1 Syncrotact 5 testing procedure Content 1. Brief description……………………..…………………………………………………2 2. Warning and Instruction …..…………………….……………………………...…….2 3. Test Equipment.…………………………….……….…..……………………………. 3 4. Synchrotact 5 (SYN 5201) configuration……......……………………………………3 5. Testing of Synchrotact 5 (SYN 5201)…………..…………………………………….5 5.1 Testing of paralleling conditions. 5.2 Testing of dead bus conditions. 5.3 Timing test. 5.4 Measurments check. 5.5 Lead angle test. 5.6 Operational test. 5.7 Self monitoring check. 5.8 Stored data check. 6. Relay Functions Selection………………..…………………………………….……..12 7. Binary Input / Output Configuration……..…..………………………………….….12 8. Parameters Setting……………………………..………………………………….….13

Transcript of Synchrotact 5 TestProcedure Updated Nov 2010 - My Protection … · 2019. 3. 14. · Synchrotact 5...

  • 1

    Syncrotact 5 testing procedure

    Content

    1. Brief description……………………..…………………………………………………2

    2. Warning and Instruction …..…………………….……………………………...…….2

    3. Test Equipment.…………………………….……….…..……………………………. 3

    4. Synchrotact 5 (SYN 5201) configuration……......……………………………………3

    5. Testing of Synchrotact 5 (SYN 5201)…………..…………………………………….5

    5.1 Testing of paralleling conditions.

    5.2 Testing of dead bus conditions.

    5.3 Timing test.

    5.4 Measurments check.

    5.5 Lead angle test.

    5.6 Operational test.

    5.7 Self monitoring check.

    5.8 Stored data check.

    6. Relay Functions Selection………………..…………………………………….……..12

    7. Binary Input / Output Configuration……..…..………………………………….….12

    8. Parameters Setting……………………………..………………………………….….13

  • 2

    Syncrotact 5 testing procedure

    1. Brief description. The Synchrotact 5 digital synchronizer is used for automatic synchronizing and paralleling of generators with lines and for the paralleling of already synchronous lines. The device is designed for system frequencies of either 50/60 or 16 2/3 Hz. Syn 5201 is a single channel synchronizing device whose component choice and software design provides the highest security against incorrect paralleling. Syn 5202 consists of two independent channels with different hardware and software. This dual-channel property maximizes security against incorrect paralleling. All parameters required for paralleling are stored in parameter set.The paralleling conditions and the characteristics of the voltage and frequency matchers are defined in this set.With the option providing seven parameter sets, paralleling can be carried out under different conditions or with different matcher charactristics using the same devices.Seven configurable digital inputs and outputs are available for the selection and back indication of parameter set. The data which are important for commissioning and for control purposes can be uploaded or downloaded using the PC tool SynView or, alternatively via the keypad on the front panel of the unit. 2. Warning and Instructions :

    Synchrotact 5 devices operate with in some cases dangerous voltages (>50 V), e.g measuring inputs up to 170 VAC & relay outputs up to 250 VAC/VDC. Manipulations carried out on these parts can cause death or injury to the persons envoirment, as described in these instruction , there is no risk.

    All relevant regulations must be observed during commissioning. It is essential that these safety regulations are read before starting any work on the Synchrotact 5 equipment.

    After the devise has been switched off, it must be insured, by measuring, that no measuring voltage or control voltages >50 V are present at the teriminals before anything is done to the device itself, e.g. unplugging the connector to replace the device. In order to prevent open voltage cuircut being accidentally closed by third parties, the cuircut in question should be marked at the disconnection point (e.g. with warning sign).

    If work is being carried out in the envoirment of the Synchrotact 5, e.g. on the relay controls, electronics power supply, synchronizing instruments, all voltages greater that 50 V which are connected to the system must be switched off.

    Caution: Before switching on, always check whether all connectors are plugged in.

    Caution: The device may only be opened by qualified personnel. It is essential that ESD regulations are complied with.

  • 3

    Syncrotact 5 testing procedure

    3. Test equipment.

    1. PC tool software Synview 3.1.(Available in QC server) 2. RJ45 ethernet cable. 3. Lap top. 4. Freja 300. 5. Synchrotact 5 simulation kit made by QC. 6. Multimeter. 7. Testing Leads. 8. Timer TM200.

    4. Synchrotact 5 (SYN 5201) configuration: 1. Start the SynView program & Power up the relay. 2. Connect the RJ45 Ethernet cable from Relay to PC. 3. To know the IP address of the Synchrotact relay follow the instruction below.

    For example it will display IP address : 192.168.0.250 Subnet mask:255.255.255.0 Gateway : 0.0.0.0 Set IP address of the PC with respect to the Relay IP address.(For eg: 192.168.0.249) Select OptionsCommunication Then Select interface as Communication Over TCP/IP and select OK.

  • 4

    Syncrotact 5 testing procedure

    Now select ToolsParameter. If communication is not ok then the following error message will be displayed.

  • 5

    Syncrotact 5 testing procedure

    If the communication is Ok it will display the settings page as below.

  • 6

    Syncrotact 5 testing procedure

    Note : We can able to change the IP address of Synchrotact relay by doing the following Steps. Select OptionCommunication. Then Select interface as Communication Over TCP/IP. Click Set IP address then it will display as

  • 7

    Syncrotact 5 testing procedure

    Here enter the IP address,Subnet mask, gateway of your choice and select ok. Now the following messgae will be displayed

    Now the IP address will be changed to our Set IP address. Important:It is recommended to use the default IP address in the relay .

  • 8

    Syncrotact 5 testing procedure

    NOTE: To make the Relay to Ready status. To reset the Error .

    & anykey for 2 Sec. To block the relay .

    3- Select Tools then Parameters : here where you are going to change the settings of the relay.

    There are 7 Parameter set available.

    4- Select Set 1 : ActualValue Calibration : Enter the voltage & frequency . Voltage & angle tunning are required for special application, so keep it zero. Command Generation : Test function for paralleling time . keep it off (This function to be explained during the time test ).

    Paralleling time ton 100 ms. Paralleling command duration (pulse length ) 0 ms. Monitoring time tsupervis 2 Sec. Multiple Command (On for Multiple closing command & Off for 1 closing Command only ).

    Paralleling Conditions :

    S= ( f1-f2 / fn) x 100 , = φ1- φ2 , ΔU= U1-U2 . Enter your setting for all of those varibles. Dead Bus Conditions :

    Enter Umax for the Dead Bus (10%,20%,….) Select which Bus is the Dead .

    U1-no voltage Off U2-no voltage On (during this testing U2 is considered as dead bus ). U1& U2-no voltage Off

    Voltage & Frequency Matcher :

    Those setting to be used only where Tap Changer & Governer are used. General Parammeters :

    DATA

  • 9

    Syncrotact 5 testing procedure

    Blocking time after selection :This is the time between starting signal upto the operating signal. 10 Sec. Total Paralleling time t tot : This will be activated once start signal is giving (it wil monitor the total paralleling time from start to run ). 0.5 min.

    5- Select Configuration : Here you have to configure the relay digital Input & Output. Select Digiat Input 1 as Paralleling Position 1 and Parameter 1.

    To Activate the setting which you change in Set1 you have to activate this BI.(connect24 VDC at the termial of this BI).(X10:1 & X10:2)

    Each BI & BO will be configured as per the Application .

    5. Testing of Synchrotact 5 (SYN 5201). For testing of Syncrotact 5 , you can use a Simulation Model (Timer +Flag relay ).

    -24

    +24

    STOP

    START

    RELEASE

    START PB

    FLAG RELAY

    SYNCHROTACTX6:1&2

    TIMER

    125 V DC+

    -

    SYNCHROTACT 5RELEASE PB

    Reset PB

    Once every things are ready , you can switch on the testing kit Freja 300 & make the relay in ready state & Intiate the starting signal , the Relay will start supervise the criteria ΔU , & S & if its matching with the setting , the relay will give a close command (X6:1 & 2) .

    After you complete all the configurations save it & press write to transfer all the data to Sychrotact 5 Relay.

  • 10

    Syncrotact 5 testing procedure

    For Dead Bus Testing : Dead Bus relaese Binary Input should be activated before giving the start signal otherwise the relay will not give the closing signal & after some time it will give Block/Error Indication. Testing of Synchrotact 5 : Refer to the test formof Synchrotact 5 relay . For all of the test , you should give a start signal to the Synchrotact relay. 5.1 Testing of Paralleling Conditions.

    1 ΔU Test (Voltage Deffirence Test )

    Set f1and f2=60Hz, 1 and 2 = 0 Test the relay as per the follwing table:

    U1 - U2Un

    5%

    30%

    SET VALUE

    U%

    CAL. VALUE in %

    x 100PICK-UP DROP OFF

    U2MEASURED VALUE

    2 S Test (Slip Test ) :

    Set U1and U2=66 V, 1 and 2 = 0 Test the relay as per the follwing table:

  • 11

    Syncrotact 5 testing procedure

    Pick-up Freq.At > 60Hz

    Drop off Freq.

    At > 60HzS Calculated Pick-up Freq.At < 60Hz

    Drop off Freq.At < 60Hz S Calculated Slip S

    10%

    30%

    20%

    3 Test (Phase Angle difference Test ) :

    Set U1 and U2=66 V, f1 and f2=60Hz Test the relay as per the follwing table:

    PICK-UP DROP OFF10o

    10o 350o

    15o

    15o 345o

    20o

    20o 340o

    25o

    25o 335o

    30o

    30o 330o

    CalculatedError Calculated

    SETTINGVALUE ANGLE

    1 = 0 2 = Controlled

    5.2 Testing of Dead Bus Conditions.

    Set 1 and 2 = 0, f1 and f2 = 60Hz, Un = 66 V Set Release U2 (No-Volt )= ON.

    Test the relay as per the follwing table:

  • 12

    Syncrotact 5 testing procedure

    MEASURED VALUEU1= Fixed, U2=Controlled U1 - U2

    Un

    10%20%30%

    SET U0VALUE

    %x 100

    PICK-UP DROP-OFF U1= Fixed

    CAL. VALUE in %

    Dead Bus Function Test :

    Set U1 =66 V, U2 =66V, f1 and f2 = 60Hz, Uo max = 80%. Keep U1, U2 above 80% of 66 V.

    INPUT OUT PUT STATUS

    ENERGIZED U1 (No Volt ) U2 (No Volt ) Expected Actual

    U1 OFF ON Close

    U1 ON OFF Open

    U2 OFF ON Open

    U2 ON OFF Close

    U1 OFF OFF Open

    U2 OFF OFF Open

    U1 ON ON Close

    U2 ON ON Close

    U1 & U2 = 0 ON ON Close

    Configuration of U1 & U2

    Note : U1 (No Volt ) = ON it means Dead Bus / Dead Line (DB or DL) U1 (No Volt ) = OFF it means Live Bus / Live Line ( LB or LL)

    5.3 Timing Test.

    By Using TM200.

  • 13

    Syncrotact 5 testing procedure

    1- Paralleling Command Duration tp on. Connect Output of Synchrotact OUT2 (X6:3 & 4) to TM200 start (N/O) & to Stop (N/C) & test it as per the follwing table.

    Setting of Command Duration ms Measured Varible ms

    100

    300

    500990

    2- Monitoring Time tsuprevis. Connect Output of Synchrotact Operating (X8:6 & 7) to TM200 start (N/O) & Synchrotact OUT2 (X6:3 & 4) to Stop (N/O) & test it as per the follwing table.

    Setting of Monitoring Time Sec. Measured Varible ms

    0

    2

    510

    3- Total Paralleling Time ttot. Connect Output of Synchrotact Operating (X8:6 & 7) to TM200 start (N/O) & Synchrotact Error (X8:1 & 2) to Stop (N/O) & test it as per the follwing table.

    Setting of Paralleling Time Min. Measured Varible ms

    0.5

    15

    4- Paralleling Time ton.

    To do this test you should use the PC tool software synview , connect the communication cable rs 232 to the relay, then goto Set 1 and select Command Generation & select :

    Test Function of Paralleling time ( select On). New Dialoge box will come and will ask for the Password . Here new extra connection is requiered to semulate it (use one contact from the timer & connect U2 throught this contact.

  • 14

    Syncrotact 5 testing procedure

    Freja 300SYNCHROTACT 5

    Un U1 U2

    U1

    U2

    TIMER CONTACT

    X6 1 2

    125 VDC

    +

    -

    Enter the Password 1234 then click start . Synchrotact will check the status & it will give a close command then the relay will calculate the time ton then will ask :

    Press Yes & it will save it.

    Paralleling Time ton. Will be 90 ms. At the same time , after the breaker is closed the Voltage difference is measured, which can then be tuned to zero by means of parameter U Offset .

    5.4 Measurments Check.

    Inject the required voltage as per the follwing table, at the Voltage Input 1 & 2 and record the display values.

    The Synchrotact test Function retrns & the Value (for example 90) back! Should this be accepted ?

    Yes No.

    Note :During this test DB Release should be Intiated .

  • 15

    Syncrotact 5 testing procedure

    U1 f1 U2 f2Applied Voltage

    Voltage seen on Disply

    5.5 Lead AngleTest.

    For Asynchronous sources paralleling:

    1. By using SynView transient recorder tool or connect external recorder (CH1:U1-U2, CH2 paralleling command (=trigger)) .

    2. Sypply two voltages with different frequencies (inside slip tolerance band). 3. Start synchronizing process till the paralleling command was given. 4. The lead angle can be calculated from the time ton , between paralleling command and

    phase coincidence (read it from the transient recorder picture). 5. Lead angle (Degree)=3.6*fn(Hz)*slip (%)*ton (Sec.).

    For Asynchronous sources paralleling:

    1. Supply two voltages with the same frequencies but with different phase angle (inside angle window).

    2. Start syncronizing process till the paralleleing command was given.

    5.6 Operational Test.

    No. Status LED Checked1 Blocked with error. BLOCKED AND ERROR2 Blocked without error. BLOCKED3 Ready. READY4 Operating. OPERATING

    5.7 Self monitoring check.

    1 2

  • 16

    Syncrotact 5 testing procedure

    No. Monitoring Checked1 Auxilary voltage monitoring2 Software monitoring N/A3 External events monitoring

    5.8 Stored data check.

    1. Change the setting of Paramete set 1 away from its default values and save it. 2. The device can then be powered off for some time without supply. 3. After some time it can be supplied again and the parameter set 1 shall be the same as

    what you set. For Factory Testing make the settings as mentioned below Parameter settings

  • 17

    Syncrotact 5 testing procedure

    Configuration:

    Pls assign Digital inputs as per schematic drawing

  • 18

    Syncrotact 5 testing procedure

  • 19

    Syncrotact 5 testing procedure

    Test Report:

  • 20

    Syncrotact 5 testing procedure

  • 21

    Syncrotact 5 testing procedure

    For Schmetic pls refer to S/S 9024 (S12735.001) 380Kv Synchronising Panel drawing. You can find the Software & Tested configuration file (Saved as Final.syn) in QC server in the following folder . Go to QC serverQC testing SoftwareABB SwitzerlandSynview 3.1 In the same folder you can find this Document as Synchrotact 5 TestProcedure Updated Nov 2010