Technical Bulletin - BEKA Schréder Foundations.pdf · This Technical Bulletin shall assist our...

6
CO Th fou Th M Ty B 01 C M B dr Ple ad W rec co Joh ON his T und he c Mou ype BEKA 11 Conc Max Bend raw eas djus We w com ond han NCR Tec dat calc W A P D D unti e of A dr cret x So ding wing se n sted wish mm ditio nn RET chn tion 6m 8m 10 12 cula Win A sa Pol Des Des ing f Ba raw te B oil Pr g Sc g: note d to h to men ons Sch TE nica ns f m M m M 0m 2m atio nd afe le e sign sign Hei ase P wing Base ress che e th o th o st nd t s on hler FO al Bu for Mou Mou Mo Mo ons spe ety equ ned ns a ight Plat g No e di sur edul hat he c tate tha n sit ritz OUN ulle GR unt unt oun oun s ar eed fac uipp d fo are ts te, o: P ime re le o t th calc e to at fi te. zko ND etin RP o ting ting ntin ntin e b d of ctor ped or M e ba as p PDP ensi on he b cul o ou inal DAT n sh or s g He g He ng H ng H base f 40 r of d wi Max ased per P-00 ions bolt late ur c l ca TIO hall stee eig eig Hei Hei ed o 0m/ f 1.5 ith xim d o r 03- s t le ed c clie alcu ON l as el p ght ght ight ight on /s f 5 a tw mum on lo engt con ents ulat NS ssis pole t t the for agai wo lu m So oca m m k ths ncre s th tion st ou es o e fo Cla inst um oil atio m mm kPa s on ete hat ns, ur c of t ollo ass t ov mina Pre ons n dr e ba the bas cus the owi B T ver aire essu s of 85 P0 S raw ase ese sed stom fol ing Ter rtur es, h ure 30 50*8 0001 S-FO wing dim e ca d on me llow de rrain rnin hav es, a 00m 6 F2 850 58 1/JS OOT g PD men alcu n th ers t win esig n C ng w ving as i m ab 0*8 8 S01 OT01 PDP nsi ulat he a to m ng le n c Cate was g a ind bov 850 1/B 1 P-00 ons tion act ma eng crite ego s ap co dica ve s P 03-0 s. ns s tual ake gth eria ory ppl omb ated sea 900 P00 S 011 sha l so the hs: a: 2 lied bine d o a lev F 0*9 8 001 S-FO 1 ar all b oil c T e ri d. ed on th vel 8 F2 900* 86 1/JS OOT re f be u con Te ight lum he l. *90 S01/ T02 for use ndit ec t de min tab 00 /B ind ed a tion ch ecis nair ble 1 P dica as g ns h hn sion re w be 100 P000 S-F atio guid hav ni ns f wind elow 1 F 00* 10 10 01/ FOO on o des ve t ic for nd s w. 10 F2 *100 000 08 /JS0 OT0 onl s on to b ca r th urf 00* 01/B 03 ly a nly be d al he c face * B and and don B cons e ar 1 P0 d sh d w ne f Bu stru rea 1150 1 000 S-F hall we for ull uct a of 12 F3 0*1 115 98 01/J FOO be the let tion f 0.4 2 3 1150 50 8 JS01 OT04 e tin n of 4 m 0* 1/B 4 n f m 2 . B

Transcript of Technical Bulletin - BEKA Schréder Foundations.pdf · This Technical Bulletin shall assist our...

Page 1: Technical Bulletin - BEKA Schréder Foundations.pdf · This Technical Bulletin shall assist our customers to make the right decisions for the construction of foundations for GRP or

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

The calculation

Mounting Heights

Type of Base Plate, as per

BEKA drawing No: PDP

011

Concrete Base dimensions

Max Soil Pressure

Bending Schedule on

drawing:

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

recommend that fi

conditions

Johann Schleritzko

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

The calculation

Mounting Heights

Type of Base Plate, as per

BEKA drawing No: PDP

011

Concrete Base dimensions

Max Soil Pressure

Bending Schedule on

drawing:

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

recommend that fi

conditions

Johann Schleritzko

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

The calculation

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

Designs are based on

Mounting Heights

Type of Base Plate, as per

BEKA drawing No: PDP

Concrete Base dimensions

Max Soil Pressure

Bending Schedule on

drawing:

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

recommend that fi

conditions

Johann Schleritzko

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

6m Mounting Height

8m Mounting Height

10m

12m Mounting Height

The calculation

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

Designs are based on

Mounting Heights

Type of Base Plate, as per

BEKA drawing No: PDP

Concrete Base dimensions

Max Soil Pressure

Bending Schedule on

drawing:

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

recommend that fi

conditions

Johann Schleritzko

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

6m Mounting Height

8m Mounting Height

10m

12m Mounting Height

The calculation

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

Designs are based on

Mounting Heights

Type of Base Plate, as per

BEKA drawing No: PDP

Concrete Base dimensions

Max Soil Pressure

Bending Schedule on

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

recommend that fi

conditions on site.

Johann Schleritzko

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

6m Mounting Height

8m Mounting Height

10m Mounting Height

12m Mounting Height

The calculations are

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

Designs are based on

Mounting Heights

Type of Base Plate, as per

BEKA drawing No: PDP

Concrete Base dimensions

Max Soil Pressure

Bending Schedule on

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

recommend that fi

on site.

Johann Schleritzko

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

6m Mounting Height

8m Mounting Height

Mounting Height

12m Mounting Height

s are

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

Designs are based on

Mounting Heights

Type of Base Plate, as per

BEKA drawing No: PDP

Concrete Base dimensions

Max Soil Pressure

Bending Schedule on

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

recommend that fi

on site.

Johann Schleritzko

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

6m Mounting Height

8m Mounting Height

Mounting Height

12m Mounting Height

s are based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

Designs are based on

Type of Base Plate, as per

BEKA drawing No: PDP

Concrete Base dimensions

Bending Schedule on

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

recommend that final calculations

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

6m Mounting Height

8m Mounting Height

Mounting Height

12m Mounting Height

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

Designs are based on

Type of Base Plate, as per

BEKA drawing No: PDP-003

Concrete Base dimensions

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

nal calculations

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

6m Mounting Height

8m Mounting Height

Mounting Height

12m Mounting Height

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

Designs are based on

Type of Base Plate, as per

003-

Concrete Base dimensions

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

nal calculations

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

6m Mounting Height

8m Mounting Height

Mounting Height

12m Mounting Height

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

Designs are based on locations of 300m above sea level.

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

nal calculations

CONCRETE FOUNDATIONS

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

Mounting Height

12m Mounting Height

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

m

mm

kPa

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

nal calculations

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

m

mm

kPa

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

nal calculations, based on the actual soil conditions

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

850*850*850

P0001/JS01/B

S

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

850*850*850

P0001/JS01/B

S-FOOT01

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

6

F2

850*850*850

58

P0001/JS01/B

FOOT01

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

850*850*850

58

P0001/JS01/B

FOOT01

Please note that the bolt lengths on drawing PDP

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

850*850*850

P0001/JS01/B

FOOT01

Please note that the bolt lengths on drawing PDP-003

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

P0001/JS01/B

003-011 are for indication only and shall be

adjusted to the calculated concrete base dimensions.

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combin

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

900*900*900

P0001/JS01/B

S

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

foundations for GRP or steel poles of the following lengths:

based on the following design criteria:

Wind speed of 40m/s for Class B Terrain Category 2

A safety factor of 1.5 against overturning was applied.

Pole equipped with two luminaires, having a combined luminaire wind surface area of 0.4 m

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

F2

900*900*900

86

P0001/JS01/B

S-FOOT02

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

A safety factor of 1.5 against overturning was applied.

ed luminaire wind surface area of 0.4 m

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

8

F2

900*900*900

86

P0001/JS01/B

FOOT02

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

Designed for Maximum Soil Pressures, as indicated on the table

locations of 300m above sea level.

900*900*900

P0001/JS01/B

FOOT02

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

Designed for Maximum Soil Pressures, as indicated on the table

900*900*900

P0001/JS01/B

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

Designed for Maximum Soil Pressures, as indicated on the table

1000*1000*

P0001/JS01/B

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

, based on the actual soil conditions have to be done for

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

below

1000*1000*

P0001/JS01/B

S-FOOT03

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

have to be done for

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

below

10

F2

1000*1000*

1000

108

P0001/JS01/B

FOOT03

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

have to be done for

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

below.

10

F2

1000*1000*

1000

108

P0001/JS01/B

FOOT03

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

have to be done for

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

1000*1000*

P0001/JS01/B

FOOT03

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

have to be done for

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

1000*1000*

P0001/JS01/B

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

have to be done for

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

1150*1150*

P0001/JS01/B

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

have to be done for

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

1150*1150*

1150

P0001/JS01/B

S-FOOT04

011 are for indication only and shall be

We wish to state to our clients that these calculations shall be used as guides only and we

have to be done for

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

12

F3

1150*1150*

1150

98

P0001/JS01/B

FOOT04

011 are for indication only and shall be

have to be done for the

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

12

F3

1150*1150*

1150

98

P0001/JS01/B

FOOT04

011 are for indication only and shall be

the

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m

1150*1150*

P0001/JS01/B

FOOT04

Technical Bulletin

This Technical Bulletin shall assist our customers to make the right decisions for the construction of

ed luminaire wind surface area of 0.4 m2.

P0001/JS01/B

Page 2: Technical Bulletin - BEKA Schréder Foundations.pdf · This Technical Bulletin shall assist our customers to make the right decisions for the construction of foundations for GRP or
Page 3: Technical Bulletin - BEKA Schréder Foundations.pdf · This Technical Bulletin shall assist our customers to make the right decisions for the construction of foundations for GRP or
Page 4: Technical Bulletin - BEKA Schréder Foundations.pdf · This Technical Bulletin shall assist our customers to make the right decisions for the construction of foundations for GRP or
Page 5: Technical Bulletin - BEKA Schréder Foundations.pdf · This Technical Bulletin shall assist our customers to make the right decisions for the construction of foundations for GRP or
Page 6: Technical Bulletin - BEKA Schréder Foundations.pdf · This Technical Bulletin shall assist our customers to make the right decisions for the construction of foundations for GRP or