TANK WIDTHUNITS CONTINUETO SPECIFIED UNITS …
Transcript of TANK WIDTHUNITS CONTINUETO SPECIFIED UNITS …
500 15001500
L
C
3
1
SLOPE
1
3
SLOPE
L
C
500500500500300
500
NO
MIN
AL
DEPTH
OVERLAND FLOW SWALE 'C' - TYPICAL SECTION
1:20
TIMBER BOLLARD AS PER KERBING
AND PAVING CONSTRUCTION DETAILS
FULL-HEIGHT KERB AND BLOCK PAVED
ACCESS ROAD AS PER KERBING AND
PAVING CONSTRUCTION DETAILS
SIDE-SLOPES AND BED TO BE
STABILIZED USING PEGGED TURF
IMMEDIATELY UPON COMPLETION
1
1
SLOPE
1
1
SLOPE
L
C
1
1
SLOPE
1
1
SLOPE
900 700700
700
NO
MIN
AL
DEPTH
OVERLAND FLOW SWALE 'A' - TYPICAL SECTION
1:20
SIDE-SLOPES AND BED TO BE
STABILIZED USING PEGGED TURF
IMMEDIATELY UPON COMPLETION
REINFORCED SIDE-SLOPES
AS PER SPECIALIST
SUB-CONTRACTOR DESIGN
500
NO
MIN
AL
DEPTH
SIDE-SLOPES AND BED TO BE
STABILIZED USING PEGGED TURF
IMMEDIATELY UPON COMPLETION
REINFORCED SIDE-SLOPES
AS PER SPECIALIST
SUB-CONTRACTOR DESIGN
REINFORCED SIDE-SLOPES AS PER
SPECIALIST SUB-CONTRACTOR
DESIGN
OVERLAND FLOW SWALE 'B' - TYPICAL SECTION
1:20
MULTIPLE LAYER STRUCTURE
POLYSTORM SHEAR CONNECTOR
(SEE ELEVATION & COMPONENT DETAIL)
INSERTED INTO COLUMN RECESS
POLYSTORM CLIP
1000
500
POLYSTORM UNIT
500
POLYSTORM CONNECTORS - PLAN VIEW
N.T.S
IMPORTANT NOTE:
CONTRACTOR TO BE AWARE OF MAXIMUM LATERAL LOADING AS DETAILED ABOVE AND MANUFACTURER REQUIREMENTS. SUITABLE
MEASURES ARE TO BE IMPLEMENTED TO ENSURE LATERAL LOADING IS NOT EXCEEDED DURING CONSTRUCTION BY CONSTRUCTION
TRAFFIC. SUITABLE EASEMENT TO TANKS TO BE IMPLENTED DURING CONSTRUCTION TO RESTRICT RISK OF OVERLOADING.
TYPICAL INSPECTION TUNNEL ARRANGMENT USING POLYSTORM
'INSPECT' UNITS
N.T.S
U
N
I
T
S
C
O
N
T
I
N
U
E
T
O
S
P
E
C
I
F
I
E
D
T
A
N
K
W
I
D
T
H
U
N
I
T
S
C
O
N
T
I
N
U
E
T
O
S
P
E
C
I
F
I
E
D
T
A
N
K
W
I
D
T
H
U
N
I
T
S
C
O
N
T
I
N
U
E
T
O
S
P
E
C
I
F
I
E
D
T
A
N
K
L
E
N
G
T
H
POLYSTORM 'INSPECT' CELL WITH
300Ø FLANGE CONNECTION
SINGLE LINE OF POLYSTORM
'INSPECT' UNITS TO RUN THE
LENGTH OF EACH TANK
CONNECTING INCOMING &
OUTGOING PIPES TO FORM A
HORIZONTAL INSPECTION
TUNNEL. IN ALL TANKS THE
'INSPECT' UNITS WILL SIT ON
THE LOWER LAYER OF UNITS
(THEREFORE MATCHING THE
INCOMING PIPE INVERT LEVELS)
MIN 100MM THICK GRANULAR MATERIAL TO
FORM PROTECTIVE SURROUND. GRANULAR
MATERIAL EITHER:
COARSE SAND (GRADE 0/4 OR 0/2 FINE
AGGREGATE TO BS EN 13242); OR SELECTED
GRANULAR MATERIAL (CLASS 6H TO SHW
SERIES 600, 100% PASSING 5MM SIEVE)
SCREWED ACCESS CAP
POLYSTORM VENTILATION BOX WITH VENT
COWL WITH 150mm ST1 CONCRETE BED
110mmØ PIPE TO BS EN 1401-1
110mmØ FLANGE ADAPTOR TO
BS EN 1401-1
GEO-SYNTHETIC MEMBRANE TO BE SEALED
TO ADAPTER FLANGE
POLYSTORM GEO-CELLULAR STORAGE CRATES
(PRODUCT CODE: PSM1A)
INDIVIDUAL UNIT SIZE: 1.00 x 0.50 x 0.40m
300Ø INLET/OUTLET PIPE WITH
GRANULAR SURROUND
POLYSTORM 'INSPECT' CELL WITH 300Ø FLANGE
CONNECTION
IMPORTANT: SINGLE LINE OF POLYSTORM 'INSPECT'
UNITS TO RUN THE LENGTH OF THE TANK,
CONNECTING BOTH PIPES TO FORM A HORIZONTAL
INSPECTION TUNNEL
OUTER 'PERMATEX 300' PROTECTIVE GEO-TEXTILE
(POLYSTORM PRODUCT CODE: PV23006)
INNER IMPERMEABLE GEOMEMBRANE
(POLYSTORM PRODUCT CODE: PV13010)
TYPICAL POLYSTORM GEO-CELLULAR TANK ARRANGEMENT
N.T.S
VARIES. REFER TO
D
RAW
IN
GS
171410-400 AN
D 171410-500
TO DOWNSTREAM
MANHOLE
FROM
INSPECTION
MANHOLE
300Ø INSPECTION PIPE WITH
GRANULAR SURROUND
POLYSTORM 'INSPECT' CELL WITH 300Ø
FLANGE CONNECTION
IMPORTANT: SINGLE LINE OF POLYSTORM
'INSPECT' UNITS TO RUN THE LENGTH OF
THE TANK, CONNECTING BOTH PIPES TO
FORM A HORIZONTAL INSPECTION TUNNEL
BACKFILL MATERIAL SHALL BE SELECTED EXCAVATED MATERIAL CONSISTING OF UNIFORM READILY
COMPATIBLE MATERIAL, FREE FROM VEGETABLE MATTER, BUILDING RUBBISH AND FROZEN MATERIAL,
OR MATERIALS SUSCEPTIBLE TO SPONTANEOUS COMBUSTION, AND EXCLUDING CLAY OF LIQUID
LIMIT GREATER THEN 80 AND/OR PLASTIC LIMIT GREATER THAN 55, AND MATERIALS OF EXCESSIVELY
HIGH MOISTURE CONTENT. CLAY LUMPS AND STONES RETAINED ON 75MM AND 37.5MM SIEVES
RESPECTIVELY SHALL BE EXCLUDED FROM THE FILL MATERIAL.
ALL TANK DETAILS SHOWN ARE INDICATIVE. REFER TO MANUFACTURERS DETAILS FOR INLET & OUTLET MANIFOLDS AND VENTING
DETAILS. ALL WORKS TO BE CARRIED OUT IN STRICT ACCORDANCE WITH MANUFACTURERS SPECIFICATION.
(REFER TO GENERAL ARRANGEMENT DRAWINGS FOR TANK LOCATIONS AND INLET/OUTLET ARRANGEMENTS).
D
(
E
X
T
.
)
100-600 150 150
PIPE Ø
MIN. CONCRETE ENCASEMENT
D1 (mm) D2 (mm)
675 150 170
750 150 190
825 150 210
900 150 225
975 150 250
1050 150 270
1200 170 300
1350 180 350
1500 200 375
1650 220 420
(C) (mm)
C
(
I
N
T
.
)
C
(
I
N
T
.
)
D
(
E
X
T
.
)
600
1500
1450
600
1150
1350
1200
700
1050
850
D2 (mm)
600
750
675
150
150
150
100
375
450
525
225
300
150
150
150
150
MIN. GRANULAR BED
D1 (mm)PIPE Ø
(C) (mm)
UNDER VEHICULAR
AREAS
UNDER
NON-VEHICULAR
AREAS
CLASS S PIPE BEDDING & SURROUND
N.T.S
CLASS Z PIPE BEDDING & SURROUND
N.T.S
PIPE BEDDING DETAILS ON NATURAL CLAY SOILS
(NTS)
TO BE USED UNDER:
1. EXTERNAL VEHICULAR AREAS WHERE
COVER TO PIPE SOFFIT IS GREATER THAN
1200mm
2. ALL EXTERNAL NON-VEHICULAR AREAS
WHERE COVER TO PIPE SOFFIT IS GREATER
THAN 900mm
NOTE:
ALL PIPEWORK SHALL HAVE FLEXIBLE COUPLINGS
(UNLESS STATED OTHERWISE)
150
150
150
150
TABLE 2
TABLE 3
TO BE USED UNDER:
1. EXTERNAL VEHICULAR AREAS (EXCEPT
ADOPTABLE HIGHWAYS) WHERE COVER
TO PIPE SOFFIT IS LESS THAN 1200mm
2. ALL EXTERNAL NON-VEHICULAR AREAS
WHERE COVER TO PIPE SOFFIT IS EQUAL TO
OR LESS THAN 600mm
NOTE:
ALL PIPEWORK WITH CLASS Z SURROUND SHALL
HAVE FLEXIBLE COUPLINGS WITH FLEXI-BOARDS
ON ALL JOINTS
PAVEMENT
CONSTRUCTION
CLASS 1 OR CLASS
2 MATERIAL
MAXIMUM
AGGREGATE SIZE
40mm IN THIS ZONE
FORMATION LEVEL
300
GRANULAR MATERIAL
AND SURROUND BED
TOPSOIL OR FOOTPATH
CONSTRUCTION
SELECTED AS DUG
MATERIAL (MAXIMUM
AGGREGATE SIZE
40mm)
D2 (TRENCH WIDTH)
D
C
PAVEMENT
CONSTRUCTION
CLASS 1 OR
CLASS 2
MATERIAL
MAXIMUM
AGGREGATE SIZE
40mm IN THIS
ZONE
300
ST4 CONCRETE
SURROUND & BED
UNDER VEHICULAR
AREAS
UNDER
NON-VEHICULAR
AREAS
TOPSOIL OR
FOOTPATH
CONSTRUCTION
SELECTED AS
DUG MATERIAL
(MAXIMUM
AGGREGATE SIZE
40mm)
D1
(150 M
IN
)
D
D1
(150 M
IN
)
D1
(150 M
IN
)
D
D2
D1 D
C
D1
FORMATION LEVEL
Checked by
Date
Drawing Number
Drawn by
Rev
DrnRev Description Chk Date
File Location: y:\ardent projects\191631 - lillybank farm, battle - working drawings\technical\acad\drawings\191631-1100-1103 main drainage construction details.dwg
Reproduced from/based upon Ordnance Survey material with the permission of the Controller of Her
Majesty's Stationary Office, Crown Copyright Reserved. License No. 100044561
user name: jonathan chinnock
Approved by
Designed by
App
Project Title:
Drawing Title:
Third Floor
The Hallmark Building
52-56 Leadenhall Street
London
EC3M 5JE
Tel: 020 7680 4088
Web: www.ardent-ce.co.uk
E-mail: [email protected]
ARDENT
CONSULTING
ENGINEERS
abcdee
Client
MILLWOOD DESIGNER HOMES
LILLYBANK FARM,
BATTLE
MAIN DRAINAGE CONSTRUCTION
DETAILS (SHEET 3 OF 4)
A1 Scale
AS SHOWN 16.10.2020 JEC
JEC MSLJEC
P266-C-1102T1
TENDER ISSUE
NOTES:
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE RELEVANT
SPECIFICATION AND ALL OTHER RELATED DRAWINGS ISSUED BY THE ENGINEER.
2. DO NOT SCALE FROM THIS DRAWING. WORK FROM FIGURED DIMENSIONS ONLY.
3. ALL DIMENSIONS SHOWN ON THIS DRAWING ARE IN MILLIMETRES UNLESS
OTHERWISE STATED.
4. ALL DIMENSIONS, LEVELS AND SURVEY GRID CO-ORDINATES ARE TO BE CHECKED
ON SITE AND THE ENGINEER NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES PRIOR
TO THE COMMENCEMENT OF THE WORKS.
5. NO DEVIATION FROM THE DETAILS SHOWN ON THIS DRAWING IS PERMITTED
WITHOUT PRIOR PERMISSION FROM THE ENGINEER.
6. PRIOR TO THE COMMENCEMENT OF WORKS, THE CONTRACTOR MUST CHECK THE
INVERT LEVELS OF THE EXISTING SPURS AND MANHOLE CHAMBERS TO WHICH ANY
CONNECTIONS ARE TO BE MADE. ANY DISCREPANCIES SHALL BE REPORTED TO THE
ENGINEER IMMEDIATELY.
7. ALL CONCRETE AND CONCRETE PRODUCTS BELOW GROUND LEVEL SHALL BE CLASS
DS-1 AND AC1 SULPHATE RESISTANT IN ACCORDANCE WITH BRE SPECIAL DIGEST 1.
8. THE SETTING OUT OF THE DRAINAGE WORKS IS TO BE AGREED ON-SITE WITH THE
ENGINEER, PRIOR TO THE COMMENCEMENT OF WORKS.
9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT THE
DRAINAGE WORKS FOR THE DURATION OF THE CONTRACT.
10. THE CONTRACTOR SHALL CONTACT ALL OF THE APPROPRIATE STATUTORY
UNDERTAKERS AND ESTABLISH THE EXACT LOCATION OF ALL SERVICES, PRIOR TO
THE COMMENCEMENT OF THE WORKS, BY HAND DUG TRIAL PITS.
11. ALL PIPE CONNECTIONS SHALL BE MADE SOFFIT TO SOFFIT.
12. STATED COVER LEVELS ARE FOR GUIDANCE ONLY AND SHALL BE SET TO THE FINISH
LEVELS OF THE CARRIAGEWAY/FOOTWAY/VERGE.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR POSITIONING GULLIES AT ALL LOW
SPOTS AS NECESSARY.
14. ALL PIPE SIZES STATED ARE NOMINAL INTERNAL DIAMETERS IN MILLIMETERS.
15. ALL SOFT SPOTS AND VOIDS SHALL BE REMOVED PRIOR TO CONSTRUCTION AND
REPLACED WITH SUITABLE FILL MATERIAL AS AGREED WITH THE ENGINEER.
CDM NOTES:
1. THE ATTENTION OF THE CLIENT AND THE PRINCIPAL CONTRACTOR IS DRAWN
TO THE FOLLOWING POTENTIAL RISKS IN CONJUNCTION WITH THE PROPOSED
ON-SITE AND OFF-SITE WORKS AS DESIGNED FOR THIS PROJECT.
2. WORKS IN THE VICINITY OF LIVE SERVICES INCLUDING GAS, ELECTRICITY
AND BT WILL BE NECESSARY AND THE ADVICE OF ALL STATUTORY SERVICE
COMPANIES MUST BE SOUGHT BEFORE ANY WORKS COMMENCE.
3. WORKS WITHIN AND ABUTTING THE EXISTING HIGHWAY WILL ENTAIL
TRAFFIC HAZARDS AND ALL APPROPRIATE SAFETY MEASURES INCLUDING
BARRIERS, SIGNS AND LIGHTING MUST BE UNDERTAKEN TO THE APPROVAL
OF THE LOCAL AUTHORITY, THE HIGHWAY AUTHORITY AND THE POLICE
DEPARTMENT.
4. HAZARDOUS MATERIALS INCLUDING CEMENT AND BITUMINOUS MATERIALS
ARE SPECIFIED AND THE MANUFACTURERS ADVICE ON SAFE HANDLING
PROCEDURES MUST BE OBTAINED AND MADE CLEAR TO ALL OPERATIVES.
5. THE CONTRACTOR WILL BE RESPONSIBLE FOR LOCATING ALL EXISTING
SERVICES WITHIN THE VICINITY OF THE WORKS HAND DUG AND ENSURE
THESE ARE PROTECTED THROUGHOUT THE DURATION OF THE WORKS. ALL
UTILITY PLANT SHOULD BE CLEARLY MARKED ON THE GROUND PRIOR TO
COMMENCEMENT OF THE WORKS.
6. THE CONTRACTOR MUST ENSURE ALL WORKING AREAS ARE FULLY SECURE.