Innovative Multiphase Extraction Design Operating above the Upper Flammability Limit
(UFL).
October 2005SYSTEM DESIGN GROUP
Stuart Torr. M.Eng. EIT
![Page 2: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/2.jpg)
Introduction
• Background• Design Challenges• Objectives • Why UFL• Safe Operating Conditions• Pipe & Equipment Safety• Operation Uncertainties• Operational Regimes• The Design
![Page 3: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/3.jpg)
Free phase condensate
Dissolved phase condensate
![Page 4: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/4.jpg)
Hydrocarbon Composition
HYDROCARBON COMPOSITION OF OFFGAS vs.TIMEPilot Test Data
0%10%20%30%40%50%60%70%80%
C1 C2 C3 C4 C5 C6 C7 C8 C9 C10
Hydrocarbon Composition
Mol
ecul
ar P
erce
ntag
e (%
StartupShutdown
![Page 5: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/5.jpg)
• Fine silty sand, water table 4 - 5 m deep
• Condensate lens near tank farms and rail yard, covers 600 m by 400 m area
• Measured product thickness in wells varies from 0.1 to 1.5 m
•Hydrocarbon is clean cut, C5-C6, and very volatile
Hydrogeological Impact
![Page 6: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/6.jpg)
• Pilot Test vertical vs. horizontal SVE wells (1993)
• Installation of 4 horizontal SVE wells, seasonal (1994-97)
• Installation of recovery trench for plume control (1994-02)
• Testing of MPE, SVE, Incinerator (2001-02)
• Design-install expanded well & header system for MPE, fluid treatment, vapour incineration (2004-05)
History of Remediation
![Page 7: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/7.jpg)
![Page 8: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/8.jpg)
Design Challenges• Scale of Impact• Volatility of product - Pentane• Safety within UFL operation• Design and install within an active plant
Design Requirements• System constructed to client standards• Minimize fuel gas usage• Design for remote operation
![Page 9: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/9.jpg)
Design Objectives
• Multiphase system• Horizontal wells to cover free phase• Maintain >120% UFL• Building safety• Operational Safeguards in design• Integrate the MPE and GWTS• Remote Operation
![Page 10: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/10.jpg)
Why Design the system for operation in the UFL?• To accelerate remediation of site• Good solution because of the high
volatility of product• Prevents operation in explosive
conditions that result in safety issues
• Required to ensure safe operational conditions in piping from wells to incinerator
![Page 11: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/11.jpg)
Operation Uncertainties
• O2 values in actual soil• Representation of O2 values in pilot-
test• Long term trends (pilot tests only
over a few months)• Pressure required for liquid
recovery• Hydrocarbon concentrations
![Page 12: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/12.jpg)
The Fire Triangle
![Page 13: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/13.jpg)
Operational Regimes:
Three ways to operate safely:
1. Below LFL (Lower Flammability Limit), or
2. Above UFL (Upper Flammability Limit)and/or
3. Below LOC (Limiting O2 Concentration)
![Page 14: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/14.jpg)
Safe Operating Conditions UFL
• Upper Flammability Limit (UFL)• Concentration above which a fuel will
not maintain combustion• UFL for pentane: 7.8% vol. (air @ STP)• UFL for methane: 15% vol. (air @ STP)
• Range can be extended by adding fuel gas at front end of piping
![Page 15: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/15.jpg)
O2 in original soil vapour, %
N2 gas added to original soil vapour, %
Pen
tane
(con
dens
ate
in v
apou
r) in
mix
ture
, %
![Page 16: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/16.jpg)
Safe Operating Conditions LFL
• Lower Explosive Limit (LFL)• Concentration below which a fuel will
not maintain combustion• LFL for pentane: 1.5% vol. (air @ STP)
• Range can be extended by adding air as diluting agent at front end of piping
![Page 17: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/17.jpg)
O2 in original soil vapour, %
N2 gas added to original soil vapour, %
Pent
ane
(con
dens
ate
in v
apou
r) in
mix
ture
, %O2 in original soil vapour, %
N2 gas added to original soil vapour, %
Pen
tane
(con
dens
ate
in v
apou
r) in
mix
ture
, %
![Page 18: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/18.jpg)
Safe Operating Conditions LOC
• Limiting O2 Concentration (LOC)• Concentration of O2 below which
combustion cannot occur• Minimum O2 concentration for
methane and pentane: 12%• Range can be extended by adding
N2 as diluting agent at front end of piping
![Page 19: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/19.jpg)
O2 in original soil vapour, %
N2 gas added to original soil vapour, %
Pent
ane
(con
dens
ate
in v
apou
r) in
mix
ture
, %O2 in original soil vapour, %
N2 gas added to original soil vapour, %
Pen
tane
(con
dens
ate
in v
apou
r) in
mix
ture
, %
![Page 20: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/20.jpg)
Pipe & Equipment Safety
• Design controls:• Prevent flammable conditions within
piping header• Use grounded stainless steel piping to
dissipate static• Use rupture plates to mitigate any
detonation• Use flame arrestor at Incinerator to
contain flame
![Page 21: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/21.jpg)
Operational Regimes• Stepwise progression through
operational regimes with changing soil conditions
1. UFL or LOC operation with incineration
2. LFL operation with incineration3. LFL operation with venting
• High concentrations in soil vapour: above UFL is most economical
• Low concentrations in soil vapour: below LFL is most economical
![Page 22: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/22.jpg)
Fuel Gas Cost Evaluation
![Page 23: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/23.jpg)
Horizontal header
![Page 24: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/24.jpg)
Future Wells
![Page 25: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/25.jpg)
Process and Instrumentation
![Page 26: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/26.jpg)
Process Flow
Horizontal MPE Multi-Phase Separator
Vapour Incineration
Aeration Tank
Fuel Gas
Ground Water Containment wells
Water DischargeOil Water
Separator
Condensate Storage
Nitrogen
![Page 27: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/27.jpg)
Design Summary
MPE System• Flowrate capability of two blowers: • 1020 m3/hr (600 acfm)• Vacuum: -68 kPag (32 kPaa)• 12 Horizontal Wells existing• System designed to handle 8 wells additional for
future expansionGroundwater Containment• 5 wells installed to prevent offsite migration (6m
x 200m Trench)• 25 l/m design flowrate
![Page 28: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/28.jpg)
• Screen: 304SS wire wrap (0.010”slot size)• Casing: 304SS
Horizontal Well Install
![Page 29: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/29.jpg)
![Page 30: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/30.jpg)
![Page 31: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/31.jpg)
![Page 32: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/32.jpg)
![Page 33: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/33.jpg)
![Page 34: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/34.jpg)
![Page 35: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/35.jpg)
Horizontal Wellhead
![Page 36: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/36.jpg)
System Installation
![Page 37: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/37.jpg)
Air Water SeparatorSystem Inlet
Fuel Gas / Nitrogen Control Valves
Fuel Gas / Flow Control Valves
![Page 38: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/38.jpg)
Blowers
Air Water Separator
![Page 39: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/39.jpg)
Air Water Separator
Condensate Storage Tank
![Page 40: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/40.jpg)
Blowers
In-line Gas Analyzers
Discharge to Incinerator
![Page 41: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/41.jpg)
Sparging Tank
Sparging Blower
PD Pump
![Page 42: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/42.jpg)
MCC Building
![Page 43: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/43.jpg)
Incinerator
![Page 44: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/44.jpg)
Oil Water SeparatorOil Water Separator
![Page 45: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/45.jpg)
MPE Building
![Page 46: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/46.jpg)
Groundwater Extraction Trench
![Page 47: Stuart Torr. M.Eng. EIT SYSTEM DESIGN GROUP - · PDF fileSYSTEM DESIGN GROUP Stuart Torr. M.Eng. EIT. ... • Condensate lens near tank farms and rail yard, ... Design Objectives •](https://reader031.fdocuments.in/reader031/viewer/2022022005/5ab34db67f8b9a6b468e5516/html5/thumbnails/47.jpg)
Summary
• UFL Operation ideal for light product
• Large impact and light product required to maintain UFL cost effectively
• Horizontal wells a better solution for capture of large plume
• System likely in operation in UFL for 2-5 yrs, LFL for longer period