HELSINKI UNIVERSITY OF TECHNOLOGY T-76.5613 Software Testing and Quality Assurance 10.10.2007 Test Planning Juha Itkonen SoberIT

Transcript of T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the...

Page 1: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

HELSINKI UNIVERSITY OF TECHNOLOGY

T-76.5613 Software Testing and Quality Assurance

10.10.2007

Test Planning

Juha ItkonenSoberIT

Page 2: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

2Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Outline

Test planning, purpose and usage of a test plan

Topics of test planning

Exercise

References:

IEEE Std 829-1998, IEEE Standard for Software Test Documentation, IEEE, 1998.

C. Kaner, J. Bach, and B. Pettichord, Lessons Learned in Software Testing: A Context- Driven Approach, John Wiley & Sons, 2002.

Page 3: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

3Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Great testing challenges

Agency: All testers act on behalf of some client. How do testers faithfully represent them?

Evaluation: Not all failures are obvious. When a bug occurs, how do testers recognize it?

Coverage: There's too much to test. How do testers decide what to test and what to ignore?

Logistics: Testing must pace and respond to the project. How do testers apply their efforts at the right time and place to beuseful?

Reporting: Testing is about information. How do testers report their work in such a way as the information will be received andused?

Stopping: Even though there's too much to test, not all testing is worthwhile to perform. How do testers know when enough's enough?

Bach. 2002Test planning decisions

Page 4: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

4Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Test Planning – different levels

Test Policy

Test Strategy

High Level Test Plan

Detailed Test PlanDetailed Test PlanDetailed Test PlanDetailed Test Plan

Master Test Plan

Company or product level

Project

Test levels (one for each within a project, e.g. unit, system, ...)

Master test plan

Acceptance test plan

System test plan

Unit and integration test plan

Evaluation plan

Number of needed levels depends on context (product, project, company, domain, development process, regulations, …)

Page 5: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

5Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Test Documentation by IEEE Std 829-1998

The topic of this lecture

Page 6: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

6Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Purpose of test planning

To prescribe the scope, approach, resources, and schedule of testing activities

To identify the items being tested, the features to be tested, the testing tasks to be performed

To assign the responsible for each task

To identify the risks associated with the plan

To make conscious decisions of all these things

Communicating, not just recording

Test planning is part of project planningFocuses on similar issuesIs applied on similar level of detailProject planning vs. Technical design <-> Test planning vs. Test (case) design

Page 7: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

7Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Some functions of a test plan

Support quality assessment that enables wise and timely product decisions.

Support the initiation and organization of the test project, including preparations, staffing, delegation of responsibilities, facility acquisition, task planning and scheduling.

Support daily management and evaluation of the test project and test strategy.

Describe and justify the test strategy in relation to product requirements and product risks. Promote awareness of the benefits and limitations of the test strategy.

Support effective coordination, collaboration, and other relations among members of the test team and between the test team and the rest of the project.

Identify and manage any risks or issues that may impact the project.

Specify the deliverables of the test project and the delivery process.

Record historical information in support of process audits, process improvement, and future test projects.

Page 8: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

8Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Topics of test planning

what needs to be planned

Page 9: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

9Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Checklist for test planning

1. Overall test objectives (why)

2. What will and won’t be tested (what)

3. Test approach (how)Test phasesTest strategy, methods, techniques, …Test case organization and trackingDefect reportingMetrics and statistics

4. Resource requirements (who)Tester assignments and responsibilitiesTest environments

5. Test tasks and schedule (when)

6. Risks and issues (what if)

Page 10: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

10Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

1. Overall test objectives

Why are we testing?

The quality goals of the project/product?

What are the most important quality attributes?

What is to be achieved by the testing?

What do we know after the testing?

What are the main risks that testing focuses?

Page 11: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

11Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Clarify your mission Examples of testing goals

Find important problems fast

Assure customer that the quality is good enough

Achieve certain quality attributes

Perform a comprehensive quality assessment

Conform to a specific (quality) standard

Maximize testing effectiveness

Minimize testing time or cost

Rigorously conform to certain processes

Satisfy particular stakeholders

Page 12: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

12Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

2. What will and won’t be tested (scope)

Identify components and features of the software under test

High-enough abstraction level

Prioritize

Both functional and non-functional aspects

Consider time, resources and risks

Everything can’t be tested and everything that is tested can’t be tested thoroughly

Identify separately components and features that are not tested

Provide reasoning

Makes the prioritization decisions explicit and visible

Steers towards the most important things

Page 13: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

13Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Analyze the product to know what to test

Get to know the product and the underlying technology

Learn how the product will be usedFind out how the product is built

Your testing will become better as the project proceeds, because you will be more of a product expert

Ask yourselfDo designers think you understand the product?Can you visualize the product and predict behavior?Are you able to produce the test data?Can you configure and operate the product?Do you understand how the product will be used?Are you aware of gaps or inconsistencies in the design?Have you found implicit specifications as well as explicit?

Page 14: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

14Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Analyze the product What and how

What

Users

Use cases

Structure

Functions

Data

Platforms

How

Review product and project documentation

Interview designers and users

Compare with similar products

Perform exploratory testing

Page 15: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

15Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Splitting features into sub-features

Feature to betested 1

Importantsubfeature 1

Importantsubfeature 2 Subfeature 3 Subfeature 4

Find the most important features to test

Not necessarily the same prioritization as for implementation

Requirement importance and risks

Page 16: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

16Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Test environments

Identification of test environments

Hardware, software, os, network, ...

Prioritization and focusing test suites on each

Number of combinations can be hugeRegression testing in different environments

Scheduling implications

Test lab

Different hardware and software platformsCleaning the machinesSetting up the test dataMoving from platform to anotherPeople vs. hardware needs

Page 17: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

17Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

3. Test approach

How testing is performedHow quality goals are achieved and what is the role of testing

Test phasesTest phases are part of development phasesPlanning is also a phaseDefine entry and exit criteria

Test levels

Types of testing, methodsBlack-box vs. White-box Testing techniques

Test completion criteria and pass/fail criteriaBy feature/module if necessary

Reporting and defect management procedures

Communicating and collaborating with development

Tools and automation

Outsourcing

Page 18: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

18Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Analyze product risk

How might this product fail in a way that matters?

At first you’ll have a general idea, at best

Your test strategy and your testing will become better as the project proceeds

because you’ll learn more about the failure dynamics of the product.

Ask yourself

Will you be able to detect all significant kinds of problems, should they occur during testing?

Do you know where to focus testing effort for maximum effectiveness?

Can the designers do anything to make important problems easier to detect, or less likely to occur?

Page 19: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

19Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Design the test strategy

What can you do to test rapidly and effectively based on the best information you have about the product?

Make the best decisions you can, up front

but let your strategy improve throughout the project

Ask yourself

Is everything in the test strategy necessary?

Can you actually carry out this strategy?

Is the test strategy too generic; could it just as easily apply to any product?

Is there any category of important problem that you know you are not testing for?

Has the strategy made use of available resources?

Page 20: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

20Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Test cases

How test cases are created and documented

Storing, using, maintaining

Testware architecture

What is needed in addition to the test cases?Stubs, drivers, test data, expected result sets and outputs, test automation scripts, …

Plan how test cases are organized

Prioritization, regression testing

Test suites

Requirements traceability

Page 21: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

21Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Organizing test cases

Prioritizing tests

Positive / negative

The most severe failures

The most likely faults

End-user prioritizing the requirements

Most faults in the past

Most complex or critical

Create test suites

Test-to-Pass (Positive testing)

Test-to-Fail (Negative testing)

Smoke test suite

Regression test suite

Functional suites

Different platforms

Priorities, different passes

Page 22: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

22Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

How to apply prioritization

Run first priority tests first

… but think prioritization more like distribution of efforts thanexecution order

Especially if the prioritization is based on requirement prioritiesassigned by functionality or module

Use most of your time for high priority tests

Use some of your time/resources for low priority testsAvoid omitting low priority tests altogetherHigh priority tests might take more time than plannedRisk of missing critical problems in low priority functionality

Prioritization can be wrong!

H HL

t

L H L H = high priority testsL = low priority tests

Page 23: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

23Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Deliverables

What documents are produced

Why?

When?

How test plans, designs, and cases are documented?

How test results are logged and reported?

How defects are managed?

Page 24: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

24Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Defect reporting

Define process to manage defectsHow defects are managed?By whom?

Bug lifecycleDefect statesPrioritiesSeveritiesWho decides? How? When?Classification

Defect-tracking systemreportingdata query and retrieval (statistics)supports the defect resolution process

What data and metrics are collected?And for what purpose?

Page 25: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

25Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Test completion criteria

Always risks involved

Risk of leaving major defects in the systemRisk of spending too much time and moneyRisk of losing market position and sales if extend testing

Weakest criteria

Deadline – When all the time and resources are used

Setting the test completion criteria (stop-test criteria) is part of test planning

When testing (or testing phase) is completed?Based, e.g., on coverage of testing, defect rates, defect severities, schedule, …

All the planned tests are executed (and passed)All specified coverage criteria have been metThe goals for number of detected defects have been reachedDefect detection rates have fallen below a specified level

Page 26: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

26Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Release Criteria

Testing should be visible in release criteria

Release criteria is not the same as test completion criteria

Release criteria is business decision and it is not test team’s or testers’ responsibility to make release decisions

Testing provides useful information on the quality of the product

Testing should be visible in release criteriaTest resultsDefect metrics and reports

Page 27: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

27Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

4. Resource requirements

PeopleHow many, what experience, what expertise? Full-time, part-time, contracts, students? Responsibilities

EquipmentComputers, test hardware, printers, tools.

Office and lab spaceWhere will they be located? How big will they be? How will they be arranged?

Tools and documentsWord processors, databases, custom tools. What will be purchased, what needs to be written?

Outsource companiesWill they be used? What criteria will be used for choosing them? How much will they cost?

Miscellaneous suppliesDisks, phones, reference books, training material. Whatever elsemight be needed over the course of the project.

Define responsibilities

Identify limited/critical resources

Location and availability

Page 28: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

28Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Plan also high-level responsibilities

Not just allocating individual tasks for people

Example:

Mark Formatting functionality

Sarah Layout functionality

Dennis Editing commands

Louise Configuration and compatibility

Dave GUI: Usability, appearance, accessibility

Paula Test data and regression testing

Jack Performance and load tests

Page 29: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

29Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

5. Testing tasks and schedule

Work Breakdown Structure (WBS)Testing tasks can be divided by e.g.

Areas of the softwareTestable featuresPhases, levels, and types of testing

Assigning task responsibilitiesMapping testing to overall project schedule

Both duration and effortBuild schedule

Number of test cyclesEnvironmentsRegression tests

ReleasesExternal links, i.e. Beta testing

Consider using relative dates

Page 30: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

30Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

The idea of relative dates

Task Start Duration

Test planning When initial requirement specification available

2 weeks

Test case design Test plan complete 12 weeks

Test round #1 Code complete build 6 weeks

Test round #2 Beta build 6 weeks

Test round #3 Release build 4 weeks

Page 31: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

31Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Estimating testing is not different

“Estimate” can be

Estimate – an approximate calculation or judgment, based on professional understanding of an expertQuote / quotation – fixed price by a contractorTarget – A desired time or cost (for political or commercial reasons)

Estimating any job involves the following

Identify tasksWho should perform the taskWhat resources, what skillsHow much effort for each taskWhen should the task start and finishPredictable dependencies

Task precedence (design test before running it)Technical precedence (add & display feature before edit feature)

Page 32: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

32Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Estimating testing is different

Testing is not an independent activity

Delivery schedules for testable items can changeTest environments are critical

Test iterations (rounds)

Testing should find faultsHow long does it take to find a fault?How many faults will be found?

Faults need to be fixedHow long does it take to fix a fault?After fixed, how much testing needs to be repeated?

How many times does this happen? - Two? Twelve?

It takes time to report defects

The more fault reports you write, the less testing you are able to do

Page 33: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

33Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Ways to estimate test effort

Guessing

Based on the size of the project / product

COCOMO and heuristics

Number of requirements or modules

Consensus of experts (Delphi)

Previous test effort

In-project experience through incremental planning

Detailed work breakdown of testing tasks

Authorized deadlines

Historical data helps estimating regardless of the method

Page 34: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

34Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

6. Risks and issues

Risky areas of the test project and plan – not the product

Critical resources

Dependencies

For each risk

Contingency plans – what if the risk realizesConsequences

Mitigation – how to make the risk smallerProbability and consequences

Prevention – how to prevent the risk altogether

Page 35: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

35Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

7. Share the plan

You are not alone

The test process must serve the project

So, involve the project in your test planning process

At least chat with the key members of the team to get their perspective and implicit acceptance to pursue your plan

Is the project team paying attention to the test plan?

Does the project team, especially first-line management, understand the role of the test team?

Does the project team feel that the test team has the best interests of the project at heart?

Page 36: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

36Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Share the plan Ways to share

Actively solicit opinions about test plan

Help the developers understand how their actions impacts testing

Get designers and developers to review and approve testing materials

Get people to review the plan in pieces

Improve review ability by minimizing unnecessary text in test plan documents

Record and track agreements

Page 37: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

37Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Test plan heuristics – is this a good test plan

Important problems fast

Focus on risk

Maximize diversity

Avoid over-scripting

Test to the intent

We are not alone

Promote testability

Test plans aren’t generic

Content or nothing

Don’t program people

The test schedule depends

Avoid the bottleneck

Rapid feedback

Testers aren’t the only testers

Review documentationHeuristic is a rule of thumb, an educated guess, a rule for action.

Kaner, Bach, Pettichord. Lessons Learned in Software Testing. 2002

Page 38: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

38Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Test plan quality criteria

Usefulness: Will the test plan effectively serve its intended functions?

Clarity: Is the test plan self-consistent and sufficiently unambiguous?

Accuracy: Is the test plan document accurate with respect to any statements of fact?

Adaptability: Will it tolerate reasonable change and unpredictability in the project?

Efficiency: Does it make efficient use of available resources?

Usability: Is the test plan document concise, maintainable, and helpfully organized?

Compliance: Does the test plan meet externally imposed requirements?

Foundation: Is the test plan the product of an effective test planning process?

Feasibility: Is the test plan within the capability of the organization that must use it?

Source: Kaner, Bach, Pettichord. Lessons Learned in Software Testing. 2002

Page 39: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

39Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Exercise: Contents of a test plan

Compare the two sample test plans

Burnstein’s Sample test planCollege Course Scheduler

IEEE Std 829 Sample test planCorporate Payroll System

Page 40: T-76.5613 Software Testing and Quality Assurance Plann… · testing activities To identify the items being tested, the features to be tested, the testing tasks to be performed To

40Juha Itkonen - 2007SoberITHELSINKI UNIVERSITY OF TECHNOLOGY

Exercise: Contents of a test plan

Focus to the following sectionsIntroductionFeatures to be testedFeatures not to be testedApproachItem pass/fail criteriaTasks and schedule

What are the good parts?why?

What are the weaknesses and problems?

How would you improve the plan?

Which one of the plans is better?documents better the planning decisionsgives guidance and supports the actual execution and management of the system testing project?