REroute I-70 CorridorHIGHWAYS TO BOULEVARDS: Creating Value In Cities By Design
UNIVERSITY OF COLORADO DENVER Jordan Block, Samantha Danforth, AnaClaudia Magalhaes, Brandon Mcnellis, Jason Newsome, & Jian Tang
![Page 2: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/2.jpg)
REDESIGNATE I-70 ALONG CURRENT I-270 AND I-76 ROUTESthe reroute
DowntownDenver
Boulder
Denver International Airport
MARYLAND
UTAH
![Page 3: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/3.jpg)
why is it important?CONTEXT MAP
![Page 4: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/4.jpg)
why is it important?REGIONAL GROWTH - I-70 EAST DRAFT ENVIRONMENTAL IMPACT STATEMENT
DEVELOPMENTPOPULATION JOBS
New development in Downtown Denver, DIA, Stapleton, and the Gateway Area is expected to increase population by 75% and increase employment by 71% in the region. These values represent build-out conditions projected for 2030.
![Page 5: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/5.jpg)
feasibility
![Page 6: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/6.jpg)
BASELINE ADT - CDOT 2011 ADT
65
135
90
105175
130
125
225
200
160 70
��������� ���������������������������������������� ��������������������������������������congestion, road delays, and safety problems.
*numbers in thousands
![Page 7: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/7.jpg)
110
170
125
125250
175
175
275
250
215 100
2011 ADT VS. 2030 ADT PROJECTIONS - CDOT
ADT on I-70 is projected to increase by 20-35% between now and 2030; ADT on I-270 and I-76 is projected to increase by 40-80%.
135
90
105
175
130
125
225
200
160 70
65
*numbers in thousands
2030 ADT
![Page 8: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/8.jpg)
175
175
100
275
250
215
NUMBER 1: REROUTE I-70
9% ������������� � redistributed from the new boulevard to the new I-70 alignment, a 14-20% increase over current I-76 and I-270 ADT.
*numbers in thousands
9% OF TRAFFIC = THROUGH TRAFFIC91% OF TRAFFIC = LOCAL TRAFFICdrcog’s, may 2000
155115170
125
9%
140125
250
125110
redistributing ADT
REDI
STRI
BUTI
ON
![Page 9: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/9.jpg)
NUMBER 2: RE-STITCHING THE NETWORK
*numbers in thousands
ADT along the new boulevard will decrease 30-40%�������������������������������absorbed by an enhanced street network.
8575 155115
30-40%
9%
175
175
100
275
250
215
250
140125
redistributing ADT
REDI
STRI
BUTI
ON
![Page 10: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/10.jpg)
NUMBER 3: IMPROVED OPTIONS
*numbers in thousands
7065 8575
11%
9%
175
175
100
275
250
215
250
140125
30-40%
ADT along the new boulevard will decrease 11%�������������������������������absorbed by enhancing access to transit and other mobility options.
redistributing ADT
REDI
STRI
BUTI
ON
![Page 11: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/11.jpg)
SUMMARY
ADT ON NEW BOULEVARD IS REDUCED BY 50-60%ADT ALONG NEW I-70 ALIGNMENT ONLY INCREASED BY 13-20%
11%
9%
30-40%
redistributing ADT
REDI
STRI
BUTI
ON
![Page 12: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/12.jpg)
SUMMARY
10%
40-50%
10%
30-40%
Through Traffic10%
90%Local Traffic
VSCurrent ADT Composition ADT Distribution ThroughImproved Infrastructure
Current I-70 Denver Blvd
REALIGMENT
STRENGTHEDNETWORK
IMPROVEDOPTIONS
redistributing ADT
![Page 13: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/13.jpg)
objectives
![Page 14: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/14.jpg)
what is our vision?APPROACH
![Page 15: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/15.jpg)
what is our vision?GOALS
![Page 16: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/16.jpg)
what is our vision?STRATEGIES
![Page 17: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/17.jpg)
DESIGN SOLUTIONS CHECKLIST objectives
PREREQUISITES � Designing a city for people
� Enhance region
� Working with existing plans
MOBILITY � ������
� Network
� Connections
� Access
� Choice
ECONOMY � Development
� Access
ENVIRONMENT � Nature
� Health and Safety
PLACE � Experience
� Foster neighborhood identity
� Connect communities
![Page 18: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/18.jpg)
big moves
![Page 19: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/19.jpg)
REDESIGNATE I-70 ALONG CURRENT I-270 AND I-76 ROUTESbig moves
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
York
St
Brigh
ton
Blvd
Vasq
uez B
lvd
Was
hing
ton
St
Peco
s St
Broa
dwaySpeer Pkwy
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvvver Bllvddd
= Rerouted I-70
![Page 20: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/20.jpg)
DESIRED CONNECTIONSbig moves
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
York
St
Brigh
ton
Blvd
Vasq
uez B
lvd
Was
hing
ton
St
Peco
s St
Broa
dwaySpeer Pkwy
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvvver BBllllvvl ddd
= Desired Connections
= Existing Streets
![Page 21: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/21.jpg)
RAIL CONSOLIDATIONbig moves
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
York
St
Brigh
ton
Blvd
Vasq
uez B
lvd
Was
hing
ton
St
Peco
s St
Broa
dwaySpeer Pkwy
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDD nvvver Blllvdddd
= Needing Consolidation
= Existing Rail
![Page 22: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/22.jpg)
RAIL CONSOLIDATIONbig moves
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
York
St
Brigh
ton
Blvd
Vasq
uez B
lvd
Was
hing
ton
St
Peco
s St
Broa
dwaySpeer Pkwy
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDD nvvver Blllvdddd
= Consolidated Rail
= Existing Rail
![Page 23: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/23.jpg)
RELOCATE NATIONAL WESTERN STOCKSHOWbig moves
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
York
St
Brigh
ton
Blvd
Vasq
uez B
lvd
Was
hing
ton
St
Peco
s St
Broa
dwaySpeer Pkwy
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvvver Bllvddd
= Proposed Site
= Existing Stock Show
![Page 24: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/24.jpg)
DEVELOPABLE LANDbig moves
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
York
St
Brigh
ton
Blvd
Vasq
uez B
lvd
Was
hing
ton
St
Peco
s St
Broa
dwaySpeer Pkwy
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvnvver Blvdddddd
= ROW AREA
![Page 25: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/25.jpg)
POTENTIAL DEVELOPMENTbig moves
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
York
St
Brigh
ton
Blvd
Vasq
uez B
lvd
Was
hing
ton
St
Peco
s St
Broa
dwaySpeer Pkwy
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDD nvvver Blllvdddd
= Potential Development
![Page 26: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/26.jpg)
NEW AREAS OF CHANGEbig moves
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
York
St
Brigh
ton
Blvd
Vasq
uez B
lvd
Was
hing
ton
St
Peco
s St
Broa
dwaySpeer Pkwy
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeD nvvver Blllvddddd
= Areas of Change
= Potential Development
![Page 27: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/27.jpg)
CHARACTER AREASbig moves
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
York
St
Brigh
ton
Blvd
Vasq
uez B
lvd
Was
hing
ton
St
Peco
s St
Broa
dwaySpeer Pkwy
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd
Denver Blvd
38th Ave
= East
= West
= Central
= Nodes
![Page 28: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/28.jpg)
design
![Page 29: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/29.jpg)
PROPOSEDsite plan
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
Brigh
ton
Blvd
Was
hing
ton
St
Peco
s St
Broa
dway
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDeDeDeenvnvnvnvvvererererr B B B BBBlvlvlvlvvvdddddd
![Page 30: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/30.jpg)
PROPOSED��������������
![Page 31: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/31.jpg)
EXISTING����������������
= Existing Blocks
![Page 32: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/32.jpg)
PROPOSED����������������
= Proposed Blocks= Existing Blocks
![Page 33: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/33.jpg)
EXISTINGland use
= Mixed Use Commercial = Industrial Mixed Use
= Residential = Parks and Opens Space
= Commercial = Industrial
= Mixed Use = Civic/Entertainment
![Page 34: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/34.jpg)
PROPOSEDland use
= Mixed Use Commercial = Industrial Mixed Use
= Residential = Parks and Opens Space
= Commercial = Industrial
= Mixed Use = Civic/Entertainment
![Page 35: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/35.jpg)
EXISTING��������������������
= Existing Buildings
![Page 36: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/36.jpg)
PROPOSED��������������������
= Proposed Buildings= Existing Buildings
![Page 37: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/37.jpg)
STREET HIERARCHYperformance
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
Brigh
ton
Blvd
Was
hing
ton
St
Peco
s St
Broa
dway
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvnvnvererer B B Blvlvlvddd
= Secondary Streets
= Interstate
= Primary Streets
![Page 38: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/38.jpg)
TRANSIT CONNECTIONSperformance
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
Brigh
ton
Blvd
Was
hing
ton
St
Peco
s St
Broa
dway
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvnvnvererer B B Blvlvlvddd
= Relocated Rail Stations
= Rail Transit
= Rail Station
![Page 39: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/39.jpg)
EXISTING BIKE CONNECTIONSperformance
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
Brigh
ton
Blvd
Was
hing
ton
St
Peco
s St
Broa
dway
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvnvnvererer B B Blvlvlvddd
= Existing Bike Routes
![Page 40: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/40.jpg)
PROPOSED BIKE CONNECTIONSperformance
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
Brigh
ton
Blvd
Was
hing
ton
St
Peco
s St
Broa
dway
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvnvnvererer B B Blvlvlvddd
= Proposed Bike Routes
![Page 41: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/41.jpg)
EXISTING GREEN CONNECTIONSperformance
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
Brigh
ton
Blvd
Was
hing
ton
St
Peco
s St
Broa
dway
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvnvnvererer B B Blvlvlvddd
= Green Nodes
= Green Connections
![Page 42: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/42.jpg)
PROPOSED GREEN CONNECTIONSperformance
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
Brigh
ton
Blvd
Was
hing
ton
St
Peco
s St
Broa
dway
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvnvnvererer B B Blvlvlvddd
= Green Nodes
= Green Connections
![Page 43: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/43.jpg)
CONNECTIONS MADEperformance
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
Brigh
ton
Blvd
Was
hing
ton
St
Peco
s St
Broa
dway
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvnvnvererer B B Blvlvlvddd
= Connections Made
= Existing Connections
![Page 44: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/44.jpg)
COMMUNITY ENHANCEMENTSperformance
Wad
swor
th B
lvd
Sher
idan
Blv
d
Fede
ral B
lvd
Que
bec
Blvd
Col
orad
o Bl
vd
Dow
ning
St
Brigh
ton
Blvd
Was
hing
ton
St
Peco
s St
Broa
dway
48th Ave
56th Ave
64th Ave
Interstate 70
MLK Blvd
Smith Rd38th Ave
DeDeDenvnvnvererer B B Blvlvlvddd
= New Development
= Restitched Fabric
![Page 45: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/45.jpg)
experience
![Page 46: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/46.jpg)
EAST AREAaerial perspective
![Page 47: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/47.jpg)
EAST AREAaerial perspective
![Page 48: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/48.jpg)
DENVER BOULEVARD AND MONACO STREETindustry incubator
![Page 49: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/49.jpg)
DENVER BOULEVARD AND MONACO STREETindustry incubator
![Page 50: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/50.jpg)
WEST AREAaerial perspective
![Page 51: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/51.jpg)
WEST AREAaerial perspective
![Page 52: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/52.jpg)
DENVER BOULEVARD AND FEDERAL AVENUEmixed use
![Page 53: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/53.jpg)
DENVER BOULEVARD AND FEDERAL AVENUEmixed use
![Page 54: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/54.jpg)
CENTRAL AREAaerial perspective
![Page 55: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/55.jpg)
CENTRAL AREAaerial perspective
1
2
3
(44th and Fox)
![Page 56: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/56.jpg)
44TH AVENUE AND FOX STREETtransit oriented development 1
![Page 57: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/57.jpg)
44TH AVENUE AND FOX STREETtransit oriented development 1
![Page 58: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/58.jpg)
GLOBEVILLEre-stitching communities 2
![Page 59: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/59.jpg)
GLOBEVILLEre-stitching communities 2
![Page 60: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/60.jpg)
riverfront redevelopmentBEFORE
3
![Page 61: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/61.jpg)
SOUTH PLATTE RIVER GREENWAY
3riverfront redevelopment
![Page 62: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/62.jpg)
CENTRAL AREAaerial perspective
1
2 3
3(Denver Blvd and Josephine)
![Page 63: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/63.jpg)
CENTRALtransit plaza 1
![Page 64: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/64.jpg)
CENTRALtransit plaza 1
![Page 65: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/65.jpg)
DENVER BOULEVARD AND BRIGHTON BOULEVARD
2gateway to central area
![Page 66: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/66.jpg)
DENVER BOULEVARD AND BRIGHTON BOULEVARD
2gateway to central area
![Page 67: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/67.jpg)
DENVER BOULEVARD AND BRIGHTON BOULEVARDgateway to downtown 3
![Page 68: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/68.jpg)
DENVER BOULEVARD AND BRIGHTON BOULEVARDgateway to downtown 3
![Page 69: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/69.jpg)
ELYRIA SWANSEAre-stitching communities 4
![Page 70: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/70.jpg)
ELYRIA SWANSEAre-stitching communities 4
![Page 71: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/71.jpg)
evaluation
![Page 72: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/72.jpg)
MAINTENANCE COST SAVINGSevaluation
Denver Boulevard annual maintenance costs:$284,909 +Increased capacity on new I-70:$207,077
Interstate 70 annual maintenance costs:
vs.
Total $491,986
Total $843,166
58%
![Page 73: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/73.jpg)
DEVELOPMENTvalue added
Total buildable land = 51,050,223 sq ft (1,172 acres) New Development = 36,810,313 sq ft (845 acres) ������= 14,239,910 sq ft (327 acres) Park Land = 4,197,322 sq ft (96 acres)
Floor Space = 200,431,703 sq ft 63% Residential 22% Commercial 5% Industrial 1% Civic
![Page 74: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/74.jpg)
DESIGN SOLUTIONS CHECKLIST evaluation
PREREQUISITES � Designing a city for people
� Enhance region
� Working with existing plans
MOBILITY � ������
� Network
� Connections
� Access
� Choice
ECONOMY � Development
� Access
ENVIRONMENT � Nature
� Health and Safety
PLACE � Experience
� Foster neighborhood identity
� Connect communities
![Page 75: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/75.jpg)
CITY FOR PEOPLE ENHANCE REGION EXISTING PLANSprerequisites
250
175
175
100
275
250
215
125
70
140
65 175
125
125
110
ADT ON NEW BOULEVARD IS REDUCED BY 50-60%
DEVELOPMENTPOPULATION JOBS
![Page 76: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/76.jpg)
TRAFFIC NETWORK CONNECTIONS ACCESS CHOICEmobility
250
175
175
100
275
250
215
125
70
140
65 175
125
125
110
ADT ON NEW BOULEVARD IS REDUCED BY 50-60%
![Page 77: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/77.jpg)
ENVIRONMENT HEALTH DEVELOPMENT ACCESSeconomy nature
![Page 78: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/78.jpg)
EXPERIENCE IDENTITY CONNECTIONSplace
![Page 79: TEAM 2 - Re-Route I-70 Corridor](https://reader030.fdocuments.in/reader030/viewer/2022020220/568c0dc41a28ab955a8dff44/html5/thumbnails/79.jpg)
questions?