlet & heated line. -Fixing of Instrument Racks with anti-vibration mounts on the floor with necessary structural modifications. -Writing of the followings beautifully on the body of the vehicle. Oil India Ltd. Duliajan. Air Quality Monitoring Mobile Laboratory. Accessories: -Cable for external mains supply- 50 meters with cable rolling drum. -Mounting arrangements for Pumps & Analysers. -Fixing of hand operated meteorological mast. -Fixing of Gas Sampling System.

Page 5: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

4

Note:- I) Model Name/Code of the vehicle being offered shall clearly be indicated in the bid. Technical leaflet/brochure of the same shall also be submitted along with the bid. II) Weight of equipments that are going to be mounted on the vehicle shall be indicated in the bid.

III) The following documents/literatures shall be submitted along with the supply- a. Sale certificate, Engine Emission Certificate, etc. in Form 21 & 22(A), Temporary Registration, Insurance, Road Tax etc. as per MV act for registration of the vehicle as New Unit in the name of M/S.OIL INDIA LIMITED, Duliajan.

b. 2(Two) sets of Spare Parts Catalogue, Workshop & Service Manual for the vehicle. c. Notwithstanding any clause mentioned elsewhere in the NIT, the invoice for the complete unit shall be submitted in 2(Two) parts separately as under.

i) Invoice for the vehicle - it should include cost of the TATA Safari and cost of modification carried out on the body of the vehicle for fitment of analyser equipments only. ii) Invoice for the equipments - it shall include cost of all equipments/components of the analyser that are mounted on the vehicle as well as supplied separately, if any, as part of the complete offer and any other cost as applicable. B. Standard 19" Air Conditioned Double Bay Instrument Rack in a Mobile Van with telescopic slides, power

distribution, Panel Air Conditioner etc. for mounting Analysers and Accessories. Specifications:

- Standard 19" (inches)X18UX600 mm - Double bay. - Fully louvered Side Panels - 2 Nos. - Bottom gland plate removables. - Vertical Power Point with MCB - Indian plugs 3 pin, 5 mps, with 3 pin plug tops - 2 Nos.

- PVC duct full height - 2 Nos. for writing & tubing. - Cable glande plate.

- Base frame. - All panels & sections power coat finish with RAL 7035 colour. - Aluminium 3 mm thick Blank panels, front panels & sections with milky white powder coating. - Tubing & Wiring using locally made SS fittings. - Anti-vibration Mounts. C. Meteorological Parameter Monitoring consisting of Wind Speed & Wind Direction Sensor and to be

supplied with a rotor and the necessary cables. Specifications: a) Combined speed direction : - Working principle : 3 cups and vane anemometer. - Speed transducer: Optoelectronic disk. - Housing : Heavy gauge anodized aluminium painted with epoxy resin. - Damage threshold : > 75 m/s - Operating temperature : -30 + 70 degree C. b) Speed : - Measurement range : 0 - 60 m/s - Threshold : 0.38 m/s (Deviation to 0.25 m/s) - Response time (63% at 12 m/s) : 2.2 s - Resolution : 0.05 m/s - Accuracy : 0.1 m/s - Linearity : +1% VL (reading)(Deviation to 0.5%)

Page 6: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

5

c) Direction : - Measurement range : 0 - 360 degree - Threshold : 0.4 m/s (Deviation to 0.3 m/s) - Response time (63% at 4 m/s) : 0.74 s - Resolution : 1.4 degree - Accuracy : 1% F.S. - Linearity : 0.5% (Integral) D. External Cable 50 meters for use with external power supply, 220V, 50 Hz. E. Gas Sampling System with manifold with moisture trap condensation & sampling filter System. Charateristics

- Thermo Peltier Condenser module to avoid condensation. - Body made of stainless steel with PFA internal coating. - Stainless Steel flange for roof fixing. - Manifold with borosilicate equipped with air extractor.

F. PC Based Data Acquisition and Processing System : It should be consisting of the following :

a) Data Logger built-into Analyser with PC Based Data Logger & communication to PC through RS 232 outputs(RS232 "8-port" board).

b) Ultra portable Laptop PC with the following configuration: Processor Brand Intel Processor Class Pentium core 2 duo Processor Speed 1.8 GHz Installed Memory RAM 1 GB Cache Size 2 MB Hard Drive Capacity Minimum 120 GB External Hard Drive with appropriate port facility connection(USB Connectivity) - 1 no. Capacity Minimum 60 GB Included Drives DVD+/-RW with CD-RW combo CD Write Speed 24X CD Rewrite Speed 24X DVD Read Speed 8X Display Type TFT active matrix Graphics Processor Intel GMA 900 Resolution 1024 X 768 pixels Modem Speed 56 Kbps Network Support Ethernet, Fast Ethernet, Gigabit Ethernet, IEEE 802.11b, IEEE 802.11g Operating system Microsoft Windows XP Professonal/VISTA Interface Connectors VGA, phoneline, Ethernet 10 Base-T/100 Base-TX/1000 Base-T Warranty 1 Year Input Devices Keyboard, Touchpad, external optical mouse, 5 in 1 card reader Included Sound Card Sound Card HP Colour LASER JET 1600 Printer or equivalent 1 No. (compatible to the Laptop)

Page 7: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

6

c) Software for Real-time monitoring Data Acquisition, WINDOWS based, Calibration, Alarms, Graphs, Curves, reporting, display, Retrival of historical data, System Configuration, Reports, Remote calibration, Data editing, Data Security. Specifications: -An intelligent, multi function, high-performance PC-based data acquisition system to run flexible, environmental data acquisition procedures. A wide variety of data acquisition cards may be installed. Set of software programs designed to perform data acquisition and control for environmental and process monitoring applications. Local reporting and graphical display capability are to be included. With pull-down windows based menus. Only basic knowledge of PC software operations should be required for system operation. All hardware components are open stock items available from multiple suppliers. -The system should be capable of detecting errors and autonomously transmit alarms to the central. Capable of Filtering Data values collected according to user-defined criteria. Both local on screen display and printing to be supported. Software should have automatic calibration control, recording and correction. Capable of calibration and data reports at different time intervals, and can transfer data via several communication devices. -Multi tasking software - no data is lost during polling -Multi-tasking software allows user interaction without interrupting data collection -Handles up to 64 analog measurement inputs -Handles 16 digital input channels -Handles 16 digital output channels -Supports up to 8 RS232C channels -Measuring rate: every 1, 2, 5, and 10 sec -User selected averages: 1, 5, 6, 15 or 60 min are typical -Data collected should be stored in a database -Dynamic display of instantaneous values in engineering units, voltages, or any calculation -Remote access for upload or download of configuration, -calibration start, viewing current measurements, and remote control -Calculations for math and meteorological statistics -Automatic calibration correction and control via relays, -calibrators or analyzer serial commands -On-line and off-line reports : daily, weekly, monthly, -yearly or any programmed period with selectable time-based averages -Calibration report -Password protection -Automatic data re-transfer in case of data transfer failure -Communication via RS232C to the smart analyzers (multi-drop available) -Collection and reporting of analyzer status information -Calibration sequence control via RS232C and/or digital outputs -Communications bypass feature for direct analyzer connection from remote locations -Large volume of database information to be made available via standard reports. One month of scan data (1-15 sec) is to be made available in binary files for graphical review and export to Excel. -Software to works with six kinds of communication protocols: . ASCII protocol . Binary protocol . Emulation protocols . ODBC protocols . MODBUS RTU protocols . OPC Server protocols -Faicility to send data online through wireless (mobile handset) from remote area using for monitoring to R&D Laboratory.

Page 8: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

7

G. CALIBRATION GAS CYLINDERS FOR CARBON MONOXIDE AND METHANE -(ONE CYLINDER EACH) -The Carbon monoxide and Methane gas should be in two separate cylinders, required for calibration of the Analysers. -The cylinders should be High Pressure seamless carbon steel as per IS 7285 and valve as per IS 3224 specifications. -The cylinders should be provided with manufacturer test certificate & CCE Nagpur certificate. -The gases should be supplied with purity certificate. Item2 : The System should includes the following items: THE AIRPOLLUTION MONITORING EQUIPMENTS/ANALYSERS ARE AS FOLLOWS : A) OXIDES OF SULFUR ANALYSER WITH HYDROGEN SULFIDE CONVERTER B) OXIDES OF NITROGEN ANALYSER C) OXIDES OF CARBON ANALYSER D) TOTAL HYDROCARBON ANALYSER E) SUSPENDED PARTICULATE MATTER ANALYSER F) ZERO AIR GENERATOR & HYDROGEN GENERATOR Details of all the above items are as under : Ambient Air Quality Monitoring Analysers for monitoring parameters like SO2, NOX, CO, HC mounted in Mobile Van A. SPECIFICATIONS OF Sulphur dioxide(SO2) Analyser- -Based on UV # Fluorescence Principle for measurement of H2S/SO2 in Ambient Air, with built-in zero/ span solenoid valve,H2S Converter and digital output RS 232 port for data transfer & internal data storage. -Analyser to be approved by US EPA No. EQSA-0802-149 -User programmable ranges between 0 to 10 ppm -Autoranging feature -Response time: automatic and programmable (mini. 10 sec) -Detection limit: 1 ppb -Noise: 0.5 ppb -Zero drift: < 0.5 ppb/24 h or <1 ppb/7 days -Span drift: < 0.5 %/24 h or < 1 %/7 days -Linearity: + 1% of full scale -Self memory backup: up to 2 months of ¼ h averages data -Operating temperature: + 5°C to + 40°C -UV fluorescence technology -Automatic pressure & temperature compensation -High efficiency aromatics hydrocarbons kicker ventilated with filtered air (no quenching from water vapor & no hydrocarbon interference). -Built-in zero air scrubber -LCD multiline graphic display (16 lines # 40 digits) -16 bits microprocessor -6 keypad programming keyboard -Interactive menu driven multilingual software -Synoptic flow diagram with main internal parameters / -Instantaneous concentration

Page 9: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

8

-Real-time calibration graph -Powerful maintenance menu: Internal service and A/D test functions with simultaneous display of all key

parameters in mV -Automatic calibration cycle with memorization of the span gas concentration -Non volatile internal data storage capacity of 2 months (1/4 average) -2 serial output ports ( two RS232 or one RS232 & one RS422) -Power supply : 230 V, 50Hz -19" rack mount chassis, 3 U (1 U = 4,45 cm) -Built-in sampling pump -Built-in zero air scrubber -Sample filter (PTFE) valves block for selection of customer supplied zero and span gas -Full instrument emulation via RS232 interface (optional ConTACTTM for Windows software) Calibration: The SOx analyzer is to be delivered with a built-in solenoid valve for automatic (or manual), local (or remote) calibration, using the zero air generator and multi-point calibrator. B. SPECIFICATIONS OF Oxides of Nitrogen (NO # NO2 - NOX) Analyser- -Based on Chemiluminescence principle for measurement of NO2/NO/ NOx in Ambient Air, with built-in zero/ span solenoid valve and digital output RS 232 port for data transfer & internal data storage. -Analyser to be approved by US EPA No. RFNA-0202-146 -User programmable ranges between 0 to 20 ppm -Autoranging feature -Response time: automatic and programmable (mini. 30 sec) -Detection limit: 0.4 ppb -Noise: 0.2 ppb -Zero drift: < 0.5 ppb/24 h or < 1 ppb/7 days -Span drift: < 0.5 %/24 h or < 1 %/7 days -Linearity: + 1% of full scale -Self memory backup: up to 1 month of ¼ h averages data -Operating temperature: + 5°C to + 40°C. -Sealed converter oven with molybdenum grids (2 years lifetime) -Ozone generator easy-to-install -Automatic pressure & temperature compensation -LCD multiline graphic display (16 lines # 40 digits) -16 bits microprocessor -SMC electronic boards technology -6 keypads programming keyboard -Interactive menu driven multilingual software -Automatic calibration cycle with memorization of the span gas concentration -Internal permeapure dryer -2 serial output ports ( two RS232 or one RS232 & one RS422) -External sample pump with scrubber -Power supply : 230 V, 50Hz -19" rack mount chassis, 3 U (1 U = 4,45 cm) -PTFE sample particulate filter and PVDF holder -Operation and service manual C. SPECIFICATIONS OF Carbon monoxide (CO) Analyser- -Based on Non Dispersive IR Principle with Gas Filter Co-relation for measurement of CO in Ambient Air, with

built-in zero/ span solenoid valve, digital output RS 232 port for data transfer & internal data storage.

Page 10: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

9

-Analyser to be approved by US EPA No. RFCA-0206-147 -User programmable ranges between 0 to 200 ppm -Autoranging feature -Response time: automatic and programmable (mini. 30 sec) -Detection limit: 50 ppb -Noise: 25 ppb -Zero drift: < 0.1 ppm/24 h or < 0.1 ppm/7 days -Span drift: < 1 %/24 h or < 1 %/7 days -Linearity: + 1% of full scale -Self memory backup: up to 2 months of ¼ h averages data -Operating temperature: + 5°C to + 40°C -Non-dispersive infrared (NDIR) using gas filter correlation (GFC) technology -Automatic pressure & temperature compensation -Built-in zero air scrubber -Sealed gas cells -LCD multiline graphic display (16 lines # 40 digits) -16 bits microprocessor -SMC electronic boards technology -6 keypad programming keyboard -Interactive menu driven software -Automatic calibration cycle with memorization of the span gas concentration -2 serial output ports ( two RS232 or one RS232 & one RS422) -Power supply : 115 V, 60Hz or 230 V, 50Hz -19" rack mount chassis, 3 U (1 U = 4,45 cm) -Sample filter (PTFE) valves block for selection of customer supplied zero and span gas -Operation and service manual Calibration The unit is to be delivered with a built-in solenoid valve for automatic (or manual), local (or remote) calibration, using the zero air generator and multi-point calibrator. D. SPECIFICATIONS OF Hydrocarbon Analyser- -for measurement of Total HC/ Methane/ Non Methane based on FID technique with built-in zero/ span solenoid valve, Built-in methane, non-methane converter and digital output RS 232 port for data transfer & internal data storage. -Analyser to be approved by France: INERIS evaluated, DRC-EQ2A-YGo-DR-020 -Measured compounds: Total HC, methane & non-methane -User programmable ranges from 0 to 1000 ppm -Response time: automatic and programmable (mini. 20 sec) -Detection limit: 0.05 ppm -Noise: 0.025 ppm -Zero drift: 0.1 ppm/7 days -Span drift: 1 %/7 days -Linearity: + 1% of full scale -Operating temperature: + 5°C to + 40°C. -Flame ionization detector (FID) technique -Long life high contrast LCD multiline graphic display -Auto-ranging feature -Interactive menu driven software -6-keypad programming keyboard -Selectable digital and graphic permanent display :

Page 11: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

10

* Time & date / Instantaneous concentration * Time & date / Instantaneous and average concentrations * Synoptic flow diagram with main internal parameters / Instantaneous concentration * Real-time calibration graph -Built-in self checks and real time diagnostics -Internal service and A/D test functions with simultaneous display of all key parameters in mV -Non volatile memory capacity of the last 1 500 average data -User programmable averaging time (1-9999 min) -PTFE sample particulate filter and PVDF holder -Automatic pressure / temperature compensation -Automatic flow control -Automatic calibration cycle with memorization of the span gas concentration -Zero and span solenoid valve (manual, automatic or remote control) -Auto-ignition of the flame in case of extinction or power failure -Built-in multidrop RS232 serial input/output interface with user selectable protocol -3 programmable dry contacts: . General alarm . Specific alarm (flowrate, temperature, flame,...) . Threshold high or low -2 selectable analog outputs 0-20 mA/4-20 mA/0-1 V/0-10 V -Built-in sample pump -Power supply : 230 V, 50 Hz / 60 Hz -19" rack mount chassis, 4 U Required utilities: -Hydrogen : 0.04 lpm of H2 gas quality N5.0)at 2 bars/ 30 psig using HG 2200R -Fuel Air : 0.5 lpm free HC air, 2.5 bars / 45 psig using ZAG 2001 Built-in converter oven module (THC,CH4 & nMHC measurements) -Selective converter oven oxidizing all the hydrocarbons with the exception of methane -For total hydrocarbons, methane and non methane hydrocarbons measurements in equivalent CH4 or in other HC as according calibration -Delivered with hardware and software for three selectable modes: -Cyclic : THC/CH4/nMHC (programmable 30-300 s) -Continuous THC -Continuous CH4 -3 selectable analog outputs included E. Combined Zero Air + Hydrogen Generator- Hydrogen Generator -Output generated: 100 to 250 Ncc/min. -Outlet pressure: 200 ml/min -Purity: >99.999% Zero Air Generator -Output generated: 1 to 5 Litres/minutes -Outlet pressure: Adjustable between 1 & 3.5 bar -Remaining pollutants level: -HCnm < 50 ppb -HCm < 50 ppb -H2O < 100 ppm

Page 12: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

11

F. Portable Calibration System with following: -Built-in 2 Permeation Ovens & permeation tubes for SO2 & NO2 -Span gas input with additional Mass Flow meter for external Span Gas connection G. Suspended Particulate Matter (SPM) Analyser -Based on Beta Gauge detection principle with C-14 source with heated sample line, TSP inlet, Pump & Standard Calibration Foil. -Beta gauge ambient particulate monitor -ISO 10473 compliant -EN12341 Approved -EC compliant (electromagnetic compatibility) -Manufactured in compliance with ISO 9001 & ISO 14001 standards -OPERATING RANGE : 0-100/200/500/1000/2000/5000/10 000 µg/m3 -Beta source: C14 (< 90 µCi) -Detector: Geiger Muller counter -Detection limit: 0.3 µg/m3 for a 24 hours cycle -Scan ning period: ½, 1, 2 or 3 hours -Measurement cycles: 15 min/30 min/1 h/2 h/3 h/6 h/12 h/24 h -Air flow rate: from 0.8 to 1.5 m3/h -Air flow rate regulation accuracy: + 2 % -Self memory backup: up to 1 month of ¼ h averages data -Temperature compensation of air lamina between source and detector -Presentation: 6U 19" rack mounted -Operating temperature: + 5°C to + 40°C. -Filter: one roll of filter tape (Fiberglass), 30 m long with autonomy of 1350 measurements (3 years) for a 24 hour cycle -Standard foil gauge for calibration check (one per year) -Built-in printer on front panel -3 programmable formatting modes for measurement values -editions, continuous chart editing/histogram charts or printing of 1/4 hour or 1 hour average values -Programmable scale and unwinding speed -12 key pads programming key boards -Digital permanent display for time/concentration/flow rate -Natural radioactivity detection alarm: Programmable threshold (to be calibrated by the user) -Non volatile memory with data storage of 7 days (1/4 hour average values) -Internal service and A/D test functions with display in mV -3 programmable dry contacts (alarms, threshold) -3 selectable analog outputs: 0-20 mA / 4-20 mA / 0-1V / 0-10V -Power supply: 220 V/50 Hz -1 serial output ports RS232 or RS422 -External diaphragm pump delivered with a flexible tube and power supply cable to connect to the monitor. -Heated sampling tube (1 meters length duct) to be connected to a selected sampling inlet to Avoid the water condensation during the sample transfer to the monitor -US EPA approved standard.

Page 13: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

12

Accessories: i) Cable for external mains power supply # 50 meters with cable rolling drum. ii) Mounting arrangement for Pumps of SPM & NOx Analysers iii) Fixing of hand operated meteorological mast. iv) Fixing of Gas Sampling system. G. Portable Multipoint Calibrator- -Dilution air flow: 30- 300 l/h (0.5- 5.0 lpm) -Accuracy: 1 % -Repeatability: 0.2 % -Permeation oven temperature:40.0 + 0.1°C -Autonomy: 8 hours during transport (internal NiCd battery or direct 12 V -Power: 230 V / 115 V, 50/60 Hz (power consumption : 200 CA) -Operating temperature: 10 to 35 °C -The Multi point calibrator is to be delivered with certified permeation tubes such as SO2, NO2, H2S, NH3, Benzene .SO2/ H2S/Benzene permeation tube: 18 months lifetime, .NO2 /NH3 permeation tubes: 12 months lifetime. General Notes for Bidders :- 1.0 This purchase will be under buy back policy only. Bidder to note that same and quote accordingly. 1.1 The specification of existing Air pollution Monitoring Van for buy back policy are as under :

a) The Mobile Air Pollution Laboratory was built on Tata 608/37 diesel chassis bearing chassis no. 3680228-0654

b) The van is fitted with one air conditioner, one voltage stabiliser, one rack for instruments, two side tables with drawers, two folding chairs.

c) The following equipments are housed in the van. Total Hydrocarbon Analyser(FID) DANI-THM-410B 1 NO. CARBON MONOXIDE ANALYSER(IR) CO 11M 1 NO. OXIDES OF NITROGEN ANALYSER AC 30M 1 NO. (CHEMILUMINESCENT) HYDROGEN SULFIDE AND SULFUR DI AF/SH 20M 1 NO. OXIDE ANALYSER(UV FLUORESCENT) AIR CONDITIONER 1 NO. d) The mobile van was procured in February, 1990 Engine no. 697sp215-07855 Regn.no.AS06-6598. OIL no. 2960.Make TATA Model 608/37 in 1990 1.2 Delivery of old Mobile Air Pollution Laboratory will be done to the successful supplier only after

commissioning and acceptance of supplied Mobile Air Pollution Monitoring unit. 1.3 Bidder must inspect the old Mobile Air Pollution Laboratory ( as is where is basis) before quoting. 2.0 The bidder to provide 2 (two) sets of technical literature for operation, maintenance & repair indicating

all components with schematic drawings, part number etc. alongwith offer.

Page 14: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

13

2.1 Two(2) sets each of Instruction cum Operational Manual, Recommended Spares Parts list etc. are to be supplied along with the supply in the event of order. Bidder has to confirm the same in the technical bid.

2.2 Test and warranty certificate is to be provided along with the material. 2.3 Quotation must be submitted in triplicate. 2.4 The bidder should quote (item wise) for all the items required for the system. 2.5 Bidder should indicate the name of manufacturer & country of origin. 3.0 Materials shall be brand new, unused & of prime quality. 4.0 The bidder should be the original equipment manufacturer (OEM) or authorized dealer of the OEM. In

case the bibber is not Original Equipment Manufacturer (OEM), proper authorization certificate (in original) is required with a back up Warranty and Guarantee from the OEM to quote against this tender. OEM also confirms that they will provide sales service and supply the spares uninterrupted for 10 (Ten) years for the quoted items. Offer without confirming above in the bid will be liable for rejection.

4.1 In case the OEM is bidding through an Indian agent, the OEM should give a written undertaking that

they will be responsible for providing the warranty and annual maintenance as per the clauses mentioned in the tender, even if there is a change in the Indian agent of the manufacturer. The undertaking from OEM should also include that, if in future, OEM does not have any Indian agent, the service will be provided directly by the service engineer of the OEM without any extra charge.

4.3 The bidders must submit a written undertaking that they would be able to supply all the requisite spares

and consumables (including bought out items) for a minimum period of 10 (ten) years from the Certified date of completion / successful field commissioning of the unit. Original Equipment Manufacturer's undertaking must be forwarded for the items not manufactured by the bidder.

5.0 After Sales Service :

The nature of after sales service, which the supplier can provide during initial commissioning and also subsequently should be clearly stated.

6.0 Warranty / Guarantee :

The offered items/complete unit, in the event of an order, must be under guarantee / warrantee by the bidder for a minimum period of not less than 18 months from the date of dispatch or 12 months from the date of successful commissioning of the complete unit at site, whichever is earlier. Defective goods / materials or parts notified by OIL to the Seller shall be replaced immediately by the Seller on F.O.R destination basis including payment of all taxes and duties at Seller's expense. This guarantee shall survive and hold good not-withstanding inspection, payment for and acceptance of the goods.

7.0 Installation & Commissioning : 7.1 The successful bidder will be required to install and commission all the analyzers in a mobile van as

indicated in the NIT with calibration at R&D Department, Oil India Ltd. Duliajan, Assam, India by their competent service engineer.

7.2 Installation/ Commissioning charges must be quoted separately on lumpsum basis which shall be considered for evaluation of the offers.Total Nos. of days required for commissioning shall also be clearly indicated by the bidders.

Page 15: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

14

7.3 The installation and commissioning should be completed within four weeks of arrival of the complete system at Duliajan, Assam, India. The complete system should become operational immediately after commissioning.

Note - OIL will give 14 days advance notice prior to installation to the successful bidder. Failure on

the part of the bidder to confirm the above will be treated as non-responsive and liable for rejection.

8.0 Training at Duliajan:

i) The supplier’s service engineer must demonstrate the performance of the equipments guaranteed in the offer and must also provide extensive training for 5 days for the operation, application and trouble shooting of the equipments after successful installation and commissioning of the complete system to OIL's satisfaction.

ii) Training charges shall be quoted separately which shall be considered for evaluation of the offers. 9.0 Annual Maintenance Contract (AMC) and Support Contract :

The entire system including all the analyzers, software and other equipments covered in the NIT should be under Annual Maintenance Contract for a period of two (2) years after the warranty period is over. Charges for Annual Maintenance Contract (AMC) after the waranty period up to 2 (two) years, with year wisw break up, must be quoted separately which shall be considered for evaluation of the offers. During the maintenance contract period, the service engineer of the supplier should make two visits for preventive/routine maintenance of the system and one breakdown maintenance every year. Spares required, if any, during the maintenance contract period will be provided by OIL.

10.0 Bidders must submit a written undertaking that they would be able to provide Warranty and AMC

services as mentioned above. The responsibility for providing the servicing during warranty and Annual Maintenance Contract (AMC) period should lie with the supplier irrespective of any change in Indian agency, if applicable.

10.1 Installation/Commissioning and Training charges, if any, should be quoted separately (and should not be clubbed together with main software) which shall be considered for evaluation of the offers.

10.2 While quoting Installation, AMC and on-site Training/expert charges above, bidder should take into account all charges including to and fro fares, boarding/lodging, local transport at Duliajan, Assam and other expenses of supplier's personnel during their stay at Duliajan. OIL may provide accommodation on Chargeable basis subject to availability. Bidder should confirm about providing all these services in their Bid. However, OIL reserves the right to avail such services at its own discretion.

10.3 Taxes & Duties:

(i) All taxes, stamp duties and other levies imposed outside India shall be the responsibility of the Bidder/Seller and charges thereof shall be included in the offered rates.

(ii) All Taxes & levies imposed in India, for the services including installation & commissioning, shall be to the Bidder/Seller's account.

(iii) Income Tax on the value of the Services rendered by the Bidder /Seller in connection with installation, commissioning, training etc. shall be deducted at source from the invoices at the appropriate rate under the I.T. Act & Rules from time to time.

19.0 Bidders should confirm each & every point clearly. Deviations, if any, should be highlighted

in the quotation.

Contd..Page-15

Page 16: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

15

ANNEXURE-II

BID REJECTION CRITERIA (BRC) / BID EVALUATION CRITERIA (BEC) : (I) BID REJECTION CRITERIA (BRC) The bids must conform to the specifications and terms and conditions given in the tender. Bids shall be rejected in case the item(s) offered do not conform to the required minimum/maximum parameters stipulated in the technical specifications and to the respective international / national standards wherever stipulated. Notwithstanding the general conformity of the bids to the stipulated specifications and terms and conditions, the following requirements shall have to be particularly met by the bidders, without which the offer will be considered as non-responsive and rejected :

(A) TECHNICAL:

1. The bidder must conform to the specifications of all the items and other terms and conditions as given in the NIT. The following requirements should also be complied

• The Data Acquisition Software should be from the OEM of the analyzers. • All analyzers to be offered should be from a single manufacturer only to ensure common

spares availability.

2. All the analyzers/equipments as given in the NIT are to be mounted/fit in standard 19” Air conditioned Double Bay Instrument Rack with anti-vibration mounts inside a TATA Safari Dicor LX 4x2 Diesel AC.

3. The bidder must have authorized servicing centre with manufacturer’s factory trained

personnel for all the analyzers, software and other equipments covered in the NIT in India.

4. The bidder must offer for buy back of the existing Air Pollution Monitoring Van and all analyzers

5. The bidder must offer certification for analyzers like SO2, NOx, CO & SPM by US EPA of

the system by EPA, US or any other similar renowned agency. (Necessary documents should be provided).

6. The bidder should have installed at least 2 Ambient Air Quality Monitoring Mobile Vans in

Petroleum sector in India. (Details of the installations like Site, Contact person, Tel. No., Fax No., e-mail id etc to be provided supported by P.O. copies/ installation certificates/ satisfactory performance reports.)

7. The bidder must be able to provide and install in the mobile air quality monitoring van an

analyzer for detailed analysis of Volatile organic compounds, toxic/ carcinogenic hydrocarbons present in air as and when required in future.

(B) COMMERCIAL :

1.0 Bids are invited under Single Stage Two Bid System. Bidders shall quote accordingly under Single Stage Two Bid System. Bidder not complying with submission procedure mentioned in General Terms & Conditions of Global Tender (MM/GLOBAL/01/2005) will be rejected.

Page 17: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

16

2.0 Bid security of US $ 3100 or Rs. 1,25,000 shall be furnished as a part of the TECHNICAL BID. Any bid

not accompanied by a proper bid security in ORIGINAL will be rejected without any further consideration. For exemption for submission of Bid Security, please refer Clause No. 9.8 (Section A) of General Terms and Conditions for Global Tender vide MM/GLOBAL/01/2005 (enclosed). The Bid Security shall be valid for 240 days from the date of bid opening.

3.0 Bidders must confirm that Goods, materials or plant(s) to be supplied shall be new of recent make and

of the best quality and workmanship and shall be guaranteed for a period of eighteen months from the date of shipment/dispatch or twelve months from the date of successful commissioning whichever is earlier against any defects arising from faulty materials, workmanship or design. Defective goods/materials or parts rejected by OIL shall be replaced immediately by the supplier at the supplier’s expenses at no extra cost to OIL.

4.0 Successful bidder will be required to furnish a Performance Bank Guarantee @10% of the order value.

The Performance Bank Guarantee must be valid for one year from the date of successful commissioning of the equipment or 18 months from the date of shipment whichever is earlier. Bidder must confirm the same in their Technical Bid. Offers not complying with this clause will be rejected.

5.0 Validity of the bid shall be minimum 6 month (180 days). Bids with lesser validity will be rejected. 6.0 Bidders are required to submit the summary of the prices in their commercial bids as per bid format (

Summary ), given below : (i) Commercial Bid Format ( SUMMARY ) for Foreign Bidders :

(A) Total Material value (B) Packing & FOB Charges (C) Total FOB Port of Shipment value (D) Ocean Freight Charges upto Kolkata, India (E) Insurance Charges (F) Total CIF Kolkata value (G) Installation , Commissioning and Testing charges (H) Training Charges (I) Annual Maintenance Contract (AMC) charges (J) Total Value, ( F + G + H + I ) above (K) Total value in words : (L) Gross Weight : (M) Gross Volume :

(ii) Commercial Bid Format ( SUMMARY ) for Indigenous Bidders :

(A) Total Material value (B) Packing and Forwarding Charges (C) Total Ex-works value (D) Sales Tax, (Please indicate applicable rate of Tax) (E) Total FOR Despatching station price (F) Road Transportation charges to Duliajan (G) Insurance Charges (H) Total FOR Duliajan value (I) Installation ,Commissioning and Testing charges (J) Training Charges (K) Annual Maintenance Contract (AMC) charges (L) Total Value, ( H + I + J + K ) above

Page 18: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

17

(M) Total value in words : (N) Gross Weight : (O) Gross Volume :

NOTE : 1. Cost of individual items must be quoted separately.

2. The items covered under this enquiry will be used by OIL in the PEL/ML areas issued/renewed after 01/04/99, applicable Customs Duty for import of goods shall be ZERO. Indigenous bidders shall be eligible for Deemed Export and should quote Deemed Export prices. Excise Duty under Deemed Export exempted.

7.0 While quoting Installation, AMC and on-site Training/expert charges above, bidder should take into

account all charges including to and fro fares, boarding/lodging, local transport at Duliajan, Assam and other expenses of supplier's personnel during their stay at Duliajan. OIL may provide accommodation on Chargeable basis subject to availability. Bidder should confirm about providing all these services in their Bid. However, OIL reserves the right to avail such services at its own discretion.

(II) BID EVALUATION CRITERIA (BEC) :

The bids conforming to the specifications, terms and conditions stipulated in the Tender and considered to be responsive after subjecting to the Bid Rejection Criteria will be considered for further evaluation as per the Bid Evaluation Criteria given below:

(A) TECHNICAL :

All the items as indicated in the material description of this tender should be offered. If any of the item not quoted by the bidder, the offer will not be considered for evaluation.

(B) COMMERCIAL : 1.0 The evaluation of bids will be done as per the Price Schedule (SUMMARY) detailed vide Para 6.0 of

BRC. 2.0 If there is any discrepancy between the unit price and the total price, the unit price will prevail and the

total price shall be corrected. Similarly, if there is any discrepancy between words and figure, the amounts in words shall prevail and will be adopted for evaluation.

3.0 For conversion of foreign currency into Indian currency, B.C. selling (Market) rate declared by State

Bank of India, one day prior to the date of price bid opening shall be considered. However, if the time lag between the opening of the bids and final decision exceed 3(three) months, then B.C. Selling(Market) rate of exchange declared by SBI on the date prior to the date of final decision shall be adopted for conversion and evaluation.

4.0 Offers not complying with the payment terms indicated in the Tender shall be loaded with one percent

above the prevailing Bank rate (CC rate) of State Bank of India for evaluation purpose. 5.0 To ascertain the inter-se-ranking, the comparison of the responsive bids will be made as under, subject

to corrections / adjustments given herein. 5.1 When only foreign bids are involved :

Comparison of bids will be done on the basis of “Total Value” which is estimated as under : (A) Total Material value (B) Packing & FOB Charges (C) Total FOB Port of Shipment value

Page 19: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

18

(D) Ocean Freight Charges upto Kolkata, India (E) Insurance Charges @ 1% of Total FOB Value (F) Banking Charges @ 0.5% of Total FOB Value above in case of payment through Letter of

Credit ( If confirmed L/C required, 1.5% of Total FOB Value will be loaded ) (G) Total CIF Kolkata Value (H) Installation , Commissioning and Testing charges (I) Training Charges (J) Annual Maintenance Contract (AMC) charges (K) Total Value, ( G + H + I + J ) above

NOTE : Banking charge in the country of the foreign bidder shall be borne by the bidder. 5.2 When only domestic bids are involved : Comparison of bids will be done on the basis of “Total Value" which is estimated as under :

(A) Total Material value (B) Packing and Forwarding Charges (C) Total Ex-works value (D) Sales Tax, as applicable (E) Total FOR Despatching station price (F) Road Transportation charges as per quote (G) Insurance [email protected]% of Total FOR Despt Station Value (H) Total FOR Duliajan value (I) Installation , Commissioning and Testing charges (J) Training Charges (K) Annual Maintenance Contract (AMC) charges (L) Total Value, ( H + I + J + K ) above

5.3 When both Foreign and Domestic bids are involved :

The Total Value of domestic bidder (inclusive of customs duty on imported raw material and components etc, and applicable terminal excise duty on the finished products and Sales Tax) excluding inland transportation to destination and Insurance charges worked out as per Para 5.2 above and Total Value of the foreign bidder worked out as per Para 5.1 above excluding inland transportation to destination will be compared. No price preference will be allowed to indigenous bidders except that for capital goods, the domestic manufacturers would be accorded a price preference to offset CST to the extent of 3 % or actual, which ever less subject to 30 % local content norms is as stipulated for World Bank Funded project to the satisfaction of OIL. When more than one domestic bidders fall within price preference range, inter-se-ranking will be done on Total Value basis.

Other terms and conditions of the Tender shall be as per General Terms and Conditions for Global Tender vide MM/GLOBAL/01/2005. However, if any of the Clauses of the Bid Rejection Criteria / Bid Evaluation Criteria (BEC / BRC) contradict the Clauses of the tender and/or MM/GLOBAL/01/2005 elsewhere, those in the BEC / BRC shall prevail.

Page 20: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

19

ANNEXURE III CHECK LIST

THE CHECK LIST MUST BE COMPLETED AND RETURNED WITH YOUR OFFER. PLEASE ENSURE THAT ALL THESE POINTS ARE COVERED IN YOUR OFFER. THESE WILL ENSURE THAT YOUR OFFER IS PROPERLY EVALUATED. PLEASE TICK MARK 'YES' OR 'NO' TO THE FOLLOWING QUESTIONS, IN THE RIGHT HAND COLUMN.

CHECK LIST (A) Technical check list

Sl. No.

Requirement Compliance

A. Servicing Van 1. Whether the Servicing van is TATA safari Dicor LX 4X2 Diesel AC with all standard fittings &

accessories, spare wheel, tools etc. as per factory supply ? Yes/No

2. Whether all the analyzers of Item 20 in the PR will be fitted in standard 19” Air conditioned Double Bay Instrument Rack with anti vibration mounts on the floor of the van ?

Yes/No

3. Whether cable for external mains- 50 meters fixing arrangements with cable rolling drum will be supplied ?

Yes/No

4. Whether there will be mounting arrangements for pumps and analyzers and of hand operated metereological mast and gas supply system ?

Yes/No

B. Standard 19” Air conditioned Double Bay Instrument Rack 1. Whether instrument rack has anti-vibration mount ? Yes/No C. Metereological Parameters Monitoring equipment 1. Whether the equipment will be supplied with a rotor and necessary cables ? Yes/No D. Gas sampling system with manifolds 1. Whether the system has manifold with moisture trap condensation and sampling filter system ? Yes/No 2. Whether thermo-peltier condenser module is available to avoid condensation ? Yes/No E. PC Based Data Acquisition and Processing system 1. Whether the system is consisting of –

i) Data Logger built into analyzer with pc based Data logger and communication to PC. ii) Laptop PC iii) Software for Real-time monitoring Data Acquisition, windows based, calibration,

Alarms, graphs, curves. Reporting, remote, calibration, data editing, data security.

Yes/No Yes/No Yes/No

F. Calibration Gas Cylinders for Carbon monoxide and methane 1. Whether the Carbon monoxide and methane are in two separate cylinders ? Yes/No 2. Whether the cylinders are high pressure seamless carbon steel as per IS 7285 & valve as per IS

3224 specification? Yes/No

3. Whether manufacturer test certificate provided ? Yes/No 4. Whether purity certificate of the gases provided ? Yes/No

G. Sulphur dioxide analyzer 1. Whether the Analyzer is capable of measuring Hydrogen sulphide also ? Yes/No 2. Whether the analyzer is approved by US EPA No. EQSA-0802-149? Yes/No 3. Whether programmable ranges in between 0 to 10 ppm ? Yes/No 4. Is the Analyzer has auto ranging feature ? Yes/No 5. Is the detection limit 1 ppb ? Yes/No 6. Whether the maximum noise of the analyzer is ≤ 0.5 ppb ? Yes/No 7. Whether the analyzer has internal data storage capacity of 1 month (1/4 average) ? Yes/No H. Oxides of Nitrogen (NO # NO2 – Nox ) Analyzer : 1. Whether the analyzer is based on Chemiluminescence principle for measurement of

NO2/NO/NOx in Ambient Air ? Yes/No

2. Whether the analyzer is approved by US EPA No.RFNA-0202-146? Yes/No

Page 21: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

20

3. Whether programmable ranges in between 0 to 20 ppm ? Yes/No 4. Is the Analyzer has auto ranging feature ? Yes/No 5. Is the detection limit 0.4 ppb ? Yes/No 6. Whether the maximum noise of the analyzer is ≤ 0.2 ppb ?

Yes/No

I. Carbon monoxide Analyzer ? 1. Whether the analyzer is based on IR principle ? Yes/No 2. Whether the analyzer is approved by US EPA No.RFCA-0206-147? Yes/No 3. Whether programmable ranges in between 0 to 200 ppm ? Yes/No 2. Is the Analyzer has auto ranging feature ? Yes/No 3. Is the detection limit 50 ppb ? Yes/No 4. Whether the maximum noise of the analyzer is ≤ 25 ppb ? Yes/No J. Hydrocarbon Analyzer ? 1. Whether the analyzer is capable of measuring Total Hydrocarbon, methane and non methane? Yes/No 2. Whether programmable ranges in between 0 to 1000 ppm ? Yes/No 3. Is the Analyzer has auto ranging feature ? Yes/No 4. Is the detection limit 0.05 ppb ? Yes/No 5. Whether the maximum noise of the analyzer is ≤0.025 ppb ? Yes/No K. Combined Zero Air + Hydrogen Generator ? 1. Whether the Hydrogen generator has output generation of 100 to 250 Ncc/min ? Yes/No 2. Whether the Hydrogen generated by the generator has purity > 99.999% ? Yes/No 3. Whether the zero air generator has output generation of 1 to 5 litres/min ? Yes/No 4. Whether outlet pressure of the zero air generator is adjustable between 1 & 3.5 bar? Yes/No 5. Whether the remaining contaminant level of the zero air generator is of the following order-

-HCnm < 50 ppb -HCm < 50 ppb -H2O < 100 ppb

Yes/No

L. Portable Calibration system 1. Whether the portable calibration system has built in 2 permeation oven & permeation tubes for

SO2 & NO2 ? Yes/No

2. Whether the system has span gas input with additional Mass Flow meter for external Span gas connection?

Yes/No

M. Suspended Particulate Matter Analyzer 1. Whether its operating range is :

0-100/200/500/1000/2000/5000/10000 µg/m3 ? Yes/No

2. Is the detection limit is 0.3 µg/m3 for a 24 hr cycle ? Yes/No M. Portable multipoint calibrator: 1. Whether the calibrator is delivered with certified permeation tubes such as SO2, NO2 H2S, NH3

Benzene ? Yes/No

Offer Ref ............................…………………… Dated ................................................ OIL's Tender No....................………….………. Signed ………………..................... For & on behalf of ................................................Designation ..................

Contd..Page-21

Page 22: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

21

ANNEXURE III ( B ) COMMERCIAL CHECK LIST THE CHECK LIST MUST BE COMPLETED AND RETURNED WITH YOUR OFFER. PLEASE ENSURE THAT ALL THESE POINTS ARE COVERED IN YOUR OFFER. THESE WILL ENSURE THAT YOUR OFFER IS PROPERLY EVALUATED. PLEASE TICK MARK 'YES' OR 'NO' TO THE FOLLOWING QUESTIONS, IN THE RIGHT HAND COLUMN. Sl# REQUIREMENT COMPLIANCE 1. Whether Original Signed quotation submitted ? YES/NO 2. Whether Fax / E-mail quotation submitted ? FAX / E-MAIL offer not acceptable. YES/NO 3. Whether 3(three) copies of quotations submitted ? YES/NO 4. Whether quoted as manufacturer ? YES/NO 5. Whether quoted as Supply House / Distributor. To Specify : YES/NO 6. If quoted as Supply House / Distributor, (a) Whether submitted valid and proper authorization letter from manufacturer confirming that

bidder is their authorized Supply House for the product offered ? YES/NO

(b) Whether manufacturer’s back-up Warranty/Guarantee certificate submitted YES/NO 7. Whether bid submitted under Two Bid System System ? YES/NO

Whether ORIGINAL Bid Bond(not copy of Bid Bond) enclosed with the offer? If YES, provide details

YES/NO

(a) Amount : (b) Name of issuing Bank :

8.

(c) Validity of Bid Bond :

9. Whether offered firm prices ? YES/NO 10. Whether quoted offer validity of 180 days from the date of closing of tenders? YES/NO 11. Whether quoted a firm delivery period? YES/NO 12. Whether quoted as per NIT (without any deviations) ? YES/NO 13. Whether any deviation there in the offer ? YES/NO 14. Whether deviation separately highlighted ? YES/NO 15. Whether agreed to the NIT Warranty clause ? YES/NO 16. Whether Price Bid submitted as per Price Schedule(refer Para 6.0 of BRC vide Annexure – II) YES/NO 17. Whether all the items of tender quoted? YES/NO 18. Whether indicated the country of origin for the items quoted ? YES/NO 19. Whether technical literature / catalogue enclosed? YES/NO 20. Whether Recommended Spares with price for 2 years of quoted ? YES/NO 21. Whether confirmed that all spares & consumables will be supplied for a minimum period of 10

years ? YES/NO

22. For Foreign Bidders - Whether offered FOB / FCA port of despatch including sea / air worthy

packing & forwarding ? YES/NO

23. For Foreign Bidders – Whether port of shipment indicated. To specify: YES/NO 24 For Foreign Bidders only - Whether indicated ocean freight up to Kolkata port (Excluding marine

insurance ) ?

25. Whether Indian Agent applicable ? YES/NO If YES, whether following details of Indian Agent provided ? YES/NO (a) Name & address of the agent in India – To indicate (b) Amount of agency commission – To indicate (c) Whether agency commission included in quoted material value ? YES/NO

26. Whether weight & volume of items offered indicated ? YES/NO

Page 23: Tender-7987-Mobail Monitoring Unit - Oil · PDF file-TATA Safari Dicor LX 4X2 Diesel AC with all standard fittings & accessories, spare wheel, tools etc. as per ... Workshop & Service

22

27. Whether confirmed to submit PBG as asked for in NIT ? YES/NO 28. Whether agreed to submit PBG within 30 days of placement of order ? YES/NO 29. For Indian bidders – Whether place of dispatch indicated in the offer ? To specify : YES/NO 30. For Indian bidders – Whether road transportation charges up to Duliajan quoted ? YES/NO 31. For Indian Bidders only - Whether offered Ex-works price including packing/forwarding charges? YES/NO 32. For Indian Bidders only - Whether offered Deemed Export prices ? YES/NO 33. Whether quoted prices are exclusive of Excise duty ? YES/NO 34. For Indian bidders only – whether import content indicated in the offer ? YES/NO 35. For Indian Bidders only - whether all Taxes have been indicated categorically ? YES/NO 36. Whether all BRC/BEC clauses are accepted ? YES/NO

Offer Ref ............................…………………… Dated ................................................ OIL's Tender No....................………….………. Signed ………………..................... For & on behalf of ................................................Designation ..................

Total Pages 22 Tender - 7987P08/09