My presentation slide of Retaining Wall,Cofferdam and Caisson
Supporting Volume Project Description - keeyask.com · Construction Sequence Years 2014 to 2016...
Transcript of Supporting Volume Project Description - keeyask.com · Construction Sequence Years 2014 to 2016...
Supporting Volume Project Description
Keeyask Generation Project Environmental Impact Statement
June 2012
B S
ize L
ands
cape
BTB
- D
EC 2
011
File
Loc
atio
n: G
:\_G
IS_P
roje
ct_F
olde
r\00_
Hydr
o\Ke
eyas
k G
S M
aste
r Tem
plat
es\K
YSK_
v10T
empl
ates
\Kee
yask
_BSi
ze_z
15_B
TB_L
ands
cape
_EIS
Tem
plat
e.m
xd
Manitoba Hydro - Hydro Power Planning - Stantec Consultants
16-APR-12
DATA SOURCE:
DATE CREATED:
CREATED BY:
VERSION NO:
REVISION DATE:
QA/QC:
Note(s):
J F M A M J J A S O N D2021
J F M A M J J A S O N D2022
J F M A M J J A S O N D2014
J F M A M J J A S O N D2015
J F M A M J J A S O N D2016
J F M A M J J A S O N D2017
J F M A M J J A S O N D2018
J F M A M J J A S O N D2019
J F M A M J J A S O N D2020
Ice Boom Installation
Infrastructure
Main Construction Camp - Phase II
North Channel Rock Groin
Powerhouse Stage I Cofferdam
Island Stage I Cofferdam
Spillway Stage I Cofferdam
Central Dam Stage I Cofferdam
Excavation for Earth Structures
North Dyke
South Dyke
Spillway Concrete
Powerhouse Concrete
Superstructure Steel in Powerhouse
Turbines & Generators
Inservice Date (Unit 1 to 7)
Cleanup & Decommissioning of Site
Task Name
North Channel Stage I Cofferdam
South Access Road
Stage I Cofferdams
Quarry Cofferdam
Stage II Cofferdams
Island Stage II Cofferdam
South Dam Cofferdams
Tailrace Channel Summer Level Cofferdam
Principal Structures
Excavation for Concrete Structures and Channels
South Dam
North Dam
Site Decomissioning/Rehabilitation
Decomissioning Construction Infrastructure
� � � � � � �
2.0
Preliminary Construction Schedule
Central Dam
XXX/YYY/ZZZ
15-JUNE-12
Manitoba Hydro Preliminary Construction Schedule. Latest version April 5,2012
Milestone �Task
Legend
Figure 3-1
JL/AMB/MES
DATA SOURCE:
DATE CREATED:
CREATED BY:
VERSION NO:
REVISION DATE:
QA/QC:
COORDINATE SYSTEM:
UTM NAD 1983 Z15N
File
Loc
atio
n: W
:\War
ehou
se_G
roup
s\Po
wer
_Sup
ply\
Pro
ject
s\Ke
eyas
k\M
aps\
EIS
\Cha
pter
4_P
roje
ctD
escr
iptio
n\M
XD
s\D
raft3
\Kee
yask
_Con
stru
ctio
nSeq
uenc
e_M
ap1_
2012
0614
.mxd
Manitoba Hydro, KGS Acres, Government of Manitoba
Manitoba Hydro - Hydro Power Planning Department
3.0 JCL/MES/ZZZ
14-JUN-12 14-FEB-12
YEAR 2
Contin
2/12
4/12
0 0.4 0.8 Miles
0 0.5 1 Kilometres
Construction Sequence Years 2014 to 2016
LegendPlanned/Removed Feature
Proposed Access Road
Access Road
Work Area and Construction Camp
Structure in Progress
Earthfill Structure (Complete)
Excavation Area
Bedrock Excavation Area
Concrete/Steel Structure
Boat Launch & Barge Landing
Existing Water Surface Area
Stage I Flooded Area
Potential Dewatered Area
B S
ize
Land
scap
e B
TB -
DE
C 2
011
1/12
WORK AREAS
2014 (June - August)
Cofferdams and Groins- Construct Quarry Cofferdam, North Channel Rock Groin and North Channel Stage I Cofferdam- Begin construction of Powerhouse Stage I CofferdamOthers- Continue construction of Contractor’s work areas- Begin construction of Ice Boom- Construct rockfill causeway to borrows G-3 and N-5- Construct upstream and downstream Boat Launch and Barge Landing
2016
Powerhouse- Complete excavation for Powerhouse structure, and Intake and Tailrace Channels (inside Powerhouse Cofferdam)- Begin placing Powerhouse and Service Bay Concrete - 1st yearSpillway- Complete excavations for Spillway structure, and Approach and Discharge Channels- Begin placing Spillway Concrete – 1st Year- Begin installation of Spillway GatesCofferdams and Groins- Complete Stage I Spillway Cofferdam, Central Dam Stage I Cofferdam and Central Dam Rockfill GroinDams and Dykes- Continue excavations and fill for North Dyke- Begin construction of Central Dam- Begin clearing and grubbing for South DykeOthers- Complete camp accommodations
2015
Powerhouse- Begin excavation for Powerhouse structure, and Intake and Tailrace ChannelsSpillway- Begin excavations for Spillway structure, and Approach and Discharge ChannelsCofferdams and Groins- Construct Stage I Spillway Cofferdam, Central Dam Stage I Cofferdam and Central Dam Rockfill GroinDams and Dykes- Begin excavations and fill placement for North DykeOthers- Continue expansion of camp accommodations- Completed Stage I River Diversion- Complete construction of South Access Road
3/12
SOUTH ACCESSROAD
2014 (September - December)
Cofferdams and Groins- Complete construction of Powerhouse Stage I Cofferdam, North Channel Stage I Cofferdam and Stage I Island CofferdamOthers- Complete construction of Ice Boom- Begin clearing the reservoir- Begin expansion of camp accommodations for additional 1500 workers- Begin construction of South Access Road
FROM
PR280
CONSTRUCTSTAGE I ISLAND
COFFERDAM
POWERHOUSE STAGE ICOFFERDAM(COMPLETE)
STEPHENSLAKE
MAIN FLOW
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
MAIN CONSTRUCTION CAMP
MAIN CONSTRUCTION CAMP
FROM
PR280
CONSTRUCTNORTH CHANNEL
ROCK GROIN
CONSTRUCTQUARRY
COFFERDAM
DEWATERED
WORK AREAS
POWERHOUSE STAGE I COFFERDAM(OUTER PROTECTIVE ROCKFILL GROINCOMPLETE, REMAINDER IN PROGRESS)
STEPHENSLAKE
MAIN FLOW
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
FROM
PR280
STEPHENSLAKE
CONSTRUCTCENTRAL DAM
STAGE I COFFERDAM
CONSTRUCTSPILLWAY STAGE I
COFFERDAM
NORTH DYKEEXCAVATION AND FILL
CONSTRUCTCENTRAL DAM
ROCKFILL GROIN
MAIN CONSTRUCTION CAMP
POWERHOUSE
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
MAIN FLOW
CENTRAL DAM
NORTH DYKE
STEPHENSLAKE
SPILLWAY
POWERHOUSE
SOUTH ACCESS ROAD
FROM
PR280
MAIN FLOW
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
CAUSWAY CROSSINGTO DEPOSIT N-5
CAUSWAY CROSSINGTO DEPOSIT G-3
ICE BOOM
CONSTRUCTNORTH CHANNEL
COFFERDAM
BOAT LAUNCH/BARGE LANDING
CONSTRUCTION PHASE
Map 3-1
JL/AMB/MES
DATA SOURCE:
DATE CREATED:
CREATED BY:
VERSION NO:
REVISION DATE:
QA/QC:
COORDINATE SYSTEM:
UTM NAD 1983 Z15N
B S
ize
Land
scap
e B
TB -
DE
C 2
011
File
Loc
atio
n: W
:\War
ehou
se_G
roup
s\Po
wer
_Sup
ply\
Pro
ject
s\Ke
eyas
k\M
aps\
EIS
\Cha
pter
4_P
roje
ctD
escr
iptio
n\M
XD
s\D
raft3
\Kee
yask
_Con
stru
ctio
nSeq
uenc
e_M
ap2_
2012
0614
.mxd
Manitoba Hydro, KGS Acres, Government of Manitoba
Manitoba Hydro - Hydro Power Planning Department
3.0 JCL/MES/ZZZ
14-JUN-12 14-FEB-12
YEAR 2
Contin
2019 (January - July)
Powerhouse- Complete installation of Unit 7 Bulkhead Dome- Complete installation of Draft Tube Gates- Continue installation of Turbines and Generators- Continue installation of Mechanical and Electrical systems- Continue placing Powerhouse and Service Bay Concrete – 4th year- Continue excavation of Tailrace ChannelCofferdams and Groins- Remove Powerhouse Stage I Cofferdam- Partial removal of North Channel Cofferdam, Stage II Island Cofferdam and North Channel Rock Groin- Repair and maintain Tailrace Summer Level Cofferdam – 2nd yearDams and Dykes- Continue construction of South Dyke- Continue construction of South Dam (river section)- Begin impounding North and Central River Channel
8/12
Construction Sequence Years 2017 to 2019
0 0.4 0.8 Miles
0 0.45 0.9 Kilometres
LegendPlanned/Removed Feature
Proposed Access Road
Access Road
Work Area and Construction Camp
Structure in Progress
Earthfill Structure (Complete)
Excavation Area
Bedrock Excavation Area
Concrete/Steel Structure
Boat Launch & Barge Landing
Existing Water Surface Area
Stage II Flooded Area
Potential Dewatered Area
2017
Powerhouse- Begin installation of Steel for Service Bay and Powerhouse Units 1, 2, 3, 4- Continue placing Powerhouse and Service Bay Concrete – 2ndyear- Install Powerhouse Crane- Commence installation of Powerhouse Intake GatesSpillway- Continue placing Spillway Concrete – 2ndyear- Complete installation of Spillway GatesCofferdams and Groins- Construct the Stage II Island Cofferdam- Remove sections of Stage I Spillway Cofferdam (and divert river through Spillway)- Construct Upstream Cofferdam for South DamDams and Dykes- Continue excavation and construction of Central Dam- Complete excavation for South Dam (inside Stage I Spillway Cofferdam), North Dam- Complete construction of North Dyke- Commence excavation and fill placement for South Dyke- Complete excavation for South Abutment Others- Complete the North Access Ramp and Parking Lot- Begin Stage II River Diversion
SOUTH DYKE
5/12
CONSTRUCT STAGE II ISLAND COFFERDAM
CONSTRUCT PARKINGLOT & ACCESS RAMP
EXCAVATE SOUTH ABUTMENTABOVE SUMMER WATER LEVEL
CONSTRUCT SOUTH DAM (INSIDE SPILLWAY COFFERDAM)
NORTH DAM
PARTIAL REMOVAL OFSPILLWAY STAGE ICOFFERDAM
SOUTH DAM UPSTREAMCOFFERDAM
FROM
PR280
STEPHENSLAKE
MAIN FLOW
POWERHOUSE
NORTH ACCESS
RAMP
CENTRALDAM
FLOODED AREASTAGE II-A - 4379 cms
NELSON RIVER
6/12
SOUTH ACCESS ROAD
SOUTH DYKE
CONSTRUCTSOUTH DAM DOWNSTREAM
COFFERDAM
FROM
PR280
STEPHENSLAKE
MAIN FLOW
CONSTRUCTSOUTH DAM
(RIVER SECTION)
SPILLWAY
CENTRALDAM
POWERHOUSE
FLOODED AREASTAGE II-A - 4379 cms
NELSON RIVER
7/12
FROM
PR280
CONSTRUCTTRANSMISSIONTOWER SPUR
STEPHENSLAKE
CONSTRUCTTAILRACE SUMMERLEVEL COFFERDAM
MAIN FLOW
SPILLWAY
SOUTH DAM(RIVER SECTION)
SOUTH DYKE
FLOODED AREASTAGE II-A - 4379 cms
NELSON RIVER
2018 (January - July)
Powerhouse- Continue installation of Powerhouse Intake Gates- Complete installation of Superstructure Steel for Service Bay and Powerhouse Units 1, 2, 3, 4- Begin installation of Superstructure Steel for Powerhouse Units 5, 6, 7- Begin installation of Turbines and Generators- Begin installation of Bulkhead Domes for Units 3, 4, 5, 6, 7- Begin installations of Mechanical and Electrical systems- Continue placing Powerhouse and Service Bay Concrete – 3rd yearCofferdams and Groins- Construct Downstream Cofferdam for South DamDams and Dykes- Complete Central Dam- Complete excavation for South Dam (river section)- Continue construction of South Dyke- Begin construction of South Dam (river section)
2018 (July - December)
Powerhouse- Complete installation of Superstructure Steel for Powerhouse Units 5, 6, 7- Continue installation of Turbines and Generators- Continue installation of Bulkhead Domes for Units 3, 4, 5, 6, 7- Continue installation of Mechanical and Electrical systems- Continue placing Powerhouse and Service Bay Concrete – 3rd year- Continue excavation of Tailrace Channel- Begin installation of Draft Tube Gates- Complete installation of Powerhouse Intake GatesCofferdams and Groins- Complete construction of Tailrace Channel Summer Level Cofferdam (1st year)Dams and Dykes- Continue construction of South Dyke- Continue construction of South Dam (river section)Others- Begin construction of Transmission Tower Spur
SOUTH DYKE
REMOVAL OF POWERHOUSE STAGE I COFFERDAM
TAILRACE CHANNEL IMPROVEMENT
FROM
PR280
REPAIR AND MAINTAIN TAILRACE CHANNEL SUMMER LEVEL COFFERDAM AS REQUIRED
STEPHENSLAKE
SOUTH DAM(RIVER SECTION)
BEGINIMPOUNDING
MAIN FLOW
FLOODED AREASTAGE II-A - 4379 cms
NELSON RIVER
Map 3-2
JL/AMB/MES
DATA SOURCE:
DATE CREATED:
CREATED BY:
VERSION NO:
REVISION DATE:
QA/QC:
COORDINATE SYSTEM:
UTM NAD 1983 Z15N
B S
ize
Land
scap
e B
TB -
DE
C 2
011
File
Loc
atio
n: W
:\War
ehou
se_G
roup
s\Po
wer
_Sup
ply\
Pro
ject
s\Ke
eyas
k\M
aps\
EIS
\Cha
pter
4_P
roje
ctD
escr
iptio
n\M
XD
s\D
raft3
\Kee
yask
_Con
stru
ctio
nSeq
uenc
e_M
ap3_
2012
0614
.mxd
Manitoba Hydro, KGS Acres, Government of Manitoba
Manitoba Hydro - Hydro Power Planning Department
2.0 JCL/MES/ZZZ
14-JUN-12 14-FEB-12
Contin
0 0.4 0.8 Miles
0 0.45 0.9 Kilometres
9/12 10/12
2020
Powerhouse- Complete installations of Turbines and Generators- Complete installation of Mechanical and Electrical systems- Remove Bulkhead Domes for Units 3, 4, 5, 6, 7- Commission additional units, First Power for Units 2, 3, 4, 5, 6, 7Spillway- Complete Spillway Rollway for Bays 2, 4, 6Others- Begin construction Infrastructure decommissioning
Construction Sequence Years 2019 to 2022
LegendPlanned/Removed Feature
Proposed Access Road
Access Road
Work Area and Construction Camp
Structure in Progress
Earthfill Structure (Complete)
Excavation Area
Bedrock Excavation Area
Concrete/Steel Structure
Boat Launch & Barge Landing
Existing Water Surface Area
Stage II Flooded Area
Initial Reservoir Area (159 m)
Potential Dewatered Area
NELSON RIVER
BEGIN CONSTRUCTION INFRASTRUCTURE DECOMMISSIONINGFRO
M PR280
STEPHENSLAKE
FLOW
RESERVOIR AT FSLEL. 159.0 m
FLOW
PROPOSED SOUTH ACCESS ROAD
STEPHENSLAKE
12/1211/12
2021 Others- Construction Infrastructure decommissioning- Station in Full Service
2022 (January - November) Others- Complete construction- Infrastructure decommissioning- Site Rehabilitation- Station in Full Service
2019 (July - December) Powerhouse- Complete Tailrace Channel excavation- Complete placing Powerhouse and Service Bay Concrete- Complete Rollways for Bays 1, 3, 5, 7- Continue installation of Turbines and Generators- Continue installation of Mechanical and Electrical systems- Complete Unit 1 commissioning (first power)Cofferdams and Groins- Remove Tailrace Summer Level CofferdamDams and Dykes- Complete South Dam and South DykeOthers- Complete Transmission Tower Spur- Remove Ice Boom- Begin Reservoir Impoundment- Remove Rockfill Causeway to Borrows G-3 and N-5- Construct upstream Boat Launch and Barge Landing
RESERVOIR AT FSLEL. 159.0 m
NELSON RIVER
MAIN FLOW
SOUTH DYKE
CENTRALDAM
NORTHDAM
POWERHOUSE
SPILLWAY
NORTH ACCESS ROAD
POTENTIALDEWATERED AREA
SOUTHDAM
NORTH DYKE
MAIN FLOW
RESERVOIR AT FSLEL. 159.0 m
NELSON RIVER
MAIN FLOW
SOUTH DYKE
CENTRALDAM
NORTHDAM
POWERHOUSE
SPILLWAY
NORTH ACCESS ROAD
POTENTIALDEWATERED AREA
SOUTHDAM
NORTH DYKE
MAIN FLOW
SUBMERGEDCHANNEL
FROM
PR280
STEPHENSLAKE
MAIN FLOW
COMMENCE RESERVOIR IMPOUNDMENTNELSON RIVER
STEPHENSLAKE
Map illustrates the estimated extent of the dewatered area when the spillway is not in operation. The true extent of this area is uncertain due to the limited bathymetric data.
Note: This estimate is based on the existing environment 95th percentile flow.
Map illustrates the estimated extent of the dewatered area when the spillway is not in operation. The true extent of this area is uncertain due to the limited bathymetric data.
Note: This estimate is based on the existing environment 95th percentile flow.
BOAT LAUNCH/BARGE LANDING
OPERATION PHASE
Map illustrates the estimated extent of the dewatered area when the spillway is not in operation. The true extent of this area is uncertain due to the limited bathymetric data.
Note: This estimate is based on the existing environment 95th percentile flow.
Map 3-3
JL/AMB/MES
DATA SOURCE:
DATE CREATED:
CREATED BY:
VERSION NO:
REVISION DATE:
QA/QC:
COORDINATE SYSTEM:
UTM NAD 1983 Z15N
File
Loc
atio
n: W
:\War
ehou
se_G
roup
s\Po
wer
_Sup
ply\
Pro
ject
s\Ke
eyas
k\M
aps\
EIS
\Cha
pter
4_P
roje
ctD
escr
iptio
n\M
XD
s\D
raft3
\Riv
er M
anag
emen
t Cof
ferd
ams_
Map
1_20
1206
14.m
xd
Manitoba Hydro, KGS Acres, Government of Manitoba
Manitoba Hydro - Hydro Power Planning Department
3.0 JCL/MES/ZZZ
14-JUN-12 14-FEB-12
0 0.4 0.8 Miles
0 0.45 0.9 Kilometres
River Management (1 of 3)
LegendEarthfill Structure
Potential Dewatered Area
Existing Water Surface Area
Flooded Area
Keeyask Principal Structures
Proposed Access Road
Access Road
Causway/Haul Road
Ice Boom
B S
ize
Land
scap
e B
TB -
DE
C 2
011
FROM
PR280
NORTH CHANNELSTAGE I COFFERDAM
STEPHENSLAKE
MAIN FLOW
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
FROM
PR280
NORTH CHANNELROCK GROIN
QUARRYCOFFERDAM
STEPHENSLAKE
MAIN FLOW
FROM
PR280
STEPHENSLAKE
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
MAIN FLOW
STEPHENSLAKE
FROM
PR280
MAIN FLOW
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
QUARRYCOFFERDAM
NORTH CHANNELROCK GROIN
QUARRYCOFFERDAM
NORTH CHANNELSTAGE I COFFERDAM
NORTH CHANNELROCK GROIN
QUARRYCOFFERDAM
STAGE I ISLANDCOFFERDAM
1/12 2/12
4/123/12
NELSON RIVER
North Channel Stage I Cofferdam
August 18 - September 3, 2014
Quarry CofferdamJuly 17-22, 2014
North Channel Rock Groin
July 28 - August 18, 2014
Stage I Island Cofferdam
September 3-18, 2014
Ice BoomAugust 21 - October 1, 2014
ICEBOOM
ICEBOOM
ICEBOOM
ICEBOOM
Map 3-4
JL/AMB/MES
DATA SOURCE:
DATE CREATED:
CREATED BY:
VERSION NO:
REVISION DATE:
QA/QC:
COORDINATE SYSTEM:
UTM NAD 1983 Z15N
File
Loc
atio
n: W
:\War
ehou
se_G
roup
s\Po
wer
_Sup
ply\
Pro
ject
s\Ke
eyas
k\M
aps\
EIS
\Cha
pter
4_P
roje
ctD
escr
iptio
n\M
XD
s\D
raft3
\Riv
er M
anag
emen
t Cof
ferd
ams_
Map
2_20
1206
14.m
xd
Manitoba Hydro, KGS Acres, Government of Manitoba
Manitoba Hydro - Hydro Power Planning Department
3.0 JCL/MES/ZZZ
14-JUN-12 14-FEB-12
0 0.4 0.8 Miles
0 0.45 0.9 Kilometres
River Management (2 of 3)
LegendEarthfill Structure
Structure Removal
Potential Dewatered Area
Existing Water Surface Area
Flooded Area
Keeyask Principal Structures
Proposed Access Road
Access Road
Causway/Haul Road
Ice Boom
B S
ize
Land
scap
e B
TB -
DE
C 2
011
FROM
PR280
NORTH CHANNELSTAGE I COFFERDAM
STEPHENSLAKE
MAIN FLOW
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
FROM
PR280
NORTH CHANNELROCK GROIN
POWERHOUSE STAGE I COFFERDAM
STEPHENSLAKE
MAIN FLOW
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
FROM
PR280
STEPHENSLAKE
SPILLWAY STAGE ICOFFERDAMFLOODED AREA
STAGE I - 4379 cms
NELSON RIVER
MAIN FLOW
STEPHENSLAKE
FROM
PR280
MAIN FLOW
FLOODED AREASTAGE I - 4379 cms
NELSON RIVER
NORTH CHANNELROCK GROIN
QUARRYCOFFERDAM
NORTH CHANNELSTAGE I COFFERDAM
NORTH CHANNELROCK GROIN
QUARRYCOFFERDAM
NORTH CHANNELROCK GROIN
QUARRYCOFFERDAM
POWERHOUSE STAGE I COFFERDAM
NORTH CHANNELSTAGE I COFFERDAM
POWERHOUSE STAGE I COFFERDAM
QUARRYCOFFERDAM
NORTH CHANNELSTAGE I COFFERDAM
POWERHOUSESTAGE I COFFERDAM
CENTRAL DAMSTAGE I
COFFERDAM
Stage II Island CofferdamAugust 1-23, 2017
Removal of SpillwayStage I Cofferdam
August 1 - September 6, 2017
SPILLWAYCOFFERDAM
CENTRAL DAMSTAGE I
COFFERDAM
STAGE II ISLANDCOFFERDAM
5/12 6/12
Central Dam Stage I Cofferdam
August 10 - October 6, 2015
8/127/12
Spillway Stage I Cofferdam
July 16 - October 14, 2015
STAGE I ISLAND
COFFERDAM
STAGE I ISLAND
COFFERDAM
Stage I Powerhouse Cofferdam
July 28 - October 14, 2014
STAGE I ISLAND
COFFERDAM CENTRAL DAMSTAGE I
COFFERDAM
STAGE I ISLAND
COFFERDAM
SPILLWAY ANDINTAKE & DISCHARGE
CHANNELS
ICEBOOM
ICEBOOM
ICEBOOM
ICEBOOM
Map 3-5
JL/AMB/MES
DATA SOURCE:
DATE CREATED:
CREATED BY:
VERSION NO:
REVISION DATE:
QA/QC:
COORDINATE SYSTEM:
UTM NAD 1983 Z15N
File
Loc
atio
n: W
:\War
ehou
se_G
roup
s\Po
wer
_Sup
ply\
Pro
ject
s\Ke
eyas
k\M
aps\
EIS
\Cha
pter
4_P
roje
ctD
escr
iptio
n\M
XD
s\D
raft3
\Riv
er M
anag
emen
t Cof
ferd
ams_
Map
3_20
1206
14.m
xd
Manitoba Hydro, KGS Acres, Government of Manitoba
Manitoba Hydro - Hydro Power Planning Department
3.0 JCL/MES/ZZZ
14-JUN-12 14-FEB-12
0 0.4 0.8 Miles
0 0.45 0.9 Kilometres
River Management (3 of 3)
LegendEarthfill Structure
Structure Removal
Potential Dewatered Area
Existing Water Surface Area
Flooded Area
Keeyask Principal Structures
Proposed Access Road
Access Road
Causway/Haul Road
Ice Boom
B S
ize
Land
scap
e B
TB -
DE
C 2
011
FROM
PR280
NORTH CHANNELSTAGE I COFFERDAM
STEPHENSLAKE
MAIN FLOW
FROM
PR280
NORTH CHANNELROCK GROIN
STEPHENSLAKE
MAIN FLOW
FROM
PR280
STEPHENSLAKE
STEPHENSLAKE
FROM
PR280
NORTH CHANNELROCK GROIN
QUARRYCOFFERDAM
NORTH CHANNELROCK GROIN
QUARRYCOFFERDAM POWERHOUSE
STAGE I COFFERDAM
NORTH CHANNELSTAGE I COFFERDAM
POWERHOUSESTAGE I COFFERDAM
QUARRYCOFFERDAM
NORTH CHANNELSTAGE I COFFERDAM
POWERHOUSESTAGE I COFFERDAM
CENTRAL DAMSTAGE I
COFFERDAM
Reservoir ImpoundmentAugust 2 - October 3, 2019
CENTRAL DAMSTAGE I
COFFERDAM
South Dam Stage II Upstreamand Downstream Cofferdams
September 8, 2017 - July 19, 2018
CENTRAL DAMSTAGE I
COFFERDAM
SPILLWAYCOFFERDAM
STAGE II ISLANDCOFFERDAM
Tailrace Channel SummerLevel Cofferdam
July 16 - September 14, 2018
SPILLWAYCOFFERDAM
STAGE II ISLANDCOFFERDAM
SOUTH DAM STAGE IIUPSTREAM AND
DOWNSTREAM COFFERDAM
TAILRACE SUMMERLEVEL COFFERDAM
SPILLWAYCOFFERDAM
TAILRACE SUMMERLEVEL COFFERDAM
STAGE II ISLANDCOFFERDAM
Removal of Powerhouse andTailrace Cofferdams
June 24 - October 3, 2019
SOUTH DYKE
CENTRALDAM
NORTHDAM
POWERHOUSE
SPILLWAY
NORTH ACCESS ROAD
POTENTIALDEWATERED AREA
SOUTHDAM
NORTH DYKE
9/12 10/12
12/1211/12
STAGE IISLAND
COFFERDAM
ICEBOOM
SPILLWAY ANDINTAKE & DISCHARGE
CHANNELS
FLOODED AREASTAGE II - 4379 cms
NELSON RIVER
FLOODED AREASTAGE II - 4379 cms
NELSON RIVER
STAGE IISLAND
COFFERDAM
ICEBOOM
SPILLWAY ANDINTAKE & DISCHARGE
CHANNELS
FLOODED AREASTAGE II - 4379 cms
NELSON RIVER
SOUTH DAM STAGE IIUPSTREAM AND
DOWNSTREAM COFFERDAM
SPILLWAY ANDINTAKE & DISCHARGE
CHANNELS
MAIN FLOW
STAGE IISLAND
COFFERDAM
ICEBOOM
FLOODED AREAPOST PROJECT - 159m
NELSON RIVER
Map illustrates the estimated extent of the dewatered area when the spillway is not in operation. The true extent of this area is uncertain due to the limited bathymetric data.
Note: This estimate is based on the existing environment 95th percentile flow.
SOUTH DAM STAGE IIUPSTREAM AND
DOWNSTREAM COFFERDAM
Map 3-6
JL/AMB/MES
DATA SOURCE:
DATE CREATED:
CREATED BY:
VERSION NO:
REVISION DATE:
QA/QC:
COORDINATE SYSTEM:
GULL LAKE
JoslinLake
CarscaddenLake
Ethel
RIVER
Ross Wright Bay
O'NEIL BAY
NELSON
RIVER
Looking Back Creek
PR 280
North Access Road
P roposed South Access Road
UTM NAD 1983 Z15N
0 0.9 1.8 Miles
0 1 2 Kilometres
ProposedKeeyask G.S.
B S
ize
Land
scap
e B
TB
- D
EC
201
1Fi
le L
ocat
ion:
W:\W
areh
ouse
_Gro
ups\
Pow
er_S
uppl
y\P
roje
cts\
Kee
yask
\Map
s\E
IS\C
hapt
er4_
Pro
ject
Des
crip
tion\
MX
Ds\
Dra
ft3\K
eeya
skR
esev
oirC
lear
ingM
etho
ds_2
0120
412.
mxd
Proposed Reservoir Clearing Methods
Manitoba Hydro; Government of Manitoba; Government of Canada; Plus 4Consulting & ECOSTEM Ltd Clearing Plan published 2011-12-02; ManitobaHydro Best Available Water (2010_WRE_QBird_CanVec50k_2012_02_16)
Manitoba Hydro - Hydro Power Planning - GIS & Special Studies
2.0 JCL/YYY/ZZZ
12-APR-12 16-FEB-12
Legend
Type of ClearingHand Clearing
Hand or Machine Clearing
Keeyask Principal Structures
Highway
Access Road
Proposed Access Road
Map 3-7
JL/AMB/MES
UTM NAD 1983 Z15N
1.0 JCL/AMB/MES
14-JUN-12
Manitoba Hydro - Hydro Power Planning - GIS & Special Studies
Burntwood/Nelson Agreement , Revision 10, December 16, 2010
0 70 140 Kilometers
0 50 100 Miles
14-JUN-12
Churchill Burntwood Nelson and
Northern Region Boundaries
DATA SOURCE:
DATE CREATED:
CREATED BY:
VERSION NO:
REVISION DATE:
QA/QC:
COORDINATE SYSTEM:
Map 3-8
JL/AMB/MES