Studio Navale Presentation at Gear Club, 2010

27
1 Constantly on the alert for new developments in the Marine sector Gear Club presentation, 15 December 2010 The reliable Greek partner in ship design and construction A brief introduction to STUDIO NAVALE by Alex Kouros Gear Club Presentation, on 15 December 2010

description

Presentation offered to Gear Club Greece, on 15 December 2010, with the opportunity of METRICA and Studio Navale cooperation.

Transcript of Studio Navale Presentation at Gear Club, 2010

Page 1: Studio Navale Presentation at Gear Club, 2010

1

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

The reliable Greek partner in ship design and construction

A brief introduction to STUDIO NAVALEby Alex Kouros

Gear Club Presentation, on 15 December 2010

Page 2: Studio Navale Presentation at Gear Club, 2010

2

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Agenda History Capabilities Organization Chart Recent Activities Why Studio Navale?

Page 3: Studio Navale Presentation at Gear Club, 2010

3

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Agenda History Capabilities Organization Chart Recent Activities Why Studio Navale?

Page 4: Studio Navale Presentation at Gear Club, 2010

4

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

History of Studio Navale 1987 onwards1987

1993Milestone for the Enhansed Surveys of Bulkers and Tankers launching demanding UTM

Alex Kouros established and operated Studio Navale

2000

Alex Kouros joined ABS Consulting

2005

2003The first conversion of a Panamax single hull Tanker into a double hull has been contracted and turned to project, showing the way in the market; until 2005, more than of 15 conversions carried out

Management of a shipping company and a ship repairs yard

2008

Idle condition of Studio Navale

Re-establishment of Studio Navale at the new premises

Operation for 13 years from the Piraeus Office

5 years hi-end consulting

Page 5: Studio Navale Presentation at Gear Club, 2010

5

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Location at CARELL SA

Page 6: Studio Navale Presentation at Gear Club, 2010

6

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Milestones of Studio Navale 1988-1989

• Finite Elements Methodology for the structural formation of the cargo hold of Cement Barge and the decks of a Livestock Carrier.

1990• Preparation of the drawings and studies fully electronically

1993• Of the pioneers in the preparation of the Enhanced Surveys Reports to the Classification Societies

requirements.• Of the pioneers in the certification as Class Subcontractors.

2000-2003• Preparation of feasibility studies for the conversion of single hull tankers to double hull ones.• 2003: The first Panamax tanker contracted for conversion. More than of 15 followed.

2005• Replacement of the rudder equipment of a Panamax bulker, as a result of a damage. Renewal 200TN

of steel in way, a new Becker type rudder and new rams of the steering mechanism fabricated and installed. MV Caravos Horizon at HSY

2008• Involvement into the new acquisitions of EKO (3 tankers + 2 RoRo Tankers).

2009• Involvement into the investigation of a fractured bottom of a bulker, through a fully developed Finite

Element Model and relevant analysis. Finite Elements (FEM) 2010

• Business cooperation with METRICA SA for scanning to ship structures related projects.

Page 7: Studio Navale Presentation at Gear Club, 2010

7

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Fast Facts about Studio Navale A technical and consulting office focused the services

to demanding projects and/or projects requiring eminent expertise and skills.

More than of 30-year experience in ship repairs, under demanding conditions and parties involved.

High reputation and respect within the shipping industry.

Fully organized with highly skilled technical personnel. Strives to continuously up-to-date equipment and

instruments. Availability throughout 24/7. Management Team acts as the frontline at-site. Management Team with technical and commercial

expertise and experience.

Page 8: Studio Navale Presentation at Gear Club, 2010

8

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Vision and Mission of Studio Navale Vision:

• To be a part of the Technical Department of a Shipping Company or a Shipping and Offshore interest Entity, at any short requests, in order technical advice and consulting is offered.

Mission:• To share the accumulated technical knowledge and

experience with existing and new Clients, by strengthen and improve existing business ties or by creating and grow new business relationships, in order to help Clients meet the continuously altered challenges of the shipping industry;

• To deploy the resources and deliver services to the utmost quality and safety standards with no compromise due to costs, revenue or profit issues.

Page 9: Studio Navale Presentation at Gear Club, 2010

9

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Agenda History Capabilities Organization Chart Recent Activities Why Studio Navale?

Page 10: Studio Navale Presentation at Gear Club, 2010

10

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Range of Services

Ships’ Technical Documentation

Ship Design

Plan Approval

Design Review

Engineering Consultancy

Conversions, Modifications and Retrofits

Design Assistance

Advance Engineering Analysis (FEM)

3D Scanning of gigantic structures

Coating and Corrosion

Risk and Reliability

Condition Surveys

Evaluation of ships and floating structures

Ship Management Services

Ship Repairs Management

Claims

Defense

Capabilities Studio Navale is a technical office,

with the scope of offering ship design, manufacturing, repairs, management services of utmost quality to the benefit of the Client.

Up-to-date software and equipment to respond to third parties requirements.

Full implementation of Finite Elements software for evaluating structures.

3D Scanning of structures to produce relevant drawings, study etc.

Condition and Evaluation Surveys. Management of ship repairs.

Page 11: Studio Navale Presentation at Gear Club, 2010

11

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Consulting Capabilities Technical

Services Design Review

and Certification

Technical Support Services

Advanced Engineering Analysis

Marine and Offshore Certification

Plant and Pipeline Certification

New Construction Technical Support

Environmental Management and Assessments

Specialty Services

Asset Management

Project Financial

Project Appraisal Service

Project Management

Technical Training

Facility Verification

Boiler and Pressure Vessel Certification

Cargo Container and Crane Certification

Site and Source Inspection

New Construction Project Support

Surveys and Condition Assessment

Marine and Offshore Certification

Plant and Pipeline Commissioning

Page 12: Studio Navale Presentation at Gear Club, 2010

12

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Agenda History Capabilities Organization Chart Recent Activities Why Studio Navale?

Page 13: Studio Navale Presentation at Gear Club, 2010

13

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Organization Chart

Page 14: Studio Navale Presentation at Gear Club, 2010

14

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Organization Chart

Page 15: Studio Navale Presentation at Gear Club, 2010

15

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Agenda History Capabilities Organization Chart Recent Activities Why Studio Navale?

Page 16: Studio Navale Presentation at Gear Club, 2010

16

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Recent Activities on Repairs Management

Replacement of an anchor and modification of IG SW pipe within ONE day, having the ship in INERTED condition (CARELL SA Project).

Contamination of the ballast tanks with fuel oil,

due to a cross pipe leakage.

Assessment, evaluation of the case and

permanent repairs within 7 days (CARELL SA

Project).

Evaluation of the existing deep well pumps in order to handle viscus liquids.Cooperation with the Makers

Survey of the ship for a PPCS purpose and evaluation of the existing damage/repairs.

Page 17: Studio Navale Presentation at Gear Club, 2010

17

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Recent Activities on Repairs Management

Extensive repairs specification of a Polish AHTB (CARELL SA Project partially conducted at NEORION Shipyards).

Demanting repairs specification of a

Singaporean AHTB (CARELL SA Project).

Repairs in a drilling platform under a demanding specification and strict HSEQ issues (NAVEP works at ELEFSIS Shipyards).

Acquisition of the ship on behalf of Owners and putting her in trading.Various repairs and Class matters were dealt with.Preparation of the Shipping Company.

Page 18: Studio Navale Presentation at Gear Club, 2010

18

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Recent Activities on Repairs Management

Page 19: Studio Navale Presentation at Gear Club, 2010

19

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Recent Activities on Double Hull Conversions

Page 20: Studio Navale Presentation at Gear Club, 2010

20

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Recent Activities on Stern Lines Installation

Page 21: Studio Navale Presentation at Gear Club, 2010

21

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Agenda History Capabilities Organization Chart 3D Scanning Services Recent Activities Why Studio Navale?

Page 22: Studio Navale Presentation at Gear Club, 2010

22

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Why Studio Navale? One-person contact. Services aiming solely the Client’s satisfaction. Experience of more than 30 years in the

production. Experienced engineers with up-to-date skills. Knowledge of the ship repairs market from

inside. Brilliant relationships with Classification

Societies. Competitive and cost-effective business

relationships. Pool of unique subcontractors, worldwide. Respect of the market. 24/7 service.

Page 23: Studio Navale Presentation at Gear Club, 2010

23

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Location

Why GREECE?• Reliable

environment• In within trading

paths• Quality/Cost very

effective• In the door of

Europe

Page 24: Studio Navale Presentation at Gear Club, 2010

24

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Risky in Greece? Certainly NO!!

The first duty of business is to survive and the guiding principle of business economics

is not the maximization of profit; it is the avoidance of loss.

The best way to predict the future is to create it!

Peter Drucker (November 19, 1909 – November 11, 2005)

Page 25: Studio Navale Presentation at Gear Club, 2010

25

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Contact: Alex Kouros, 24/7 Cell +30 6936709950Email: [email protected]

Phone: +30 2104004401 Fax: +30 210 4007511Industrial Park of Schisto, Block 8 (Building 805-806),

GR-188 63 Perama (Piraeus), Greecewww.carell.gr

Committed to the client superior results

Page 26: Studio Navale Presentation at Gear Club, 2010

26

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

MV Caravos Horizon, Maneuverability update

Page 27: Studio Navale Presentation at Gear Club, 2010

27

Con

sta

ntl

y o

n t

he a

lert

for

new

develo

pm

en

ts in

th

e

Mari

ne s

ecto

r

Gear Club presentation, 15 December 2010

Finite Elements (FEM)