TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007 pics on Underground and Astroparticle Physic 14 September 2007

Transcript of TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National...

Page 1: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Status of the NOvA Experiment

Robert PlunkettFermi National Accelerator Laboratory

Batavia, IL, USA

TAUP 2007Topics on Underground and Astroparticle Physics

14 September 2007

Page 2: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007The NOvA Collaboration

25 Institutions, 129 Physicists and EngineersArgonne, Athens, Caltech, College de France, Fermilab, Harvard, Indiana, ITEP-

Moscow, Michigan State, Minnesota, Minnesota-Duluth, Munich, Northern Illinois, Ohio State, Rio de Janeiro, South Carolina, Southern Methodist University,

Stanford, Stonybrook, Texas, Texas A&M, Tufts, UCLA, Virginia, William and Mary

Page 3: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Located 30 km south of CanadaImproved road access planned

810 km baseline14.6 mrad off-axis

Ash River Site for NOvA

Page 4: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007NuMI Tunnels and Facility

p beam

Pion beam

250 m

NuMI Components in Main Injector

NuMI Pretarget Area

Page 5: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007 Existing NuMI Neutrino Beam

207m

•120 GeV protons strike the graphite target

• Nominal Intensity 2.4x1013 ppp with ~2 sec cycle time.

• Initial intensity ~2.5 x 1020 protons/year

• Ultimate intensity ~ 3.4 x 1020 protons/year (2008-9)

Horn and Stripline

Page 6: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007Upgrades to NuMI for NOvA

Reconfigure horns for higher energy optimum.

Increase beam power by use of Recycler (1.3 s cycling).

New target system for higher intensity

NOvA beam choice

Page 7: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Expected evolution of proton intensity

Achieved!

Expected after current shutdown

Requires use of recycler storage ring after Tevatron shutdown

Possible upgrade

path

Page 8: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Graphical Representation of Off-Axis Beam

Length of this vector very insensitve to pion

0

lab

TL

PP

At ~ /2 PT 0 as vary *

Flux peaks in desired region

Page 9: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Off-axis provides improved background levels

Fig. 2.8: Simulated energy distributions for the e oscillation signal, intrinsic beam e events, neutral-current events and charged-current events with and without oscillations. The simulation used m2

32 = 2.5 x 10-3 eV2, sin2(2 23) = 1.0, and sin2(2 13) = 0.04. An off-axis distance of 12 km at 810 km was assumed.

NC at low energy because no high energy tail

Beam e are spread out over a wide

range - remove by windowing

Backgrounds show a different energy

spectrum and can be removed during

analysis

Page 10: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

•Far - 18 kT reference design, 12 x 12 modules, 1178 layers

•Near - 218 T, 2 x 3 modules, 199 layers, muon ranger at end

•Integration-prototype Near - 88 T, 2 x 3 modules, 124 layers, start in 2008

Three NOvA Detectors

Page 11: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

NOvA Building a considerable structure

19 m

107 m

Pulsed beam allows surface construction.Overburden of 1.2m concrete, and 30 cm Barite reduces C.R. backgrounds (especially to low levels

Block assembly area

Page 12: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Construction in Subsections for Structural Stability

31-planeblock

1-cm expan-sion gap

31-planeblock

Block pivoter raises 127 Ton blocks

Each block has ~6000 channelsFilling proceeds as blocks constructedDetailed mechanical analysis for stability against bulge, creep.

Page 13: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Extruded PVC tubes filled with liquid scintillator

To 1 APD pixel

typicalchargedparticle

path

L

To 1 APD pixel

typicalchargedparticle

path

L

6 cm

4 cm

60 cm

6 cm

4 cm

60 cm

6 cm

4 cm

60 cm

6 cm

4 cm

60 cm

~ 16 m

Prototype with full-length fiberReadout cosmic muons

Page 14: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Constructed from modular extrusions

Liquid scintillator (14.8M liters, 12.6 ktons)

Contained in 3.9 x 6.6 cell cells of length 15.7 m

18 m attenuation length5.5% pseudocumene

Extruded PVC (5.4 ktons)

15% anatase TiO2 for high reflectivity

Wavelength shifting fiber (18k km)

0.7 mm diameter Looped, both ends to same readout

pixel

Page 15: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Extrusion Structure and Initial Production

16 Cell extrusions – ready for further assembly

15.8 m in length is long.

Page 16: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007NOvA HPD Detector Electronics

QE ~85%, gain ~100QE well-matched to fiber spectrum

Cooled by thermoelectric cooler to -15 CUntriggered continuous digitization

APD on prototype carrier board

Emission Spectra and Q.E. Water cooling for TEC’s

Page 17: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

MINOS underground area allows a Near Detector

target volume

veto

shower containment

muon ranger

218 tons total / 20 tons fiducial

At low 13, reducing uncertainty on background at far detector can increase sensitivity by even more than additional exposure

Page 18: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007Electron Identification for NOvA

>20 variables in Neural Net

Examples shown – other variables study charge-range distributions

Overall efficiency ~30% (optimizable)

Neural Net Output

signal

signal

signal

bkg.

NC

NC

CC

CC

CC

beam e

Page 19: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Event Reconstruction – tuning for maximum sensitivity

• All backgrounds• NC background• νμ CC background

‣“Primary cuts” = reconstruction,

containment, and number of hits‣ANN is 39.3%

Efficient for events passing primary cuts.

Note that here, sin2213 = 0.1, w/o matter effects

Page 20: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007Muon Neutrino CC Display

Page 21: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007Electron Neutrino CC Event

Page 22: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Excellent Sensitivity to e Appearance

3 sensitivity for non-zero 13

NOvA gives order of magnitude improvement (compared to CHOOZ 90%) for most values of CP-.

Page 23: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

NovA studies the neutrino mass hierarchy using matter effects

App

eara

nce

Pro

bs.

Typical values for L=810 km, sin2213 = 0.05

anti-

Normal hierarchy

In these regions, and anti- rates are difficult to distinguish.

Inverted hierarchy

anti-

CP phase (0-2)

Page 24: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007Sensitivity to Mass Hierarchy

95% C.L.Normal

Inverted

Intercept with T2K curve resolves ambiguityTogether, may also have implications for CP-violation

Page 25: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Sensitivity to CP violation using 1.2 MW

NOvA gives clues as to future direction of neutrino program. Will ultra-precise neutrino sources be needed?

Page 26: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

Precision Measurement of m2

23,sin2223

6 years at 700 kW 6 years at 1.2 MW

For comparison, current situation (note scale)

Page 27: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

95% C.L. Resolution of θ23 Ambiguity

If sin2(2θ23)≠1 then:

θ23>π/4 => e couples more to νμ

θ23<π/4 => e couples more to ντ

NOvA combined with a precise reactor experiment (eg. Daya Bay) can resolve this ambiguity

Page 28: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007Provisional Project Schedule

Building construction

Accelerator shutdown: Injection lines and ND

excavationNuMI switch to ME configuration

Start of FD operation

Page 29: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007Summary and Conclusions

• Extensive technical and approval progress for NOvA project– Incorporated accelerator

upgrade to 700 kW– Finalizing structural design– Successful extrusions– DOE CD1 approval

• Nova experiment next step in use of NuMI beamline and its upgrades.– Mixing strength, mass

hierarchy, direction to pursue for CP violation

• Highly complementary to T2K experiment– Combination of results will

define field.• On track for first detector

(IPND) start in 2008.

IPND extrusions at manufacturer

Page 30: TAUP 2007 R. Plunkett 14 September,2007 Status of the NOvA Experiment Robert Plunkett Fermi National Accelerator Laboratory Batavia, IL, USA TAUP 2007.

TAUP 2007R. Plunkett14 September,2007

And now, special feelings for Sendai...

Nature is speaking.Sky, earth, beams of neutrinos;

Will we see the way?