Page 1: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

INTEGRATED CONSTRUCTION SYSTEM

Technical Manual

Page 2: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FOUNDATION

Construction

Panel thk

22 mm pipe for electrical

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation) D.P.C. membrane

Tyvek

Floor panel

Hydro insulation

Utilities

MGO board Wall panel

Screw nails according calculation but no more than 150 mm

Bottom plate (wooden)

Screw nails according calculation

End panel connector thk 45 mm Green Panel SIP screws

Sealant

45 x195 mm pressured treated wood

D.P.C. membrane

Anchor bolt Up lift element

(tie down element)

DETAIL NAME: SIP WALL/ SIP FLOOR SCALE: Not aplicable

DETAIL 01 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 3: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FOUNDATIONS

Construction

Panel thk

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation) D.P.C. membrane

Tyvek

Floor panel

Hydro insulation

MGO board

Wall panel

Screw nails according calculation but no more than 150 mm

Bottom plate (wooden)

Screw nails according calculation

End panel connector thk 45 mm

Green Panel SIP screws Sealant

45 x195 mm pressured treated wood

D.P.C. membrane

Anchor bolt

DETAIL NAME: SIP WALL/ SIP FLOOR

INTEGRATED CONSTRUCTION SYSTEM

SCALE:Not aplicable DETAIL 02

LAST UPDATE: 13 August 2014

Page 4: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FOUNDATIONS

Construction

Panel thk

22 mm pipe for electrical

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation) D.P.C. membrane

Floor joist (perpendicular to wall)

Tyvek

Hydro insulation

MGO board Wall panel

Screw nails according calculation but no more than 150 mm

Bottom plate (wooden)

Screw nails according calculation

Blocking connector thk 45 mm

Thermal insulation

Sealant

45 x195 mm pressured treated wood

D.P.C. membrane

Anchor bolt Up lift element

(tie down element)

DETAIL NAME: SIP WALL/ SIP FLOOR SCALE: Not aplicable

DETAIL 03 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 5: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FOUNDATIONS

Construction Panel thk

Acoustic

22 mm pipe for electrical

Gypsum board/ MGO board

Floor support material Aerated concrete (acoustic insulation) D.P.C. membrane

Floor joist

Green Panel SIP screws

Min. 5 cm bearing

MGO board

Tyvek

Wall panel

Two rows attached or per local code Bottom plate (wooden)

Sealant

Screw nails according calculation

45 x195 mm pressured treated wood

D.P.C. membrane

Anchor bolt

DETAIL NAME: SIP DROOP WALL/ SIP FLOOR SCALE: Not aplicable

DETAIL 04 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 6: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Panel thk

MGO board

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Wall panel

Screw nails according calculation but no more than150 mm

Screw nails according calculation

Bottom plate (wooden)

Sealant

End panel connector thk 45 mm

Green Panel S.I.P. screws

45 x 195 mm pressured treated wood

Floor panel

Tyvek

DETAIL NAME: SIP WALL/ SIP FLOOR/ STEEL BEAM SCALE: Not aplicable

DETAIL 5 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 7: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Panel thk

20 mm pipe for electrical Wall panel horizontal chase centered Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation) Screw nails according calculation D.P.C. membrane Sealant

Bottom plate (wooden)

End panel connector

Floor Joist/ Posi-Joist/ I-Joist Header wrap (if required) (perpendicular to wall) Screws nails according calculation

Extension top plate (wooden)

Top plate (wooden)

Gypsum board/ MGO board Screws nails according calculation but not less than 50 mm

Sealant

DETAIL NAME:

SCALE: Not aplicable DETAIL 6

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

SIP WALL/ FLOOR/ JOIST PARALLEL

Page 8: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Utilities

Panel thk

Wall panel 20 mm pipe for electrical horizontal chase centered

Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation) D.P.C. membrane

Floor Joist/ Posi Joist/ I-Joist (perpendicular to wall)

Top plate (wooden)

Gypsum board/ MGO board

Green Panel approved sealant at locations shown Screw nails according calculation

Bottom plate (wooden)

End panel connector Header wrap (if required)

Screws nails according calculation Extension top plate (wooden)

Screws nails according calculation but not less than 50 mm Green Panel approved

sealant at locations shown

DETAIL NAME:

SCALE: Not aplicable DETAIL 7

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

SIP WALL/ FLOOR/ JOIST PARALLEL

Page 9: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Panel thk

Gypsum board/ MGO board

Green Panel S.I.P. screw according calculation

Bottom plate (wooden)

End panel connector (wooden)

Green Panel screw nails according calculation Green Panel S.I.P. screw

according calculation

Green Panel screw nails according calculation

Alternative top plate O.S.B. board (wooden)

Gypsum board/ MGO board

DETAIL NAME: SIP WALL CORNER SCALE: Not aplicable

DETAIL 8 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 10: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Panel thk

Gypsum board/ MGO board

Green Panel S.I.P. systeml

End panel connector

Rockwool insulation

Structural partition wall

Gypsum board/ MGO board

O.S.B.

P.I.R. foam

Green Panel S.I.P. screw

DETAIL NAME:

SCALE: Not aplicable DETAIL 9

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 11: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Panel thk

Gypsum board/ Green Panel S.I.P. system MGO board

Gypsum board/ MGO board

Galvanized metal angle 37.5 x 0.4 mm Galvanized metal plate

75 x 0.4 mm

Gypsum board/ MGO board 3,6,9 mm

P.I.R. foam

Green Panel D.I.P. system non structural wall

DETAIL NAME:

SCALE: Not aplicable DETAIL 10

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 12: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Green Panel SIP screw

Roof panel

Galvanized metallic angle 37.5 x 0.4 mm Wall panel

Gypsum board/ MGO board

Screw nails according calculations

End panel connector 45 mm

Top plate (wooden)

P.I.R. foam

O.S.B.

Screw nails according calculations

Panel thk

DETAIL NAME:

SCALE: Not aplicable DETAIL 11

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 13: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

2 cm

Joint wood plate

Screw nails according calculations

Panel edge sealant at roof panels only

Joint wood plate

Green Panel approved sealant at location shown Gypsum board/ MGO board

Green Panel approved panel Screw nails according seal tape at roof panels only

calculations

DETAIL NAME: SIP JOINT/ SINGLE LUMBER SPLINE SCALE: Not aplicable

DETAIL 12 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 14: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

2 cm SIP joint element

Panel edge sealant at roof panels only

Screw nails according Spline attached full round head calculations smooth shank nails both sides

Gypsum board/ MGO board Screw nails according calculations

Green Panel approved sealant at location shown

Green Panel galvanized metallic plate

DETAIL NAME: SIP JOINT/ SPLINE SCALE: Not aplicable

DETAIL 13 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 15: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Screw nails according calculations

SIP panel

Joint wood plate

Screw nails according calculations

Gypsum board/ MGO board

Panel edge sealant at roof panels only

Joint wood plate

Green Panel approved sealant at location shown Green Panel approved panel seal tape at roof panels only

DETAIL NAME: SIP JOINT/ SINGLE 4 X LUMBER SPLINE

SCALE: Not aplicable DETAIL 14

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 16: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Top plate (wooden)

Green Panel screw nails according calculations

B B

2 x lintel plate (wooden)

Green Panel screw nails according calculations

2 x blocking

Panel thk

A A

End panel top plate 45mm

Green Panel approved sealant at location shown

B B

DETAIL NAME: SMALL OPENING INSIDE PANEL

SCALE: Not aplicable DETAIL 15

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 17: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Top plate (wooden)

Screw nails according calculations

ΚΟΡΥΦΗΣ

O.S.B. board

P.I.R. foam

Screw nails according calculations Bottom plate (wooden)

Panel thk

Bottom plate (wooden)

DETAIL NAME:

SCALE: Not aplicable DETAIL 16

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

SIP WALL/ ROOF/ RAKE

Page 18: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Gypsum board

O.S.B.

P.I.R. foam

Floor support material Aerated concrete (acoustic insulation) D.P.C. membrane

Solid Beam (for support andconnections see Detail no. 48 - Floors chapter)

Screw nails according calculations

Screw nails according calculations

S.I.P. system

Panel thk

DETAIL NAME:

SCALE: Not aplicable DETAIL 17

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 19: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Screw nails according calculations

Green Panel S.I.P. system

P.I.R. foam

O.S.B.

Panel joint wood plate 45 x 90 mm

Bottom plate 45 x 90 mm

DETAIL NAME:

SCALE: Not aplicable DETAIL 18

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 20: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Screw nails according calculations

Green Panel S.I.P. system

Panel joint wood plate 90 x 90 mm

Bottom plate 45 x 90 mm

DETAIL NAME:

SCALE: Not aplicable DETAIL 19

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 21: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Screw nails according calculations

Hangers 600 mm

DETAIL A

DETAIL A

Green Panel S.I.P. system

Panel joint wood plate

4 x 7.5/ 200

Bottom plate 45 x 90 mm

Hangers

DETAIL NAME:

SCALE: Not aplicable DETAIL 20

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 22: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Lintel wood plate 2 pieces of 45 x 90 mm

Green Panel S.I.P system

Bottom plate

Green Panel S.I.P. system

Lintel structure for openings more than 2.80m according engineering calculations

45x90mm

45x90

DETAIL NAME:

SCALE: Not aplicable DETAIL 21

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 23: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Continue lintel wood plate 2 pieces of 38 x 89 mm

DETAIL NAME:

SCALE: Not aplicable DETAIL 22

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 24: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

DETAIL NAME:

SCALE: Not aplicable DETAIL 23

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 25: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Fire

S.I.P. system, roof panel S.I.P. system, roof panel

LAST FLOOR, ap. 1 LAST FLOOR, ap. 2 S.I.P. system, wall panel Fire protection Gyproc 50 mm

Floor support material Aerated concrete (acoustic insulation) D.P.C. membrane

Wood beam Rockwool

Gypsum board/ MGO board S.I.P. system, wall panel

FIRST FLOOR, ap. 1

Floor support material Aerated concrete (acoustic insulation) D.P.C. membrane

Floor support material Aerated concrete

(acoustic insulation) D.P.C. membrane

O.S.B

Rockwool I beam wood + O.S.B.

Fire protection Gyproc 50 mm

S.I.P. system, wall panel

FIRST FLOOR, ap. 2

Floor support material Aerated concrete (acoustic insulation)

D.P.C. membrane

Wood beam ROCKWOOL Rockwool

O.S.B Gypsum board/ MGO board

I beam wood+O.S.B. O.S.B S.I.P. system, wall panel

Gypsum board/ MGO board

Fire protection Gyproc 50 mm GROUND FLOOR, ap. 1 GROUND FLOOR, ap. 2

S.I.P. system, wall panel

Floor support material Floor support material Aerated concrete Aerated concrete (acoustic insulation) (acoustic insulation) D.P.C. membrane D.P.C. membrane

DETAIL NAME:

SCALE: Not aplicable DETAIL 24

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 26: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Fire

Floor support material

Aerated concrete (acoustic insulation) D.P.C. membrane

DETAIL NAME:

SCALE: Not aplicable DETAIL 25

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 27: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Fire

Sound absorption tape

Beam Beam O.S.B. 12 mm for Rockwool 30 mm insulation support

Rockwool 30 mm S.I.P. panel GAP, 12 mm

DETAIL NAME:

SCALE: Not aplicable DETAIL 26

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 28: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Screw nail types

DETAIL NAME: GREEN PANEL SCREW NAIL TYPES SCALE: Not aplicable

DETAIL 27 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 29: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

0.35 0.30 0.70 0.80 0.55 0.60 1.25 1.25 0.80 1.25 1.05 1.25

B2 B6 B11

B1 B4 B5 B8 B9 B10 B12 B13 B14

B3 B7

CUTTING LIST

DETAIL NAME: CUTTING LIST SCALE: Not aplicable

DETAIL 28 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 30: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Lintel plate 45 x 90 mm

Lateral plate Lateral plate 45 x 90 mm 45x90mm

Base plate 45 x 90 mm

NOTE! If the window opening more then 60 x 60 cm, structural frame is needed.

DETAIL NAME:

SCALE: Not aplicable DETAIL 29

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 31: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Lintel plate 45 x 90 mm

Lateral plate 45x90mm

Lateral plate 45 x 90 mm

NOTE! If the window opening position has in top of the panel less then 60cm, it needs engineering calculations; for more than 60x60cm, it needs structural frame

Base plate 45 x 90 mm

DETAIL NAME:

SCALE: Not aplicable DETAIL 30

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 32: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Top plate 45 x 90 mm

End panel plate 45 x 90 x 2665

Bottom plate 45 x 90 mm

Joint panel plate 90 x 90 x 2665

End panel plate 45 x 90 x 2665 VIEW

Joint panel plate 90 x 90 x 2665

PLAN

DETAIL NAME:

SCALE: Not aplicable DETAIL 31

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 33: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Acoustic

Rafter

Rockwool

Purlin Extension plate Top plate

S.I.P. system

Gypsum board/ MGO board

Lintel

Top plate

13

300

112 50100 20

Tyvek Wood slate

Roof tile

Fascia board

Wood eave board

Brick Rendering

Window

Lintel

Brick

DETAIL NAME:

SCALE: Not aplicable DETAIL 32

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 34: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Acoustic

Fire

Gypsum board/ MGO board O.S.B.

Acoustic slide concrete O.S.B. Rockwool Plastic profile S.I.P. panel

Steam barrier Rockwool O.S.B. Gypsum board/ MGO board

O.S.B.

S.I.P. system

TOP VIEW

Brick/ concrete

Fire protection, Gyproc 50 mm

End panel plate (wooden)

Fire protection, Gyproc 50 mm Screw nails according

calculations

End panel plate (wooden)

Brick/ concrete

P.I.R. foam

O.S.B.

DETAIL NAME:

SCALE: Not aplicable DETAIL 33

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 35: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Thermal insulation

O.S.B.

S.I.P. system

Pressured treated wood Bottom plate (wooden)

O.S.B.

P.I.R. foam

Foam edging strip

Foam edging strip

Under floor heating

Anchor bold

DETAIL NAME:

SCALE: Not aplicable DETAIL 34

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 36: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Fire

Thermal insulation

Brick/ concrete APARTMENT 1 Gypsum board/ MGO board

Tyvek O.S.B.

O.S.B. P.I.R. foam

Fire protection, Gyproc 50 mm

Fire protection, Gyproc 50 mm Screw nails according

calculations S.I.P. system

Tyvek Double gypsum board/

MGO board Gypsum board/

APARTMENT 2 MGO board

DETAIL NAME:

SCALE: Not aplicable DETAIL 35

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 37: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Fire

Thermal insulation

Finished brick

Tyvek

Brick fixing system

Screw nails according O.S.B.

Wood beam

Rockwool

Gypsum board/ MGO board O.S.B.

P.I.R. foam

calculation Fire protection,

Gyproc 50 mm Up lift element (wooden)

Extension plate (wooden)

Top plate (wooden)

Screw nails according calculation

O.S.B.

DETAIL NAME:

SCALE: Not aplicable DETAIL 36

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 38: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Fire

Hydro insulation

Chimney

Hydroinsulation

O.S.B.

Fire protection

Roof S.I.P. panel

Gypsum board/ MGO board

5 cm

5 cm

P.I.R. am O.S.B. Gypsum board/

MGO board

DETAIL NAME:

INTEGRATED CONSTRUCTION SYSTEM

SCALE:Not aplicable DETAIL 37

LAST UPDATE:13 August 2014

Page 39: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Concrete box

Fire protection

Fire place - structure

S.I.P. system, wall panel End panel connector (wooden) FIRE PLACE Stone mask TOP VIEW

S.I.P. system

Fire protection

Fire place concrete

Fire

Hydro insulation

Chimney

Fire place concrete structure

Fire protection

Fire place concrete structure

Gypsum board/ MGO board

S.I.P. system

SECTION

structure

Concrete base

DETAIL NAME:

SCALE: Not aplicable DETAIL 38

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 40: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Utilities

S.I.P. system End panel connector

Screw nails according

Utilities pipes

O.S.B.

Wood slate

calculations

End panel connector

P.I.R. foam

O.S.B.

S.I.P. system

DETAIL NAME:

SCALE: Not aplicable DETAIL 39

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 41: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Acoustic

Utilities

Finishing material

Base concrete

O.S.B.

Top plate (wooden)

Screw nails according calculations

Anchor bold

Utilities pipe

P.I.R. foam

O.S.B.

Gypsum board/ MGO board

Plinth

Floor tiles

Concrete slab

Tyvek

Base concrete

DETAIL NAME:

SCALE: Not aplicable DETAIL 40

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 42: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

WALLS

Construction

Utilities

M.G.O. board

O.S.B. Utilities pipe

P.I.R. foam

Gypsum board/ MGO board

O.S.B. Plinth

Top plate (wooden)

Screw nails according calculations

Anchor bold

Floor tiles

Concrete slab

Tyvek

Base concrete

DETAIL NAME:

SCALE: Not aplicable DETAIL 41

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 43: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FLOORS

Construction

Panel thk

20 mm pipe for electrical horizontal chase centered Gypsum board/ MGO board

Floor support material

Aerated concrete (acoustic insulation)

D.P.C. membrane

Acoustic

Hydro insulation

Wall panel

Green Panel approved sealant at locations shown Bottom plate (wooden)

Screw nails according calculation

End panel connector

Floor Joist/ Posi-Joist/ I-joist (perpendicular to wall) Header wrap (if required)

Extension top plate (wooden)

Screws nails according calculation Gypsum board/ MGO board Top plate (wooden)

but not less than 50 mm Screws nails according calculation

Green Panel approved sealant at locations shown

DETAIL NAME: SIP WALL/ FLOOR/ JOIST PARALLEL SCALE: Not aplicable

DETAIL 42 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 44: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FLOORS

Construction

Utilities Panel thk

Hydro insulation

20 mm pipe for electrical horizontal chase centered

Gypsum board/ MGO board Wall panel

Floor support material Bottom plate (wooden)

Aerated concrete (acoustic insulation) D.P.C. membrane

Wood and O.S.B. joist

Top plate (wooden)

Gypsum board/ MGO board

Screw nails according calculation

Green Panel approved sealant at locations shown

End panel connector 45 mm

D.P.C. membrane

Height extension top plate

Green Panel approved sealant at locations shown Screw nails according calculation

DETAIL NAME: SIP WALL/FLOOR/ JOIST PARALLEL SCALE: Not aplicable

DETAIL 43 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 45: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FLOORS

Construction

100 mm

S.I.P. wall

D.I.P. system nonstructural wall

Gypsum board/ MGO board 3,6,9 mm

P.I.R. foam

S.I.P. wall Galvanized metal angle 37.5 x 0.4 mm

45 x 195 mm pressured treated wood

Floor support material D.P.C. membrane

Aerated concrete (acoustic insulation) Anchor bolt D.P.C. membrane

Floor panel

Tyvek

DETAIL NAME:

SCALE: Not aplicable DETAIL 44

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 46: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FLOORS

Construction

Acoustic

Screw nails O.S.B. floor support

“I” type beam Green Panel

according calculations

Acoustic absorption tape

Top plate 2 plies x 45mm x 90 mm

Hanger as per calculation

S.I.P. system Green Panel

DETAIL NAME:

SCALE: Not aplicable DETAIL 45

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 47: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FLOORS

Construction

Acoustic

Screw nails according calculations

Acoustic absorption tape

O.S.B. floor support

Screw nails according calculations Top plate

2 plies x 45mm x 90 mm

Beam

S.I.P. system Green Panel

DETAIL NAME:

SCALE: Not aplicable DETAIL 46

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 48: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FLOORS

Construction

O.S.B. O.S.B.

Top plate Wood beam 45 x 90 mm

P.I.R. foam

S.I.P. panel Hanger as per calculation

DETAIL NAME:

SCALE: Not aplicable DETAIL 47

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 49: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FLOORS

Construction

Acoustic

Fire Gypsum board/ MGO board

Aerated concrete (acoustic insulation)

O.S.B. 18 mm

Rockwool 50 mm

Plastic profile

Beam Double gypsum board/ MGO board Gypsum board/ MGO board

O.S.B.

Concrete

Fire protection Gyproc 50 mm

Bottom plate (wooden)

End panel connector

Gyproc 50 mm

Screw nails according calculations

S.I.P. system

P.I.R foam

Tyvek

O.S.B.

DETAIL NAME:

SCALE: Not aplicable DETAIL 48

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 50: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FLOORS

Construction

Acoustic

Gypsum board/ MGO board

Brick/ concrete

O.S.B.

P.I.R. foam

Bottom plate (wooden)

Up lift element

Screw nails according calculations Extension plate(wooden)

Top plate (wooden)

O.S.B.

Screw nails according calculations

Rockwool

Wood beam

O.S.B.

Gypsum board/ MGO board

Screw nails according calculations

S.I.P. system

DETAIL NAME:

SCALE: Not aplicable DETAIL 49

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 51: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

FLOORS

Construction

O.S.B. Utilities pipe

P.I.R. foam

Metallic profile

Bottom plate (wooden)

Screw nails according calculations End beam connector (wooden)

O.S.B.

Gypsum board/ MGO board

Aerated concrete (acoustic insulation)

O.S.B.

Wood beam

Double gypsum board or other approved thermal barrier

P.I.R. foam

DETAIL NAME:

SCALE: Not aplicable DETAIL 50

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 52: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

ROOF

Construction

Green Panel screw nails according calculation

Green Panel approved sealant at locations shown

S.I.P. roof panel

Gypsum board/ MGO board

Beveled lumber attached, full round head smooth shank nails both sides

10d nails two rows staggered or per local code

O.S.B. panel

P.I.R. foam

O.S.B. panel

DETAIL NAME: SIP WALL ANGLED CORNER SCALE: Not aplicable

DETAIL 51 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 53: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

ROOF

Construction

O.S.B. panel

Roof panel S.I.P. system

Green Panel screw

P.I.R. foam

Gypsum board/ MGO board Green Panel approved galvanized metal angle SILI top plate

Screw nail according calculations

Wall panel S.I.P. system

Gypsum board or other approved thermal barrier

P.I.R. foam

O.S.B. panel

Screw nails according calculations

End panel plate

Green Panel approved sealant at locations shown

Panel thk

DETAIL NAME: SIP WALL/ ROOF/ PLUMB CUT EAVE SCALE: Not aplicable

DETAIL 52 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 54: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

ROOF

Construction

Pre-engineered wood trusses

Screw nails according calculations

Galvanized metallic plate for joint pieces with nails

Galvanized metallic plate for joint pieces with nails

Wood beam/ joist

Gypsum board / MGO board

Height extension top plate (wooden)

Green Panel screw nails Top plate according calculations

(wooden) 45 mm Wall panel S.I.P. system

Panel thk

DETAIL NAME: SIP WALL/ PRE-ENGINEERED WOOD TRUSSES SCALE: Not aplicable

DETAIL 53 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 55: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

ROOF

Construction

Panel edge sealant End panel connector 45 mm

Green Panel approved sealant at locations shown

O.S.B.

Galvanized metallic profile

Gypsum board or other Green Panel S.I.P. screw approved thermal barrier Min. 5 cm bearing

Ridge beam

DETAIL NAME: SIP ROOF/ RIDGE BEAM/ RIDGE PLATES SCALE: Not aplicable

DETAIL 54 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 56: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

ROOF

Construction

1 cm min.

Panel edge sealant

Two part polyurethane Green Panel screw foam sealant

O.S.B.

Galvanized metallic profile

Gypsum board/ MGO board

Min. 5 cm bearing

Ridge beam

DETAIL NAME: SIP ROOF/ RIDGE BEAM/ TWO PART FOAM SCALE: Not aplicable

DETAIL 55 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 57: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

ROOF

Construction

End panel connector 45mm

Screw nails according calculation Panel edge sealant

O.S.B.

Gypsum board/ MGO board Min. 5 cm bearing Ridge beam

Green Panel S.I.P. screw

Green Panel approved sealant at locations shown

Galvanized metallic profile

DETAIL NAME: SIP ROOF/ RIDGE BEAM/ OVERLAY

SCALE: Not aplicable DETAIL 56

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 58: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

ROOF

Construction

Panel edge sealant

O.S.B.

Gypsum Board/ MGO board

Green Panel galvanized metallic angle

Green Panel approved two part polyurethane foam sealant

Green Panel S.I.P. screw

Valley beam (min. 5 cm bearing each panel)

DETAIL NAME: SIP ROOF/ VALLEY BEAM/ TWO PART FOAM

SCALE: Not aplicable DETAIL 57

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 59: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

ROOF

Construction

Green Panel approved two O.S.B. surface spline attached part polyurethane foam sealant full round head smooth shank nails top side Screw nails according calculation

Gypsum board/ MGO board Green Panel approved panel O.S.B. seal tape at roof panels only

Panel edge sealant Beam

Green Panel S.I.P. screws

DETAIL NAME: SIP JOINT/ BEAM/ OSB SURFACE SPLINE

SCALE: Not aplicable DETAIL 58

INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 60: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

ROOF

Construction

Green Panel S.I.P. screws

Gypsum board/MGO board

O.S.B.

Beam

DETAIL NAME: SIP PANEL/ INTERMEDIATE BEAM SCALE: Not aplicable

DETAIL 59 INTEGRATED CONSTRUCTION SYSTEM LAST UPDATE: 13 August 2014

Page 61: Technical Manual - GREEN · PDF fileTechnical Manual . FOUNDATION Construction . Panel thk . 22 mm pipe for electrical ... Screw nails according calculation End panel connector thk

Factory: Innovation Business Park,

Gladiolelor FN, Compartment B12, Clinceni, Ilfov, Romania, 077090 Tel.: +40 (21) 369.30.73 Fax: +40 (21) 369.30.72

Offices: The Grand Complex, 7th Floor Office 7.01

90 Calea 13 Septembrie 5th district Bucharest, Romania, 050726

[email protected] www.green-panel.eu

INTEGRATED CONSTRUCTION SYSTEM