Elec BOQ as per price schedule (138150) after TB 0 1 rev.1.xls

549
APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892 CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASAB PACKAGE "A" (BAB) - SUMMARY Bill No. Description Amount(AED) 01 Lump Sum Element: Preliminaries Re-measurable Elements: 02 Gas producer and Injector Wellheads and Flowlines 03 Workover 04 Reinststement for the Existing Pipelines. 05 Modification of Gas Flowlines and Trunklines 06 Replacement of Corroded Gas Flowlines and Trunklines 07 Miscellaneous Civil Works 08 Demolition Works 09 Natural flowing Oil Wellheads - Optional 10 Water Injection Wellheads - Optional 11 Flowlines - Optional Total Re-measurable Elements 12 Schedule of Bulk Materials Rates Rate Only 13 Time Rate for Contractor's Personnel Rate Only 14 Time Rate for Contractor's Equipment Rate Only Total Estimated Contract Price For Package A Bab (Bill 01 to 12) Optional Elements: 15 Preliminares for year 4 16 Preliminares for year 5 17 Additional % required as price adjustment to rates in Bill no's 2 to 14 for executing Work in Year 4 _____% 18 Additional % required as price adjustment to rates in Bill no's 2 to 14 for executing Work in Year 5 _____% Package "A" (BAB) Page: 1/56 APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892 CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASAB BILL NO. 01 - PRELIMINARIES - BAB Item Qty Unit Rate (AED) Amount(AED) 1 Allow for mobilization of Contractor's personnel, plant, equipment, offices complete with furniture and site set-up, including all necessary temporary fencing, storage areas, fabrication facilities, access and the like required for execution of the Works. 1 Item 2 Allow for all site running costs, including non productive personnel, offices, workshops, stores, accommodation, cost of fuel, water, electricity and all other charges, include maintenance throughout the duration of the Works. 36 Month 3 Allow for all site administrative arrangements including management, supervision, security, HSE and QA/QC for the duration of the works 36 Month 4 Allow for compliance with ADCO's Health, Safety and Environment (HSE) Rules and Conditions for Contractors throughout the duration of the Works including Permit to Work and IVMS requirements 36 Month 5 Allow for all direct and indirect costs for receiving free issue material from ADCO stores, transport to work site, traceable documentation, material reconciliation and identification of shortages and return to ADCO stores of any surplus material. 36 Month 6 Allow for the provision of Performance Bank Guarantee in accordance with the Contract. 1 Item 7 Allow for the provision of Insurances in accordance with the Contract. 1 Item 8 Allow for the provision of all necessary Contract documentation, including but not limited to, as-built drawings, progress reports, procedures etc. as requested by ADCO 36 Month 9 Allow for demobilization of Contractor's personnel, equipment, offices and site set up, include removal of rubbish and debris and reinstatement of ground to original condition as instructed by ADCO. 1 Item 10 Provision of 4WD vehicles as specified for ADCO use 180 Months 11 Provision of LD driver ( 01 No.) as specified for ADCO use . 36 Months 12 HSE incentives to Contractors personnels - Provisional Sum PS 600,000.00 13 Allow for all other obligations in accordance with the Contract. Tenderer to provide details. 1 Item Total of Bill No. 01- Preliminaries Carried to General Summary AED 600,000 Notes: 1) 2) Monthly payment for Items 2, 3, 4, 5 and 8 shall start upon satisfactory completion of Items 1, 6 and 7. (Satisfactory completion of item 1 shall mean that CONTRACTOR has mobilised sufficient key personnel, plant, equipment, site offices, workshops, fabrication facilities, site accommodation and site facilities to allow ADCO to issue Task Orders for construction works). 3) Monthly payment for Items 2, 3, 4, 5 and 8 shall be made for the actual duration between completion of mobilisation and commencement of demobilisation (Item 9). Note that, ADCO shall not pay for items 2, 3, 4, 5 and 8 for any delayed period, if the commencement of demobilisation is delayed due to CONTRACTOR's delay in completion of any Task Order(s). Descr iption Payment for Items 1, 6, 7 and 9 shall be made upon satisfactory completion of the activity and approval by ADCO.

Transcript of Elec BOQ as per price schedule (138150) after TB 0 1 rev.1.xls

Sheet1APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABPACKAGE "A" (BAB) - SUMMARYBill No.DescriptionAmount(AED)01Lump Sum Element:PreliminariesRe-measurable Elements:02Gas producer and Injector Wellheads and Flowlines03Workover04Reinststement for the Existing Pipelines.05Modification of Gas Flowlines and Trunklines06Replacement of Corroded Gas Flowlines and Trunklines07Miscellaneous Civil Works08Demolition Works09Natural flowing Oil Wellheads - Optional10Water Injection Wellheads - Optional11Flowlines - OptionalTotal Re-measurable Elements12Schedule of Bulk Materials RatesRate Only13Time Rate for Contractor's PersonnelRate Only14Time Rate for Contractor's EquipmentRate OnlyTotal Estimated Contract Price For Package A Bab (Bill 01 to 12)Optional Elements:15Preliminares for year 416Preliminares for year 517Additional % required as price adjustment to rates in Bill no's 2 to 14 for executing Work inYear 4_____%18Additional % required as price adjustment to rates in Bill no's 2 to 14 for executing Work inYear 5_____%Package "A" (BAB)Page: 1/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 01 - PRELIMINARIES - BABItemDescriptionQtyUnitRate (AED)Amount(AED)1Allow for mobilization of Contractor's personnel, plant, equipment,offices complete with furniture and site set-up, including all necessarytemporary fencing, storage areas, fabrication facilities, access and thelike required for execution of the Works.1Item2Allow for all site running costs, including non productive personnel,offices, workshops, stores, accommodation, cost of fuel, water,electricity and all other charges, include maintenance throughout theduration of the Works.36Month3Allow for all site administrative arrangements including management,supervision, security, HSE and QA/QC for the duration of the works36Month4Allow for compliance with ADCO's Health, Safety and Environment(HSE) Rules and Conditions for Contractors throughout the duration ofthe Works including Permit to Work and IVMS requirements36Month5Allow for all direct and indirect costs for receiving free issue materialfrom ADCO stores, transport to work site, traceable documentation,material reconciliation and identification of shortages and return toADCO stores of any surplus material.36Month6Allow for the provision of Performance Bank Guarantee in accordancewith the Contract.1Item7Allow for the provision of Insurances in accordance with the Contract.1Item8Allow for the provision of all necessary Contract documentation,including but not limited to, as-built drawings, progress reports,procedures etc. as requested by ADCO36Month9Allow for demobilization of Contractor's personnel, equipment, officesand site set up, include removal of rubbish and debris andreinstatement of ground to original condition as instructed by ADCO.1Item10Provision of 4WD vehicles as specified for ADCO use180Months11Provision of LD driver ( 01 No.) as specified for ADCO use .36Months12HSE incentives to Contractors personnels - Provisional SumPS600,000.0013Allow for all other obligations in accordance with the Contract.Tenderer to provide details.1ItemTotal of Bill No. 01- Preliminaries Carried to General SummaryAED600,000Notes:1)Payment for Items 1, 6, 7 and 9 shall be made upon satisfactory completion of the activity and approval by ADCO.2)Monthly payment for Items 2, 3, 4, 5 and 8 shall start upon satisfactory completion of Items 1, 6 and 7. (Satisfactory completionof item 1 shall mean that CONTRACTOR has mobilised sufficient key personnel, plant, equipment, site offices, workshops, fabricationfacilities, site accommodation and site facilities to allow ADCO to issue Task Orders for construction works).3)Monthly payment for Items 2, 3, 4, 5 and 8 shall be made for the actual duration between completion of mobilisation andcommencement of demobilisation (Item 9). Note that, ADCO shall not pay for items 2, 3, 4, 5 and 8 for any delayed period, if thecommencement of demobilisation is delayed due to CONTRACTOR's delay in completion of any Task Order(s).4)Payment of items 10 and 11 shall be made monthly "Pro-rata" based on date of making vehicles and drivers available for ADCOuse.Package "A" (BAB)Page: 2/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.011EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 02 - GAS PRODUCER & INJECTOR WELLHEADS AND FLOWLINES - BABDIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Total ManHoursSiteData Collection/SurveyCoordination/Management/IDC/In-house MeetingsProcurement Support (Vendors Evaluation + FAT)Hazardous Area Classification DrawingsElectrical Load ListLighting Installation Phhilosophy DrawingEquipment Shedule (Typical)Electrical Design BasisEarthing Layout for WellHeads FacilityMTO For Earthing MaterialTBE For Electrical Bulk MaterialInterconnection/Wiring Diagrams For Electrical EquipmentRFQ for Solar LightsTBE For Solar LightsRFQ For Cathodic Protection SystemTBE For Cathodic Protection SystemENGINEERING1Site Visits, Collection and Verification of Data.16Visit2Stress Analysis flowlinesa) Producers14Nob) Injectors2No3Stress Analysis - Well Headsa) Producers14Wellb) Injectors2Well4Topographic Survey for flowlinesa) Producers35000Mb) Injectors25000M5Topographic Survey for Well Head Sitesa) Producers14Nob) Injectors2No6Buckling Analysisa) Producers14Nob) Injectors2No7Residual Engineeringa) Producers14No18487010507021021063421404256840000b) Injectors2No2641015010303962068120000CONSTRUCTION WORKSMechanical8Preparation of right of way and routing survey; takingdelivery, loading, hauling, stringing, bending, welding, allNOT, including pigging of flowlines and provision andinstallation of pipeline markers; all necessary trenching ,earthworks, grading, imported filling, compactionincluding forming berm; supply and install field jointcoating, and protection materials; supply and install CPsystem; and all other things necessary to completea) Producers, 8" dia35000Mb) Injectors, 6" dia25000M9Extra Over for Flowlines to headers through Sabkha. (Re-measurable)a) Producers, 8" dia8000Mb) Injectors, 6" dia4000MWellhead piping system, including valves and supports all10in compliance with the scope of worka) Producers with 6" diameter flow line14Wellb) Producers with 8" diameter flow line14Wellc) Injector with 6" diameter flow line.2Welld) Producers with 6" diameter flow line with HIPPS5Welle) Producers with 8" diameter flow line with HIPPS5WellPackage "A" (BAB)Page: 3/56ItemDescriptionQtyUnitRate (AEU)Amount(AED)11Tie-in in compliance with Scope of Worksa) Producers14Nob) Injectors2No12Supply and Installation of Anchor Flangea) 6" diameter28Nob) 8" diameter4NoCivilFoundations for solar panels with batteries and powersupply distribution panel, passive cooling shelters, Well13Head Control panels, Well casing cathodic protectionequipment, pipe supports, crash barriers, windsocks,crossovers, Fence and chemical injection skid.a) Producers14Nob) Injectors2No14Anchor Blocksa) for 6" diameter anchor flange28Nob) for 8" diameter anchor flange4NoStructuralAccess platforms, cross overs, ladders and hand rails.15a) Producers14Nob)Injectors2NoMiscellaneous steel supports for wind sock, vent stack,16ESD push button, electrical / instrument JB.a) Producers14Nob) Injectors2No17Fencing, main gates, escape gates and access gates.(Lump Sum)a) Producers14Nob) Injectors2No18Crash barriers (Lump Sum)a) Producers14Nob)Injectors2No19Access road tracks at well head and around fences (Lump Sum)a) Producers14Nob) Injectors2NoPackage "A" (BAB)Page: 4/56ItemDescriptionQtyUnitRate (AED)Amount(AED)20Construction of various types of crossings encounteredduring flowline construction.a) Road Crossing10Nob) Track Crossing10Noc) Rig Crossing10Nod) Pipeline Crossing10Noe) Power(Gas/Oil/Water) Crossing10Nof) Control Crossing10Nog) CNIA Fence Crossing10NoElectricalPower supply cabling (Laying and termination) from solar21panels to usersa) Producers14Wellb) Injectors2WellEarthing system in complete compliance with the Scopeof Work.22a) Producers14Wellb) Injectors2Well23Lighting to passive cooling shelters.a) Producers14Wellb) Injectors2WellInstrumentationInstallation of instrumentation and control cabling andaccessories to wellhead control system, passive shelter,24field instrumentation, fire & gas detection system andinstallation and hook up. (Lump Sum)a) Producers14Wellb) Injectors2Wellc) Producers with HIPPS7WellInstallation of Free Issue Etc uipment25Installation of chemical injection skida) Producers14Wellb) Injectors2WellPackage "A" (BAB)Page: 5/56ItemDescriptionQtyUnitRate (AED)Amount(AED)26Installation of wellhead hydraulic panela) Producers14Wellb) Injectors2Well27Installation of PLC control panel (Lump Sum)a) Producers14Wellb) Injectors2WellInstallation of solar power panel system complete with28batteries & Power supply distribution panels.a) Producers14Wellb) Injectors2Well29Installation of passive cooling shelter.a) Producers14Wellb) Injectors2Well30Installation of F&G Beacon, Sounders and detectors.a) Producers14Wellb) Injectors2Well31Installation of Safety shower and eye wash station,a) Producers14Wellb) Injectors2Well32Installation Safety shower and eye wash station.a) Producers14Wellb) Injectors2Well33Permanent Cathodic Protectiona) Producers14Wellb) Injectors2Well34NDT and Inspectiona) Producers14Wellb) Injectors2Well35Paintinga) Producers14Wellb) Injectors2WellPackage "A" (BAB)Page: 6/56ItemDescriptionQtyUnitRate (AED)Amount(AED)36Hydrotesting Testinga) Producers, 8" dia35000Mb) Injectors, 6" dia25000M37Testing & Pre-Commissioninga) Producers14Wellb) Injectors2Well38Supply of Nitrogen for Purging8000M339Burn Pits16No.CoatingThree layer Polypropylene Coating for Line Pipes as more40fully described in the Scope of Work and Specificationa) 8" diameter35000Mb) 6" diameter25000MTransportation41Handling, Loading, Transporation and Off loading of LinePipes from Abu Dhabi Port to Contractor's Coating Yardfor Coatinga) 8" diameter35000Mb) 6" diameter25000M42Handling, Loading, Transporation and Off loading ofCoated Line Pipes from Contractor's Coating Yard toWork sitea) 8" diameter35000Mb) 6" diameter25000M43Handling, Loading, Transporation and Off loading of LinePipes from Abu Dhabi Port to ADCO Bab 13 storea) 8" diameter35000Mb) 6" diameter25000M44Handling, Loading, Transporation and Off loading of LinePipes from ADCO Bab 13 store to Contractor's coatingYard for Coatinga) 8" diameter35000Mb) 6" diameter25000MPackage "A" (BAB)Page: 7/56ItemDescriptionQtyUnitRate (AED)Amount(AED)Commissioning Assistance45Commissioning Assistance by CONTRACTOR consisting of60Dayall personnel, tools, equipment and materials.Vendor Representation46Chemical Injection Skid Vendor20Day47Mob / Demob Chemical Injection Skid Vendor20No.48Wellhead Hydraulic Panel Vendor40Day49Mob / Demob Wellhead Hydraulic Panel Vendor20No.50PLC Control Panel Vendor40Day51Mob / Demob PLC Control Panel Vendor20No.52HIPPS Panel Vendor6Day53Mob / Demob HIPPS Panel Vendor3No.54Solar Panel Vendor40Day55Mob. / Demob. Solar Panel Vendor20No.56For any additional requirements may need by theCONTRACTORS. The Contractor shall list all additionalrequirements if any.Total of Bill No. 02 -Gas Producer & Injection Wellheads and FlowlinesAEDCarried to General SummaryPackage "A" (BAB)Page: 8/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 03 - WORKOVER - BABDIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Unit QtyNo. of wellsTotal QuantityunitsRemarksDismantling of Existing Gas Producing/ Injector Well Head Facilities,Equipments, Piping, Instruments, Electrical fixtures, junction boxes andCables, Instruments, Instruments Cables and Tubing, for GasProducing/ Injector as per the Scope of Work and the Drawings.Transporting and storing at CONTRACTOR store/ yard near to site tillthe reinstating stage will commence.1Typical Design A2Well2Typical Design B2WellReinstating of Dismantled Wells Equipments, Piping, Instruments,Electrical fixtures junction boxes and Cables, Instruments, Instruments,Cables and Installing new tubing for Gas Producing/ Injector Well HeadFacilities as per the Scope of Work and the Drawings including thetransporting the dismantled items from Store yard to the site after wellworkover.3Typical Design A2Well4Typical Design B2Well5Dismantling of existing HIPPS systems2Well6Reinstatement of HIPPS system only with all associated Engineering,temporary works, fabrication and installation of spools etc2Well7Dismantling of RTU panels including antennae from the existing wellsand transport to GASCO facility (RTU modification excluded).2Well8Transportation and Installation of RTU panel and antennae in new orexisting well, cable termination and manpower assistance during2Wellcommissioning of RTU.9For any additional requirements may need by the CONTRACTORS. TheContractor shall list all additional requirements if any.2WellTotal of Bill No. 03 - Workover Carried to General SummaryAEDPackage "A" (BAB)Page: 9/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892`CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 04 - REINSTATEMENT OF DISLOCATED GAS WELL PIPING, FLOW LINES AND TRUNK LINES- BAB.DIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Unit QtyNo. of wellsTotal QuantityunitsRemarksPerformance of all field construction works in strict accordance withADCO specifications and all applicable package documents / Project(P-90194) Specifications and as directed by ADCO representativeincluding but not limited to Mobilization and demobilization of allrequired personnel, instrument, plant and equipments together withtransportation, handling, stores, accommodation,site office, technicalsupervisory and administration staffs, Detailed Engineering, sitesurvey, site clearing, purging & gas free of existing pipeline, stringing,pipe supporting, NDT inspection, cutting, welding, damages / pipedeformation repairing, manual excavation, material take off,supplying of all required construction material, painting & field jointcoating, cathodic protection, hydrotesting, trench re-backfilling, bermreinstatement, fence demolition & replacement, loading & unloading,testing , inspection, disposal of material, precommissioning,commissioning, etc,all in accordance with Scope of Works. TheRehabilitation Construction Works shall include, but not limited, tothe following:1Carry out NDT inspection for the aboveground piping and pipelines inwellhead area to manifold station at the dislocation portionsincluding test reports with recommendation of repairing and orreplacement of damaged parts.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100m2Carry out topographical and underground survey detection for eachpipeline and issue survey reports showing location of pipeline andberm, defects location of pipeline, recommendation forreinstatement and or replacement including alignment sheets.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100mPackage "A" (BAB)Page: 10/56ItemDescriptionQtyUnitRate (AED)Amount(AED)3Carry out nitrogen purging and gas free works including provision ofnitrogen gas, equipment and man power, gas testing, cleaning,flashing, pigging and all related gas free works for above piping andunder ground pipeline of well heads, stations, flow lines and trunkline.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100m4Demolish under ground deformed (buckled) Pipes and fittings,including hand excavation, cutting, transport and store them in adesignated location.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100m5Take delivery of free issue materials, Installation of under groundpipelines, including fabrication, welding, field coating, NDT,Inspection, backfilling, grading, levelling, construction of berms, pre-commissioning and commissioning.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100m6Demolish above ground deformed (buckled) Pipes and fittings,cutting, transport and store them in a designated location.a)Flow line 6 inch100mb)Flow line 8 inch100mc)Trunk line 10 inch50md)Trunk line 12 inch50me)Reinjection Trunk line 12 inch50mf)Trunk line 16 inch50mg)Reinjection Trunk line 16 inch50mPackage "A" (BAB)Page: 11/56ItemDescriptionQtyUnitRate (AED)Amount(AED)7rake delivery of free issue materials, Installation of above groundpipes, fittings, including fabrication, welding, NDT, Inspection,painting, or field coating, pre-commissioning and commissioning.a)Flow line 6 inch100mb)Flow line 8 inch100mc)Trunk line 10 inch50md)Trunk line 12 inch50me)Reinjection Trunk line 12 inch50mf)Trunk line 16 inch50mg)Reinjection Trunk line 16 inch50m8Pipe line Berm reinstatement. Carryout reinstatement works requiredto retain berm in accordance with the drawinga)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100m9Carryout the repairing of damaged supports / foundation. Checkphysically all above ground dislocated piping / pipeline supports andsleepers for any damage or crack, issue reports recommending forrepair or replacement.a)Flow line 6 inch1Nrb)Flow line 8 inch1Nrc)Trunk line 10 inch1Nrd)Trunk line 12 inch1Nre)Reinjection Trunk line 12 inch1Nrf)Trunk line 16 inch1Nrg)Reinjection Trunk line 16 inch1Nr10Carryout the replacement of damaged supports / foundation. Checkphysically all above ground dislocated piping / pipeline supports andsleepers for any damage or crack, issue reports recommending forrepair or replacement.a)Flow line 6 inch1Nrb)Flow line 8 inch1Nrc)Trunk line 10-inch1Nrd)Trunk line 12 inch1Nre)Reinjection Trunk line 12 inch1Nrf)Trunk line 16 inch1Nrg)Reinjection Trunk line 16 inch1NrPackage "A" (BAB)Page: 12/56ItemDescriptionQtyUnitRate (AED)Amount(AED)11Reinstatement of dislocated piping / pipe line above ground includingprovision of required supports / foundation or modification ofsupports / foundation etc in accordance with SOW.a)Flow line 6 inch100mb)Flow line 8 inch100mc)Trunk line 10 inch50md)Trunk line 12 inch50me)Reinjection Trunk line 12 inch50mf)Trunk line 16 inch50mg)Reinjection Trunk line 16 inch50m12Reinstatement of dislocated pipe line below ground in accordancewith SOW.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100m13Carryout 3 layer PP Coating system to the Line Pipesa)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100mTransporation14Handling, Loading, Transportation and off loading of Line Pipes fromAbu Dhabi Port to Contractor's Coating Yard for Coating.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100m15Handling, Loading, Transportation and off loading of Coated LinePipes from Contractor's Coating Yard to Work Site.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100mPackage "A" (BAB)Page: 13/56ItemDescriptionQtyUnitRate (AEU)Amount(AED)16Handling, Loading, Transportation and Off loading of line pipes fromAbu Dhabi Port to ADCO BAB 13 Store.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100m17Handling, Loading, Transportation and Off loading of line pipes fromADCO BAB 13 Store to Contractor's Coating Yard for Coating.a)Flow line 6 inch500mb)Flow line 8 inch500mc)Trunk line 10 inch100md)Trunk line 12 inch100me)Reinjection Trunk line 12 inch100mf)Trunk line 16 inch100mg)Reinjection Trunk line 16 inch100m18Carryout replacement of damaged fences. Check physically thedamaged fences of wellheads, gathering plants and CICPA, issuereports with recommendation for repairing or replacement, providetemporary fence, transport demolished fence to ADCO store etc.a)Wellhead fence100mb)Gathering plants fence100mc)CICPA fence100m19For any additional requirements may need by the CONTRACTORS.The Contractor shall list all additional requirements if any.Bill No. 04 - Reinstatement of Dislocated Gas Well Piping, Flow Lines and Trunk LinesCarried to General SummaryAEDPackage "A" (BAB)Page: 14/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 05 - MODIFICATION OF GAS FLOW LINES AND TRUNK LINES- BABDIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Unit QtyNo. of wellsTotal QuantityunitsRemarksPerformance of all field construction works in strict accordance with ADCOspecifications and all applicable package documents / Project (P-90194)Specifications and as directed by ADCO representative including but notlimited to Mobilization and demobilization of all required personnel,instrument, plant and equipments together with transportation, handling,stores, accommodation,site office, technical supervisory andadministration staffs, Detailed Engineering, site survey, site clearing,purging & gas free of existing pipeline, stringing, pipe supporting, NDTinspection, cutting, welding, damages / pipe deformation repairing,manual excavation, material take off, supplying of all requiredconstruction material, painting & field joint coating, cathodic protection,hydrotesting, trench re-backfilling, berm reinstatement, fence demolition& replacement, loading & unloading, testing, inspection, disposal ofmaterial, precommissioning, commissioning, etc,all in accordance withScope of Works. The Modification Construction Works shall include, butnot limited, to the following:ISite Visits, Collection and Verification of Data.10No. ofVisitResidual Engineering as described in Scope of Work, including but not2limited to Flow line resizing, Stress Analysis, Topographic Survey,Buckling Analysis, Geotechnical Investigations, etc.a)Flowline 6 inch500Mb)Flowline 8 inch500Mc)Trunkline 10 inch100Md)Trunkline 12 inch100Me)Reinjection Trunkline 12 inch100Mf)Trunkline 16 inch100Mg)Reinjection Trunkline 16 inch100M3Magnetic Survey of Dislocated Lines as per Scope of Worka)Flowline 6 inch500Mb)Flowline 8 inch500Mc)Trunkline 10 inch100Md)Trunkline 12 inch100Me)Reinjection Trunkline 12 inch100Mf)Trunkline 16 inch100Mg)Reinjection Trunkline 16 inch100M4Demolish deformed (buckled) Pipes and fittings, including handexcavation, cutting, transport and store them in a designated location.a)Flowline 6 inch500Mb)Flowline 8 inch500Mc)Trunkline 10 inch100Md)Trunkline 12 inch100Me)Reinjection Trunkline 12 inch100Mf)Trunkline 16 inch100Mg)Reinjection Trunkline 16 inch100MPackage "A" (BAB)Page: 15/56ItemDescriptionQtyUnitRate (AED)Amount(AED)Take delivery of free issue materials, Installation of pipelines, including ,5fabrication, welding, valves, supports, backfilling, foundations, grading, dewatering and drying, levelling and berms.a)Flowline 6 inch500Mb)Flowline 8 inch500Mc)Trunkline 10 inch100Md)Trunkline 12 inch100Me)Reinjection Trunkline 12 inch100Mf)Trunkline 16 inch100Mg)Reinjection Trunkline 16 inch100M63 LPP Coating system to the Line Pipesa)Flowline 6 inch500Mb)Flowline 8 inch500Mc)Trunkline 10 inch100Md)Trunkline 12 inch100Me)Reinjection Trunkline 12 inch100Mf)Trunkline 16 inch100Mg)Reinjection Trunkline 16 inch100M7Cathodic Protection for Flowlinesa)Flowline 6 inch500Mb)Flowline 8 inch500Mc)Trunkline 10 inch100Md)Trunkline 12 inch100Me)Reinjection Trunkline 12 inch100Mf)Trunkline 16 inch100Mg)Reinjection Trunkline 16 inch100M8NDT and Inspectiona)Flowline 6 inch500Mb)Flowline 8 inch500Mc)Trunkline 10 inch100Md)Trunkline 12 inch100Me)Reinjection Trunkline 12 inch100Mf)Trunkline 16 inch100Mg)Reinjection Trunkline 16 inch100M9Testing & Pre-Commissioninga)Flowline 6 inch500Mb)Flowline 8 inch500Mc)Trunkline 10 inch100Md)Trunkline 12 inch100Me)Reinjection Trunkline 12 inch100Mf)Trunkline 16 inch100Mg)Reinjection Trunkline 16 inch100M10Modifying the flowlines at gas producer wells & gathering stations byadding portable pigging launcher and receiver traps along with itsconnectionsa)Engineering1No.b)Procurement1No.c)Construction and Commissioning1No.11For any additional requirements may need by the CONTRACTORS. TheContractor shall list all additional requirements if any.Total of Bill No. 05 - Modification of Flow line and Trunk lines Carried to General SummaryAEDPackage "A" (BAB)Page: 16/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 06 - REPLACEMENT OF CORRODED GAS FLOW LINES AND TRUNK LINES - BABDIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Unit QtyNo. of wellsTotal QuantityunitsRemarksPerformance of all field construction services in strict accordance withcompany specifications and all applicable package documents / Project (P-90194) Specifications and as directed by ADCO representative including but notlimited to Mobilization and demobilization of all required personnel,instrument, plant and equipments together with transportation, handling,stores, accommodation,site office, technical supervisory and administrationstaffs, IPS / NDT inspection, reports evaluations, tophographical survey,underground detection, site clearing, purging & gas free of existing pipeline,stringing, pipe supporting, inspection, manual execavation, cutting, welding,damages / pipe deformation repairing, demolition of corroded pipe line,damaged / redundant chemical injection skids, procurement of all requiredmaterials, painting & field coating, hydrotesting, cathodic protection, trenchpreparation and backfilling, berm reinstatement, loading & unloading,mobilization and demobilization, etc, all in accordance with Scope of Works.The Replacement Works shall include, but not limited, to the following:1Carry out IPS inspection for each pipeline and Review and evaluate IPS reportby independant specialist to define the locations of corroded pipes along eachpipeline.a)Gas Production Flowlines - 6 inch1000Mb)Gas Injection Flowlines - 6 inch1000Mc)Gas Production Flowlines - 8 inch1000Me)Gas gathering Trunkline- 10 inch1000Mf)Gas gathering Trunkline 12 inch1000Mg)Gas Injection Trunkline 12 inch1000Mh)Gas gathering Trunkline 16 inch1000Mi)Gas Injection Trunkline 16 inch1000M2Carry out topographical and underground survey detection for designatedlocations in each pipeline and issue survey reports including alignment sheets.a)Gas Production Flowlines - 6 inch1000Mb)Gas Injection Flowlines - 6 inch1000Mc)Gas Production Flowlines - 8 inch1000Me)Gas gathering Trunkline 10 inch1000Mf)Gas gathering Trunkline 12 inch1000Mg)Gas Injection Trunkline 12 inch1000Mh)Gas gathering Trunkline 16 inch1000Mi)Gas Injection Trunkline 16 inch1000M3Manual Excavation of trench at corroded pipeline portion(s).a)Gas Production Flowlines - 6 inch1000Mb)Gas Injection Flowlines - 6 inch1000Mc)Gas Production Flowlines - 8 inch1000Me)Gas gathering Trunkline- 10 inch1000Mf)Gas gathering Trunkline - 12 inch1000Mg)Gas Injection Trunkline - 12 inch1000Mh)Gas gathering Trunkline - 16 inch1000Mi)Gas Injection Trunkline - 16 inch1000MPackage "A" (BAB)Page: 17/56ItemDescriptionQtyUnitRate (AED)Amount(AED)4Carry out NDT inspection for the corroded pipes as early defined by IPSinspection and specialist.a)Gas Production Flowlines - 6 inch1000Mb)Gas Injection Flowlines - 6 inch1000Mc)Gas Production Flowlines - 8 inch1000Me)Gas gathering Trunkline - 10 inch1000Mf)Gas gathering Trunkline -12 inch1000Mg)Gas Injection Trunkline - 12 inch1000Mh)Gas gathering Trunkline- 16 inch1000Mi)Gas Injection Trunkline - 16 inch1000M5Carry out all demolition works of the corroded pipes and fittings includingpurging, cleaning, flashing, decommissioning, gas free, cutting, removal,loading and trasporting of demolished material to designated location approvedby ADCO.a)Gas Production Flowlines - 6 inch1000Mb)Gas Injection Flowlines - 6 inch1000Mc)Gas Production Flowlines - 8 inch1000Me)Gas gathering Trunkline - 10 inch1000Mf)Gas gathering Trunkline - 12 inch1000Mg)Gas Injection Trunkline - 12 inch1000Mh)Gas gathering Trunkline - 16 inch1000Mi)Gas Injection Trunkline - 16 inch1000M6Cleaning, preparation and reinstatement of trench including bed grading,crossings reinstatement, temporary supporting, protection, safety signs andany other works required.a)Gas Production Flowlines - 6 inch1000Mb)Gas Injection Flowlines - 6 inch1000Mc)Gas Production Flowlines - 8 inch1000Me)Gas gathering Trunkline - 10 inch1000Mf)Gas gathering Trunkline -12 inch1000Mg)Gas Injection Trunkline - 12 inch1000Mh)Gas gathering Trunkline - 16 inch1000Mi)Gas Injection Trunkline - 16 inch1000M7Installation of pipeline portion(s) including loading, handling, stringing, liningup, welding, testing, inspection, PWHT, field coating, factory coating, nitrogenpurging, precommissioning and commissioning and tie in of new pipelineportionsa)Gas Production Flowlines - 6 inch1000Mb)Gas Injection Flowlines - 6 inch1000Mc)Gas Production Flowlines - 8 inch1000Me)Gas gathering Trunkline - 10 inch1000Mf)Gas gathering Trunkline - 12 inch1000Mg)Gas Injection Trunkline -12 inch1000Mh)Gas gathering Trunkline - 16 inch1000Mi)Gas Injection Trunkline - 16 inch1000MPackage "A" (BAB)Page: 18/56ItemDescriptionQtyUnitRate (AED)Amount(AED)8Backfilling, installation of Pipeline Markers, Reinstatement of pipeline Berm,existing roads and facilities crossings including pipelines, CNIA fence, Fences,buried cables, OH cables and rigs as per their original design.a)Gas Production Flowlines - 6 inch1000Mb)Gas Injection Flowlines - 6 inch1000Mc)Gas Production Flowlines - 8 inch1000Me)Gas gathering Trunkline - 10 inch1000Mf)Gas gathering Trunkline - 12 inch1000Mg)Gas Injection Trunkline - 12 inch1000Mh)Gas gathering Trunkline - 16 inch1000MI)Gas Injection Trunkline - 16 inch1000MCathodic Protection of the new pipeline portion(s) and existing pipelinescrossed by designated pipeline.a)Gas Production Flowlines - 6 inch1000Mb)Gas Injection Flowlines - 6 inch1000Mc)Gas Production Flowlines - 8 inch1000Me)Gas gathering Trunkline - 10 inch1000Mf)Gas gathering Trunkline - 12 inch1000Mg)Gas Injection Trunkline - 12 inch1000Mh)Gas gathering Trunkline - 16 inch1000MI)Gas Injection Trunkline - 16 inch1000M10For any additional requirements may need by the CONTRACTORS. TheContractor shall list all additional requirements if any.Bill No. 06 - Replacement of Corroded Gas Flow Lines and Trunk Lines Carried to General SummaryAEDPackage "A" (BAB)Page: 19/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 07 - MISCELLANEOUS CIVIL WORKS - BABDIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Unit QtyNo. of wellsTotal QuantityunitsRemarksPROCURE, SUPPLY, INSTALLATION / CONSTRUCTION ANDCOMMISSIONING OF CIVIL WORKSThe EPC SOW shall include the following works in which the works willbe finilized during the award of tast order.SUB-CONTRACTING WORKS1Carry out Topographical survey including, mobilization, trial pits,underground/above ground detection, equipments, transportation,demobilization, reports, etc.100.00m2Carry out Geotechnical Investigation including mobilization,equipments, taking samples, transportation, demobilization, reports,etc.2i)Trial Pits 2.0 x 2.0 x 2.5m deep1.00No.3ii) Bore hole 5m deep1.00No.4iii) Bore hole 10m deep1.00No.5vi) Bore hole 20m deep1.00No.6v) Plate load test1.00No.7vi) Laboratory Tests including Particle size analysis, Moisture content,CBR value, Chemical tests, Compaction tests, Atterberg limits, etc.1.00LSCarry out design, construction & commissioning of STP (SewageTreatment Plant).8i) STP 50m3 Capacity1.00LS9ii) STP 100m3 Capacity1.00LS10iii) STP 200 m3 Capacity1.00LS11iv) STP 500m3 Capacity1.00LSEARTHWORKSExcavation in ordinary soil / engineered fill, trimming of excavationbottom, stacking, compaction of subgrade etc., all complete, as perADCO's Amendments / Supplements for DEP 34.11.00.11 Gen andinstructions from ADCO.12i) Excavation from 0 up to 1.5m depth1.00m313ii) Excavation from 1.5 up to 3.Om depth1.00m14iii) Excavation from 3.0 up to 6.0m depth1.00m3Backfilling using excavated fill materials in layers not exceeding1.00m3200mm in thickness, loading, unloading, carting, filling, watering andcompacting/ ramming each layer, all complete, as per ADCO'sAmendments / Supplements for DEP 34.11.00.11 Gen and instructionof the ADCO to achieve 95% MDD15Backfilling using selected and approved imported material in layers not1.00m3exceeding 200mm in thickness, loading, unloading, carting, filling,watering and compacting/ ramming each layer, all complete, as perADCO's Amendments / Supplements for DEP 34.11.00.11 Gen andinstruction of the ADCO to achieve 95% MDD16Cutting of ordinary soil upto Rough Grade Level & excavation required1.00m3for slope protection, levelling grading, etc., all complete, as per ADCO'sAmendments / Supplements for DEP 34.11.00.11 Gen and instructionsfrom ADCOPackage "A" (BAB)Page:20/56ItemDescriptionQtyUnitRate (AED)Amount(AED)17Disposal of Surplus Earth up to near by location specified by ADCO1.00m318Grading: Filling using selected and approved material in layers not1.00m3exceeding 500mm in thickness, loading, unloading, carting, filling,watering and compacting/ ramming each layer, all complete, as perADCO's Amendments / Supplements for DEP 34.11.00.11 Gen andinstruction of the ADCO to achieve 85% MDDGravel Surfacing: Supplying and laying Gravel surfacing on well1.00m3compacted sub-grade including all labour, materials, equipment,handling, cleaning, finishing etc., all complete, as per ADCOSpecification and instructions from ADCO.19i) 60mm thick gravel layer100.00m220ii) 80mm thick gravel layer100.00m221iii)120mm thick gravel layer100.00m2CONCRETE WORKSSupplying and laying Design Mix cement concrete for Plain CementConcrete and Reinforced Cement concrete works at all levels andelevations for all kinds of works, including all Formwork, Concreteprotection, polythene sheet, admixtures, labour, materials, equipment,handling, batching, transporting, mixing, pumping, placing, levelling,compacting, curing, testing, cleaning, finishing the exposed surface etc.,all complete, as per ADCO Specification,and instructions for thefollowing Concrete grades:22i) Grade C20 (Blinding, Screed, Plain Concrete)1.00m323ii) Grade C40 (Reinforced Concrete) for Pipe support Foundations, pipesleepers, Street light pole foundations, Wind socks foundations, etc.24iii)Grade C40 (Reinforced Concrete) for Concrete Crash Barriers1.00m325iv) Grade C40 (Reinforced Concrete) for Duct Banks1.00m326v) Grade C40 (Reinforced Concrete) for Anchor Blocks1.00m327vi) Grade C40 (Reinforced Concrete) for Concrete Culverts1.00m328vii) Grade C40 (Reinforced Concrete) for Concrete Pavements1.00m329viii) Grade C40 (Reinforced Concrete) for Misc Foundations (for fencing,1.00m3metallic crash barriers, kerb stone backing, etc.)Supplying, laying and fixing all types of Pre-Cast Reinforced CementConcrete units of specified grade for Trench covers, Identification tilesover buried cables etc., at all levels and elevations, in all kinds ofworks, including all labour, material, equipment, moulding, formwork,batching, mixing, laying, compacting, curing, rendering, handling,storing, transporting, for all leads, erection without damage, setting inposition, filling gaps between adjacent pre-cast units with specifiedconcrete or cement sand mortar or joint sealant, including concreteprotection (if required), all complete, as per specifications, drawingsand instructions of ADCO.30i) Kerb Stones 200x400x600mm25.00Nos31ii) Kerb Stones 150x400x600mm25.00Nos32iii) Grade C40 Precast Concrete foundations1.00m3Package "A" (BAB)Page: 21/56ItemDescriptionQtyUnitRate (AED)Amount(AED)GROUTINGSupplying and installing Cement based / Epoxy non shrink grout fromreputed manufacturer and approved make, including delivery, storage,all formwork, mixing, placing, finishing and curing, testing, labour,material, equipment, surface finish etc., all complete, as per ADCOspecifications, drawings and instructions of the ADCO33Cement Based non shrink grout (Min. Comp. strength of 60N/mm2 at28 days)1.00m334i) Epoxy non shrink grout (Min. Comp. strength of 65N/mm2 at 24 Hrs)1.00m3FIRE PROOFING35-ire Proofing of the Structural Steel Members using Intumescent fire,rotection coating (asbestos free) including labour, materials,equipment, handling, transporting, mixing, cleaning, surfacepreparation, painting, surface finishing, all complete, as per ADCOSpecification 34.19.20.11 A, Amendments to Shell DEP.34.19.20.11-Gen, Dec 1999 and instructions from ADCO.1.00m2REINFORCEMENT STEEL36Supplying and placing reinforcement (Type II deformed high yield bars:omplying with BS 4449, BS 4483 or EN 10080, ASTM A615 with:haracteristic strength of 460N/mm') in Reinforced Cement concreteand allied works, including transportation, cleaning, straightening,rutting, bending, binding in position with annealed wire and/orwelding, providing concrete cover blocks with all labour, materials,equipment, handling, etc., all complete, as per DEP 34.19.20.31-Genind ADCO's Amendments/ Supplements for DEP, drawings andnstructions.1.00KgROADS & PAVEMENTSAsphalt Roads: Construction of Asphalt roads of width up to 8m widencluding required shoulder, as specified in Specification and drawing ,ncluding laying, compaction, CBR tests, field density tests, labour,material, equipment all complete as per specifications and instructionsof ADCO.Subgrade (15% to 25% CBR at 95% MDD)200mm thick granular subbase (40%CBR at 95% MDD)150mm thick Base course (min 75% CBR at 98% MDD)50mm thick single wearing course rolled asphaltPrime coat(Above layers are for illustrative only and actual road design shall bebased on the vehicular loading)37i)8m wide Heavy Duty roads (Quantity excluding shoulder)20.00RM38ii)6m wide Heavy Duty roads (Quantity excluding shoulder)20.00RM39iii)4m wide Heavy Duty roads (Quantity excluding shoulder)20.00RM40arth/catch TracksConstruction of Earth/catch tracks with a minimum width 8m andminimum 300mm thickness compacted to 95% MOD including removalA Vegetation and soft soil, as specified in SOW document, includingeying, compaction, labour, material, equipment all complete as perpecifications and instructions of ADCO.50.00m2Package "A" (BAB)Page: 22/56ItemDescriptionQtyUnitRate (AED)Amount(AED)41Existing Road Repair / Modification works to match with existingincluding all equipments, labour, transportation, etc.50.00m2Interlocking Paving: Supplying and laying Interlocked concrete pavingblocks of grade C40, over a well compacted sand bedding ofcompacted thickness 50mm (after vibration) with sub-base andcompacted subgrade, including all labour, materials, equipment,handling, cleaning, finishing the exposed surface, etc., all complete, anycolour, as per ADCO specifications and instructions from ADCO.42i)60mm thick paving blocks (Light Duty), laid on 50mm compactedsand bed and 150mm thick sub-base compacted to 80%MDD1.00m243ii) 80mm thick paving blocks (High Duty), laid on 50mm compactedsand bed and 300mm thick sub-base. The material should haveminimum 40% CBR at 95% MDD.1.00m2Gravel Surfacing: Supplying and laying Gravel surfacing on wellcompacted sub-grade including all labour, materials, equipment,handling, cleaning, finishing etc., all complete, as per ADCOSpecification and instructions from ADCO.44i)80mm thick gravel layer100.00m245ii)100mm thick gravel layer100.00m246iii)120mm thick gravel layer100.00m2DISMANTLING AND DEMOLITIONDismantling of following works for minor structures, at all levels andelevations, including all labour, equipment, safety precautions, stackingof serviceable material and disposal of unserviceable material upto alead as directed by the ADCO, cutting of reinforcement, Blindingconcrete, levelling of surface after dismantling is over, etc., allcomplete, as per instructions from ADCO.47i) RC concrete foundations of all grades along with Blinding concrete1.00m348ii) Structural steel works such as pipe supports, cross over platform1.00Kgincluding grating, handrail, anchor bolts etc.49iii) Fencing (including concrete posts, foundations, beams, gates etc)1.00RM50iv) Asphalt Roads including kerb stone, swale etc.1.00m2STRUCTURAL STEEL PIPE SUPPORTSStructural Steel Works :Supply, Fabrication, Erection, alignment, welding, bolting, painting ofstructural steel works including galvanizing and painting, conformingto S275JR grade or equivalent, at all levels including all labour,equipment, making shop drawings, cutting, bending, rolling, grinding,drilling, erection bolts, permanent bolts, edge preparation, testing ofwelders, inspection and testing of welds, all other activities requiredfor completion of the works all complete, as per DEP 34.28.00.31 andADCO's Amendments/Supplements for DEP, drawings and instructionsof ADCO. Painting shall conform to ADCO specification ES-30-99-37-013, Painting and coating of new equipments.51i) For Structural steel works in columns, beams, bracings, stiffeners,ladder etc.1.00KgPackage "A" (BAB)Page: 23/56ItemDescriptionQtyUnitRate (AED)Amount(AED)52ii) For Road Guard Rails1.00Kg53Serrated Gratings:Supply, fabrication, transportation, erection and alignment of factory1.00Kgmade galvanized serrated gratings and stair treads with checker nosing,35 mm by 5 mm bearing bars at 30 mm centres with steel conformingto S275JR, at all levels and elevations, including all labour, material,equipment, preparation of fabrication drawings for floorings,platforms, drain and trench covers, walk-ways, passages, other fittingsand fixtures, etc., all complete, as per specifications, drawings andinstructions of ADCO.54Floor plates:Supply, fabrication, transportation, erection and alignment of Floor1.00Kgplates of raised pattern 8 mm thick excluding the height of the raisedpattern, with steel conforming to S275JR, skid resistant at all levels andelevations, including all labour, material, equipment, preparation offabrication drawings for floorings, platforms, drain and trench covers,walk-ways, passages, other fittings and fixtures, etc., all complete, asper specifications and instructions of ADCO.FENCING, GATES, CRASH BARRIERS55CICPA Fence25.00RMSupplying and installation of fencing as per CICPA specification,including posts, excluding foundations, all complete, and in accordancewith SOW document.56Chainlink Fence25.00RMSupplying and installation of chainlink fencing as per latest SHELL DEP34.13.20.31-GEN , including posts, excluding foundations, all complete,and in accordance with SOW document.GatesSupplying and installation of Gates, as per CICPA/CNIA specification,including posts, excluding foundations, all complete, and in accordancewith SOW document.571.0m wide single leaf Emergency gate/personal entry1.00Nos584.Om wide double leaf gate1.00Nos596.Om wide double leaf gate1.00Nos600.8m wide double leaf gate1.00Nos61Replacement/reinstatement of Fences:Supplying and installation of fence for the damagaed/removed ones25.00RMincluding material, labour, equipment, fabrication, erection, alignment,welding, bolting, painting etc. all complete to match with the existingfencing and in accordance with SOW document.62Mettalic Crash BarriersSupplying and installation of mettalic crash barriers along the road25.00RMincluding material, labour, equipment, fabrication, erection, alignment,welding, bolting, painting etc. all complete in accordance with SOWdocument.63Sand BarriersSupplying and installation of sand barriers adjacent to fencing at Well25.00RMheads and locations specified by ADCO including material, labour,equipment, fabrication, erection, alignment, welding, bolting, paintingetc. all complete as per SOW.Package "A" (BAB)Page: 24/56ItemDescriptionQtyUnitRate (AED)Amount(AED)DRAINAGE WORKSuPVC Drain pipes64i) uPVC Drain pipe 2" dia100.00RM65ii) uPVC Drain pipe 4" dia100.00RM66iii) uPVC Drain pipe 6" dia100.00RM67iv) uPVC Drain pipe 6" dia100.00RM68v) uPVC Drain pipe 8" dia100.00RMRCC Sewage Holding Tanks69i) Sewage Holding Tank - 25m31.00Nos70ii) Sewage Holding Tank - 50m31.00Nos71iii) Sewage Holding Tank - 75m31.00NosGRP Sewage Holding Tanks72i) Sewage Holding Tank - 25m31.00Nos73ii) Sewage Holding Tank - 50m31.00Nos74iii) Sewage Holding Tank - 75m31.00NosMonholes along with Heavy Duty Cover:Reinforced Concrete Construction of Manhole along with Heavy DutyCover including GRP lining and concrete protection.75i)600x600mm upto 1.0m deep Manhole1.00Nos76ii) 800x800mm upto 1.0m deep Manhole1.00Nos77iii)1000x1000mm upto 1.2m deep Manhole1.00Nos78iv) 1000x1000mm upto 1.6m deep Manhole1.00Nos79v) 1000x1000mm upto 2.Om deep Manhole1.00Nos80vi) 1200x1200mm upto 1.4m deep Manhole1.00Nos81vii) 1200x1200mm upto 1.8m deep Manhole1.00Nos82viii) 1200x1200mm upto 2.7m deep Manhole1.00NosMonholes along with Light Duty Cover:Reinforced Concrete Construction of Manhole along with Light DutyCover including GRP lining and concrete protection.83600x600mm upto 1.0m deep Manhole1.00Nos84i) 800x800mm upto 1.0m deep Manhole1.00Nos85ii) 1000x1000mm upto 1.2m deep Manhole1.00Nos86iii) 1000x1000mm upto 1.6m deep Manhole1.00Nos87iv) 1000x1000mm upto 2.Om deep Manhole1.00Nos88v) 1200x1200mm upto 1.4m deep Manhole1.00Nos89vi) 1200x1200mm upto 1.8m deep Manhole1.00Nos90vii) 1200x1200mm upto 2.7m deep Manhole1.00NosSOLAR LIGHTING POLESDesign, procure, supply, installation and commissioning of Solar streetLighting system comprising of accessories such as LED Light, Solarpanel, Battery, Controller, Light Pole, cables, etc. excluding anchor boltand concrete foundation.918 meter high Light Pole1.00Nos9210 meter high Light Pole1.00NosPackage "A" (BAB)Page: 25/56ItemDescriptionQtyUnitRate (AEU)Amount[AED)BURIED CABLE TRENCHESExcavation and refilling of underground cable trenches with allaccessories like soft sand, concrete tiles, warning tape of the followingtype.93i)300 (W) x 800(D)25.00RM94ii)450 (W) x 800(D)25.00RM95iii)600 (W) x 800(D)25.00RM96iv)800 (W) x 800(D)25.00RMDEWATERINGSupply of equipments, labour, transportation, construction oftemporary drain channel to the location specified by ADCO, etc.including 2 pumps (One operation+ one stand-by) along with powersupply.9710 Well Point System1.00LS9820 Well Point System1.00LS9930 Well Point System1.00LS10040 Well Point System1.00LS10160 Well Point System1.00LSFURNITUREProcurement, supply & installation of the furnitures in accordance withscope of work document(CONTRACTOR shall propose 3 options of each furniture for clientselection)Bed Rooms102Bed (Minimum 210 x 160 cm)1.00Nos103Pillows (Minimum 50 x 90 cm)2.00Nos104Mattress (to match Bed)1.00Nos105Blanket (Minimum 218 x 218 cm)1.00Nos106Blanket cover (Minimum 218 x 218 cm)2.00Nos107Blanket protection (Minimum 218 x 218 cm)1.00Nos1081.60 m wide wooden desk with drawers, wooden arm chair & table1.00Noslamp.109Leather single sofa with matching foot stool.1.00Nos110Bedside table with drawers & reading lamp.1.00Nos111Electrical room heater1.00Nos112Wooden 3 doors cabinet with internal LED lights1.00Nos11342" LED TV1.00NosOffices114Low partition cluster of 2: 1.2x1.4 m with drawer's pedestal.1.00Unit115Low partition cluster of 4: 1.2x1.4 m with drawer's pedestal.1.00Unit116L shape desks 1.6x0.8 m with drawer's pedestal.1.00Nos117High back mesh wheel seats with lumbar & head supports.1.00Nos118Low back mesh fixed seats with lumbar supports.1.00Nos1192 Door High cabinet with wooden and glass doors (W 0.9 x D 0.4 x H2.0 m)1.00NosCAR PARKING SHEDS120Shaded car parks 2.5 x 5.0 meters (excluding foundation) in accordance1.00Noswith scope of work documentCONTRACTOR shall provide a detail break down list of all activities.Package "A" (BAB)Page: 26/56ItemDescriptionQtyUnitRate (AED)Amount(AED)Procure, Supply, Installation and commissioning of prefab Caravans121Procure, Supply, Installation and Commissioning of AccomodationCaravan compete, but not limited to section 4 (MINIMUM1.00LSREQUIREMENT FOR PREFAB CARAVAN) of Appendix H including allinternal installations / services such as electrical, sanitary, plumbing, airconditioning, finishes, etc.122Residual Engineering1.00LSThe EPC SOW shall include the following works in which the workswill be finilized during the award of tast order.123Carry out site visit to familiarize the Scope of work1.00(LS)124Carry out Land survey and underground detection survey1.00LS125Mannual Excavation as per ADCO specification1.00m3126Mechanical Excavation as per ADCO specification1.00m3127Filling around the foundations with selected and approved imported1.00m3material to make up level, in layers of not more than 200mmcompacted to 95% MDD.12875mm thick Blinding/PCC works (Grade C20)1.00m2129Reinforced concrete (grade 40MPa) including formwork, concreteprotection and reinforcement (grade 460) for foundations, steps, etc.1.00m3Electrical1304 Core 50 sqmm CU, XLPE, armoured cable, PVC sheathed cable and200.00mcable termination to the existing MDBs including earthing connections.1313xl0sgmm CU,XLPE, armoured cable, PVC sheathed cable and cabletermination to the existing Street lighting circuit/out door system.100.00m1323x4sqmm CU,XLPE, armoured cable, PVC sheathed cable and cabletermination to the existing Street lighting circuit/out door system.100.00m133Flexible, single core,PVC insukated 6 sqmm cable inside conduit.100.00m134External pole lights (1 X 250W SVL) with 10 m GI poles with foundation2.00Nosand all accessories ad interconnection to existing system135Bollard garden lights (1.2mtr) lights4.00NosPackage "A" (BAB)Page: 27/56ItemDescription-QtyUnitRate (AED)Amount(AED)Telecom136Supply, install, terminate, test and commission the telephone system,1.00Lotincluding outdoor copper cabling, JB and patching accessories1.00Lot137Supply, install, terminate, test and commission the Fiber Optic cablesand patching accessories138Supply, install, terminate, test and commission the MATV system and1.00Lotco-axial cables and accessories.139Supply, install, voice/data and MATV outlets, including structured1.00Lotcabling system and indoor cabling.Fire Alarm140Fire Alarm cabling and interface with ADCO FACP.1.00LotFire Fighting System141Extension of firewater system (with suitable isolation valves), procure/install / test / commsion required number of Hydrant Sations (twooutlets) - each complete with 2 Hydrant valves, 2 Nos. 25m fire hoses,2 nozzles, fire hose box, protection barriers, foundations and necessarysafety signs.1.00LotWater SupplyWater Tanks:Procure, Supply, transportation, installation and alignment of'InsulatedGRP hot pressed Panel Storage water tank with booster pumpingsystem composed of 2 Nos.Booster Pumps (1 + 1 stand by) and allnecessary valves, piping, etc., including all labour, material, equipment,etc., all complete, as per specifications and instructions of ADCO.1422500L Capacity1.00LS1435000L Capacity1.00LS1447500L Capacity1.00LS14510000L Capacity1.00LS146Supplying and Installation of External Water Supply system includingpipes, fittings, isolation valves, accessories, pits ... etc.1.00(LS)Bill No. 07 - Miscellaneous Civil Works Carried to General SummaryAEDPackage "A" (BAB)Page: 28/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01IEC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 09 - DEMOLITION - BABDIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Unit QtyNo. of wellsTotal QuantityunitsRemarksPerformance of all field demolition construction services in strictaccordance with company specifications and all applicable packagedocuments / Project Specifications and as directed by ADCOrepresentative including but not limited to site clearing, purging & gasfree of existing pipeline, decommissinoing, deposited removal,flushing, cleaning, inspection, cutting, excavation, trench re-backfilling,grading, loading & unloading, mobilization and demobilization, siteoffices and accommodation all to complete satisfaction of ADCO. TheDemolition Construction Works shall include, but not limited, to thefollowing:1Carry out radio detection survey for the above ground redundantfacilities like piping, cables, foundations,equipments etc but not limitedto, in wellhead area and station and mark physically the exactlocations of them on the field with specific markers and markeddrawings with descreption of demolition works.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M2Carry out topographical and underground survey for redundantfacilities like pipeline, cables, foundations, etc but not limited to, andmark physically the exact locations of them on the field with specificmarkers and marked drawings with descreption of demolition works.Also provide the locations of existing facilities crossing or parallel tothe redundant facilities and Contractor to update the master alignmentsheet showing / update all existing facilities.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000MPackage "A" (BAB)Page: 29/56ItemDescriptionQtyUnitRate (AED)Amount(AED)3Excavation the trench to expose buried pipelines as per ADCOspecification, the excavation material will be utilized for re-backfillingof trenchs after pipeline removal.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M4Nitrogen Purging, flashing, cleaning and decommissioning of pipeline tobe completely gas free for safe cutting and removal works.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M5Pipeline & piping Cutting, removal, and related foundations / supports/ cables / poles removal, re-backfilling and grading of the trench.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M6Loading and unloading of the demolished line pipes, fittings, valves,equipment devices, shelter and other demolished material andfacilities from site to designated locations as agreed with ADCO.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000MPackage "A" (BAB)Page: 30/56ItemDescriptionQtyUnitRate (AED)Amount(AED)7Reinstatement of existing utilities & pipelines crossings with acceptableprotections of these facilities and reinstatement existing roadsincluding tracks and rigs as per their original design.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16' pipelines1000M18" pipe lines1000M8Pluging & blinding of tie ins points of existing facilities inside stationsand wellhead area.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M9For any additional requirements may need by the CONTRACTORS. TheContractor shall list all additional requirements if any.Total of Bill No. 09 - Demolition Works Carried to General SummaryAEDPackage "A" (BAB)Page: 31/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01IEC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 09 - DEMOLITION - BABDIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Unit QtyNo. of wellsTotal QuantityunitsRemarksPerformance of all field demolition construction services in strictaccordance with company specifications and all applicable packagedocuments / Project Specifications and as directed by ADCOrepresentative including but not limited to site clearing, purging & gasfree of existing pipeline, decommissinoing, deposited removal,flushing, cleaning, inspection, cutting, excavation, trench re-backfilling,grading, loading & unloading, mobilization and demobilization, siteoffices and accommodation all to complete satisfaction of ADCO. TheDemolition Construction Works shall include, but not limited, to thefollowing:1Carry out radio detection survey for the above ground redundantfacilities like piping, cables, foundations,equipments etc but not limitedto, in wellhead area and station and mark physically the exactlocations of them on the field with specific markers and markeddrawings with descreption of demolition works.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M2Carry out topographical and underground survey for redundantfacilities like pipeline, cables, foundations, etc but not limited to, andmark physically the exact locations of them on the field with specificmarkers and marked drawings with descreption of demolition works.Also provide the locations of existing facilities crossing or parallel tothe redundant facilities and Contractor to update the master alignmentsheet showing / update all existing facilities.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000MPackage "A" (BAB)Page: 29/56ItemDescriptionQtyUnitRate (AED)Amount(AED)3Excavation the trench to expose buried pipelines as per ADCOspecification, the excavation material will be utilized for re-backfillingof trenchs after pipeline removal.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M4Nitrogen Purging, flashing, cleaning and decommissioning of pipeline tobe completely gas free for safe cutting and removal works.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M5Pipeline & piping Cutting, removal, and related foundations / supports/ cables / poles removal, re-backfilling and grading of the trench.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M6Loading and unloading of the demolished line pipes, fittings, valves,equipment devices, shelter and other demolished material andfacilities from site to designated locations as agreed with ADCO.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000MPackage "A" (BAB)Page: 30/56ItemDescriptionQtyUnitRate (AED)Amount(AED)7Reinstatement of existing utilities & pipelines crossings with acceptableprotections of these facilities and reinstatement existing roadsincluding tracks and rigs as per their original design.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16' pipelines1000M18" pipe lines1000M8Pluging & blinding of tie ins points of existing facilities inside stationsand wellhead area.4" pipe lines1000M6" pipe lines2000M8" pipe lines5000M10" pipe lines1000M12" pipe lines1000M16" pipe lines1000M18" pipe lines1000M9For any additional requirements may need by the CONTRACTORS. TheContractor shall list all additional requirements if any.Total of Bill No. 09 - Demolition Works Carried to General SummaryAEDPackage "A" (BAB)Page: 31/5667No HIPPS, location 80m from wellhead1Nr68HIPPS type 1, location 30m from wellhead1Nr69HIPPS type 1, location 80m from wellhead1Nr70HIPPS type 2, location 30m from wellhead1Nr71HIPPS type 2, location 80m from wellhead1NrBulk Material SupplyExtra over Bill No. B2 item 03 to 50 inclusive for supply of bulkmaterials by CONTRACTORANSI 1500 # Single Completion Oil Well713" dia. Wellhead with 4" dia. Flowline1NrRate only733" dia. Wellhead with 6" dia. Flowline1Nr743" dia. Wellhead with 8" dia. Flowline1NrRate only754" dia. Wellhead with 4" dia. Flowline1NrRate only764" dia. Wellhead with 6" dia. Flowline1Nr774" dia. Wellhead with 8" dia. Flowline1NrRate only783" dia. Wellhead with HIPPS with 4" dia flowline1Nr793" dia. Wellhead with HIPPS with 6" dia flowline2Nr803" dia. Wellhead with HIPPS with 8" dia flowline1NrRate only814" dia. Wellhead with HIPPS with 4" dia flowline1Nr824" dia. Wellhead with HIPPS with 6" dia flowline2Nr834" dia. Wellhead with HIPPS with 8" dia flowline1NrRate onlyANSI 1500 # Dual Completion Oil Well843" dia. Wellhead with 4" dia. Flowline1NrRate only853" dia. Wellhead with 6" dia. Flowline1Nr863" dia. Wellhead with 8" dia. Flowline1NrRate only874" dia. Wellhead with 4" dia. Flowline1Nr884" dia. Wellhead with 6" dia. Flowline1Nr894" dia. Wellhead with 8" dia. Flowline1NrRate only903" dia. Wellhead with HIPPS with 4" dia flowline1Nr913" dia. Wellhead with HIPPS with 6" dia flowline1Nr923" dia. Wellhead with HIPPS with 8" dia flowline1NrRate only934" dia. Wellhead with HIPPS with 4" dia flowline1Nr944" dia. Wellhead with HIPPS with 6" dia flowline1Nr954" dia. Wellhead with HIPPS with 8" dia flowline1NrRate onlyPackage "A" (BAB)Page: 34/56ItemDescriptionQtyUnitRate (AED)Amount(AED)ANSI 2500 # Single Completion Oil Well963" dia. Wellhead with 4" dia. Flowline1NrRate only973" dia. Wellhead with 6" dia. Flowline1NrRate only983" dia. Wellhead with 8" dia. Flowline1NrRate only994" dia. Wellhead with 4" dia. Flowline1NrRate only1004" dia. Wellhead with 6" dia. Flowline1Nr1014" dia. Wellhead with 8" dia. Flowline1Nr1023" dia. Wellhead with HIPPS with 4" dia flowline2Nr1033" dia. Wellhead with HIPPS with 6" dia flowline3Nr1043" dia. Wellhead with HIPPS with 8" dia flowline5Nr1054" dia. Wellhead with HIPPS with 4" dia flowline1Nr1064" dia. Wellhead with HIPPS with 6" dia flowline2Nr1074" dia. Wellhead with HIPPS with 8" dia flowline5NrANSI 2500 # Dual Completion Oil Well1083" dia. Wellhead with 4" dia. Flowline1NrRate only1093" dia. Wellhead with 6" dia. Flowline1Nr1103" dia. Wellhead with 8" dia. Flowline1NrRate only1114" dia. Wellhead with 4" dia. Flowline1NrRate only1124" dia. Wellhead with 6" dia. Flowline1Nr1134" dia. Wellhead with 8" dia. Flowline1Nr1143" dia. Wellhead with HIPPS with 4" dia flowline1Nr1153" dia. Wellhead with HIPPS with 6" dia flowline1Nr1163" dia. Wellhead with HIPPS with 8" dia flowline1Nr1174" dia. Wellhead with HIPPS with 4" dia flowline1Nr1184" dia. Wellhead with HIPPS with 6" dia flowline1Nr1194" dia. Wellhead with HIPPS with 8" dia flowline1NrDismantling of Existing Wellhead InstallationsAllow for carefully dismantling existing producer wellheadscomplete with expansion loop. Existing valves and instrumentsto be handed to ADCO and existing piping to be disposed offsite or handed over to ADCO all as directed by ADCOrepresentative.120Single completion wellhead7Nr121Dual completion wellhead8NrRe-Instating Well Head InstallationsAllow for collecting of materials from ADCO specified location,inspect, report any shortages, transport and reinstating ofexisting oil producer wellhead installation complete withexpansion loop, existing valves and instruments etc; ensureoperability of system, include pressure testing of S.S tubes andpre-commissioning of WHCP.122Single completion wellhead7Nr123Dual completion wellhead8NrBill No. 10 - Natural Flowing Oil Wellheads in Bab Carried to General SummaryAEDPackage "A" (BAB)Page: 35/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.011EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 11 - WATER INJECTION WELLHEADS IN BABDIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Unit QtyNo. of wellsTotal QuantityunitsRemarksOil Wellhead Tie- inEngineerin,g1Residual engineering to wellhead area1Well2Provision of all "as built" documentation1WellWater Injector Wellhead InstallationTake delivery of free issue materials, fabricate and install wellheadpiping and fittings including; all NDT as per ADCO Specification;painting; take delivery of and install pipe supports, guides andanchors, sand and crash barriers, gin pole, access ladders etc.complete; fabricate and install all pipe hurdles; take delivery,install, calibrate, hook up, and commission all instrument andcontrol equipment including flow metering skid, supply and installall instrumentation cables / tubing, supports, tray, (earth worksand wellhead access platform measured separately) for acomplete water injection wellhead tie-in installation.ASME 1500 fl Injection Well33" dia. Single completion water injector12Nr44" dia. Single completion water injector12Nr53" x 3" dia. Dual completion water injector4Nr64" x 4" dia. Dual completion water injector4Nr73" x 4" dia. Dual completion water injector4Nr84" x 3" dia. Dual completion water injector4NrEarthworksCut / fill over area of wellhead to receive new gatch filling as9required by residual engineering.750m3Imported gatch filling in making up levels in wellhead area as10required by residual engineering450m3Wellhead Access PlatformsSupply and install wellhead access platform complete, includeremoveable handrails, foundations etc. complete in accordancewith drawing no. 30-71-76-3302 Rev 1, Sheet 1 of 3 to 3 of 3.To Single Completion Wellheads11Height of platform not exceeding 1m high4Nr12Height of platform over 1m, not exceeding 1.6m high12Nr13Height of platform over 1.6m, not exceeding 2.2m high8NrTo Dual Completion Wellheads14Height of platform not exceeding 1m high4Nr15Height of platform over 1m, not exceeding 1.6m high8Nr16Height of platform over 1.6m, not exceeding 2.2m high4NrPackage "A" (BAB)Page: 36/56ItemDescriptionQtyUnitRate (AED)Amount(AED)Water Injector Metering Skid PipeworkTake delivery, fabricate and install water injection metering skidpiping as a complete unit; including supply of bulk pipe fittings, S.Stubing fittings, NDT, pipe supports, instrumentation and paintingcomplete as per ADCO specificatopn ( skid frame and foundationsmeasured separately)173" dia. Single completion metering skid pipework12Nr184" dia. Single completion metering skid pipework12Nr193" x 3" dia. Dual completion metering skid pipework4Nr204" x 4" dia. Dual completion metering skid pipework4Nr213" x 4" dia. Dual completion metering skid pipework4Nr224" x 3" dia. Dual completion metering skid pipework4NrWater Injector Metering Skid Frame and FoundationTake delivery and install water injection metering skid supportframe on and including precast concrete foundation, include allexcavation, filling, compaction, protection, blinding, and disposalof surplus material complete23Single completion metering skid24Nr24Dual completion metering skid12NrBulk Material SupplyExtra over Bill No. B2 item 03 to 08 inclusive for supply of bulkmaterials by CONTRACTOR253" dia. Single completion water injector12Nr264" dia. Single completion water injector12Nr273" x 3" dia. Dual completion water injector4Nr284" x 4" dia. Dual completion water injector4Nr293" x 4" dia. Dual completion water injector4Nr304" x 3" dia. Dual completion water injector4NrDismantling of Well head installationAllow for carefully dismantling existing water injection wellheadscomplete with expansion loop. Existing valves and instruments tobe handed to ADCO and existing piping to be disposed off site orhanded over to ADCO, as all directed by ADCO representative.31Single completion wellhead4Nr32Dual completion wellhead4NrRe-Instating Well Head InstallationsAllow for collecting of materials from ADCO specified location,inspect, report any shortages, transport and reinstating of waterinjection wellhead installation complete with expansion loop,ensure operability of system, including pressure testing of S.Stubes and pre-commissioning of flow cntrol skid.33Single completion wellhead4Nr34Dual completion wellhead4NrBill No. 11 - Water Injection Wellheads in Bab Carried to General SummaryAEDPackage "A" (BAB)Page: 37/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 12 - FLOWLINES IN BABDIPL QuantitiesItemDescriptionQtyUnitRate (AED)Amount(AED)Unit QtyNo. of wellsTotal QuantityunitsRemarksEngineering1Residual Engineering, include topographic survey of flowline routes80,000.00m2Provision of all "as built" documentation30.00Nr.Surface Run Oil and Water Flowlines (API 5L Grade B unlessotherwise noted)Preparation of right of way, including required cutting and filling,take delivery, loading, hauling, stringing, bending, welding, all NDT,pigging of flowlines and provision and installation of pipelinemarkers in accordance with ADCO Specification.34" x Sch. 807,000.00rn44" x Sch. 12048,000.00m54" x 0.438" wt (to API 51 Grade X-52)7,000.00m66" x sch. 12030,000.00m76" x 0.312"wt17,500.00m86" x 0.500" wt (to API 5L Grade X-52)7,000.00m98" x sch. 12035,000.00m108" x 0.375"wt3,500.00In118" x 0625"wt (to API 5L Grade X-52)3,000.00inWater Injection Expansion LoopsTake delivery of tree issue materials, fabricate and install pipeworkand fottings in expansion loop including take delivery of andinstalling pipe supports, guides and anchors complete; fabricationand installation of pipe hurdles; all jointing, NDT & PWHT whererequired, as per ADCO Spec and painting.124" dia. Sch. 12018.00Nr136" dia. Sch. 12018.00Nr.148" dia. Sch. 1209.00Nr.Water Infector Header Tie-inCut existing cluster header, take delivery, fabricate and installpipework and fittings in tie-in spool including all jointing, NDT &PWHT where required, as per ADCO Spec. and painting.158" diameter cluster header; 6" diameter supply header offtake12.00Nr.166" diameter cluster header; 6" diameter supply header offtake12.00Nr.178" diameter cluster header; 4" diameter supply header offtake8.00Nr.186" diameter cluster header; 4" diameter supply header offtake8.00Nr.Package "A" (BAB)Page: 38/56ItemDescriptionQtyUnitRate (AED)Amount(AED)194" diameter cluster header; 4" diameter supply header offtake8.00Nr.20Extra over for 6" diameter isolation valve and flanges includingconcrete block or steel valve support.24.00Nr.21Extra over for 4" diameter isolation valve and flanges includingconcrete block or steel valve support.24.00Nr.Pipe HurdlesFabricate and install pipe hurdles, scrap pipes supplied by ADCO,where flowlines cross areas of Sabkha22Type WPH 1 (Option 1)3,700.00Nr.23Type WPH 1 (Option 2)2,000.00Nr.Cold BendingExtra over Bill No. B11 item 3 to 11 inclusive for cold bending ofpipes, irrespective of radius.244" x Sch. 805.00Nr.254" x Sch. 12020.00Nr.264" x 0.438" wt (to API 51 Grade X-52)15.00Nr.276" x 0.312"wt50.00Nr.286" x sch. 12090.00Nr.296" x 0.500" wt (to API 5L Grade X-52)18.00Nr.308" x 0.375"wt4.00Nr.318" x sch. 12010.00Nr.328" x 0625"wt (to API 5L Grade X-52)4.00Nr.CrossingsCrossing by thrust boring or horizontal direction drilling (HDD)include all protection material, cathodic protection works, crashbarriers and reinstatement work complete.334" Flowline170.00m346" Flowline400.00m358" Flowline100.00mOpen cut crossings not exceeding 1.5m deep, include excavation /backfilling by machine and /or hand, supply and installation ofcoating and protection material, cathodic protection andreinstatement works completeAsphalt road crossing364" Flowline100.00m376" Flowline300.00m388" Flowline400.00mCNIA and other Fence Crossing394" Flowline100.00m406" Flowline250.00m418" Flowline160.00mGatch track crossing424" Flowline250.00m436" Flowline300.00m448" Flowline300.00mSand track crossing454" Flowline400.00m466" Flowline5,000.00m478" Flowline8,000.00mRig track crossing484" Flowline250.00m486" Flowline750.00m508" Flowline100.00mCrossing of ADNOC / GASCO / ADWEA / MoD facilityPackage "A" (BAB)Page: 39/56ItemDescriptionQtyUnitRate (AED)Amount(AED)514" Flowline100.00m526" Flowline500.00m538" Flowline100.00mExtra over for crossing ADNOC/Gasco/ADWEA/MoD for open cutcrossing over 1.5m, not exceeding 3m deep544" Flowline80.00m556" Flowline600.00m568" Flowline90.00mExtra over for crossing ADNOC/Gasco/ADWEA/MoD for open cutcrossing over 3.0m, not exceeding 4.5m deep574" Flowline30.00m586" Flowline450.00m598" Flowline30.00mRouting of flowlines through existing culverts604" Flowline30.00m616" Flowline250.00m628" Flowline30.00mAdditional excavation and backfilling at crossings63By hand8000m364By Machine8000m3Buried Gas Flowlines (API 5L Grade X6S unless otherwise notedlPreparation of right of way, including required cutting and filling,take delivery, loading, hauling, stringing, bending, welding, all NOT,pigging of flowlines and provision and installation of pipelinemarkers, all necessary trenching not exceeding 1.5m deep,imported filling, compaction including forming berm, supply andinstall field joint coating, and protection material, supply and installCP system complete654" x 0.337" wt3,000.00m666" x 0.500 wt3,000.00m676" x 0.562 wt700.00m688" x 0.500 wt (12.7mm w,t)1,000.00m698" x 0.562 wt800.00m70Extra over for the above items for trenching exceeding 1.5m but notexceeding 3m deep500.00m71Extra over for the above items for trenching exceeding 3.Om but notexceeding 4.5m deep500.00mCold BendingExtra over for the above items inclusive for cold bending of pipes,irrespective of radius724" x 0.337" wt5.00Nr736" x 0.500 wt5.00Nr746" x 0.562 wt2.00Nr758" x 0.500 wt (12.7mm w,t)2.00Nr768" x 0.562 wt2.00NrPackage "A" (BAB)Page:40/56ItemDescriptionQtyUnitRate (AED)Amount(AED)Cold Tie-InsConnect to existing RMS/DGM blind flange connection, takedelivery, fabricate and install pipework, fittings and valves in tie-inincluding all jointing, NDT and PWHT where required.77Existing 8" flanged connection; new 4" diameter flowline1.00Nr78Existing 8" flanged connection; new 6" diameter flowline2.00Nr79Existing 8" flanged connection; new 8" diameter flowline1.00NrBuried Disposal Water Flowlines (GRE)Preparation of right of way, including required cutting and filling,take delivery, loading, hauling, stringing, jointing, all NDT, pigging offlowlones and provision and installation of pipeline markers, allnecessary trenching not exceeding 1.5m deep imported filling,compaction including forming berm complete.806" diameter2,000.00m81Extra over for the above item (6" dia) for trenching exceeding 1.5mbut not exceeding 3m deep200.00mExtra over for the above Item (6" dia for GRF fittings826" dia. elbow, 90 degrees2.00Nr836" dia. elbow, 45 degrees2.00Nr846" dia. Equal tee2.00Nr856" x 4" dia. reducing tee1.00Nr866" dia flange, 300#1.00Nr876" dia blind flange, 300#1.00NrValves88Install 4" carbon steel ball valve, include bolted connection.1.00Nr89Install 6" carbon steel ball valve, include bolted connection.1.00NrCrossings for Buried PipelinesOpen cut crossings not exceeding 1.5m deep, include excavation /backfilling by machine and /or hand, supply and installation ofcoating and protection material, cathodic protection (if applicable),and reinstatement works completeAsphalt Road904" Flowline, carbon steel100.00m916" Flowline, carbon steel100.00m928" Flowline, carbon steel100.00m936" Flowline, GRE50.00mGatch Track944" Flowline, carbon steel100.00m956" Flowline, carbon steel100.00m968" Flowline, carbon steel100.00mPackage "A" (BAB)Page: 41/56ItemDescriptionQtyUnitRate (AED)Amount(AED)976" Flowline, GRE50.00mSand Track984" Flowline, carbon steel100.00m996" Flowline, carbon steel100.00m1008" Flowline, carbon steel100.00m1016" Flowline, GRE50.00mAdditional Excavation and back filling at crossings102By Hand1,000.00m3103By Machine1,000.00m3Hydrostatic Testing of FlowlinesProvision of labour, equipment, tools and material to pressuriseand test carbon steel and /or GRE flowlines and associated fittings,include disposal of water upon completion104Mobilisation / demobilisation of test crew and equipment250.00NrHydrotest with water supplied by ADCO1054" dia pipe3,000.00m1066" dia pipe2,000.00m1078" dia pipe650.00mHydrotest with potable water supplied by CONTRACTOR1084" dia pipe54,000.00m1096" dia pipe56,200.00m1108" dia pipe48,000.00mHydrotest with chemically treated water supplied by CONTRACTOR1114" dia pipe3,000.00m1126" dia pipe2,000.00m1138" dia pipe650.00mBill No. 12 - Flowlines in Bab Carried to General SummaryAEDPackage "A" (BAB)Page: 42/56APPENDIX "I" OF ATTACHMENT "D" TO CONTRACT NO. 15730.01/EC 10892CALL OUT SERVICES CONTRACT FOR ASR GAS FACILITIES IN BAB AND ASABBILL NO. 13 - SCHEDULE OF MATERIAL RATES - BABDIPL QuantitiesItemDescriptionMesc. No.UnitRate in AEDUnit QtyNo. of wellsTotal QuantityunitsRemarksGAS INJECTOR - LINE PIPES1LINE PIPE, SML, X-65, SOUR, 6 IN, 23 MM WT,7419760609MTR2LINE PIPE, SML, X-65, SOUR, 3 IN, 15.24 MM WT, SCH XXS7419760349MTR3LINE PIPE, SML, X-65, SOUR, 2 IN, 11.07 MM WT, SCH XXS7419760289MTR4PIPE, SML, 316L SS, PLAIN END, 2 IN, 2.77 MM WT, SCH 10S7436330571MTR5PIPE, SML, 316L SS, SOUR, PLAIN END, 2 IN, SCH XXS7436330629MTR6PIPE, SML, 316L SS, BW, 1 IN, SCH 10S7436310339MTR7LINE PIPE, SML, CS, A-106 GR.B, SOUR, BVLD, 3 IN, SCH 40,7430031031MTR8LINE PIPE, SML, X-65, SOUR, 6 IN, 12.7 MM WT,7419760529MTR9LINE PIPE, SML, X-65, SOUR, 6 IN, 18.26 MM WT,7419760559MTRGAS INJECTOR - FITTINGS11FITTING, BRANCH WELD OUTLET, CS, A694 F65 BR, 2 IN, RUN 6 - 10 IN, BR SCH7679197089PC160, RUN SCH XXS, SOUR12FITTING, BRANCH WELD OUTLET, CS, A694 F65 BR, 2 IN, RUN 6 - 10 IN, BR SCH7679197069PCXXS, RUN SCH 23.00 MM, SOUR13ELBOW, LR, CS, A860 WPHY 65, BW, 45 DEG, SOUR, 6 IN, 23 MM WT,7629282749PC14ELBOW, LR, CS, A860 WPHY 65, BW, 90 DEG, SOUR, 6 IN, 23 MM WT,7629352739PC15ELBOW, LR, CS, A860 WPHY 65, BW, 90 DEG, SOUR, 3 IN, 15.24 MM WT, SCH XXS7629352339PC16ELBOW, LR, CS, A860 WPHY 65, BW, 90 DEG, SOUR, 2 IN, 11.07 MM WT, SCH XXS7629352139PC17TEE, EQUAL, BW, CS, A860-WPHY65, SOUR, 2 IN, SCH XXS7629922139PC18TEE, REDUCING, BW, CS, A860-WPHY65, SOUR, 6 IN, 3 IN, 23.00 MM X 15.24 MM7629948209PC19TEE, REDUCING, BW, CS, A860-WPHY65, SOUR, 3 IN, 2 IN, 15.24 MM X 11.07 MM7629948109PC20ELBOW, LR, 316L SS, BW, 90 DEG, 2 IN, 2.77 MM WT, SCH 10S7633413341PCPackage "A" (BAB)Page: 43/56ItemDescriptionMesc. No.UnitRate in AED21ELBOW, LR, 316L SS, BW, 90 DEG, 1 IN, 2.77 MM WT, SCH 10S7633413041PC22TEE, EQUAL, 316L SS, BW, 2 IN, 2.77 MM WT, SCH 10S7633848341PC23TEE, REDUCING, 316L SS, BW, 2 IN, 1 IN, 2.77 MM WT, SCH 10S7633856729PC24FITTING, FLANGEOLET, CS, CL 150, RF, BR 1 IN, RUN 3 TO 4 IN, BR SCH 80, RUN7680370079PCSCH 40,25FITTING, BRANCH NIPPLE OUTLET, CS, PLAIN, 3000 PSI, BR 1/2 IN, RUN 1. 1/2 TO7680310011PC6 IN, BR SCH 8026ELBOW, LR, CS, BW, 90 DEG, SOUR, 3 IN, 0.216 IN WT, SCH 407630426251PCGAS INJECTOR - FLANGES27FLANGE, WN, RJ, API 6A, SOUR, ASTM A694 F65, 5.1/8 IN, SCH 160, API 10000 PSI0915511229PC28FLANGE, WN, RJ, API 6A, SOUR, ASTM A694 F65, 7.1/16 IN, SCH , API 10000 PSI0915511289PC29FLANGE, WN, RJ, API 6A, SOUR, ASTM A694 F65, 5.1/8 IN, 61N, SCH XXS, API0915511219PC10000 PSI30FLANGE, WN, RJ, API 6A, SOUR, ASTM A694 F65, 2.9/16 IN, SCH XXS, API 10000 PSI0915511149PC31FLANGE, WN, Ill, API 6A, SOUR, ASTM A694 F65, 1.13/16 IN, SCH XXS, API 10000 PSI0915511089PC32FLANGE, WN, RJ, API 6A, SOUR, ASTM A694 F65, 1.13/16 IN, SCH 160, API 10000 PSI0915511069PC33FLANGE, BLIND, RJ, API 6A, SOUR, ASTM A694 F65, 2.9/16 IN, API 100000915210919PC34FLANGE, BLIND, RJ, API 6A, SOUR, ASTM A694 F65, 1.13/16 IN, API 100000915210859PC35FLANGE, WN, RJ, API 6A, SOUR, ASTM A694 F65, 2.1/16 IN, SCH XXS, API 10000 PSI0915511129PC36FLANGE, WN, 316L SS, SOUR, RJ, 1.13/16 IN, 21N, SCH XXS, API 10000 PSI0915506109PC37FLANGE, WN, RF, 316L SS, 2 IN, CL 150, SCH 10S7665794381PC38FLANGE, WN, RF, 316L SS, SOUR, 1 IN, CL 150, SCH 10S7665794341PC39FLANGE, BLIND, SOUR, 316L SS, RF, 2 IN, CL 1507665123209PC40FLANGE, WN, CS, RF, 3 IN, SCH 40, 0.216 IN WT, CL 1507662783121PC41FLANGE, BLIND, CS, SERRATED SPIRAL FINISH, RF, 3 IN, CL 1507662100721PC42FLANGE, BLIND, CS, SERRATED SPIRAL FINISH, RF, 1 IN, CL 1507662100661PCPackage "A" (BAB)Page: 44/56ItemDescriptionMesc. No.UnitRate in AEDGAS INJECTOR - VALVES43VALVE, CHECK, SWING, API 6A 60K, RED BORE, FLANGED RJ-6BX, API 10000 PSI924475209PCWP, 5 1/8 IN, AS PER DATA SHEET GA-E-60762445 1/8 VALVE, GATE, RED BORE, FLGD, API6 60K, AISI4130+INC 625, RJ-6BX, 10000924458209PCPSI, 5 1/8 IN, AS PER DATA SHEET GA-E-60975452 9/16 VALVE, GATE, RED BORE, FLGD, API6 60K, AISI4130+INC 625, RJ-6BX,924458129PC10000 PSI, 2 .9/16 IN,46VALVE, CHECK, SWING, API 6A 60K, FLANGED RJ-6BX, API 10000 PSI WP, 2.9/16924475049PCIN,471.13/16" VALVE, GATE, RED BORE, FLGD, API6 60K, AISI4130+INC 625, RJ-6BX,924458069PC10000 PSI, 1.13/16 IN,48VALVE, GLOBE, FLANGED, INCONEL 625, RJ-6BX, API 10000 PSI, 2 IN, 1.13/161N,924903109PCAS PER DATA SHEET GA-E-6077049VALVE, BALL, SS, TRIM SS, FLGD, RF, CL 150, FB, 1 IN, LOW TEMP, EXTENDED7703255051PCBONNET50VALVE, BALL, CS, TRIM 316L, FLGD, RF, RB, CL 150, 1 IN, DATA SHEET GA-E-604007700000059PC51VALVE, CHOKE, FLGD, RTJ, 5.1/8 IN, API 10000 PSI,924082209PC52VALVE, CHOKE, FLGD, RTJ, 1.13/16 IN, API 10000 PSI,924082109PC535 1/8" VALVE, GATE, RED BORE, FLGD, API6 60K, AISI4130+INC 625, RJ-6BX,924458229PC10000 PSI, 5 1/8 IN, AS PER DATA SHEET GA-E-60975 with actuatorGAS INJECTOR - SPECIAL ITEMS54STRAINER, Y-TYPE, 5.1/8 IN, FLANGED, RJ, API 10000 PSI,7683231189PC55PIPELINE ISOLATING JOINT, 6 IN8564181069PC56MONOFLANGE, DOUBLE BLOCK AND BLEED, SAE 6370 UNS G41300, 1.13/16 IN,6098569359PCAPI 10000 LB, RTJ, 1/2 IN NPTF, NACE, TRIM SS316LGAS INJECTOR - PACKAGES57WELLHEAD HYDRAULIC CONTROL PANEL PLC FOR GAS INJECTION WELLHEADS202090060PCWITH GREY SCALE INDICATION58WELLHEAD HYDRAULIC CONTROL PANEL FOR 61N GAS INJECTION WELLHEADS202090050PCWITH SEPARATE ACCUMULATOR SKID59SOLAR POWER SYSTEM, TYPE- B, AS PER ADCO SPEC 11.99.54.16036533010059PC60SHELTER, PASSIVE COOLED AS PER ADCO SPEC 11.99.53.16019664700059PC61CONTROL STATION, TYPE GHG 414 81, CEAG6788722109PC62WIND SOCK, NYLON, VINYL COATED, 3908K53, McMASTER-CARR, 36 IN MOUTH x9515762329PC18 IN TAIL, 8 FT63EYE, FACE & BODY WASH SYSTEM, (EMERGENCY SHOWER)9664695049PCPackage "A" (BAB)Page: 45/56ItemDescriptionMesc. No.UnitRate in AEDGAS INJECTOR - INSTRUMENT & CONTROL64TRANSMITTER, GAUGE PRESSURE, ELECTRONIC, IGP10-T60F5E-Ll, FOXBORO6033645329PC65TRANSMITTER, DIFF PRESSURE, ELECTRONIC, IDP10-T26C05E-L1, FOXBORO6030645109PC66TRANSMITTER, TEMPERATURE, 330MM, HASTELLY-C, COMPLETE WITH 2 INTHERMOWELL FLANGED RF, CL.25006044691069PC67GAUGE, PRESSURE, DIRECT, 316L SS TUBE, 1/2 IN NPT, 4 IN, 0 - 300 BAR,MEX5D60B38, BOURDON HAENNI6035317549PC68DIAL THERMOMETER, BI-METAL, 150 MM, 0 - 120, DEG. C, 6 MM, TZ 150,BOURDON HAENNI6048137389PC69FLOW INDICATOR, 0.0-60.0 / 0.0 - 80.0 MMSCF/D, BA304D, BEKA ASSOCIATES-UK6062295559PC70FLASHING BEACONS, 24VDC, IP65, RED, 60 FLASH/MIN, XB12B02406RNBNNNN,MEDC UK6055092089PC71FLASHING BEACONS, 24VDC, IP65, AMBER, 60 FLASH/MIN,XB12B02406ANBNNNN, MEDC UK6055092049PC72SIREN (SOUNDER), DUAL-TONE, 24VDC, IP65, 115DBA, 500 TO 1000 HZFREQUENCY, DB3PDO48N2BNN, MEDC UK6055092109PC73UV/IR FLAME DETECTOR, ANALOG, ATEX, SS, UV/IRS-A-X-SS +JB-MPNS-S+ SSK-4,NET SAFETY MONITORING INC.6055297529PC74MANUAL CALL POINT, 1P65, WITH END OF LINE RESISTOR, BG31256EBR, MEDC UK6055092029PC75HYDROGEN SULPHIDE SMART TRANSMITTER, 0-20 PPM, 54000TH-1-0-06-1,6055595909PCGENERAL MONITORS76GRP SUN SHADE WITH 2 IN MOUNTING BRACKET FOR H2S GAS TRANSMITTER,GENERAL MONITOR5928421903PC77AMPOULE, 10 PPM, 50004-3, GENERAL MONITORS6059232029PCGAS PRODUCER - LINE PIPES783" PIPE, SEAMLESS, BW, SCH. 40, ASTM A333-67430160671MTR791" PIPE, SEAMLESS, BW, SCH. 80, ASTM A333-67430160371MTR808" PIPE, SEAMLESS, BW, THK.25.40mm, ASTM A333-67430161011MTR81PIPE, SML, CS, A-333 GR.6, SOUR, BEVELLED, 8.0 IN, W.THK 1 IN7430161019MTR82LINE PIPE, SML, CS, A-106 GR.B, SOUR, BVLD, 3 IN, SCH XXS, 36 - 46 FT7430031151MTR834" PIPE, SEAMLESS, BW, SCH. XXS, ASTM A106B7430031631MTR841" PIPE, SEAMLESS, BW, SCH. XXS, ASTM A106B7430030421MTR851" PIPE, SEAMLESS, BW, SCH. XXS, ASTM A333-67430160401MTRPackage "A" (BAB)Page: 46/56ItemDescriptionMesc. No.UnitRate in AED863" PIPE, SEAMLESS, BW, SCH. 105, ASTM A312-TP316L7436330651MTR872" PIPE, SEAMLESS, BW, SCH. 160, ASTM A312-TP316L7436330631MTR881" PIPE, SEAMLESS, BW, SCH. 80S, ASTM A312-TP316L7436330361MTR893" PIPE, SEAMLESS, BW, SCH. 40, ASTM A106-B7430031031MTR90PIPE, SML, CS, A-106 GR.B, SOUR, BVLD, 2 IN, XXS, 36 - 46 FT7430030751MTR918" PIPE, SEAMLESS, BW, THK.15.88mm, API 5L-X657419760789MTR928" PIPE, SEAMLESS, BW, THK.12.7mm, API 5L-X657419760769MTRGAS PRODUCER - FITTINGS933" ELBOW 90, LR, BW, SCH. 40, ASTM A420-WPL67631432281PC941" ELBOW 90, LR, BW, SCH. 80, ASTM A420-WPL67631431801PC953"x1"NIPOLET, BW, SCH. 40 x SCH. 80,7680297079PCASTM A350-LF2 CL1, WITH HIPPS968" ELBOW 90, LR, THK.25.40mm, BW, ASTM A420-WPL67631432921PC978" ELBOW 45, LR, THK.25.40mm, BW, ASTM A420-WPL67631342921PC982" ELBOW 90, LR, SCH. XXS, BW, ASTM A234-WPB7630426131PC991" ELBOW 90, LR, SCH. XXS, BW, ASTM A234-WPB7630425831PC1001" EQUAL TEE, BW, SCH. XXS, ASTM A234-WPB7630815831PC101FITTING, BRANCH WELD OUTLET, CS, BR 3 IN, RUN 8 IN, SCH - / XXS7679083011PC1028"X4" RED. TEE, BW, THK.25.40mm x SCH. XXS, ASTM A420-WPL67631882229PC1032"X1" RED. TEE, BW, SCH. XXS x SCH. XXS, ASTM A234-WPB7630881081PC1048"X2" WELDOLET, BW, THK.25.40mm x SCH. XXS, ASTM A105N7679176889PC1058"Xl" NIPOLET, BW, THK.25.40mm x SCH. XXS, ASTM A105N7680296079PC1068"X2" WELDOFLANGE, THK.25.40mm x SCH. XXS, 2500# RF ASTM A105N7680374829PC1078"xl" WELDOFLANGE THK.25.40mm x SCH. XXS, 2500#, RF, ASTM A105N7680374769PC1084"x1" WELDOFLANGE SCH.XXS x SCH. XXS, 2500#, RF, ASTM A105N7680374459PCPackage "A" (BAB)Page: 47/56ItemDescriptionMesc. No.UnitRate in AED1091" ELBOW 90, LR, BW, SCH. XXS, ASTM A420-WPL67631431831PC1101" EQ. TEE, BW, SCH. XXS, ASTM A420-WPL67631841831PC1112" ELBOW 90, LR, BW, SCH. 160, ASTM A403-WP316L7633413401PC1121" ELBOW 90, LR, BW, SCH. 80S, ASTM A403-WP316L7633413081PC1132"x1" RED. TEE, BW, SCH. 160 x SCH. 80S, ASTM A403-WP316L7633855791PC1142"x1" CONC. RED. BW, SCH.160 x SCH.80S, ASTM A403-WP316L7633706391PC1151" EQUAL TEE, BW, SCH. 80S, ASTM A403-WP316L7633848081PC1168" ELBOW 90, LR, THK.15.8mm, BW, ASTM A860 WPHY-657629352909PC1173"x1" WELDOFLANGE, BW, SCH. 40 x SCH. 80, 150#, RF, ASTM A105N7680370079PC1183"x1/2" NPT,THREADOLET, BW, 3000#, ASTM A105N7680310011PC1193" ELBOW 90 LR,, BW, SCH. 40, CS ASTM A234-WPB7630426251PC1208" EQ. TEE, THK.25.40mm, BW, ASTM A420-WPL67631911419PC121ELBOW, LR. 316L SS, BW, 90 DEG, 3 IN, 0.120 IN WT, SCH 10S7633413639PCGAS PRODUCER - FLANGES1223" FLANGE, WNFL, SCH. 105, 150#, RF, ASTM A182-F316L, SERRATED SPIRAL7665794401PCFINISH (RA 6.3 TO 12.5)1233" FLANGE, WNFL, SCH. 40, 150#, RF, ASTM A350-LF2, CL1, SERRATED SPIRAL7662761129PCFINISH (RA6.3-12.5)1241" FLANGE, WNFL, SCH. 80, 150#, RF, ASTM A350-LF2, CL1, SERRATED SPIRAL7662761569PCFINISH (RA 6.3-12.5)1253" BLIND FLANGE, 150#, RF, ASTM A350-LF2 CL1, SERRATED SPIRAL FINISH (RA7662130729PC6.3-12.5)1" FLANGE, WNFL, SCH. 80, 2500#, RF, ASTM A350-LF2, CL1, SERRATED SPIRAL7662768369PC126FINISH (RA 6.3-12.5)1278" FLANGE, WNFL, THK.25.40mm, 2500#, RF, ASTM A105N, SMOOTH FINISH (RA7662777409PC3.2 TO 6.3)1288" FLANGE, WNFL, THK.25.40mm, 2500#, RTJ, API 6A7662812189PC129FLANGE SET, ORIFICE, WELDNECK TYPE, CS, 8 IN, CL 2500, WITH 3/4 IN. NIPPLE,7662955221PC130THK.25.40mm, 2500#, RF, ASTM A105N, SMOOTH FINISH (RA 3.2 TO 6.3)7662777349PCFLANGE, WN, CS, RF, SOUR, A105N, 3 IN, SCH XXS, CL 25001314" FLANGE, WNFL, SCH. XXS, 2500#, RF, ASTM A105N, SMOOTH FINISH (RA 3.27662777369PCTO 6.3)Package "A" (BAB)Page: 48/56ItemDescriptionMesc. No.UnitRate in AED1322" FLANGE, WNFL, SCH. XXS, 2500#, RF, ASTM A105N, SMOOTH FINISH (RA 3.27662777309PCTO 6.3)1331" FLANGE, WNFL, SCH. XXS, 2500#, RF, ASTM A105N, SMOOTH FINISH (RA 3.27662777269PCTO 6.3)1343/4" FLANGE, WNFL, SCH. XXS, 2500#, BE, ASTM A105N, SMOOTH FINISH (RA 3.27662777249PCTO 6.3)135FLANGE, BLIND, CS, RF, SOUR, A105, 3 IN, CL 25007662084849PC136FLANGE, BLIND, CS, RF, SOUR, A105, 4 IN, CL 25007662084869PC1372" BLIND FLANGE, 2500#, RF, ASTM A105N, SMOOTH FINISH (RA 3.2 TO 6.3)7662084809PC1381" BLIND FLANGE, 2500#, RF, ASTM A105N, SMOOTH FINISH (RA 3.2 TO 6.3)7662084769PC1391" FLANGE, WNFL, SCH. XXS, 2500#, RF, ASTM A350-LF2 (CL 1), SMOOTH FINISH7662768569PC(RA 3.2 TO 6.3)1401" BLIND FLANGE, 2500#, RF, ASTM A350 -LF2 (CL 1) SMOOTH FINISH (RA 3.2 TO 6.3)7662137169PC1412'' FLANGE WNFL, SCH. 160, 2500#, RF, ASTM A182-F316L, SMOOTH FINISH (RA7665797309PC3.2 TO 6.3),1421" WNFL SCH. 80S, 2500#, RF, ASTM A182-F316L, SMOOTH FINISH (RA 3.2 TO 6.3)7665797269PC1432" FLANGE, BLIND, 2500#, RF, ASTM A182-F316L, SMOOTH FINISH (RA 3.2 TO 6.3)7665084901PC1442" SPECTACLE BLIND FLANGE, 2500#, RF, ASTM A240 GR 316L, SMOOTH FINISH7688105501PC(RA 3.2 TO 6.3)1458" FLANGE, WNFL, THK.15.88mm, 2500#, RF, ASTM A694 F65, SMOOTH FINISH7661627889PC(RA 3.2 TO 6.3)1463" FLANGE, WNFL, SCH. 40, 150#, RF, ASTM A105N, SERRATED SPIRAL FINISH7662783121PC(RA6.3 TO 12.5)1473" BLIND FLANGE, 150#, RF, ASTM A105N, SERRATED SPIRAL FINISH (RA6.3 TO7662100721PC12.5)1481" BLIND FLANGE, 150#, RF, ASTM A105N, SERRATED SPIRAL FINISH (RA6.3 TO7662080669PC12.5)1498" SPACER RING, 2500#, RF, (ASME FLANGES), ASTM A516 GR65 S57688462181PC1508" SPADE 2500#, RF, ASTM A516 GR.65 557688422181PC1511" SPECTACLE BLIND, 2500#, BE, ASTM A516 GR65 557688372061PC152FLANGE, BLIND, SS, RF, A18