Team DEADS: Deer and Elk Automated Deterrent
System
Team: Justin Dick, Ngon Du, Lassen Loop, & Travis TaylorSponsor: Idaho Dept. of Fish and Game/Land OwnersAdvisors: Dr. Brian Johnson & Dr. Richard Wall
OUTLINESystem OverviewProject SpecificationsDesign ReviewBudgetScheduleQuestions
System Overview
Project Specifications
Project Specs: Interface
User selected time operation time.Wireless sensors-cannon communications.
Project Specs: Operation
2 week+ battery life.Detect Deer and Elk at least 200 feet away
from sensors.300 ft sensor-cannon communication range.Sensors communicate to all cannons in range.Random cannon detonation interval.Operate in a variety of terrains & vegetation.
Project Specs: All Weather
Withstand temperatures from -10°F to 120°F in direct sunlight.
Operate in snow and rain.
Project Specs: Size
Sensor:Weigh less than 2 lbs.Smaller than 5”x5”x5” (not including mast).
Control Unit:Weigh less than 5 lbsSmaller than 10”x10”x5”
Project Desirables
InterfaceNetwork select option.On/Off switch
OperationUse existing gas valves with solenoid
modification.
Design Decisions
SensorsCompleted:
Upgraded Whip AntennaModified NEMA IV
EnclosureSturdy Design
Larger and Heavier than Anticipated
To Do:Add Power Switch Incorporate Battery TrayBuild Remaining
Housings
Sensor Modification
Original Sensor/TX Module
Modified Sensor Module Enclosure
Wireless Network Topology
Solenoid and ValveCompleted:
Solenoid Operates Valve
Controlled with MC via H-Bridge
To Do:
Test with pressurized line.
Receiver & ControllerCompleted:
Toggles Solenoid Accepts Trimpot Input
To Do: Add Power Switch Wire to Receiver Add Receiver Input
Activation
Receiver & Controller Operation
Dial Select detonations per
sighting.On/Off SwitchChannel Select
Feature built into Glolabs parts
Controller Network Concept
7 I/O pins required for our design
Performance6654 Successful Detonations
Equivalent to 554 animal sightings (worst case). Better performance using non-generic batteries Recommend lithium AAs
Receiver 1in wider than specified.Still need to calibrate sensors/measure range.
Client QuestionsDetonation vs. Timing SchemeProof of Concept
Using cannon Valve only
Valve position / mountingAdditional LabelingMini-expo Nov 30
Budget / Schedule
Item Type Quantity Shipping Cost Per Unit Budgeted Actual AdditionalParts obtained Glolab
Sensor & Transmitter
KMDT Wireless Motion Detector Transmitter Kit 3 $15.00 $60.00 $225.00 Recurring
Receiver KR4B RECEIVER KIT 1 $9.00 $36.00 $45.00 Non-recurring
Receiver KR4A RECEIVER KIT 1 $12.61 $51.86 $64.47 RecurringAntenna WA418 4 $5.00 $7.00 $48.00 RecurringTotal $382.47 Digikey H-Bridge L293B 2 $1.10 $4.32 $10.84 RecurringVoltage Regulator 497-1441-5-ND 4 $16.40 $0.72 $19.28 Recurring (1)Battery Holders 1295K-ND 3 $9.20 $1.70 $14.30 RecurringTrim Pot P9A1-50K-ND 1 $2.20 $7.14 $9.34 Total $53.76 Parallax
Controller BASIC Stamp 1 Module BS1-IC 1 $7.00 $29.00 $36.00 RecurringDevelopment Board/Kit Basic Stamp 1 Starter Kit 1 $8.00 $79.00 $87.00
Non-recurring
Total $115.00 Kim Controls
Housing(Sensor/Transmitter)
Nema 4 4x4x3 Enclosure BN4040403CH 3 $9.00 $36.25 $135.75 Recurring
Housing(Receiver/Controller/Circuit Board)
Nema 4 4x4x3 Enclosure BN4040403CH 1 $9.00 $36.25 $45.25 Recurring
Total $154.44 Solenoid 1 $0.00 $0.00 $0.00 $0.00 Total $705.67 Available $1,020.23
Remaining ExpensesItem Type Quantity Shipping Cost Per Unit Budgeted Actual AdditionalParts TBD
Batteries AA's 8 $0.50 $4.00 RecurringSensor Battery 9-volt 3 $0.50 $1.50 Recurring
Poster Board 1 $75.00 $75.00 Non-recurring
User Manual 1 $20.00 $20.00 Non-recurring
Circuit Board Setup (Dr. Wall) 1 $155.00 $155.00
Non-recurring
Total $304.50
Overall BudgetTotal Expected Cost
Total Spent $705.67
Available $1020.23
Remaining Budget $314.56
Remaining Expenses $254.50*
*May not reflect additional miscellaneous items.
ScheduleMid-Semester Hardware Review Oct 25Design Report Review Nov 12Design Expo Nov 30 Course Deliverables Due Dec10
Schedule
Questions?