Presentation Outline Introduction and History Product Overview Quality, Operational Capability
& Capacity Process Improvements Engineering & Specific
Products of Interest Elastomer R&D Summary Pressure Control Equipment BOP Control Systems HPT Gate Valves Flow Control Products Wellhead & Production
Systems Wellhead Gate Valve Products
History of T-3 Energy
Gus Halas hired as
CEO
• Cost reductions.• Hired new senior
management.• Facilities
rationalization.• Expanded
geographically.
• Enhanced original equipment product development.
• Expanded geographically.• Increased manufacturing
capacity for Ram BOPs.• Increased Wellhead
Engineering for product development.
• Introduced new products in all product lines.
• Integrated Management Systems.
• Process Improvements and Lean Manufacturing.
Leading provider of aftermarket services of pressure and flow control equipment primarily along the U.S. Gulf Coast.
Capitalized by
2001 20022000 2003 2004 2005 2006 2007
Sold Products Segment
Sold Distribution Segment
First Reserve Sells all T-3 Energy Common Shares in a Series of Block Trades.
2008
Company OverviewWe design, manufacture, repair, and service products used in thedrilling and completion of new oil and gas wells, the workover of
existing wells, and the production and transportation of oil and gas.
Wellhead Products 18% of 12-31-2007
Revenues
Production Phase
Pipeline Products 13% of 12-31-2007
Revenues
Transmission andProcessing Phase
Pressure and Flow Control Products 69% of 12-31-2007
Revenues
Drilling Phase
Crown &
Standpipe Manifold
Choke & Kill Manifold
Blowout
Master Bushing
Remote Control System Panel
Surface Control System Choke & Kill
Manifold
Blowout Preventer Stack
Remote Control System Panel
Surface Control System
Wellhead & Production
Tree Pipeline Valves
Strong Customer BasePressure & Flow ControlPressure & Flow Control WellheadWellhead PipelinePipeline
Drilling Contractors & Rig BuildersDrilling Contractors & Rig Builders
Atwood Oceanics Burgan Drilling Cactus Drilling Company Diamond Offshore Drilling Daldrup & Sohne AG Drilltec Ensign Drilling, Inc. ENSCO Offshore Company Frontier Drilling Grey Wolfe Drilling Company Helmerich & Payne Hercules Drilling (TODCO) IDM Jardboranir KCA Deutag LTI
Max Streicher MB Petroleum Nabors Drilling Noble Drilling Parker Drilling Company Patterson UTI Drilling Precision Drilling Pride International Rowan Companies Saipem SONGA Drilling Transocean Trinidad Drilling Venture Drilling Weatherford Drilling International
Strong Customer Base
E&P OperatorsE&P Operators
AGIP Petroleum Co. Amerada Hess Anadarko Apache Corporation British Petroleum Burlington Resources Chevron Conoco Phillips Devon Energy Dominion Exploration & Production El Paso Oil & Gas Ellora Operating Encana ExxonMobil Houston Exploration Hunt Petroleum KOC Marathon Oil Co.
Murphy Exploration & Production Newfield Exploration Nexen Petroleum Noble Energy O’Benco, Inc. PDO Pemex Peoples Energy Plains Resources Pogo Producing Company Samson Oil & Gas SandRidge Energy Saudi Aramco Shell Offshore St. Mary Land & Exploration Swift Energy Unocal Corporation Will Drill Resources
Strong Customer Base
11"-10K BOP, CLOSING UNITSGERMANYDRILLTEC
11"-10K BOPHOLLANDINTERNATIONAL SNUBBING SERVICES
7"-10K BOPN. SEAITS
BOPs, C/K MANIFOLDSHOLLANDHUISMAN-ITREC
21” & 13” BOPs, VARIOUS SPOOLS, VALVESSAUDI/MEXICO/ANGOLAHERCULES
13"-10K, 20" BOPICELANDHEKLA
13"-10K BOP, 21" BOP, 29.5 DIVERTERKUWAITBURGAN (PISC)
13"-15K BOP ROMANIAGULF SYSTEMS PETROLEUM (GSP)
13"-3K BOPOMANENSIGN
13"-5K BOPGABONENSIGN
13"-10K BOP, 29.5 DIVERTER, 21" BOPQATARENSCO
13"-10K BOP, 11"-10K BOP, 21" DIVERTER, 29.5 DIVERTEREGYPTEDC (MOLLER SUPPLY)
13”-10K BOP, C/K MANIFOLDS, CLOSING UNITSGERMANYDALDRUP & SOHNE AG
21" BOPINDIAABAN
KEY INTERNATIONAL ORDERSKEY INTERNATIONAL ORDERS
11”-5K BOPOMANMB PETROLEUM
13"-10K BOP, 21" BOPPERUPETREX (GAFFNEY KROESE)
13"-10K BOP, 16"-5K BOPME/MEXICONOBLE DRILLING
BOPs, C/K MANIFOLDSICELANDJARDBORANIR
13"-10K BOP MIDDLE EASTMAERSK (MOLLER SUPPLY)
18-10K BOPBRAZILPRIDE INTL.
11" BOP, 13" BOPRUSSIA/AUSTRALIA/MEXICO/OMAN
WEATHERFORD DRILLINGINTERNATIONAL
BOPs, C/K MANIFOLDS, CLOSING UNITSGERMANYMAX STREICHER
BOPs, FC GATE VALVESABERDEEN/HOLLANDWEATHERFORD UK
11"-10K BOP, 13"-10K BOPUS/CANADATRINIDAD
11"-5K BOPMEXICO/COLUMBIASAXON ENERGYSERVICES/SCHLUMBERGER
13"10K BOP, 11"-10K BOPITALYSAIPEM (GAFFNEY KROESE)
13"-15K BOP, 16"-10K BOPAZERBAIJANNOBEL OIL/AZERI DRILLING
16" BOP, 21" BOPMEXICONABORS INT.
KEY INTERNATIONAL ORDERSKEY INTERNATIONAL ORDERS
Drilling Phase (BOP) Market Share
33%Land & Jack-Up Drilling Rigs
26%Entire Market
T-3 Percentage of New Installed Base Between
2005 and 2007
New and Remanufactured BOP Market
16%Land & Jack-Up Drilling Rigs
13%Entire Market
T-3 Percentage of New Installed Base Between
2005 and 2007
New Manufactured BOP Market
1%
BOP Elastomers Market Share (Combined New and Remanufactured BOP Market)
Drilling Phase Elastomer Product Market ~ $150MM
19%Land & Jack-Up Drilling Rigs
16%Entire Market
T-3 Percentage of New Installed Base Between
2005 and 2007
New Manufactured BOP Control Systems
History & Milestones
0
100
200
300
400
500
Tota
l Num
ber
2002 2003 2004 2005 2006 2007
Ram & Annular BOPs
New Manufacture Remanufacture
$0
$40
$80
$120
$160
$200
$240
$280
2004 2005 2006 2007
Afterm arket
OEM Products
T-3’s OEM Product Transition
$105.290% OEMIncrease
$67.4
$103.2
$ in Millions
$31.0
$163.1
79% OEMIncrease
% OEM 46% 57% 65% 76%
$217.4
$166.1
$58.8
58%increase
International Expansion Priorities
2008 and 2009 focus on expanding international footprint throughauthorized repair facilities, agents, distributors, and customer liaisons.
On July 14, 2008, T-3 Energy Services, Inc. Entered Into Middle East Joint Venture Agreement With Aswan International Engineering
Company LLC Located in Dubai, UAE
Gefro
AswanT3 Mexico / Groupo R
Pressure Control Group
Wellhead & Production Systems
Pipeline Valve Specialty
Custom Coating Specialties
Nisku, Alberta
Houston
2
Robstown
Odessa
Perryton
Jennings
HoumaLafayette
Shreveport
Indianapolis
Buffalo
Tyler
Rock Springs
Casper
Conway
Cardenas, Mexico
●
Dallas
OKC
New Orleans
Denver
W. Virginia
Grand Junction
Black text denotes existing
Red text denotes priority
Domestic Footprint and Growth Priorities
Pennsylvania
AtlantaFarmington
Venicia
Long Beach
Growth Trajectory
Financial Management
Continue conservative
financial business model with respect to
capital investment, debt
management, and quality of
earnings.
6A-0202 6A-0041 6A-0564 6A-0386 6A-0253 6A-0756 16A-0087 16A-0026 16A-0131 16A-0171 16C-0032 16D-0018 6D-0462
Growth and Acquisition
Continue to pursue growth
opportunities via acquisition, geographic
expansion, and capacity
improvement.
New Product Introductions
Continue development of new name-branded and
engineered products in all three
product sectors, including
aftermarket services and non-metallic
elastomer products.
Supply Chain and Sourcing
Formalize Sourcing Pipeline
and technical resource team to
support new product
introductions and existing product
margins.
Process Improvement
Continue to focus on
Continuous Process
Improvement and Lean
Manufacturing opportunities
throughout the organization.
Products
Remanufacture / Repair
Low Pressure O.E.M.
High Pressure O.E.M.
Sub Sea OEM
Prod
uct C
ompl
exity
Rated Working Pressure
Drilling Phase Products
1. Blowout Preventers (BOP)
Large pressure valve that when activated, seals the well and prevents fluids and
gases from escaping. Protects the crew & maintains integrity of
the wellbore.
2. BOP Control Systems
Hydraulic control systems that are used to remotely function BOPs. A control system is required for each
BOP stack.
3. Non-Metallic Elastomers &
Rams
Non-metallic sealing devices
used within BOPs and other
pressure-control related equipment.
4. HXE Drilling & Well Servicing
Chokes
Valves used to control fluid flow rate or reduce
system pressure. Usually installed within a manifold
assembly.
5. Choke and Kill Manifolds
Arrangements of piping, valves, and
chokes used to control, distribute and maintain fluid flow from drilling
activity.
1
2
3
4 5
Featured Annular-BOP Products
29 ½” 500 PSI 7012 Annular Diverter BOP
Low pressure annular BOP designed for control shallow
gas environments when drilling for casing
placement. Popular BOP for stack configurations
found in Mexico and South America.
7022L Annular Blow Out Preventer
Designed for surface installations on land & platform
applications. Compact and seal reliably on almost any
shape or size pipe, casing or tool in the wellbore, as well as complete shut off (CSO) of the
open bore. Provides enhanced positive pressure control while stripping drill
pipe.
7082 Annular Blow Out Preventer
Lower profile BOP designed for surface installations on
land & platform applications.Compact and seal reliably
on almost any shape or size pipe, casing or tool in the
wellbore, as well as complete shut off (CSO) of the open bore. Best overall
performing annular.
7072 Sub-Sea Blow Out Preventer
Designed for sub-sea installation with a studded top by flanged bottom with side outlets available. Compact design with a wedge-style head. Compact and seal
reliably on almost any shape or size pipe, casing or tool in
the wellbore, as well as complete shut off (CSO) of the
open bore.
Featured RamFeatured Ram--BOP ProductsBOP Products
6011i Ram ROP
Priced to compete with remanufactured
equipment and has the same well pressure
control performance as "U" ram BOPs, which
ensures product support worldwide. Includes expanded options for
ram blocks and packers, and can be fitted with fixed bore & variable
bore rams.
Sub-Sea Well Isolation BOP
13-5/8” 10,000 PSI Isolation BOP
necessary for surface drilling from floating drilling rigs needing to shear drill pipe. This is a growing
method for conducting
exploration drilling offshore and is
analogous to slim hole drilling on land.
6012 Ram BOP
API 16A Ram type blowout preventer suitable for surface
drilling (land and offshore) and well
intervention. Can be supplied with qualified
ram packers, top seals, and bonnet seal kits for
extreme service conditions, high or low temperature, and harsh chemical environments.
Sub-Sea Shearing BOP
Designed pre-dominantly for
existing floating drilling rigs with 18-3/4”
10,000 psi ram-type BOPs seeking an
upgrade. Fitted with a combination of casing shear bonnets, casing shear rams, tandem shear bonnets, and
Model 6012 shearing sealing rams.
6031 Ram BOP
Designed for cold weather conditions and
smaller land drilling rigs in which a low
profile BOP is required. Popular in
the Canadian and Rocky Mountain
region. Modeled after a Shaffer-style ram
architecture.
Subsea BOP Product Highlight13-5/8” 10,000 PSI Subsea Isolation BOP
Proprietary Compact Sub-Sea Bonnet will Operate with Hydraulically Actuated Mechanical Lock (“HAML”) Removed.
Can be fitted with tandem shear bonnet designed with fully internal and protected porting.
Sub-Sea BOP Product Developments18-3/4” 15,000 psi Ram BOP
ProprietarySub-Sea Design.
Incorporation of a Proprietary Locking System.
Incorporation of a Patentable
Packers for Fixed and Variable Pipe
Rams and Shearing Sealing
Rams.
Sub-Sea Ram BOP
Drilling Phase BOP Products
6000 Shearing Sealing Rams
Integral bland shearing sealing rams with energized sealing
capabilities much the same as pipe rams.
Employed as blind rams during normal drilling
operations and conform to NACE requirements It
can shear pipe numerous times without affecting operation & sealing.
6012 Ram BOP Wear Plates
Customer-driven design innovation to
extend the service life of a Model 6012 or
competitor ram BOPs. Reduces maintenance and
repair costs to reduce the total cost of
product ownership.
Low Torque Bonnet Seals
For both T-3’s 6012 and 6011i ram BOPs.
Customer-driven design innovation to
enhance bonnet sealing. Increase
ease of operation with standard tooling and reduced safety risk
associated with high bonnet bolt torque.
Model 6012 Casing Shear Rams
Designed to shear large pipe up to 13
3/8” casing, as required for dynamically
positioned sub-sea drilling. Incorporated guides help ensure pipe containment within the shear
interface.
18-3/4” 10K VBR Inverted Ram
For T-3’s 6012 BOPs, seals off
wellbore on bottom of stack thereby
allowing for pressure testing above rams.
Featured Ram-BOP ProductsModel 6000 Shearing Sealing Rams
API 16A Fatigue Tested Ram has a Fold Over Shoulder
that Bends the Lower Section of
Sheared Pipe, Allowing Clearance
for the Ram to Close & Seal.
Shearing and sealing
capabilities up to 6-5/8” - 25.2 lb/ft Grade S-135 drill pipe with Large
Bore Shear Bonnets &
Tandem Boosters
Shearing and sealing capabilities up to 5-1/2” - 24.7 lb/ft Grade S-135
drill pipe with standard bonnets.
Featured Ram-BOP ProductsProprietary Casing Shear Bonnets
18-3/4” 10K Casing Shear Bonnet
1,800,000 lbs of shearing force available with 0 psi wellbore pressure
@ 2,800 psi hydraulic pressure
1,500,000 lbs of shearing force available with 5,000 psi wellbore pressure @ 2,800 psi hydraulic
pressure
Sub-Sea Valve Products
T-3 Sub-Sea DF Gate Valve
hydraulically actuated balanced stem allows
no fluid displacement in the valve body during operation. This allows bi-directional sealing
without the possibility of multi-valve line
"Hydraulic Locking“. Operates up
to 15,000 PSI.
HPTTM Sub-Sea Drilling Valve
HPT™ subsea valves are qualified to API 17D for
10,000 feet of water depth. The valves are
available in various configurations. Ease of maintenance is achieved
through a quick disconnect mechanism
between the actuator and the gate valve.
HPTTM Sub-Sea Production Valve
HPT™ manual subsea gate valves provide a
reliable bubble tight shut off for a variety of subsea production applications.
The HPT™ lip arrangement between the
seat and pocket insert reduces debris from
entering the body cavity.
Sub-Sea Production Valve Actuation
HPT™ Subsea Actuators are qualified to API 17D for 10,000 feet of water
depth as fail-safe close or open design. Unique integral hydrostatic
pressure compensating design avoids sea-water ingress and removes the
need for an external hydrostatic unit.
Proprietary Sealing Products
T3 Wellhead S-Seal (Piston Type)
S-Seal – Piston Type areelastomeric interference seals with anti-extrusion
devices which are used on machined surfaces, such as
tubing hanger necks and unitized wellhead support
packoffs.
T3 Wellhead Metal-to-Metal Seal
T3-MM seals are intended for machined surface
sealing applications. The metal seal is made of a soft
metal such as 316 SS or Incoloy 825 and is crushed
into place.
T3 Wellhead CS-Seal
CS-Seals - Elastomeric interference casing seals
with anti-extrusion devices.
Low Torque Bonnet Seals
For both T-3’s 6012 and 6011i ram BOPs.
Customer driven design innovation to enhance
bonnet sealing. Increase ease of operation with standard tooling and
reduce risk associated with high bonnet bolt
torque. API 16A qualified.
Production Phase Product Solutions
TimeSaverTM Wellhead with DDV System
Weatherford’s Down hole Deployment Valve technology. Used in under-balanced drilling.
It is a valve that is put in the well's casing down hole and used to allow the drilling assembly to go in and out of the hole with
little hydrostatic head.
TimeSaverTM Wellhead System
Standard API dimensions and mandrel casing hangers. 2 and 3 stage adaptability for a
wide variety of casing programs. Pre-assembled
and saves BOP-nippling time while drilling.
Dual Block Wellhead System
Two integrated vertical bores for production of
oil & gas in a single unit. Can operate as a
christmas tree assembly on various wellhead
systems.
Through-Bore Diverter System (TDS)
safely reduces rig time by a minimum of 24 hours
per well and lowers drilling costs by not
requiringfield welding or waiting
for cementing operations.
Production Phase Valve Products
Conventional Wellhead System
A wellhead is that part of an oil well
which terminates at the surface, where petroleum or gashydrocarbons can
be withdrawn.Ensures safe and efficient flow of oil and gas from the
wellbore to separation and
pipeline equipment.
T-3 Proprietary Production and Well
Servicing Chokes
A production choke is a hydraulic or manually
operated control valve.
T-3 Proprietary D5 / D10 Gate Valve and “FC” Style Valves
Valves installed on top of the well to
direct product flow. Largest consumable
on a wellhead
Transmission and Processing PhaseComplete line of recently introduced TComplete line of recently introduced T--3 name3 name--branded gate valves, ball valves, control branded gate valves, ball valves, control
valves, check valves, & pipeline valves used in gathering systemvalves, check valves, & pipeline valves used in gathering systems & pipelines.s & pipelines.
T-3 CFT Trunnion Mounted Ball Valves
Designed with a take-apart three-piece forged body design and trims available to meet the demanding requirements of the
pipeline and process industries. Available in sizes
from 2" through 36" and classes 150 through 1500.
T-3 T1-EX Expanding Gate Valve
A complete block and bleed valve that protects sealing surfaces. The operating clearances allow smooth operation without gate sticking or
debris buildup in the body cavity. Design reduces pressure drop and allows for the smooth
passing of pipeline pigs.
T-3 EW Globe Style Control Valves
Designed for both general and high performance applications in most process control industries
including gas & oil transportation, petrochemical refining, &
production and power generation.
Aftermarket Services
Elastomers and Replacement Parts
T-3 Energy manufactures and stocks replacement parts, including name-
brand elastomer products. Available upon request for
both field service or customer preventative maintenance needs.
24/7 Field Service and Technical Support
T-3 Energy provides field service personnel in a
myriad of locations and is available 7 days a week, 24 hours a day. Field service crews are trained to service both T-3 Energy products and competitor products.
Equipment Repair and Remanufacture
T-3 Energy’s history starts as a responsive and technically
prolific organization capable of servicing all competitor
products. Combined with T-3 Energy’s engineering
capabilities, customers are provided the same level of
confidence as if purchasing a newly manufactured product.
Quality, Operational Capability & Capacity
Quotations Purchasing Inventory Engineering Change Customer reports Financials Order Entry Shipping & Receiving Material Management Material trace Invoicing Payroll
Process Control and MRP
Bar-Coded “Process Control Routers” ensure products are manufactured to the latest engineering specifications.
HR, Quality, Environmental, & Safety
T3-E4465 Behavior-Based Safety Best Management Practice ProgramT3-E4468 Confined Space Entry ProgramT3-E4469 Determination of Confined Space Entry Decision TreeT3-E44611 Electrical Safety ProgramT3-E4473 Emergency Preparedness and Response PlanT3-E44612 Fall Protection ProgramT3-E44622 First Aid ProgramT3-E44624 Good Housekeeping ProgramT3-E44638 Lock Out / Tag Out ProgramT3-E44650 Process Safety Management Awareness ProgramT3-E44683 Return To Work Program (Transitional Duty Program)T3-E44653 Scaffolding User Awareness ProgramT3-E44655 Short-Service Employee PolicyT3-E44657 Stop Work Authority PolicyT3-E4428 QUEST Incentive Program
T3-E44680 Powered Industrial Trucks Safety ProgramT3-E44681F Practical Forklift Examination ChecklistT3-6304F Daily Forklift Inspection LogT3-E44610 Driver Safety and Pre-Hire Screening BMPs
Hazardous CommunicationT3-E44625 Hazardous Communication ProgramT3-E4466 Bloodborne Pathogens Awareness ProgramT3-E4467 Compress Gas Cylinder HandlingT3-E44654 Scheme for the Identification of Piping SystemsT3-E44635 Hydrogen Sulfide Awareness Training ProgramT3-E44636 Job Safety Analysis Program
NORM T3-E44669 Used Equipment Screening Procedure (NORM)
Revision B
Environmental, Health and SafetyManagement System Interface
General Health and Safety Programs
Issued By: Michael Rai Anderson, P.E. - Director T3.E0001 April 1, 2005
Powered Industrial Trucks / Drivers Safety
ISO / Management
System Components
EH & S Management
System
Environ-mental
Protection
Health and Safety
NORM
General Programs
Industrial Hygiene /
PPEReporting
KitsPlant Safety Equipment
Forklift & Drivers Safety
Hazards Commun-
cation
Click on the Topic you Wish to Narrow
Your Search.
T3.E4464 Air Permit by Rule / Air Permit Exemption Requirements Decision TreeT3.E44643 Paint Booth, Sand Blast Booth, Oven Stack Opacity ProcedureT3.E446??F Air Emissions Tracking & Recordkeeping System
T3.E44639 MSDS Management ProgramT3.E44628 Chemical & Raw Material Management Requirements MatrixT3.E44613 EPCRA Inventory Reporting Decision TreeT3.E44614 EPCRA Tier II Reporting Decision TreeT3.E44615F EPCRA Tier II Chemical Inventory WorksheetT3.E44616 EPCRA Spill Reporting Decision TreeT3.E44612 EPCRA General Requirements Speadsheet
T3.E4513 General Environmental Compliance ScheduleT3.E4514F Environmental Annual Regulatory Reporting ChecklistT3.E4415F Environmental/Regulatory Inspection ChecklistT3.E44619F Reportable Spill Event FormT3.E44620F Non-Reportable Spill Report FormT3.E44657F SPCC Audit FormT3.E44658F Monthly SPCC Audit Form (For facilities with SPCC Plans)T3.E44661F Secondary Containment Stormwater Drainage Release FormT3.E44665F Storm Water Discharge Overall Compliance ChecklistT3.E44666F No Exposure Certification (NEC) Facility Inspection FormT3.E44667F Industrial Benchmark Samping Exceedance ReportT3.E44631F Hazardous Waste Storage Inspection FormT3.E4516F Site Inspection Corrective Action SpreadsheetT3.E4517F 30-Day QUEST Deficiency Notification Report
T3.E44661F Secondary Containment Stormwater Release FormT3.E44657 SPCC Requirements Decision Tree
Chemical and Raw Material Management
Spill Prevention and Control
Inspection Checklists and Reporting Kits
Revision B
Environmental, Health and SafetyManagement System Interface
Air Quality
Issued By: Michael Rai Anderson, P.E. - Director T3.E0010 April 1, 2005Health and
Safety
EH & S Management
System
ISO / Management
System Components
Environ-mental
Protection
Air Quality
Spill Prevention&
Control
Storm Water
Chemical and Raw Material
Click on the Topic you Wish to Narrow Your
Search.
Reporting Kits
Waste Disposal
Wastewater
• API 6A – Wellhead & Christmas Trees• API 6D – Gate Valves• API 16A – Blow-Out Preventers• API 16C – Choke and Kill Manifolds• API 16D – Control Systems• API 17D – Subsea Valves (EEC)• NBBI “VR” – Pressure Relief Valves• QMI ISO 9001:2000 – QMS
QUEST Performance
Average Total Cost of Quality as a Percentage of Revenue
1.77%
0.67%
2.44%
1.97%
0.23%
2.20%2.33%1.99%
0.34%
0.0%
0.5%
1.0%
1.5%
2.0%
2.5%
3.0%
Rew ork as a % of TotalRevenue
Warranty as a % of TotalRevenue
Total COQ as a % of TotalRevenue
2005 Company Averages2006 Company Averages2007 Company Averages (Orig 5)
6A-02026A-0041
6A-0564 6A-0386
6A-02536A-0756
6A-029016A-0087
16A-002616A-0131
16A-017116A-0057
16C-003216C-0005
16D-00186D-0462
17D-0033
T3 Energy Average Annual Safety Performance
6.55.9
5.45.8
4.3
2.1
0.00.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
2002 2003 2004 2005 2006 2007
TRIR
Industrial Average TRIRAnnual T3 Energy TRIR2007 Company Goal
Nisku, Alberta
Houston
2Jennings
HoumaLafayette
Rock Springs
Cardenas, Mexico
Current PCG Locations
Recent Acquisitions / Joint VenturesPressure Control Group
Equipment Type T3 MainT3 VentureT3 CypressT3 JenningsT3 Creekmont T3 NiskuT3 Rockies TotalCNC HBM 9 1 4 0 2 0 0 16CNC Vertical Mill 3 3 0 1 1 1 0 9CNC Horizontal Machining Center 1 0 0 1 3 0 0 5CNC Lathe 4 4 1 2 7 0 0 18CNC VTL 2 1 2 0 0 0 0 5Manual HBM 3 1 2 0 0 1 1 8Manual VTL 3 3 3 0 0 1 2 12Manual Engine Lathe 9 9 1 4 6 2 5 36
Current Major Equipment
BOP Capacity Expansion2005 2006 2007 2008
Projected
New BOP Unit Capacity
156 396 396 444
Repair BOP Unit Capacity
252 252 252 396
Total BOP Unit Capacity
408 648 648 840
2005
Initiate Facilities Rationalization and Lean Manufacturing
2006 2007 2008
Phase II – New BOP Manufacturing Capacity Initiative
Phase I - New BOP Manufacturing
Capacity Initiative
Phase I – BOP Re-Manufacturing Capacity Initiative
Phase II – BOP Re-Manufacturing Capacity Initiative
Capacity Addition– Rock Springs Re-manufacture Expansion
Item Budgeted CostCNC HBM (4" bar) Used 200,000$ Heat treat oven 100,000$ Sub-Arc welder and manipulator 90,000$ Manual HBM (5" bar) 80,000$ 64" Manual VTL 75,000$ Blast Room 68,640$ Tooling & Fixtures 75,000$ PMI Machine 44,000$ Computers and Office Furniture 35,000$ Air Compressor 30,000$ Radial Arm Drill Press (8') 30,000$ Test, Paint, & Wash Booths 71,645$ Misc. 19,000$ Total Phase I 918,285$
Capacity Addition – Cypress Re-manufacture Expansion
Item Budgeted Cost
CNC HBM (5" bar) 460,000$ CNC HBM (6" bar) 1,850,000$ CNC VTL (84") 550,000$ Equipment Moves (Total) 445,000$ Computers & Wiring 70,000$ Inspection Equipment 70,000$ Air Compressor 35,000$ Build 70' x 170' building for expansion 1,786,096$ Sub-Arc welder and manipulator 90,000$ Sand Blast Room 220,000$ Total Phase I 5,576,096$
Daewoo Daewoo6" G&L HBM
OMVTL
BullardVTL KIA
SMG&LHBM
Lucas Union
CincinnattiBickford
KingVTL
KingVTL(sml)
54"BullardVTL
54"BullardVTL
Assembly
T.D.Q.
Inspection
Shipping & Receiving
P
W
BT
Maint.
Weld Shop Offices
Staging
Machine Shop
Inventory / Warehouse
ORR O O O O
Offices
Covered Shed
Plant Layout of Cypress Expansion
Cypress Expansion
Geographic Expansion
Capacity Expansion
Acquisition / Partnership
Process Improvements
Lean Manufacturing – Focused FacilitiesPCG Work Performed June 2003:
Region BOP ServiceBOP New
Manufacturing
Choke Manufacturing
& Service
Manifold Manufacturing
& Service
Accessory Manufacturing
& RepairRubber Goods & Control Systems
Drilling Equipment
Service
T3 Venture Gulf Coast X X X X XT3 O&M Gulf Coast X X XT3 Main Gulf Coast X X XT3 Jennings Gulf Coast X X X XT3 Cypress Gulf Coast X X X
1 6 2 2 2 6 0 2 20
PCG Work Performed Currently:
Region BOP ServiceBOP New
Manufacturing
Choke Manufacturing
& Service
Manifold Manufacturing
& Service
Accessory Manufacturing
& RepairRubber Goods & Control Systems
Drilling Equipment
Service
T3 Venture Gulf Coast X X XT3 Main Gulf Coast X XT3 Jennings Gulf Coast X XT3 Cypress Gulf Coast X XT3 Cardenas Mexico XT3 Nisku Canada X X
3 4 1 2 1 2 1 1 12
Geographic presence has increased by a factor of three (1 to 3), while reducing the work discipline distribution by almost half (20 to 12).
Lean Manufacturing – Facilities
Operational Square Feet
Annual Cost
Annual Cost Per Square
Foot
2003 870,812 $2,177,472 $2.5
2007 491,869 $1,078,116 $2.2
Reduction (Total) 378,943 $1,099,356 $0.3
Reduction (%) 43.5% 50.5% 12.3%
Lean Manufacturing – Logistics
Embedded line haul logistics network has reduced freight expense from approximately $0.06/lb to $0.02/lb.
*When comparing the average costs incurred in 2004.
Houston
Jennings
HoumaLafayette
Cypress
New Technology
Magnetic Fixture Plate w/ Risers
Magnetic Fixture in Operation
Operational Improvement Examples
Old Run Current RunSize Model Item Operation Time (Hrs) Time (Hrs) % Change13 10k Double 6012 Body Finish 75 45 -40%11 5k Double 6011i Body Rough 72 36 -50%
Engineering & Specific Products of Interest
Engineering Product Disciplines
2004
Drilling Phase (Pressure Control
Group) Engineering
2005 2006 2007
Production Phase Product Engineering
Transmission Phase Product Engineering
Drilling Phase (Flow Control Group)
Engineering
2 Engineering Team Members
24 Engineering Team Members
I.P. Status Drilling and Production Phase Products
Patented
Model 6000 Shearing Sealing Ram (7,207,382) Threaded Union Safety Device (6,557,577) Oil Field Choke (5,241,980) Multiple Sleeve Valve Assembly (6,283,152) Well Production and Multi-Purpose Intervention Access HUB (7,219,740 B2) Valve Seal Assemblies and Methods (6,664,572 B2 and 7,004,452 B2) Hydraulic Failsafe Valve Actuator (6,487,960 B1) Hydraulic Double-Acting Valve Actuator (6,659,419) Subsea Hydraulic Actuator with Built-in Pressure Compensator (6,783,107 B2)
Patent-Pending
DDV Wellhead System Subsea Dual Bore Well Jumper Subsea Jumper Deployment “Method and Apparatus” Subsea Light Weight Stab Plate “Connector and Method” Subsea High-Integrity Pressure Protection System “Device, Method, and Apparatus” Machined Bore “Method” D5 and D10 Production Gate Valves
Prospective Patents
18 3/4” 15,000 BOP Sealing Architecture T3 Tubing Hanger Metal Seal T3 Two-Stage Through Diverter System Frac Isolation System
2004
Drilling Phase (Pressure Control
Group) Engineering
2005 2006 2007
Production Phase Product Engineering
Transmission Phase Product Engineering
Drilling Phase (Flow Control Group)
Engineering
2 Engineering Team Members
24 Engineering Team Members
24
4440
38
52
60
16
30 28
20
0
10
20
30
40
50
60
Year
s
API Engineering Experience
API 16A - Packing Unit & Ram Packers
API 16A - Ram & Annular BOPs
API 16A - Drill Through Equipment
API 6A - Production Chokes
API 6A - Gate Valves
API 6A - Wellhead & Christmas TreeEquipment
API 6D - Pipeline Valves
API 16C - Choke & Kill Systems
API 16D - Well Control Equipment ControlSystems
API 17D - Subsea Wellhead & ChristmasTree Equipment
Engineering Product Disciplines
Saudi Aramco BOP Elastomer Research & Development
Currently co-developing a high temperature, chemical-resistant elastomer with Freudenberg NOK’s (“FNOK”) industrial seals division, Simrit. Incorporate modern elastomeric base gums. Two candidate cure systems have been targeted for
their chemical resistance, heat resistance, and general working resilience.
Initial test results of the physical properties show that both candidate compounds are comparable to severe-service elastomers currently used in high-performance blowout preventer products today.
Aramco Qualification – Partner
Molded Product Design The ram packers for use in the 7-1/16”
test fixture and the 13-5/8”-10M BOP have been designed and the components have been sourced. This new packer includes non-extrusion
devices to ensure performance under severe-service conditions.
Aramco Qualification – Seal Design
Analytical screening to be performed at a third-party lab, Southwest Research Institute Temperature and chemical exposure using ASTM samples. SWI has configured their test fixtures and have completed a H2S and
pressure safety verification of the fixtures. After modification of the test protocol, up to three simultaneous
immersions may now be performed. The original estimated duration of immersion testing was five months, it is now two months.
Products will be subjected to physical testing: High temperature testing to 300oF. H2S / CO2 / CH4 testing.
Aramco Qualification – Lab
Mock Ram Cavity The 7-1/16” test fixture
has been designed per SWI requirements and has been quoted.
A new secondary containment vessel has been incorporated for additional safety measures.
Aramco Qualification – Test Fixture
Q1
Base Gum Comparative
Analytical Testing
Q2 Q3 Q4
Prototype Elastomer Production
BOP Ram Cavity Test
Fixture Completion
Full Scale Temperature and Chemical
Exposure Testing
Third-Party Report Review and Release
Aramco Qualification – 2008 Schedule
Aramco Technical Review
Commences
Pressure Control Equipment
T3 Manifold
T3 Manifold
T3 Manifold
T3 Manifold
BLOWOUT PREVENTER STACK 13-5/8" 5000 psi
BOP Principle Views 13-5/8" 5000 psi
BLOWOUT PREVENTER STACK 13-5/8" 15,000 psi
BOP Principle Views 13-5/8" 15,000 psi
BLOWOUT PREVENTER STACK 21-1/4" 2000 psi
BOP Principle Views 21-1/4" 2000 psi
BLOWOUT PREVENTER STACK 7-1/16” 15,000 psi
BOP Principle Views 7-1/16” 15,000 psi
ANNULAR BLOWOUT PREVENTER/DIVERTER 29-1/2" 500 psi
BOP Principle Views BOP/Diverter 29-1/2" 500 psi
Energized Sealing Capabilities, Much the Same as Pipe Rams
Conforms to NACE MR-01-75 Requirements for Integral Blade Shearing Sealing Rams
Ram has a Fold Over Shoulder that Bends the Lower Section of Sheared Pipe, Allowing Clearance for the Ram to Close & Seal
Shear Ram can Shear Pipe Numerous Times Without Effecting Operation & Sealing
Shear Ram is a Single-piece Body
Model 6000 Shearing Sealing Rams™Capabilities
Shear ram can be used as a blind ram during normal drilling operations
Shearing and sealing capabilities up to 5-1/2” - 24.7 lb/ft Grade S-135 drill pipe with standard bonnets
Shearing and sealing capabilities up to 6-5/8” - 25.2 lb/ft Grade S-135 drill pipe with Large Bore Shear Bonnets & Tandem Boosters
Qualified to API 16A fatigue test
Model 6000 Shearing Sealing Rams Capabilities
Pipe Shearing Sequence
BOP Control Systems
API 16D Blowout Preventer Control System
The Thunder Horse Control Unit was made to the client’s specifications using a non-glare finish on the stainless steel construction to ensure safe conditions when in use on the offshore platform
during daylight hours.
Thunder Horse is the World’s largest floating platform, designed to process 250,000 barrels of oil per day and 200 million cubic feet per day of natural gas and is the largest producer in the Gulf of Mexico.
API 16-D Spec MFGTemperature ClassificationClose annular, all rams & open (1) sideHCR’s for volumeTwice the pilot volumeAll Diverter modes1.5 Volume DesignClosing ratioReservoir twice usable volumeResponse time, 30 sec for BOP<18 ¾”Pump Systems capacity/closing ratioTop Load BottlesNo hydraulic in Electrical PanelsAlarmsElectrical back up powerComponents test pressure of 1.5 w.p. & 3:1 burstTraceability & ConformanceA spec to follow when one isn’t available25% Volume shut downRemote 2-hand operation
Accumulator Racks, Tri-Plex Pumps, P.L.C. Controls & Air Pumps
BOP Accumulator PLC Control System
TYPICAL BOP REMOTE WITH12” TOUCHSCREEN
TYPICAL REMOTE PANEL WITH 5”TOUCH SCREEN & PUSH-BUTTONS
T3 NISKU PRESSURE CONTROL PRODUCTS
Configurable Screens
USING THE CONFIGURATION OPTION VIRTUALLY ANY LAYOUT IS CREATABLE
BOP Accumulator PLC Control System
T3 MANUFACTURES A NUMBER OF BOP CONTROL SYSTEMS
– LAND DRILLING RIG BOP ACCUMULATOR CONTROLS
– OFFSHORE RIG BOP ACCUMULATOR CONTROLS
STAND ALONE OR A PART OF THE ENTIRE SYSTEM
IF A 12” TOUCHSCREEN IS UTILIZED NO PUSH BUTTONS ARE NECESSARY
BOP Accumulator PLC Control System
INCORPORATES A “PUSH & HOLD TO OPERATE” FUNCTION AS PER API-16D SPECIFICATION COMPLIANCY
INCORPORATES A “CLOSE BLIND RAMS” POP-UP WARNING SCREEN TO PREVENT ACCIDENTAL OPERATION
THE 12” SCREEN CAN DOUBLE AS ANOTHER DISPLAY CONTROL STATION DISPLAYING VARIOUS SPEEDS, PRESSURES AND VIDEO FEEDS
FULLY CONFIGURABLE STACK ALLOWS FOR AN ACCURATE GRAPHICAL REPRESENTATION OF THE BOP
T3 NISKU PRESSURE CONTROL PRODUCTS
15,000 psi Test Unit
High Pressure Test & Glycol Units
HPT Gate Valves
• Bi-directional valve with downstream sealing.
• Elastomer free therefore no explosive decompression.
• Replaceable pocket Inserts therefore reduced risk of washout.
• Reduced body cavity contamination via seal design and assembly.
• Inventory savings though commonality of parts.
HPT Manual Gate Valve –Key Features
Inconel metal seal
Wave spring retainer ring
Wave spring retainer ring
Spring energized PEEK
face Seals
Built in lip
HPT Manual Gate Valve Seal Assembly
• Good for –75F to 450F. • API 6FA/FC Fire Tested.• API 6AV1 Slurry Tested.• Operates in pressures up to
20,000psi.• Operates in sour
applications.• Also good for methane,
methanol, paraffin solvents, completion fluids, and acids containing <13.5% HCl.
• All seals meet NORSOK M-710 Revision 2 compliance.
HPT Manual Gate Valve –Operating Conditions
HPT Manual Gate Valve with Ball Screw
HPT Gate Valve Size
Number of Turns Torque at 15K
7-15K 19.0 175 ft-lbs7-10K 16.0 145 ft-lbs4-15K 20.5 110 ft-lbs
5-1/8”- 5K Tree with HPT Valves Titon Flow Control - North Sea Production
HPT Manual Gate Valve Production Applications
7.25-10K AND 5.25-10K HPT Valves Independence Hub Project Partners – Helix, Anadarko, Devon, Dominion and Statoil Hydro
HPT Manual Gate Valve Production Applications
7” 15K TRMO Manual and Hydraulic Failsafe – 15K Production TreeOrange, Texas
HPT Manual Gate Valve Production Applications
5”15K Subsea Tieback Boarding Valves SHELL E&P – Llano / Habanero to Auger Tension Leg Platform
HPT Manual Gate Valve Production Applications
EEC Model 3”10K Subsea PLETWalters Oil & Gas
HPT Manual Gate Valve Production Applications
HPT Ball Screw Gate Valve HPT Ball Screw Gate Valve –– 77””15K Frac Tree15K Frac TreeBronco / CuddBronco / Cudd
HPT Manual Gate Valve Frac Applications
HPT Gate Valves and HXE Chokes – 7”15K Frac Tree w/ 4”15K Wing Valves –2”15K Flowback Manifold w/ HXE Flowback Chokes
Bronco / Cudd
HPT Manual Gate Valve Flowback Applications
3”15K HPT Surface Test Tree PackageTETRA
HPT Manual Gate Valve Well Testing
Flow Control Products
Trim Options Positive Needle & Seat Plug & Cage External Sleeve Disk trim Gate and Seat
Actuation Options Manual Pneumatic Hydraulic Electric
Orifice Sizes2/64” – 5”
Pressure RatingANSI 150 – API 20K psi
Temperature Ratings-75 degrees F – 650 degrees F
Materials 4130, 410, 718, Duplex & 625 Clad
Flow Control Products
Needle & Seat Trim Higher capacity
Low to medium pressure drops
Moderate erosion
External Sleeve Trim Lower capacity
Medium to high pressure drops
Severe erosion service
Lower noise
Better controllability
Positive Trim High capacity
Low to medium pressure drops
Moderate erosion
Positive Cage Trim Lower capacity
Medium to high pressure drops
Severe erosion service
Lower noise
Flow Control ProductsChoke Trim Options
Flow Control ProductsProduction Applications
HXE Drilling/Well Servicing Choke
Actuator Outlet
Body
Inlet
HXE Drilling/Well Servicing Choke
Metallic Spring EnergizedFluorocarbon Lip Seal
PEEK Bushing
Reversible Tungsten CarbidePlug and Seat
Wellhead & Production Systems
Operating since 1979, Wellhead and Production Systems has developed a comprehensive value proposition for our customers:
Products and Technology: Full Service Engineering Service Research and Development (TS, TDS, FIS, DDV, Gate Valve and Seal Technology) Standardized Production Control and MRP Platform (Visual Manufacturing)
Service: Distributed Geographic Foot Print Extensive Manufacturing Capacity (Domestic and International) Continued Growth through Acquisition of Targeted Technologies (EEC) Expanded Customer Support Team
Quality and Competency: Internationally Recognized API Certifications Internal Training Programs for Employee Development Integrated QA/QC, HSE, and Employee Development Programs Top Quality Personnel to Manage Organizational Growth and Development Expanded Supply Chain and International Sourcing Department
Wellhead and Production Systems
TimeSaverTM Wellhead with DDV System
Weatherford’s Downhole Deployment Valve technology. Used in under-balanced drilling.
It is a valve that is put in the well's casing downhole and used to allow the drilling assembly to go in and out of the hole with
little hydrostatic head.
TimeSaverTM Wellhead System
Standard API dimensions and mandrel casing hangers. 2 and 3 stage adaptability for a
wide variety of casing programs. Pre-assembled
and saves BOP-nippling time while drilling.
Dual Block Wellhead System
Two integrated vertical bores for production of
oil & gas in a single unit. Can operate as a
Christmas tree assembly on various wellhead
systems.
Through-Bore Diverter System (TDS)
safely reduces rig time by a minimum of 24 hours
per well and lowers drilling costs by not
requiringfield welding or waiting
for cementing operations.
Demand is a function of drilling & completion activity, particulDemand is a function of drilling & completion activity, particularly arly activity in activity in ““resource playsresource plays””, such as the Barnett Shale, such as the Barnett Shale
Wellhead Production Phase Products
T3-22 / T3-29 SOW Casing Head
T3-22 / T3-29 Sliplock Casing Head
T3-29 Casing Hanger T3-22 Casing Hanger T3-MH Mandrel Hanger
Conventional Surface Wellhead Equipment
T3-22-L / T3-29-L Casing Spool
TC-1A-ENTC-1WBO2 Coupling
TCM Single Bowl Tubing Head
Conventional Surface Wellhead EquipmentT3-TC-60 Dual
Bowl Tubing Head
T3–DC Tubing Hanger
T3-TC–60 Tubing Hanger
CS-Seals - Elastomeric interference casing seals
with anti-extrusion devices.
Product Innovations - Seals
T3 CS-Seal T3 Metal-to-Metal Seal
T3 S-Seal (Piston Type)
S-Seal – Piston Type are elastomeric interference seals with anti-extrusion
devices which are used on machined surfaces, such
as tubing hanger necks and unitized wellhead support
packoffs.
T3-MM seals are intended for machined surface sealing
applications. The metal seal is made of a soft metal such
as 316 SS or Incoloy 825 and is crushed into place.
Product Innovations – Telescoping Frac Isolation Systems
3,000 PSI Tubing Head 5,000 PSI Tubing Head 10,000/15,000 PSI Tubing Head
Product Innovations – T3 Coil Tubing Head Adapter
High Pressure S-Seals
Product Innovations
Thru Diverter System I
Thru Diverter System II
Product Innovations – T3 TimeSaverTM
Wellhead Gate Valve Products
• Bi-directional valve with downstream sealing.
• Elastomer freetherefore no explosive decompression.
• Replaceable pocket Insertstherefore reduced risk of washout.
• Reduced body cavity contamination via seal design and assembly.
• Inventory savingsthough commonality of parts.
HPT Manual Gate ValveDrilling and ProductionDrilling and Production
• Good for –75F to 450F. • API 6FA/FC Fire
Tested.• API 6AV1 Slurry
Tested.• Operates in pressures
up to 20,000psi.• Operates in sour
applications.• Also good for methane,
methanol, paraffin solvents, completion fluids, and acids containing <13.5% HCl.
• All seals meet NORSOKM-710 Revision 2 compliance.
The T3-D5 and T3-D10 Gate Valves meet API 6A PR1 and PR2 Performance Test Requirements for Temperature Classes P through U
(-20° to 250°F) and material classes AA, BB, DD, and EE.
T3 Diamond Series D5 Gate Valve
T3 Diamond Series D10 Gate Valve
Conventional Surface Wellhead Equipment
T3’s Diamond Series valves are designed to be durable and easy to operate.
D5 Seat AssemblyWave Spring
Energized Seats
FluorocarbonFace Seals
Elastomer Retainer Ring
D10 Seat Assembly
Fluorocarbon Face Seals
Metal to Metal Sealing
Spring EnergizedPEEK Face Seal
Thank you!