Taramakau Road Bridge

Transcript of Taramakau Road Bridge - REAAA · 2019. 7. 12. · •1.5km of new road approaches •250m 7 span...

  • Taramakau Road Bridge

  • • 1.5km of new road approaches• 250m 7 span river bridge (42no. 34m Super Tee Beams)- Stahlton • 250m long 10m high Temporary Bridge Structure• 11m long x 70m wide Rail Overpass Bridge (47no 11m Double Hollowcore beams -Stahlton• Over 5,000m3 of concrete• Over 700 tonnes of reinforcing steel• 120,000m3 of gravel imported• 28,000m2 Sealing• 22,000 Mixed Native Plants- FH Canterbury Landscaping• 4m of rain in the first 12 months