Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

14
CONSTRUCTION FOR TETRAPOD PRESENTATION Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Transcript of Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

Page 1: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

CONSTRUCTION FOR TETRAPOD PRESENTATION

Subcontractor: Phuc HungPrepared by:

1

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Page 2: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

CONSTRUCTION SEQUENCE FOR CONSTRUCTION TETRAPOD BLOCK

1. Site preparation

2. Operate & transport Tetrapod’s formwork to the site

3. Installation formwork

4. Installation scaffolding

5. Casting conscrete

6. Dismantling scaffoiding, formwork

7. Curing, transport to Tetrapod’s storage yard & go to the other

blocks

Prepared by: 2

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Page 3: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

1. SITE PREPARATION

Prepared by: 3

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Construction for auxiliaries building & Casting Tetrapod’s yard

Page 4: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE

Prepared by: 4

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Tetrapod’s Formwork

Page 5: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE

Prepared by: 5

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for concrete mixed plant

Page 6: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

2. OPERATE & TRANSPORT TETRAPOD’S FORMWORK TO THE SITE

Prepared by: 6

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for concrete mixed plant

Page 7: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

3. INSTALLATION FORMWORK

Prepared by: 7

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for Tetrapod’sformwork

Page 8: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

3. INSTALLATION FORMWORK

Prepared by: 8

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for Tetrapod’sformwork

Page 9: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

3. INSTALLATION FORMWORK

Prepared by: 9

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Installation for Tetrapod’sformwork & scaffolding

Page 10: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

4. CASTING CONCRETE

Prepared by: 10

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Casting concrete

Page 11: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

5. DISMANTLING SCAFFOIDING, FORMWORK

Prepared by: 11

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Dismantling scaffoiding, formwork

Page 12: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

6. CURING CONCRETE

Prepared by: 12

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Curing concrete

Page 13: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

7. TRANSPORT TO TETRAPOD’S STORAGE YARD

Prepared by: 13

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

Transport to tetrapod’s storage yard

Page 14: Subcontractor: Phuc Hung Prepared by: 1 LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT.

AS ABOVE, ALL THE IMAGES WERE COLLECTED BY OUR

ENGINEERS WHEN THEY WERE CARYING OUT FOR CASTING

TETRAPOD BLOCK IN DA NANG PORT IMPROVEMENT PROJECT.

Prepared by: 14

LACH HUYEN PORT INFRASTRUCTURE CONSTRUCTION PROJECT

THANK YOU SO MUCH !!!