Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total...

15
 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply, installation, integration Comp. 1       1.1 Manufacture, transport to site, install, connect BOP subsystems, controls and auxiliaries, test and commission of a complete dual fuel generator, 67MW, 11kV, as per technical Annex A "The Technical Specifications" and Section A & C. without section C.11. "Upgrading Existing Generators Synchronization Routing" and without spare parts as per A.25.2 "Warrantee period of the enginegenerator".  Major items, but not limited to, the equipment and works required to complete the Diesel Generator #5 project:    One (1) dual fuel Gas Diesel Generator power unit, complete with generator, flywheel, coupling, gear box, base and auxiliary equipment   Fuel system (Day light fuel tanks and refueling system, concrete containment pit, pipes,  connections to the energy center fuel system ,valves, counters and other )   Natural gas fuel system   Air intake      

Transcript of Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total...

Page 1: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

1

Table A ‐ BOQ 

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

1  Dual Fuel generator Phase 1 

Design, manufacture, supply, 

installation, integration 

Comp.  1          

1.1  Manufacture, transport to site, install, 

connect BOP subsystems, controls and 

auxiliaries, test and commission of a 

complete dual fuel generator, 6‐7MW, 

11kV, as per technical Annex A "The 

Technical Specifications" and Section A 

& C. without section C.11. "Upgrading 

Existing Generators Synchronization 

Routing" and without spare parts as per 

A.25.2 "Warrantee period of the 

engine‐generator".  Major items, but 

not limited to, the equipment and 

works required to complete the Diesel 

Generator #5 project:  

  

One (1) dual fuel Gas Diesel Generator 

power unit, complete with generator, 

flywheel, coupling, gear box, base and 

auxiliary equipment 

  

Fuel system (Day light fuel tanks and 

refueling system, concrete containment 

pit, pipes,  connections to the energy 

center fuel system ,valves, counters and 

other ) 

  

Natural gas fuel system    

Air intake    

 

   

Page 2: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

2

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

1.1  Exhaust system‐ (Remark : stack height will be 

30m at least) 

          

lube oil system    

Air starting, compressed air system    

Black start    

Cooling systems    

Keep warm system     

Barring system    

Protective device (over speed, Governor, shut‐

off valves etc.) 

  

Connectivity with the main electrical  system    

Grounding    

Local switchboards, Control, MCC 

switchboards, PLC switchboards 

  

Controls, synchronization, load sharing, 

protection, systems 

  

Working station (HMI screen)    

Connectivity with the main SCADA system 

(Not include HMI screens, that will be done by 

others) 

  

Connectivity with the environment monitoring 

system 

  

 

   

Page 3: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

3

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

1.1  HVAC   works:            

Complete air condition system for all Electrical 

rooms  

 

 Fans schedules ‐ for smoke exhaust and 

ventilation of main generator room  

  

 Fresh air handling units as per spec  , the  

drawings  and schedules ‐ for ventilation ‐ inlet 

including 30 % filters bank   

  

Sheet metal air duct work as per spec. and  the 

drawings for all building levels   

  

Insulation work for air ducts and piping as per 

spec  and drawings 

  

 Meters and gages as per spec , and the 

drawings.   

  

 Foundations and mounting Supports as per spec 

and the drawings.  

  

 Balancing and testing  as per spec and drawings     

Complete electrical plant installation for all 

HVAC works including all switchboards, cabling, 

control,  control cable, fiber optic etc.  

  

Connectivity with the main SCADA system (Not 

include HMI screen, that will be done by others) 

  

Communication system for phase one     

Warranty period      

Other           

 

 

 

Page 4: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

4

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

1.2  Electrical system‐ phase 1                

1.2.1  HV114, HV214 

Manufacture, transport to site, install as an 

expansion to existing MV switchboard, 

interconnect of controls and auxiliaries, test and 

commission of a complete Schneider Electric 

MC‐SET cubicle 24kV, In=2000A Isc=25kA (3sec), 

maximum operating voltage of 24kV, for feeder 

connection cubicle as defined in the drawings 

and the specifications including: 24kV 1250A 

SF6  withdrawable circuit breaker, earthling 

switch, current  transformers, surge arrestors, 

protection relays with fiber optic connections 

converters, FO cabling, metering devices, 

interlocks, control devices, accessories, labels. 

Com

p. 

2          

1.2.2  HV601, HV602 

Manufacture, transport to site, install, 

interconnect of controls and auxiliaries, test and 

commission of a complete 24kV In=1250A 

Isc=25kA, Incomer  connection cubicle as 

defined in the drawings and the specifications 

including 1250A SF6 or vacuum withdrawable 

circuit breaker, earthling switch, current and 

potential transformers, surge arrestors, 

protection relays with fiber optic connections 

converters with FO cabling, metering devices, 

control devices, accessories, labels and 

Open/close I/O modules. 

Com

p. 

2          

1.2.3  HV601A 

Ditto, but 24kV Isc=25kA, potential 

transformers, cubicle. 

Com

p. 

1          

 

   

Page 5: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

5

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

1.2.4  HV603 

Ditto, but  24kV In=800A Isc=25kA, Step‐up 

transformer  connection cubicle as defined 

in the drawings and the specifications 

including 800A SF6 or vacuum withdrawable 

circuit breaker, earthling switch, current and 

potential transformers, surge arrestors, 

protection relays with fiber optic 

connections converters with FO cabling, 

metering devices, control devices, 

accessories, labels and Open/close I/O 

modules. 

Comp.  1          

1.2.5  HV604, HV605, HV606 

Ditto, but  24kV In=800A Isc=25kA, outgoing  

connection cubicle as defined in the 

drawings and the specifications including 

800A SF6 or vacuum withdrawable circuit 

breaker, earthling switch, current 

transformer, surge arrestors, protection 

relays with fiber optic connections 

converters with FO cabling, metering 

devices, control devices, accessories, labels 

and Open/close I/O modules. 

Comp.  3          

1.2.6  HV701 

Manufacture, transport to site, install, 

interconnect of controls and auxiliaries, test 

and commission of a complete 12kV  

In=1250A Isc=20kA, Generator connection 

cubicle as defined in the drawings and the 

specifications including 1250A SF6 or 

vacuum withdrawable circuit breaker, 

earthling switch, current and potential 

transformers, surge arrestors, protection 

relays with fiber optic connections 

converters with FO cabling, metering 

devices, control devices, accessories, labels 

and Open/close I/O modules. 

Comp.  1       

Page 6: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

6

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

1.2.7  HV702 

Ditto, but a complete 12kV In=1250A 

Isc=20kA, bus riser cubicle as defined in the 

drawings and the specifications including 

earthling switch, withdrawable potential 

transformers, surge arrestors, accessories 

and labels. 

Comp.  1       

1.2.7  HV702 

Ditto, but a complete 12kV In=1250A 

Isc=20kA, bus riser cubicle as defined in the 

drawings and the specifications including 

earthling switch, withdrawable potential 

transformers, surge arrestors, accessories 

and labels. 

Comp.  1       

1.2.8  TRF010 

Manufacture, transport to site, install 

connect and commission of a complete oil 

immersed power Transformer 22/11kV up to 

10MVA Ynd11, Uk=8%, NLTC 0, ±2.5%, ±5%, 

±7.5% . 

Comp.         

1.2.9  TRF011 

Manufacture, transport to site, install 

connect and commission of a complete oil 

immersed power Transformer 22/0.4kV 

1600kVA Dyn11, Uk=6%, NLTC 0, ±2.5%, 

±5%. 

Comp.  1       

1.2.10  TRF012 

Manufacture, transport to site, install 

connect and commission of a complete oil 

immersed power Transformer 22/0.4kV 

630kVA Dyn11, Uk=4.5%, NLTC 0, ±2.5%, 

±5%. 

Comp.  1       

 

   

Page 7: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

7

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

1.2.11  NGR 

Manufacture, transport to site, install 

connect and commission of a neutral 

grounding resistor 22kV 500A/15sec. 

Comp.  1          

1.2.12  Design, manufacture, transport to site, 

install connect a 2500A 65kA Busbar duct 

including all turns and supporting structures 

for connecting between transformer TRF011 

and the main circuit breaker of switchboard 

MCC1000. 

Comp.  1        

1.2.13  Supply and Installation of power cabling, 

cable terminations and wiring of all MV, LV, 

control, communication, fiber optic and 

instrumentation 

Comp.  1        

1.2.14  Supply and Installation of cable tray system 

for (HV,MV, LV, Communication, FIRE alarm ) 

Comp.  1        

1.2.13  Supply and Installation of power cabling, 

cable terminations and wiring of all MV, LV, 

control, communication, fiber optic and 

instrumentation 

Comp.  1       

1.2.14  Supply and Installation of cable tray system 

for (HV,MV, LV, Communication, FIRE alarm ) 

Comp.  1       

1.2.15  Conectivity with the main SCADA system 

(Not include HMI screen) 

Comp.  1       

1.2.16  Supply and install complete lightning system 

as per Israeli standard SI 1173 part 1, and 

relocation of existing lightning rod after 

increasing stack's height  

Comp.  1       

 

   

Page 8: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

8

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

1.2.17  Complete BOP systems and building 

accessories as described in the drawings 

Comp.  1          

Supply and Installation of complete lighting 

and receptacles systems and outlets 

according to drawings and specifications. 

1.3  Design, procure, and install Increasing the 

height of an existing stack to 24 meters high. 

Comp.  4          

1.4  Manufacture, transport to site, install inside 

the generator hall, of an electrical operated 

maintenance crane for handling the heaviest 

electrical, mechanical part of the generator, 

pumps and chiller auxiliaries and mechanical 

parts as per manufacturer's standard up to 5 

tons. 

Comp.  1          

1.5  Mandatory spare part   ‐   list of all parts, 

materials and costs for warrantee period 

that are required for the operation of the 

generator 4000H/Y‐8000H/Y. In order to 

keep the guarantee availability as presented 

in the contract  

Comp.  1          

Total for phase 1      

 

   

Page 9: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

9

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

2  Optional (for phase 1)                

2.1  Additional price for Upgrading Existing 

Generators Synchronization Routing 

according to Chapter C   

(option for phase 1) 

Comp.  1          

2.2  Design and supply of additional day tank at 

capacity of 10m3 that will be connected to 

the existing LFO system and will be replace 

the old daily tank that shall be remove from 

the site by the contractor. According to 

Chapter C  (option for phase 1)  

Comp.  1          

Total for phase 1 ‐ optional     

 

   

Page 10: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

10

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

3  NATURAL GAS SYSTEM‐(Phase 2‐ option) 

Manufacture, transport to site, install and 

connect all necessary components, controls 

software  programming, commission, testing 

and all other. That are required for operating 

the generator automatically on natural gas  

Comp.  1          

Total for phase 2      

4  Co‐GENERATION‐ (Phase 3‐ option) 

Design, manufacture, supply, installation, 

integration 

Comp.  1    

  

  

  

  

  

  

     

Design, supply, install and commission 

absorption chillers cooling tower and 

auxiliary as per  technical spec. 

     

Major items, but not limited to, the 

equipment and works required to complete 

the Co ‐Generation project:  

     

Assembled absorption chillers as per spec, 

drawings and schedules.  

     

Main centrifugal cold water pumps as per 

spec ,  drawings and schedules.   

     

Main centrifugal cooling water pumps as per 

spec ,  drawings and schedules.   

     

Main centrifugal heat recovery water pumps 

as per spec ,  drawings and schedules.   

     

Foundations and mounting Supports as per 

spec and the drawings

   

 

   

Page 11: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

11

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

4  Supply and install all Pipework and fittings as 

per spec and drawings, including ןinsulation, 

penetrations, sleeves, sealing, all excavation, 

filling and recover of road.   

      

  

  

  

  

  

  

  

  

     

Assembled cooling tower cell as per specs, 

drawings and schedules.  

     

Complete electrical installation for 

absorption chiller and cooling tower 

including , cabling, control, etc.  

     

MCC switchboard , drawings and schedules       

Supply and Installation of power cabling, 

cable terminations and wiring of all LV, 

control, communication, fiber optic and 

instrumentation 

     

Supply and Installation of cable tray system 

for (LV,  Communication ) 

     

Connectivity with the main SCADA system 

(Not include HMI screen) 

     

Warranty period       

Other       

Total for phase 3     

   

Page 12: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

12

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

  Optional (for phase3) 

price for install and commissioning 

additional cooling tower cell as per specs 

include all auxiliary, pipework, electrical and 

control work that required to complete the 

cooling tower 

         

Total for phase 3      

 

 

   

Page 13: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

13

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

remark 

6  Engine& Generator  LTSA package (Services 

during the Service and Maintenance Period 

as per  chapter A section A25) 

              

6.1  Technical Support for the entire term of the 

Contract ‐ annual payment for hotline support 

as per chapter A section A25 

 year   10          

6.2  Option : Remote Support   year         

6.3  Maintenance for phase 3 (Absorption Chiller)  year  10       

6.4  On‐site support           

6.4.1  Technician Visit ‐ arrival of a senior technical 

member from manufacturer's staff to 

assist/carry out a repair work, at IAA's site as 

defined in the Technical Specifications.  

 day           In addition to the 

payments for 

technician's 

working day that is 

defined as 10 

hours per day, the 

IAA will pay for 

economy class 

flight costs 

(against 

presentation of 

invoices) and daily 

allowance of 200 

euros per day. 

During Warranty 

Period the 

Technician Visit 

will be provided as 

part of the 

Warranty with no   

cost to the IAA. 

6.4.2  Hourly Fee for additional work hours beyond the 10 hours work day 

hour         

   

Page 14: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

14

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

Remark 

6.5  Spare Parts          

6.5.1  All Spare Parts, Special Tools, Consumables 

and costs of supervision by Contractor's 

representative that are required, according to 

Contractor's O&M Manual and in accordance 

with prudent industry practices, for all 

Preventative Maintenance of the Generator 

up to and including full overhaul. 

        The contractor shall 

attach a list of all 

works, part’s and 

costs required for 

preventive 

maintenance 

including time 

schedule until full 

major overhaul, 

including a 

breakdown of all 

parts that are 

required for each 

Preventative 

Maintenance service 

and whether such 

service requires 

supervision by the 

Contractor.This shall 

also be used for the 

evaluation of the 

proposals in the 

table attached as 

annex B to the Price 

Proposal Form. 

   

Page 15: Table A BOQ - files.iaa.gov.il · 1 Table A ‐ BOQ No. Description Unit Qty. Unit Price Total Price remark 1 Dual Fuel generator Phase 1 Design, manufacture, supply,

 

15

No.  Description  Unit  Qty.  Unit 

Price 

Total 

Price 

Remark 

6.5.2  Mandatory spare part   ‐   list of all parts, 

materials and costs for warrantee period that 

are required for the operation of the 

generator 4000H/Y‐8000H/Y. In order to keep 

the guarantee availability as presented in the 

contract  

Comp.  1        The contractor shall 

attach a list of all 

parts , materials and 

costs and shall 

specify within this 

list the 

recommended 

Spare Parts, Special 

Tools and 

Consumables 

required for 

Unplanned 

Maintenance” or 

"Corrective 

Maintenance"  

7  Addition Training                 

7.1  Training at the manufacturer’s facilities as per 

annex A section (per technic) 

Comp.  1          

7.2  Training  at the owner's facilities‐ one week 

training 

week  1          

Total for LTSA package