Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating...

15
Supplier Requirements Manual Revision Date: January 12, 2017 (Added/changed text appears in Red)

Transcript of Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating...

Page 1: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

Supplier

Requirements

Manual

Revision Date:

January 12, 2017

(Added/changed text appears in Red)

Page 2: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

2

Table of Contents

1.0 Introduction

2.0 Safety

3.0 Environmental Policy

4.0 Quality Policy

5.0 Supplier Quality Requirements

6.0 Supplier Performance Monitoring

7.0 Contact Information

Appendix A Supplier Corrective Action Request Form

Appendix B Tooling Pictures

Appendix C Schedule of Cost Recoveries

Appendix D Revision History Log

Page 3: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

3

1.0 Introduction

This manual is intended to assist suppliers in understanding AirBoss Flexible Products’ (AFP)

expectations. All AFP production part or production service suppliers must be registered to

either ISO 9001 or ISO/TS 16949. AFP’s goal is for all of its suppliers to be ISO/TS 16949

registered. AFP encourages all of its suppliers to be committed to the protection of our

environment through pollution prevention and to be ISO 14001 registered.

It is AFP’s expectation that all suppliers provide materials or services that are defect free and

delivered at the right time and at the right quantity. For the latest edition of this Supplier

Requirements Manual, please visit our website at www.flexible-products.com.

2.0 Safety

Safety glasses with side shields are required when on our manufacturing floor. Eyeglasses or

safety glasses without side shields are not acceptable as eye protection. Please stay with the

AirBoss Flexible Products escort at all times.

Initial shipment of a material or item that poses a potential health or safety risk to an AirBoss

Flexible Products employee must be accompanied with a SDS (Safety Data Sheets).

Page 4: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

4

3.0 Environmental Policy

AirBoss Flexible Products, a design and manufacturer of injection molded rubber parts and

assemblies for the automotive industry, located in Auburn Hills, MI is committed to the

protection of the environment and to fulfill our compliance obligations. As a responsible

corporate citizen, we recognize that the activities of our business cannot be separated from our

impact on the natural environment in which we operate. We believe that it is every employee

at AirBoss Flexible Products responsibility to be committed to the protection of the

environment. Therefore, “Our goal is to minimize the environmental impact of our operations

and to strive for continual improvement in the environmental management system to enhance

our environmental performance.” This will be accomplished by:

Continually improve with emphasis on pollution prevention.

Abide by all relevant environmental laws, regulations and other requirements.

Reduce, reuse, and recycle to minimize waste.

Environmental policy is communicated to our employees and the public through our

corporate website.

4.0 Quality Policy

To provide the highest value to the Customer by designing, producing and delivering quality

products on time, in a safe, efficient and lean environment.

Page 5: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

5

5.0 Supplier Quality Requirements

5.1 Annual Layout

To ensure continuing conformance to all AFP parts, a full layout inspection of the

parts to the AFP product drawing shall be performed. These layouts shall be

conducted annually and the results kept on file.

5.2 Certifications

When suppliers are sending material or part certifications to AirBoss Flexible

Products, make sure the specifications are clearly noted on them.

5.3 Conflict Minerals

All suppliers shall be able to determine the locations where the tin, tantalum,

tungsten, and gold, contained within products sold to AirBoss Flexible Products,

originated within the Democratic Republic of the Congo or are able to verify that

the tin, tantalum, tungsten, and gold contained did not originate within the

Democratic Republic of the Congo. If it is determined the Supplier is using

conflict minerals, then contact AFP Purchasing immediately.

5.4 Contingency Plan

Suppliers shall develop a contingency plan for potential catastrophes disrupting

the product flow to AirBoss Flexible Products and advise Purchasing immediately

in the event of an actual disaster. In an actual catastrophe, the supplier shall

provide AirBoss Flexible Products access to the supplier’s tools.

5.5 Delivery

The supplier is required to achieve 100% on-time delivery per the AirBoss

Flexible Products schedule. Any schedule requirement that cannot be met must

be communicated to our Production Supply Coordinator. If a supplier fails to ship

product as required by their release or agreed upon shipping schedule, they may

be required to expedite at their own expense. Additionally, the supplier may be

responsible for any other expenses incurred by AFP as a result of the supplier’s

past due situation.

5.6 EDI

Suppliers can get their weekly releases and input their ASN’s through the EDX

website. The website address is www.myedx.com. The Rocket Supplier EDX

manual can be obtained on our website at www.flexible-products.com.

Page 6: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

6

5.7 Labeling

Two labels must be attached to the container with the following minimum

information:

1) AirBoss Flexible Products Part Number

2) Part Description

3) Part Quantity

4) Manufacturing Date

5) Lot Code

6) Supplier Name

Old labels on the container must be removed or covered up.

5.8 Lot Control

Suppliers are required to have lot control procedures in place to identify product

from receipt of raw materials through their internal processes to the shipment of

the finished product.

5.9 Non-conforming Material

If product is rejected at AirBoss Flexible Products, a Supplier Corrective Action

Request (SCAR) will be issued to the supplier. The Supplier must respond within

24 hours with the immediate containment plan and if the containment of the parts

is lost, then immediately contact the AFP Quality Department. The supplier shall

respond within 10 working days with a permanent corrective action plan. The

Supplier Corrective Action Request form is located in Appendix A. Suppliers

may be required to certify product after a rejection has occurred. For the first

offense, the supplier shall conduct sort and certification of product until the

permanent corrective action is in place. For the second offense, for the same

rejection, the supplier may be placed on Third party containment until the agreed

upon duration between AFP and the supplier. A schedule of potential cost

recoveries are located in Appendix C and this includes:

1) Administrative Fee- which may include issuing and closing out the SCAR,

managing sorters, and filling out any customer related documents

2) External Sorting- a sort house that AFP or the supplier selects to be used to

sort product

3) AFP Sorting- AFP is elected to sort the product

The cost recovery will be communicated by the AirBoss Flexible Products

Quality Department and debited through the Finance Department.

Page 7: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

7

If a supplier suspects non-conforming material has been shipped to AFP, they are

encouraged to proactively report it to the AFP Quality Department as soon as

possible. Otherwise, the charges in Appendix C may apply.

5.10 Packaging

The supplier and AirBoss Flexible Products shall determine the type, method of

packaging and the quantity of parts per container. For bulk containers, the tare

weight must be located on the container. Flexible Product’s returnable containers

are to be used only for AirBoss Flexible Products’ parts.

5.11 PPAP

All suppliers must submit the PPAP level 3 documentation per the AIAG manual

and to complete the International Material Data System (IMDS) which reports the

material composition information on all new and modified components, unless

otherwise directed. PPAP parts must accompany the PPAP documentation on the

date that it is due on the Purchase Order. Before receiving PPAP approval, the

following items will also be needed if tooling is involved:

1) Pictures of all the tooling

(Refer to Figure #1 in Appendix B)

2) Tool identification number to be placed on the tooling

(Refer to Figures #2 in Appendix B)

3) State on the tooling who owns it

(Refer to Figure #3 in Appendix B)

Tooling invoices will not be paid in full until the tooling pictures are approved

and the PPAP is approved. PPAP approval is required before the first shipment of

production parts.

Page 8: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

8

5.12 Special Process Assessments

Clause 8.2.2.2 of ISO/TS 16949:2009 requires that the supplier shall audit each

manufacturing process to determine its effectiveness. Applicable special

processes are listed below:

Heat Treating- CQI-9 Special Process: Heat Treat System Assessment

Plating- CQI-11 Special Process: Plating System Assessment

Coating- CQI-12 Special Process: Coating System Assessment

Welding- CQI-15 Special Process: Welding System Assessment

Molding- CQI-23 Special Process: Molding System Assessment

Casting- CQI-27 Special Process: Casting System Assessment

These self assessment(s) shall be conducted annually and the results kept on file.

5.13 Supplier Development

Purchasing and/or Supplier Development may become involved when suppliers

are not responsive to requests for corrective actions or due to overall poor

performance with regards to quality or delivery issues. Supplier Development

may conduct an onsite visit, which can include:

1) Verification of corrective actions

2) Supplier Audit

3) Run at Rates

4) Continual improvement activities (i.e. delivery, quality, cost savings)

5.14 Supplier Request for Change

Engineering and Purchasing shall be notified prior to implementing any of the

following changes:

1) Design

2) Material

3) Process

4) Manufacturing location

5) Tooling

The supplier shall also notify Purchasing when there is potential supply or

capacity issues.

Page 9: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

9

5.15 Terms and Conditions

AirBoss Flexible Products Terms and Conditions are located on our website at

www.flexible-products.com.

6.0 Supplier Performance Monitoring

Suppliers will be monitored on a monthly basis for quality, delivery and service. Each quarter,

suppliers are evaluated and a supplier score card will be generated and sent out. The supplier

score card is broken out below:

Area Description Score

(Points)

Quality Maintain ISO 9001/TS16949 Registration 10

0 quality issues 30

1 month with quality issue(s) 20

2 months with quality issue(s) 10

3 months with quality issue(s) 0

Quality Score Available 40

Delivery No premium freight 5

No late ASN’s 5

0 delivery issues 30

1 month with delivery issue(s) 20

2 months with delivery issue(s) 10

3 months with delivery issue(s) 0

Delivery Score Available 40

Service PPAP’s submitted on-time 10

Corrective actions submitted on-time 10

Service Score Available 20

Total Score Available 100

If a supplier falls below a minimum score of 80 points out of 100 points, for two consecutive

evaluation periods, then a Supplier Corrective Action will be issued. The supplier must establish

a corrective action plan to improve their score. If the supplier is consistently below expectations,

Purchasing may place the supplier on New Business Hold (NBH) until improvements are made.

Page 10: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

10

7.0 Contact Information

Title Name Phone E-mail

Accounts Payable

Janel Brewer 248-293-8600 [email protected]

Inside Sales

Rob Thomas 248-293-8607 [email protected]

Inside Sales

Sandra Clements 248-293-8625 [email protected]

PPAP Coordinator Sharon Knapp 248-293-8657 [email protected]

PPAP Coordinator

Gail Hammonds 248-293-8616 [email protected]

Production Supply

Coordinator

Charlene

Reynolds

248-293-8624 [email protected]

Production Supply

Manager

Tera Melton 248-293-8601 [email protected]

Purchasing Manager

(Production Supply)

Sara Grieve 248-293-8641 [email protected]

Purchasing

(Junior Buyer)

Lynn Richards

248-293-8665 [email protected]

Quality Department Devonte Glenn 248-293-8667 [email protected]

Supplier Development

Engineer

Kenneth Heavner 248-293-8605 [email protected]

VP Engineering Dean Juriga 248-293-8647 [email protected]

Page 11: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

11

Appendix A

Page 12: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

12

Appendix B

Figure 1

Figure 2

Page 13: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

13

Figure 3

Page 14: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

14

Appendix C

Schedule of Cost Recoveries Amount

Administrative Fee $150

External Sorting Charges Direct costs from the sorting

company

AFP Sorting Charges $25/hour

Page 15: Supplier Requirements Manual - airbossofamerica.com · Coating- CQI-12 Special Process: Coating System Assessment Welding- CQI-15 Special Process: Welding System Assessment Molding-

15

Appendix D

Revision

Date

Section Description of Change

2/10/14 All Released

12/10/14 5.0 Added Supplier Certifications

3/2/15 5.0

7.0

Appendix A

Appendix B

Appendix C

Revised Special Process Assessments

Revised Contact Information

Removed section 8.0

Removed section 9.0

Added Supplier Corrective Action Request Form

Moved from section 8.0 Tooling Picture Examples

Moved from section 9.0 Revision History Log

3/17/15 5.0

Appendix C

Appendix D

Revised Non-conforming Material

Schedule of Cost Recoveries

Moved from Appendix C Revision History Log

1/28/16 5.0

7.0

Revised Non-conforming Material

Added CQI-23 Molding System Assessment

Added additional contacts

1/12/17 1.0

3.0

5.0

7.0

Revised Introduction

Revised the Environmental Policy

Added Annual Layouts

Added Conflict Minerals

Added Casting System Assessment (CQI-27)

Revised Delivery

Revised Non-conforming Material

Revised Supplier Development

Added Terms and Conditions

Revised Contact Information