Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

62
INTERNATIONAL SEMINAR ON MASS RAPID TRANSIT SYSTEM(MRTS) 4th5 th November 2014 REVIEW AND ASSESSMENT OF CHALLENGES REVIEW AND ASSESSMENT OF CHALLENGES G CO S C O O C A G CO S C O O C A DURING CONSTRUCTION OF CHENNAI DURING CONSTRUCTION OF CHENNAI METRO METRO

Transcript of Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Page 1: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

INTERNATIONAL SEMINAR ON

MASS RAPID TRANSIT SYSTEM(MRTS)( )4th‐5th November 2014

    REVIEW AND ASSESSMENT OF CHALLENGES  REVIEW AND ASSESSMENT OF CHALLENGES  G CO S C O  O  C A  G CO S C O  O  C A  DURING CONSTRUCTION OF CHENNAI DURING CONSTRUCTION OF CHENNAI 

METRO METRO 

Page 2: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

CONTENTCONTENT

PROJECT DETAILS

PROJECT DESCRIPTION

GEOLOGICAL AND GEOTECHNICAL OVERVIEW

TUNNELLING PERFORMANCE (TBM ADVANCE/EXCAVATION)TUNNELLING PERFORMANCE (TBM ADVANCE/EXCAVATION)

TUNNELING THROUGH STATION

TUNNEL – STATION INTERFACE

CROSS PASSAGE SOIL TREATMENT

Page 3: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

DESIGN AND CONSTRUCTION OF UNDERGROUND AND ASSOCIATED TUNNELS FOR UAA‐01 & UAA‐05 AND ASSOCIATED TUNNELS FOR UAA 01 & UAA 05 

OF CHENNAI METRO

CLIENT :CHENNAI METRO RAIL LTD

GENERAL CONSULTANT :EMBYEGENERAL CONSULTANT :EMBYE

CONTRACTOR :TRANSTONNELSTORY‐AFCONS JV

DESIGNER :PARSONS BRINCKERHOFF

SOURCE OF FUND :FUNDED BY JICA

Total Twin Tunnel Length : 17.5 KM

Page 4: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

UAA UAA  0101UAA UAA ‐‐ 0505

UAA UAA ‐‐ 0101

Afcons Project

Page 5: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

SITE LAYOUT OF THE PROJECT

AA 01UAA 01

UAA 05UAA 05

Page 6: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

EPBM EPBM –– Main BodyMain Body

20# shove rams

Page 7: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Transportation of TBM From Port to Site

Page 8: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

View of EOT at Washermanpet

Page 9: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Tail Skin Lowering for TBM 718 at Shenoy Nagar Station

Page 10: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Front & middle Shields ready for lowering into Shaft 

Page 11: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

TBM AssemblyTBM Assembly

Page 12: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Trial of Muck Tilting Divice

Page 13: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

VIEW OF 1ST TUNNEL ‐ SHENOY NAGAR STATION

Page 14: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

View of Twin Tunnel

Page 15: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Casting shed & View of Commissioned Moulds 

Page 16: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Segment casting at casting Yard Segment casting at casting Yard 

Page 17: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

View of Segment  stacking 

Page 18: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Cutter Head / Cutting ToolsCutter Head / Cutting Tools

Page 19: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Sample TBM Data RecordSample TBM Data Record

Types of reports/records

•TBM Steering & alignmentTBM Steering & alignment

•TBM Excavation volume control

•Tunnel grouting records

•Ring survey & orientation recordRing survey & orientation record

•Ring build record (steps, cracks, 

damage etc)

•TBM Operational Data recordp

Page 20: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Typical Soil Profile  Typical Soil Profile  ‐‐ Packages 05Packages 05

Page 21: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Typical Mixed Soil Profile  Typical Mixed Soil Profile  ‐‐ Packages 01Packages 01

GroundGround LevelLevel :: ++22..855855

RoofRoof TopTop levellevel :: --00..420420

ConcourseConcourse LevelLevel :: --66..420420

BaseBase SlabSlab LevelLevel :: --1414..135135

DD--WallWall TipTip levellevel :: --2424..600600

Page 22: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Mixed GroundMixed Ground

Page 23: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Typical Rock Soil Profile  Typical Rock Soil Profile  ‐‐ Packages 01Packages 01

Page 24: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Soil ProfileSoil Profile‐‐Mannadi StationMannadi Station

Project UAA 01

Page 25: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Soil ProfileSoil Profile‐‐ Chennai Central StationChennai Central Station

Project UAA 01

Page 26: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Core DetailsCore Details

Page 27: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Surface Constraints

Saint Andrew’s ChurchSHIFTING OF MONUMENT AT RIPPON

BUILDING AREA

Page 28: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

High Court Mannadi

Page 29: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Surface Constraint Chennai Central

Page 30: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

SHC Shaft

Surface Constraint Chennai Central

Page 31: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Surface Constraint ‐Egmore

Page 32: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Surface Constraint - Railway tracks on the stretch High Court –Chennai Central and geological Profile

Page 33: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)
Page 34: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Surface Constrain - Railway tracks on the stretch Chennai Central ‐Mayday Park Tunnel

Page 35: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

View of  Locomotive ‐Mayday ParkView of  Locomotive  Mayday Park

Tunnelling beneath Coovam River

Under Coovam River

Page 36: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

100%

TYPICAL   GEOLOGICAL   PROFILE    VARIATION

60%

80%

100%

age

W1 W2 W3 W4Expected

20%

40%

Perce

nt

0%

4842

.0133

4847

4862

.9

4880

4891

4903

4910.4

4915

4923

4934

4940

4951

4956

4967

4977

4992

Chainage

60%

80%

100%

entage

Actual Profile

0%

20%

40%

3 7 9 0 1 3 4 5 3 4 0 1 6 7 7 2

Perce

4842

.0133

4847

4862

.9

4880

4891

4903

4910.4

4915

4923

4934

4940

4951

4956

4967

4977

4992

Chainage W1‐Fresh Rock W2‐Slightly weathered  Rock 

W3‐M Weathered RockW4‐ Highly Weathered Rock

Page 37: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Geological Variation Results:Cutter Consumption & Frequency of Intervention

Page 38: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

TBM retrieval in wet condition

Page 39: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

CHENNAI CENTRAL (Overlapping of Two Corridor)(Overlapping of Two Corridor)

Page 40: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Retrieval Shaft  at SCC ‐Mayday Park Tunnel

Page 41: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Obstacles during Tunnel OperationObstacles during Tunnel Operation

Ground Level

CL

Red Zone O

raZon

Gr

Zone

 

L

TUNNEL A

ange ne

reen ZoneGreen Z

Orang

e Zo

ne

TUNNEL BA B

1.0 mt 1.0 mt

Bore well influence 1mt from Extrados of TunnelBore well influence 1mt from Extrados of TunnelBore well influence 1mt from Extrados of Tunnel Bore well influence 1mt from Extrados of Tunnel SegmentSegment

Page 42: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Obstacles during Tunnel OperationObstacles during Tunnel Operation

UAA 01

NO. OF EXISTING WELLS IN DIFFERENT ZONES: UAA01

UAA 01

Project

RED ZONE  (11.355 m. f T l

ORANGE ZONE (5.15 m. from RED 

GREEN ZONE    ( 4.5 m. from 

TOTAL R + O + G

Projectfrom Tunnel 

CL)

(5. 5 m. from RZONE)

( 4.5 m. fromORANGE ZONE)

G

Package 01 304 98 90 492g

Package 0561 24 60 145

Total 365 122 150 637Total 365 122 150 637

Page 43: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

BUILDING CONDITION SURVEY

BUILDING CONDITION SURVEY

Page 44: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

TUNNELLING PERFORMANCETUNNELLING PERFORMANCEThe TBMS are normally operated on a 24 hr basis, working 2 shifts per day.p yThe following main results have been achieved:

Average Daily Production:.12 ..Rings =16.8 mBest Day(09/02/2013): 39rings=54 6 mBest Day(09/02/2013): 39rings=54.6 mBest week(04/02/2013 to 09/02/2013): 139 rings=182 mBest Month ( Oct 2013): 525 rings= 735 m

We have achieved 39 Rings Boring in a day first time in the World

Considering that all the 5 TBMs have been operated in a very sensitive urban environment, almost always in closed mode, these results can be regarded as very positive and above the usual standard.

Page 45: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Heave pressure verification

3 50

4.00

4.50

5.00

2.00

2.50

3.00

3.50

ress

ures

(bar

)

0.50

1.00

1.50

Pr

Cohesive material0.00

0+22

00+

260

0+30

00+

340

0+38

00+

420

0+46

00+

500

0+54

00+

580

0+62

00+

660

0+70

00+

740

0+78

00+

820

0+86

00+

900

0+94

00+

980

1+02

01+

060

1+10

01+

140

1+18

01+

220

1+26

01+

300

1+34

01+

380

1+42

01+

460

1+50

01+

540

1+58

0

CHAINAGE

Cohesive material

Heave pressure (by Jancsez th.) Recommended Max. Pressure

Page 46: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Recommended EPB pressure and G t I j ti  P  Grout Injection Pressure 

3.00

2.00

2.50

ar)

1 00

1.50

Pres

sure

s (b

0.50

1.00

0.00

1+58

0

1+62

0

1+66

0

1+70

0

1+74

0

1+78

0

1+82

0

1+86

0

1+90

0

1+94

0

1+98

0

2+02

0

2+06

0

2+10

0

2+14

0

2+18

0

2+22

0

2+26

0

2+30

0

2+34

0

2+38

0

2+42

0

2+46

0

2+50

0

CHAINAGE

Recommended pressure Min.pressure Max.pressure Grout injection system

Page 47: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Earth Pressure Monitoring

1

1.5

2

2.5

3

Pressur

e (b

ar)

0

0.5

1

0 200 400 600 800 1000 1200 1400 1600 1800 2000

Earth P

Ring No. Mannadi Station D'W ll C tti

High Court S i  AD'Wall Cutting Station Area

2.5

3

3.5

ure (b

ar)

0.5

1

1.5

2

Earth Pressu

00 200 400 600 800 1000 1200 1400 1600 1800 2000

Ring No. 

Page 48: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Typical Machining Parameters monitoring

20000

25000

30000

orce

Thrust Force(kN)

22.53

3.5

M

Cutting wheel Rotation (rpm)

0

5000

10000

15000

0 500 1000 1500 2000

Thru

st Fo

00.51

1.52

0 500 1000 1500 2000

RPM

0 500 1000 1500 2000

Ring No. 

0 500 1000 1500 2000

Ring No. 

Torque(MN.m) Advance Speed (mm/Min)

2

2.5

3

3.5

4

que

30

40

50

60

eed(

)mm/M

in.

0

0.5

1

1.5

2

Torq

0

10

20

0 500 1000 1500 2000

Adv

ance Spe

0 500 1000 1500 2000

Ring No. Ring No. 

Page 49: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Operation steps in Mechanized Tunneling Operation steps in Mechanized Tunneling 

Making Launching ShaftA bl   f TBM  i i  Sh fAssembly of TBM Initial DriveMuck Out

Receiving ShaftTunnel Break through Dissemble TBM 

BoringAssembly of LiningGroutingSegment Lining

Close of Launching shaft  upon Completion

Retrieval of TBM to GroundtClose of receiving shaft

Grouting

p p

Segment yardCasting of Segment

Page 50: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Type of TBMType of TBMEPBM‐Mixed Ground Type EPB‐Soft Ground Type

UAA 01Washermanpet to Chennai CentralM f t H k ht

UAA 05Shenoy Nagar to Thirumangalam

Manufacture‐Herrenknecht Manufacture‐Herrenknecht

UAA 01May day Park to Chennai 

EPB‐Rock/Mixed Face

May day Park to Chennai CentralManufacture‐Robbins

Page 51: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

TBM ConfinementTBM Confinement

Page 52: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Breaking Out Through Confinement

Page 53: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

UAA 01Mining Through D  Th h

Interface Tunnel  Interface Tunnel  ‐‐ StationStation

Mining Through Station Trag Through

UAA 01Mining Through Drag Through

Break In Break InBreak Out Break Out

Break In

UAA 05

Break Out

Mining Through h h reak 

hrou

gh

Mining Through Drag Through Drag Through Br Th

Break InBreak InBreak Out Break InBreak Out

Page 54: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

TBM 717  Break In – Anna Nagar  TBM Break In Shenoy Nagar StationTBM 717  Break In  Anna Nagar Tower

TBM Break In‐ Shenoy Nagar Station

Page 55: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

View of 1st Tunnel & TBM 718 ‐ Shenoy Nagar Station

Page 56: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Mining Through StationMining Through Station

Plan

Elevation

Page 57: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

TBM Drag through

Page 58: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

TBM TBM Break throughBreak through717

Page 59: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

718711

711 710717710 711 710717710

Page 60: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

Tunnel Boring Machine SpecificationTunnel Boring Machine Specification

TBM’s Cost of each TBM & backup equipment 33.5CrTBM total weight 290 TExcavation diameter 6.6 mExcavation diameter 6.6 mOverall length 9.7 mElectrical power 940 kW Left & right rotation speed Max 4.57 rpmRam advance speed Max. 80 mm/minRam jacks 32 #Ram jacks 32 #Total advance thrust force 42000 KNEarth pressure sensors 6 #

Page 61: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)

TreatmentTreatmentCross Passage Soil Cross Passage Soil TreatmentTreatment

Page 62: Technical Paper on Chennai Metro Project (Mr Klaus Muenz and Nandan Kumar)