SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 1 – 10
40 MVA Power Transformer Stability Test1. TRANSFORMER DETAILS:
MAKE : ABB
SERIAL NO. :4359245110
FREQUENCY : 50Hz
TYPE OF COOLING : ONAN/ONAF
VECTOR GROUP : YN yn0+d11
NO OF TAPS : 25
NOMINAL TAP : 13
Feeder name- Bay- E03 at 132kV side and Bay K09 at 11kV side
RATING
WINDIN
G
RATED POWER(MVA) RATED VOLTAGE
(KV)
RATED CURRENTS
(A)ONAN/ONAF
HV 31.5/40 132 137.8/175.0
MV 31.5/40 11.5 1581/2008
SW 10.5/13.3 8 757.7/962
IMPEDANCE VOLTAGE
IMPEDANCE
VOLTAGE
WINDING POWER HV VOLTAGES(KV) %
HV-LV AT 40MVA
Tap1—151.8 19.51
Tap13---132.0 17.69
Tap25---112.2 16.28
The CT T1 used For Differential protection (F87T)
CT ratio for 132kV Line side CT’s = 300/1A Relay- RET670- ABB
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 2 – 10
CT ratio for 11kV Line side CT’s = 2500/1A
The CT T3 used For REF protection at HV side (F64HV)
CT ratio for 132kV Line side CT’s = 300/1A Relay- RET615- ABB
CT ratio for HV neutral side= 300/1A
The CT5 used For REF protection at MV side (F64MV)
CT ratio for 11kV Line side CT’s = 2500/1A Relay- RET615- ABB
CT ratio for MV neutral side= 2500/1A
The CT1 used For SBEF protection at HV Neutral side (F51NHV )
CT ratio for HV neutral side= 300/1A Relay- REF615- ABB
The CT4 used For SBEF protection at MV neutral side (F51NMV)
CT ratio for MV neutral side= 2500/1A Relay- REF615- ABB
The CT9 used For SBEF protection at tertiary side (F51NT)
CT ratio for Tertiary neutral side= 300/1A Relay- REF615- ABB
The CT T1 used For O/C & E/F protection at HV Line side (F51/51NHV)
CT ratio for 132kV Line side CT’s = 300/1A Relay- REF615- ABB
Relay used for Over Voltage protection (F59)
VT Ratio 11kV/√3/110V/√3 Relay- REF615- ABB
A. Transformer Stability Test( RET 670)
1a) STABLE CONDITION (132kV BB2 Earth Q25 Closed)
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 3 – 10
Three phase voltage injected in 11kV side thru Bay K09(I/C-1), K11 and all CTs are normal
PHASE
Primary
current (A)
Relay Display
Measurement (A)
Diff. Display
Measurement (A)
CT Terminals Sec
Current (A)
132kV 11kV 132kV 11kV Diff. Rest 132kV 11kV
R 111 151 34.17 392 0
34.32
0.103 0.186
Y 112 150 34.55 392 0 0.107 0.192
B 109 151 33.98 387 0 0.104 0.187
N
1b) UNSTABLE CONDITION (132kV side CT Bypassed by closing the Earth switch Q8 )
a)Three phase voltage injected in 11kV side thru Bay K09(I/C-1)**and all CT’s are Normal
PHASE
Primary
current (A)
Relay Display
Measurement (A)
Diff. Display
Measurement (A)
CT Terminals Sec
Current (mA)
132kV 11kV 132kV 11kV Diff. Rest 132kV 11kV
R 10 150 3.2 393 31.20
34
9.6 153
Y 8 152 3.1 390 31.8 9.2 152
B 10 151 3.0 385 31.2 9.0 149
N 1.6 5.1
1c) STABLE CONDITION (132kV BB2 Earth Q25 Closed)
Three phase voltage injected in 11kV side thru Bay K09(I/C-1)** and all CTs are normal
PHASE
Primary
current (A)Test Plug (A)
Diff. Display
Measurement (A)Relay Display (A)
132kV 11kV 132kV 11kV Diff. Rest 132kV 11kV
R 111 152 110 151 0
34.2
34.2 193
Y 111 150 111 153 0 34.2 389
B 110 151 110 151 0 33.0 388
N - - - - - - - -
REMARKS: 40 MVA Transformer diff Stability circuit found :- OK
B. 40 MVA TRANSFORMER HV REF PROTECTION STABILITY / SENSITIVITY TEST
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 4 – 10
Phase CT Ratio : 300/1 A
Neutral CT Ratio : 300/1 A
Relay Setting (Is) :. A
Stabilizing resistor (final setting) : _ Ohm
Stabilizing resistor set at : Ohm
Transformer Tap position : 13
Primary current measured : A
(132kV Earth switch Q25 (BB2 ESW) Close (BUSBAR -2 under Shutdown)
B1. HV REF STABILITY (Relay Type- RET615-ABB)
Stable Condition (All CT’s are Normal)
Descript
ion
Measured Current at
Protection Panel E03+R (mA)
HV
REF
NCT
(mA)
Voltage Measured Across Current
RET615
F64HV
13&14
(mA)
F64HV
Relay
Display
(A)
Resis.
Current
(mA)
R Y B N
XA:21 XA:22 XA:23 XA:24
XA:
11&12
Relay
RET615
F64HV
(V)
Metrosil
RMHV
(mV)
Stabilize
Resistor
RSHV
(mV)
R Ph &
Neut.
Norma
l
100 31.0 29.037.5/
37.20 0 0 0 0 0 0
Y Ph &
Neut.
Norma
l
31.2 104.1 31.2 28.839.2/
40.00 47.8 47.3 0 0 0
B Ph &
Neut.
Norma
30.2 31.1 99.1 37.2 37.6/
37.7
0 43 44.2 0 0 0
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 5 – 10
l
RYB 110 102 109 0 0 0 18.9 18.9 0 0 0
B2. HV REF Sensitivity Test (Neutral side CT reversed)
Descript
ion
Measured Current at
Protection Panel E03+R (mA)
HV
REF
NCT
(mA)
Voltage Measured Across Current
RET615
F64HV
13&14
(mA)
F64HV
Relay
Display
(A)
Resis.
Current
(mA)
R Y B N
XA:21 XA:22 XA:23 XA:24
XA:
11&12
Relay
RET615
F64HV
(V)
Metrosil
RMHV
(V)
Stabilize
Resistor
RSHV
(V)
R ph
Normal93.7 38.4 37.9 18.9
29.9/
29.60 30.2 30.1 48.2 15.0 48.1
Y ph
Normal37.7 96.7 38.9 20.5
31.8/
31.80 32.5 32.5 51.3 16.2 51.9
B ph
Normal37.8 37.9 92.5 19
28.7/
29.60 30.3 30.3 48.4 14.9 48.4
B3. HV REF Stable condition
Descript
ion
Measured Current at
Protection Panel E03+R (mA)
HV
REF
NCT
(mA)
Voltage Measured Across Current
RET615
F64HV
13&14
(mA)
F64HV
Relay
Display
(A)
Resis.
Current
(mA)
R Y B N
XA:21 XA:22 XA:23 XA:24
XA:
11&12
Relay
RET615
F64HV
(V)
Metrosil
RMHV
(mV)
Stabilize
Resistor
RSHV
(mV)
R Ph &
Neut.
100 31.4 31.3 37.8 37.6/
37.5
0 19 90 0 0 0
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 6 – 10
Norma
l
Y Ph &
Neut.
Norma
l
31.2 104.3 31.2 39.840.1/
40.10 44 44 0 0 0
B Ph &
Neut.
Norma
l
30.7 30.5 100.2 36.937.3 /
37.60 42.5 42.5 0 0 0
REMARKS: 40MVA Transformer HV REF circuit found -:- OK
C. 40 MVA TRANSFORMER MV REF PROTECTION STABILITY / SENSITIVITY TEST
Phase CT Ratio : 2500/1 A
Neutral CT Ratio : 2500/1 A
Relay Setting (Is) : A
Stabilizing resistor (final setting) : _ Ohm
Stabilizing resistor set at : Ohm
Transformer Tap position : 13
Primary current measured : A
(132kV Earth switch Q25 (BB2 ESW) Close (BUSBAR -2 under Shutdown)
C1. MV REF STABILITY (Relay Type- RET615-ABB)
Descript
ion
Measured Current at
Protection Panel E03+R (mA)
MV REF
NCT
(mA)
Voltage Measured Across Current
RET615
F64MV
13&14
(mA)
F64MV
Relay
Display
(A)
Resis.
Current
(A)
R Y B N
XA:14 XA:15 XA:16 XA:17XA:
18&19
Relay
RET615
F64MV
(mV)
Metrosil
RMMV
(mV)
Stabilize
Resistor
RSMV
(mV)
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 7 – 10
R Ph &
Neut.
Norma
l
183 0 0 183.5183/
181.70 35.5 0 0 0 0
Y Ph &
Neut.
Norma
l
0 187 0 187187.9/
187.80 105 105 0 0 0
B Ph &
Neut.
Norma
l
0 0 181 179.8178.9 /
178.20 23 22 0 0 0
RYB 152 152 149 0 0 0 24.5 25.5 0 0 0
C2. MV REF Sensitivity Test (Neutral side CT reversed)
Descript
ion
Measured Current at
Protection Panel E03+R (mA))
MV REF
NCT
(mA)
Voltage Measured Across Current
RET615
F64MV
13&14
(A)
F64MV
Relay
Display
(A)
Resis.
Current
(A)
R Y B N
XA:14 XA:15 XA:16 XA:17XA:
18&19
Relay
RET615
F64MV
(mV)
Metrosil
RMMV
(V)
Stabilize
Resistor
RSMV
(V)
R Ph 179 5.1 2.9 171.3177.8/
1790 145 145 349 903 351
Y Ph 0 184 0 176184/
181.40 150.1 149.9 352 923 358
B Ph 0 0 178 169.7175.1/
178.20 145.9 145.2 346 898 349
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 8 – 10
C3. MV REF Stable condition
Descript
ion
Measured Current at
Protection Panel E03+R (mA))
MV REF
NCT
(mA)
Voltage Measured Across Current
RET615
F64MV
13&14
(A)
F64MV
Relay
Display
(A)
Resis.
Current
(A)
R Y B N
XA:14 XA:15 XA:16 XA:17XA:
18&19
Relay
RET615
F64MV
(mV)
Metrosil
RMMV
(V)
Stabilize
Resistor
RSMV
(V)
R Ph 183 0.1 2.2 182.4181.2/
180.40 0 0 0 0 0
Y Ph 0.1 187 5.1 187.6188.1/
187.80 42.8 42.5 0 0 0
B Ph 0 0 182.4 180179.8/
1800 20.7 20.9 0 0 0
REMARKS: 40MVA Transformer MV REF circuit found -:-
D1.Transformer O/C & E/F protection Core:- CT Ratio 300/1A
CT Details
Phase
Injected
Secondary Current [mA] – Monitored at:
SWGR E03+S (mA)E03+R1, TB XC=
132kV Relay Panel (mA)F51/51NHV-TB:X120 (mA)
T1
1S1-1S2
O/C,E/F
R Y B N R Y B N R Y B N
502 505 508 514 01 02 03 04 3A 5A 7A 9A
RN 101 31.5 31.5 37.7 101 31.2 31.8 37.8
YN 31.2 104 31.0 40 31 105 31 40
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 9 – 10
300/1A BN 31 30.3 101 37.9 31 31 101 37
RYB 110 105 110 0 110 111 110 0
F51/51NHV Display (A)
R Y B N
IL1 IL2 IL3 IL431.8 9.9 9.9 11.9
9.9 32.6 9.9 12.6
9.8 9.8 31.5 11.9
34.5 34.9 34.5 0
D2. Transformer MV NCT for SBEF protection Core: - CT Ratio 2500/1A
CT Details
Phase
Injected
Pri
Current
(A)
Secondary Current [mA] – Monitored at:
E03+R1, TB XC=
132kV Relay Panel
Test plug X51NMV
(RTXP18)
+F51NMV (REF615) +F51NMV
Display
(A)CT4
Tr. MV SBEF
224, 225 @MK (TB X120) Relay
10 11 9A 10A 13,14 Io
RN 183 179.9 183 183.4 183 183 476.0
YN 187 188 187 187 187 186 485
BN 182 182 181 183 181 182 471.3
RYB 0 0 0 0 0 0 0
D3. Transformer HV NCT for SBEF protection Core: - CT Ratio 300/1A
CT Details
Phase
Injected
Pri
Current
(A)
Secondary Current [mA] – Monitored at:
E03+R1, TB XC=
132kV Relay Panel
Test plug X51NHV
(RTXP18)
+F51NHV (REF615)
(TB X120)
+F51NHV
Display
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 10 – 10
CT1
Tr. HV
SBEF
Tr (202) MK boxN(220,221)
S1 S2 A
6 7 9A 10A 13 14 Io
RN 37.8 37.3 37 37.5 37.2 37.2 11.7
YN 39.0 39.5 39 39.6 39.9 39.9 12.5
BN 37.3 36.6 36.9 37.6 37.0 37.8 11.7
RYB 0 0 0 0 0 0 0
D4. Transformer Tertiary Wdg CT for SBEF protection Core:- CT Ratio 300/1A
CT Details
Phase
Injected
Pri
Current
(A)
Secondary Current [mA] – Monitored at:
E03+R1, TB XC=
132kV Relay Panel
Test plug X51NT
(RTXP18)
+F51NT (REF615)
(TB X120)+F51NT Display
CT9
Tr. Tertiary
SBEF
Tr(202) MK box3N(228,229)
S1 S2 Io
13 14 9A 10A 13 14 A
RN 0 0 0 0 0 0 0
YN 0 0 0 0 0 0 0
BN 0 0 0 0 0 0 0
RYB 0 0 0 0 0 0 0
11KV Panel side Display results-:-
A21-Siemens BCPU Relay 7SJ63
7SJ63Display R Y B N RYB
IL1 0.47 0 0 0.47 0.4 KA
IL2 0 0.47 0 0.47 0.4 KA
IL3 0 0 0.48 0.47 0.4 KA
IN 0.47 0.47 0.47 0 0 KA
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 11 – 10
AVR Panel & BCU Measurement:
PhasesAVR
(A)
BCU
(A)
R 0 0
Y 0.2 482
B 0 0
RYB 0.2 393
Winding Temperature CT Measurements:
HV Temp CT Ratio: 250/2A
MV Temp CT Ratio: 2050/2A
Injection LCC RCC Main Tariff Check Tariff
R Y B N R Y B N R Y B R Y B
R 30/154 0/48 0/47 - 30/150 0/47 0/47 - 0.5 0 0 0.5 0 0
Y 0/48 30/157 0/48.2 - 0/46 30/153 0/48 - 0 0.5 0 0 0.5 0
B 0/47 0/47 30/152 - 0/47 0/47 30/151 - 0 0 0.5 0 0 0.5
RYB 30/165 30/167 30/166 - 30/162 30/164 30/163 - 0.4 0.4 0.4 0.4 0.4 0.4
RTU
R Y B N
R 153 47 47
Y 47 157 48 -
B 47 47 152 -
RYB 164 168 165 -
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature
Phases HV Temp Sec.Current MV Temp Sec. CurrentR 0 0Y 245 462B 0 0
RYB 270 370.9
SITE TEST REPORT
Replacement of 132/11kV Transformers, Transformer Protection Panels and 110 V Batteries at W13 Substation
(CONTRACT No. N6399)
Consultant ENERGO Name of the Equipment 40MVA Power Transformer-T201Name of the Feeder E03 / K09 Transformer Feeder
MainContractor
Manufacturer ABBDate 20.02.2013 Page 12 – 10
Remarks -:- CT circuits for Tr Diff.Stability, HV & MV REF stable confirmed.
** Three phase generator voltage injected through K11 spare bay at 11kV side
Tested by Witnessed by Approved byABB Transmission &
Distribution ENERGODate 20.02.2013 20.02.2013Name R.Krishna Murthy Mohammad Rasheed
Signature