Transcript of SV-ITS PROGRAM: Silicon Valley Smart Corridor Project Overview SERIES 2000 User’s Group.
SV-ITS PROGRAM: SV-ITS PROGRAM: Silicon Valley Smart Silicon Valley Smart Corridor Project OverviewCorridor Project Overview
SERIES 2000 User’s GroupSERIES 2000 User’s Group
““What Is Being Done to Reduce What Is Being Done to Reduce
Congestion?”Congestion?”
SV-ITS ProgramSV-ITS ProgramSilicon Valley Silicon Valley
Intelligent Transportation System Intelligent Transportation System
ProgramProgram
SV-ITS PROGRAMSV-ITS PROGRAM
Why is there traffic Why is there traffic congestion?congestion?
Limited roadway capacity Limited roadway capacity Spill-over Fwy trafficSpill-over Fwy traffic Non-coordinated agency Non-coordinated agency
systems systems Few methods to Few methods to
communicate with driverscommunicate with drivers Lots of cars!Lots of cars!
SV-ITS PROGRAMSV-ITS PROGRAM
““What Can Be Done to Reduce What Can Be Done to Reduce
Congestion?”Congestion?” Integrate traffic management centersIntegrate traffic management centers Share data with commuterShare data with commuterDeploy devices to monitor and Deploy devices to monitor and
manage trafficmanage traffic
SV-ITS PROGRAMSV-ITS PROGRAM
SV-ITS PROGRAMSV-ITS PROGRAM
An Example: Silicon An Example: Silicon
Valley Smart CorridorValley Smart Corridor
The largest ITS project in The largest ITS project in Northern California. Northern California.
35 mile fiber network, 35 mile fiber network, including arterials, including arterials, expressways, and freeway.expressways, and freeway.
15 m
iles
SV-ITS PROGRAMSV-ITS PROGRAM
City of San JoseCity of San Jose City of Campbell City of Campbell City of Milpitas City of Milpitas City of Santa Clara City of Santa Clara Town of Los GatosTown of Los Gatos County of Santa Clara County of Santa Clara VTA (Valley Transportation Authority VTA (Valley Transportation Authority MTC (Metropolitan Transportation Comm)MTC (Metropolitan Transportation Comm) Caltrans (California Dept of Transportation)Caltrans (California Dept of Transportation) CHP (California Highway Patrol) CHP (California Highway Patrol)
THE PROJECT PARTNERSTHE PROJECT PARTNERS
DKS Associates DKS Associates IBI GroupIBI Group CCS Planning and CCS Planning and
Engineering Engineering Transcore/SAICTranscore/SAIC Gardner Systems Gardner Systems
SV- ITS PROGRAMSV- ITS PROGRAM
Little or no data from fieldLittle or no data from field++
Non-integrated systemsNon-integrated systems++
No means to operate No means to operate multiple systems multiple systems
++
No method for sharing real-No method for sharing real-time data with travelerstime data with travelers
==
WITHOUT WITHOUT CORRIDORCORRIDOR
ROAD RAGE
SV- ITS PROGRAMSV- ITS PROGRAM
Cameras & loops Cameras & loops ++
Data Exchange Network Data Exchange Network ++
Communication between Communication between multiple control centers multiple control centers
++
HAR, CMS, EMS, TravInfo for HAR, CMS, EMS, TravInfo for sharing datasharing data
==
Happy Travelers Happy Travelers
WITH WITH CORRIDORCORRIDOR
SV-ITS PROGRAMSV-ITS PROGRAM
COORDINATED SIGNALSCOORDINATED SIGNALS
VIDEO & DETECTOR VIDEO & DETECTOR LOOPS LOOPS
CMSCMS
EMSEMS
HARHAR
DATA EXCHANGE DATA EXCHANGE NETWORKNETWORK
INTERNET
SV- ITS PROGRAMSV- ITS PROGRAM
GETTING OVER-GETTING OVER-FLOW TRAFFIC FLOW TRAFFIC BACK TO 880BACK TO 8803 ROUTES TO ON-RAMPS3 ROUTES TO ON-RAMPS
northbound traffic only northbound traffic only
EMS #3
EMS #2
EMS #1
THE SV-ITS PROGRAMTHE SV-ITS PROGRAM
Regional ITS needs Regional ITS needs SVSC design permits expansion (DEN)SVSC design permits expansion (DEN) Address “Market Package” ConceptAddress “Market Package” Concept Benefits of PartneringBenefits of Partnering
San JoseSan Jose - Design Agency - Design Agency CountyCounty - Construction Agency - Construction Agency VTAVTA - Funding Agency - Funding Agency Other AgenciesOther Agencies - Project specific partners - Project specific partners
SV-ITS PROGRAMSV-ITS PROGRAM
SV-ITS PROGRAMSV-ITS PROGRAM
San Jose International Airport Area San Jose International Airport Area Advanced Transportation Management SystemAdvanced Transportation Management System
($2.0 million)($2.0 million)
NEW SV-ITS PROJECTSNEW SV-ITS PROJECTS
SV-ITS PROGRAMSV-ITS PROGRAM
SVSC - ITS SVSC - ITS EnhancementEnhancement($4.1 million) ($4.1 million)
NEW SV-ITS PROJECTSNEW SV-ITS PROJECTS
SVSC - MILPITAS-SVSC - MILPITAS-FREMONT ATMS FREMONT ATMS ($2.9 million($2.9 million)
SV-ITS PROGRAMSV-ITS PROGRAM
NEW SV-ITS PROJECTSNEW SV-ITS PROJECTS
SILICON VALLEY – WEST SILICON VALLEY – WEST CORRIDORCORRIDOR
(pending funding $3.0 million est.) (pending funding $3.0 million est.)
SV-ITS PROGRAMSV-ITS PROGRAM
NEW SV-ITS PROJECTSNEW SV-ITS PROJECTS
““What is being done to reduce congestion?”What is being done to reduce congestion?”
• Agencies are working cooperatively on Agencies are working cooperatively on regional solutionsregional solutions
• SV-ITS projects are multi-jurisdictional to SV-ITS projects are multi-jurisdictional to encourage cooperation. encourage cooperation.
• The projects improve efficiency by adding The projects improve efficiency by adding ITS technology. ITS technology.
SV-ITS PROGRAMSV-ITS PROGRAM