Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9...

17
Sureflex JIP - sharing the latest flexible pipe integrity management guidance and operational experience Subsea Expo, AECC, 8 th February 2018 Ian Macleod, Engineering Manager

Transcript of Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9...

Page 1: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Sureflex JIP - sharing the latest flexible pipe integrity management guidance and operational experience Subsea Expo, AECC, 8th February 2018 Ian Macleod, Engineering Manager

Page 2: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Sureflex JIP project history

1990

2020

2010

2000 UKOOA Flexible Pipe Integrity JIP

Sureflex JIP (2015-17)

Sureflex JIP (2009/10), Oil & Gas UK

HSE Monitoring / Integrity JIP

Sureflex network (proposed)

Page 3: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Scope • Population and damage statistics • Inspection and monitoring review • Share IM good practice / guidance • Review technology development • Share operator case studies

Participants • 13 members, plus non-member contributions • ~40 contributor organisations

− Operators, manufacturers, certification bodies, regulators, engineering contractors, inspection / monitoring vendors

Sureflex JIP scope and participants

Page 5: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Flexible pipe population statistics

15,341

11,111

3,516

365

0.01

0.1

1

10

100

1000

10000

100000

1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020

Tota

l Fle

xibl

e Pi

pe L

engt

h M

anuf

actu

red

(km

)

Year

All Pipe

Flowlines

Risers

Jumpers

Cumulative manufactured length • flowlines, risers, jumpers

Page 6: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

0

2500

5000

7500

10000

12500

15000

0 2 4 6 8 10 12 14 16 18 20

Desi

gn P

ress

ure

(psi

)

Inner Diameter (inch)

Pressure x ID Experience

Pressure x ID 30k

Pressure x ID 50k

Pressure x ID 70k

Pressure x ID 90k

Example population statistics

Page 7: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Example population statistics

17.3

%

21.5

%

3.8%

7.9%

3.4% 5.

4%

4.4%

10.1

%

4.3%

12.4

%

0.9%

4.4%

2.2%

1.8%

0.0%

0.1%

0.0%

0.0%

0%

5%

10%

15%

20%

25%

30%

0 to

100

100

to 2

00

200

to 3

00

300

to 4

00

400

to 5

00

500

to 7

50

750

to 1

000

1000

to 1

250

1250

to 1

500

1500

to 1

750

1750

to 2

000

2000

to 2

250

2250

to 2

500

2500

to 2

750

2750

to 3

000

3000

to 3

250

3250

to 3

500

over

350

0

Popu

latio

n (%

)

Range, Design Water Depth (m)

Page 8: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

• Damage and failure categorised in full, by; – 37 separate damage / failure causes – 8 separate status criteria;

• e.g. damaged, leak, minor defect, shutdown, rupture • Biggest drivers (in grouped / consolidated causes)

Damage and failure experience – biggest drivers

Page 9: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Damage and failure statistics

1.E-05

1.E-04

1.E-03

1.E-02

1976

-198

119

81-1

986

1986

-199

119

91-1

996

1996

-200

120

01-2

006

2006

-201

120

11-2

016

Dam

age

/ Fa

ilure

Rat

es(in

cide

nts p

er P

ipe-

Year

)

DamagedFailed - LeakFailed - Rupture

Risers

1.E-05

1.E-04

1.E-03

1.E-02

1976

-198

1

1981

-198

6

1986

-199

1

1991

-199

6

1996

-200

1

2001

-200

6

2006

-201

1

2011

-201

6

DamagedFailed - LeakFailed - Rupture

Flowlines & Jumpers

Page 10: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Damage and failure experience

Damage / failure rates in decline since mid ’90s • PARLOC shows that flexible pipe compares favourably

with rigid pipe based on LOC per pipe • Experience of survival in abnormal events

– e.g. excessive offsets, extreme storms

However… • Some increases in corrosion and fatigue • Rates may not have reached equilibrium • Oldest pipes age ~40yrs

– and manufactured in low numbers

Page 11: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

• Fatigue failure in the main pipe section – Local to bend stiffener region

• Carcass tearing failures – Axial loading on carcass and axial movement relative

to outer

Failure mechanisms identified since 2010 JIP

Page 12: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

• Smooth bore riser ruptures – Reverse permeation in pressurised J-tubes =>

internal sheath failure => inner annulus pressurised => armours overloaded

– Historical failures not previously reported / shared

Failure mechanisms identified since 2010 JIP

Page 13: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

• Keeping the statistics up to date = > ongoing learning – Standardised reporting template created in JIP – Events can be submitted to [email protected]

• Sureflex Network, ongoing initiative to – Capture and maintain damage / failure statistics – Share global

lessons learned

Experience since the JIP, and the future

Page 14: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

• Some additional events since the JIP completion

Experience since the JIP, and the future

Page 15: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Inspection and monitoring methods (extract)

• Workshop reviews; industry take-up, feedback, TRL – ~35 technologies reviewed

• Per technology; benefits, limitations, procedure, industry practice, and guidance notes

Page 16: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Failure rates in decline since the mid-1990s • Incident rates may not have reached equilibrium • New failure modes are still being discovered • Flow induced pulsations, can represent significant vibration /

fatigue threat in connected pipework

Experience confirms good degree of robustness • Extreme storm and abnormal event survival

Inspection and monitoring technologies • Vendors continue to develop and extend capabilities

Recommend statistics kept up to date and shared • Standardised reporting template created • Sureflex Network with ongoing sharing

Key conclusions and recommendations

Page 17: Sureflex JIP - sharing the latest flexible pipe integrity ... ian m… · PowerPoint 16:9 Widescreen Author: PAXTON, Steven (WG) Created Date: 20180126164938Z ...

Thank you. Questions?

To request standard reporting template, contact:

[email protected]