    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    SARAKI ROAD (AGRIC ROUND ABOUT M.O.H ROUND ABOUT)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    A. CIVIL WORKS

    A1. Digging of foundation pit for

    poles in normal areas

    7 NO. 3,500.00 24,500.00

    A2. Casting of poles bases !i"!

    s!all in"lude t!e folloing items

    of or#$

    % &'"a(ation of !ole )00 ' )00 '

    1200mm for all t*pes of soil

    in"luding !ard ro"#

    % +ooden form or# to standard

    spe"ifi"ations

    % 100#g of "ement

    % 25mm diam. - foundation

    bolt / nuts

    % 100mm diam. C pipe

    "omplete it! a""essories

    % aggregate granite "!ippings

    % !arp sand

    % +ater et".

    7

    ets ),000 47),000.00

    A3. Digging and ba"# filling of

    tren"! 300mm ' )00mm to

    allo for la*ing of "able

    250 250.00 737,500.00

    A4. -!rust boring underneat!

    a"ross asp!alt road and la*ing

    of 6C pipes under t!e road

    a*

    100 15,000.00 1,500,000.00

    A5. Constru"tion of transformer

    plint!

    0 0 0.00 0.00

    A). Constru"tion of lig!ting#ios#A-%panel plint!

    2 ets 225,000.00 450,000.00

    A7. Allo for t!e "onstru"tion of

    "ustomi8ed al#%in "ubi"le to

    a""ommodate t!e 50#(a

    generator, Automati" -ransfer

    it"! 9A-: s*n"!roni8ing

    panel and street lig!t #ios#.

    2 ets 1,500,000.00 3,000,000.00

    CIVIL WORKS SUBTOTAL % % % !"#$$"%%%.%%

    MOE/ST. REH/ SARAKI ROAD /PG.#

  • 8/10/2019 Street Light Rehabilitation-general

    2/47

  • 8/10/2019 Street Light Rehabilitation-general

    3/47

    SARAKI ROAD (AGRIC ROUND ABOUT MOH ROUND ABOUT)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &

    EARTHLING

    D1 uppl* and installation of purpose

    built 50#(a diesel generator indoort*pe floor mounted free standing A

    panel made of 4.0mm "orrosion

    resistan"e s!eet dul* a"id treated

    !a(ing t!e folloing arrangements$

    % 1 No ' 100A -/N CC; 9A;;: as

    in"omer

    % 2 No ' 100A -/N "ontra"tor 9A;;:

    %etering(oltage meter rela*

    %OffAuto sele"tors sit"!

    %ets of "ontrol rela*s

    %ets of prote"ting fuses

    %ets of Au'iliar* "ontra"tor

    %ets of pin rela*

    %ets of -imer

    %ets of pilot lamps

    %Digital ammeter

    %Digital (oltmeter

    %Digital attmeter

    &n"losed in 1200 ' 750mm, 4.0mm

    t!in# metal s!eet. -!e panel s!all be

    ele"tri"all* insulated it! pro(ision for

    bottom and top "able entr*. All "ontrol

    "able s!all be 4.0mm CC

    9Niger"!in: "able

    2 ets 1,5,0003,70,000.00

    D2. uppl* and installation of purpose

    built standard street lig!t #ios# made

    of 4mm "orrosion resistan"e s!eet

    dul* a"id treated !a(ing t!e folloing

    arrangements$

    % 1 No. 100A - /N CC; 9A;;:

    brea#er as in"omer% 2 No. 100A "ontra"tor

    % 2 No. ' )0A -/N CC; 9A;;:

    brea#er as out goings

    % anualAuto sele"tor sit"!

    % ig!=o (oltage rela* sensor

    2 ets 550,000 1,100,000.00

    MOE/ST.REH/SARAKI ROAD /PG+

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

  • 8/10/2019 Street Light Rehabilitation-general

    4/47

    SARAKI ROAD (AGRIC ROUND ABOUT MOH ROUND ABOUT)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able

    D3. &art!ling s*stem s!all in"lude

    100mm !ea(* dut* t*pe gal(ani8ed

    eart! rod "lamp it! 1)sB.mm C

    "able as eart! "ontinuit* "ondu"tor.

    =ot um % 55,000.00

    DIST. CONTROL & EARTHLING

    SUBTOTAL

    ,"*,"%%%.%%

    &. #%%KVA" ##/%.,# TRANSFORMER

    S/S

    &1 Allo for t!e "omplete ser(i"ing of t!e

    e'isting 100A, 110.415#( oil

    immersed transformer !i"! s!all

    in"lude t!e under listed items of or#$

    % ?epla"ement of / fuse !olders

    "omplete it! fuse element

    %C!anging of transformer oil

    % >mpro(ement of eart!ling s*stem to

    obtain a minimum of 5 0!ms eart!resistan"e test

    % C!anging of "ross lin#ed

    pol*et!*lene "able "omplete it!

    terminating #its

    % ?e"onstru"tion of transformer plint!

    !ere desirable

    . % %350,000.00

    &2. uppl* / installation of 100A,

    110.415 -ransformer 9&==O:

    0 0 0.00 0.00

    &3. Allo pa*ments of statutor*Non%

    statutor* fee to CN in"luding loss

    of re(enue !ere appli"able

    =ot um % 2,500,000.00

    &4. Allo for testing and

    "ommissioning

    =ot um % 500,000.00

    #%%KVA" ##/%.,# SUBTOTAL +"+%"%%%.%%

    MOE/ST. REH/SARAKI ROAD /PG,

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    SARAKI ROAD (AGRIC ROUND ABOUT MOH ROUND ABOUT)

  • 8/10/2019 Street Light Rehabilitation-general

    5/47

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR

    1. uppl* and installation of 50A,

    415( 1500?, 50E Cummins Auto

    mains failure starting prime "ontinuous

    dut* generating sets, brus!lessre(ol(ing field t*pe, 4%poles self%

    regulating A? it! t!e folloing$

    % &ngine and alternator full prote"tion

    % Current "ompounded e'"itation

    support s*stem

    % =arge terminal !ousing on ant

    (ibration units, "omplian"e it!

    ;2)13, ;4, ; 5000, - 111,

    >&C 34%1, &D0530 and N&A

    -!e generator set s!all be orderedit! t!e folloing additional fa"ilities

    in%built from t!e fa"tor*$

    % ea(* dut* air filters

    % Oil sump pump for eas* e(a"uation

    of aste oil

    % tarting batteries it! "ables and

    bra"#et

    % ;atter* isolator

    % uel pre%ilter+ater separator

    inis!ed in Cummins traditional

    unsell green "olour

    2 Nos. 3,75,000 7,50,000.00

    2. O(erseas a"tor* >nspe"tion to

    itness t!e a"tor* A""eptan"e -est

    9A-: of t!e

  • 8/10/2019 Street Light Rehabilitation-general

    6/47

    % )5mm diam. ea(* dut* eart!ele"trode of 3050m lengt!% 50#g salt% 100#g "!ar"oal% &'"a(ation in all t*pes of soil in"luding!ard ro"# of si8e 00mm ' 00mm,putting t!e eart!ling it! t!e suppl* of

    s!arp sand. &art! pit "!amber s!all be450 ' 450mm "onstru"ted it! bri"#and "omplete it! "on"rete eart! pit"o(er

    =O- 6 25,000.00 25,000.00

    ). Complete too# #it for t!e maintenan"e

    of poer plants as des"ribed in t!e

    te"!ni"al spe"ifi"ations and as

    re"ommended b* t!e manufa"turers

    2 ets 500,000 1,000,000.00

    7. abri"ate and install an insulated metal

    !ood to du"t t!e generator radiator !ot

    air e'!aust to t!e outside t!roug! t!e

    metal in t!e all to super(ising&ngineerFs detail

    2 ets 225,000 450,000.00

    . uppl* and install plate mounted a'ial

    fan e'tra"tor "omplete it! industrial

    fan "ontroller and air operated =ou(re

    s!utters and 4%pole, single p!ase motor

    to >55.

    2 ets 55,000 110,000.00

    . 1500= 9litre: diesel fuel storage da* tan#

    of re"tangular ma#e it! s!eet steel of

    4mm t!i"#ness on a 1000mm !ig!

    pedestal "omplete it! fuel line pipe

    or#, su"! as gate (al(es anda""essories et"

    2 ets )00,000 1,200,000.00

    10. 2+ 92.: Gdut*standb*H diesel tuel

    pump "omplete it! "ontrol panel, dut*

    sele"t sit"! and fuel pipe

    or#a""essories

    4 Nos. 55,000 220,000.00

    11. >nstallation a""essories s!all in"lude

    "able tra*s, unistru"t et". and ot!er

    ne"essar* materials

    =ot um 100,000.00

    12. Allo for t!e operation and

    maintenan"e it!in t!e first )%mont!s of

    defe"t liabilit* period after t!e"ommissioning of t!e proIe"t

    % % 3,500,000.00

    %KVA C-0 G10 S12

    SUB TOTAL

    #!"%*%"!%%.%%

    MOE/ST. REH/ SARAKI ROAD /PG.!

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    SARAKI ROAD (AGRIC ROUND ABOUT MOH ROUND ABOUT)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    SUMMARY

  • 8/10/2019 Street Light Rehabilitation-general

    7/47

    A. C>>= +O? % % % ),1,000.00

    ;. O=&,

    >-->N&

    % % % 27,025,000.00

    C. CA;=& % % % 12,1,000.00D. D>-?>;6->ON, CON-?O=

    / &A?-=>N&&=ON % % % 74,10,50.00

    MOE/ST. REH/ SARAKI ROAD /PG.

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU

    GAMBARI)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    A. CIVIL WORKS

    A1. Digging of foundation pit for

    poles in normal areas

    4 NO. 3,500.00 14,000.00

    A2. Casting of poles bases !i"!

    s!all in"lude t!e folloing items

    of or#$

    % &'"a(ation of !ole )00 ' )00 '1200mm for all t*pes of soil

  • 8/10/2019 Street Light Rehabilitation-general

    8/47

    in"luding !ard ro"#

    % +ooden form or# to standard

    spe"ifi"ations

    % 100#g of "ement

    % 25mm diam. - foundation

    bolt / nuts% 100mm diam. C pipe

    "omplete it! a""essories

    % aggregate granite "!ippings

    % !arp sand

    % +ater et".

    4 ets ),000 272,000.00

    A3. Digging and ba"# filling of

    tren"! 300mm ' )00mm to

    allo for la*ing of "able

    3200 250.00 00,000.00

    A4. -!rust boring underneat!

    a"ross asp!alt road and la*ingof 6C pipes under t!e road

    a*

    100 15,000.00 1,500,000.00

    A5. Constru"tion of transformer

    plint!

    0 0 0.00 0.00

    A). Constru"tion of lig!ting

    #ios#A-%panel plint!

    2 ets 225,000.00 450,000.00

    A7. Allo for t!e "onstru"tion of

    "ustomi8ed al#%in "ubi"le to

    a""ommodate t!e 50#(a

    generator, Automati" -ransfer

    it"! 9A-: s*n"!roni8ing

    panel and street lig!t #ios#.

    2 ets 1,500,000.00 3,000,000.00

    CIVIL WORKS SUBTOTAL % % % !"%+!"%%%.%%

    MOE/ST. REH/ AHMADU BELLO /PG.#

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULUGAMBARI)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    ;. POLES" FITTINGS ANDACCESSORIES

    ;1. .0 Double arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    4 No. 125,000 75,000.00

    ;2. .0 single arm standard street

    lig!t pole "omplete it!

    2 No. 115,000 230,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    9/47

    installation materials

    9&D:

    ;3. )0 ' 30 ' 1)0mm, 115 atts

    ) ' 1 Cree=umileds ?ebel

    =&D 9= @ ): lig!ting fitting

    "omplete it! installationa""essories

    175 No. 175,000.00 30,)25,000.00

    ;4. )0100A C "onne"tor 45 #t 4,500.00 202,500.00

    ;5. 3 t*pe C insulation tape 30 ?oll 3,500.00 105,000.00

    ;). 5A C; industrial brea#er 9A;;: 175 No. 1,500.00 2)2,500.00

    ;7. undr* items s!all in"lude bolt,

    nuts and ot!er ne"essar*

    materials

    =O- um % 100,000.00

    ;. ainting of poles and repairs of

    arms

    No. ),500.00 57,500.00

    FITTINGS & ACCESSORIES SUB

    TOTAL

    +'"!%+"%%.%%

    C. CA;=& $ A== ;&

    N>N O? A;&&-A=

    C1. 4 ' 25.0mm C+AC

    underground armoured "able

    200 tr. 4,500.00 00,000.00

    C2. 4 ' 1).0mm C+AC

    underground armoured "able

    3500 tr. 3,750.00 13,125,000.00

    C3. 2.5sB.mm tin it! eart!

    CC "able 9N+C:

    25 Coils 1,500.00 4)2,500.00

    C4. Cable a""essories to in"lude

    "able lugs et"

    =O- um % 15,000.00

    CABLE SUM TOTAL #,"%'"%%.%%MOE/ST. REH/ AHMADU BELLO /PG'

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU

    GAMBARI)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &

    EARTHLING

    D1 uppl* and installation of purpose

    built 50#(a diesel generator indoor

    t*pe floor mounted free standing A

    panel made of 4.0mm "orrosion

    resistan"e s!eet dul* a"id treated

    !a(ing t!e folloing arrangements$

    % 1 No ' 100A -/N CC; 9A;;: as

    in"omer

    % 2 No ' 100A -/N "ontra"tor 9A;;:%etering(oltage meter rela*

    %OffAuto sele"tors sit"!

  • 8/10/2019 Street Light Rehabilitation-general

    10/47

    %ets of "ontrol rela*s

    %ets of prote"ting fuses

    %ets of Au'iliar* "ontra"tor

    %ets of pin rela*

    %ets of -imer

    %ets of pilot lamps

    %Digital ammeter

    %Digital (oltmeter

    %Digital attmeter

    &n"losed in 1200 ' 750mm, 4.0mm

    t!in# metal s!eet. -!e panel s!all be

    ele"tri"all* insulated it! pro(ision for

    bottom and top "able entr*. All "ontrol

    "able s!all be 4.0mm CC

    9Niger"!in: "able

    2 ets 1,5,000 3,70,000.00

    D2. uppl* and installation of purpose

    built standard street lig!t #ios# madeof 4mm "orrosion resistan"e s!eet

    dul* a"id treated !a(ing t!e folloing

    arrangements$

    % 1 No. 100A - /N CC; 9A;;:

    brea#er as in"omer

    % 2 No. 100A "ontra"tor

    % 2 No. ' )0A -/N CC; 9A;;:

    brea#er as out goings

    % anualAuto sele"tor sit"!

    % ig!=o (oltage rela* sensor

    2 ets 550,000 1,100,000.00

    MOE/ST.REH/AHMADU BELLO /PG+

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU

    GAMBARI)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    % 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able

    D3. &art!ling s*stem s!all in"lude

    100mm !ea(* dut* t*pe gal(ani8ed

    eart! rod "lamp it! 1)sB.mm C

    "able as eart! "ontinuit* "ondu"tor.

    =ot um % 55,000.00

    DIST. CONTROL & EARTHLING

    SUBTOTAL

    ,"*,"%%%.%%

  • 8/10/2019 Street Light Rehabilitation-general

    11/47

    &. #%%KVA" ##/%.,# TRANSFORMER

    S/S

    &1 Allo for t!e "omplete ser(i"ing of t!e

    e'isting 100A, 110.415#( oil

    immersed transformer !i"! s!all

    in"lude t!e under listed items of or#$

    % ?epla"ement of / fuse !olders"omplete it! fuse element

    %C!anging of transformer oil

    % >mpro(ement of eart!ling s*stem to

    obtain a minimum of 5 0!ms eart!

    resistan"e test

    % C!anging of "ross lin#ed

    pol*et!*lene "able "omplete it!

    terminating #its

    % ?e"onstru"tion of transformer plint!

    !ere desirable

    . % % 350,000.00

    &2. uppl* / installation of 100A,

    110.415 -ransformer 9&==O:

    0 0 0.00 0.00

    &3. Allo pa*ments of statutor*Non%

    statutor* fee to CN in"luding loss

    of re(enue !ere appli"able

    =ot um % 2,500,000.00

    &4. Allo for testing and

    "ommissioning

    =ot um % 500,000.00

    #%%KVA" ##/%.,# SUBTOTAL +"+%"%%%.%%

    MOE/ST. REH/AHMADU BELLO /PG,

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU

    GAMBARI)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    . % KVA" ,#V DIESEL GENERATOR

    1. uppl* and installation of 50A,

    415( 1500?, 50E Cummins Auto

    mains failure starting prime "ontinuous

    dut* generating sets, brus!less

    re(ol(ing field t*pe, 4%poles self%

    regulating A? it! t!e folloing$

    % &ngine and alternator full prote"tion

    % Current "ompounded e'"itation

    support s*stem

    % =arge terminal !ousing on ant

    (ibration units, "omplian"e it!

    ;2)13, ;4, ; 5000, - 111,

  • 8/10/2019 Street Light Rehabilitation-general

    12/47

    >&C 34%1, &D0530 and N&A

    -!e generator set s!all be ordered

    it! t!e folloing additional fa"ilities

    in%built from t!e fa"tor*$

    % ea(* dut* air filters

    % Oil sump pump for eas* e(a"uation

    of aste oil

    % tarting batteries it! "ables and

    bra"#et

    % ;atter* isolator

    % uel pre%ilter+ater separator

    inis!ed in Cummins traditional

    unsell green "olour

    2 Nos. 3,75,0007,50,000.00

    2. O(erseas a"tor* >nspe"tion to

    itness t!e a"tor* A""eptan"e -est

    9A-: of t!e

  • 8/10/2019 Street Light Rehabilitation-general

    13/47

    !ood to du"t t!e generator radiator !ot air

    e'!aust to t!e outside t!roug! t!e metal

    in t!e all to super(ising &ngineerFs detail

    . uppl* and install plate mounted a'ial fan

    e'tra"tor "omplete it! industrial fan

    "ontroller and air operated =ou(re

    s!utters and 4%pole, single p!ase motor to>55.

    2 ets 55,000 110,000.00

    . 1500= 9litre: diesel fuel storage da* tan#

    of re"tangular ma#e it! s!eet steel of

    4mm t!i"#ness on a 1000mm !ig!

    pedestal "omplete it! fuel line pipe or#,

    su"! as gate (al(es and a""essories et"

    2 ets )00,000 1,200,000.00

    10. 2+ 92.: Gdut*standb*H diesel tuel

    pump "omplete it! "ontrol panel, dut*

    sele"t sit"! and fuel pipe

    or#a""essories

    4 Nos. 55,000 220,000.00

    11. >nstallation a""essories s!all in"lude "abletra*s, unistru"t et". and ot!er ne"essar*

    materials

    =ot um 100,000.00

    12. Allo for t!e operation and maintenan"e

    it!in t!e first )%mont!s of defe"t liabilit*

    period after t!e "ommissioning of t!e

    proIe"t

    % % 3,500,000.00

    %KVA C-0 G10 S12

    SUB TOTAL

    #!"#%%"%%.%%

    MOE/ST. REH/ AHMADU BELLO /PG.!

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    AHMADU BELLO WAY (ELESIN R/ABOUT CHALLENGE/ SULU

    GAMBARI)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    SUMMARY

    A. C>>= +O? % % % ),03),000.00

    ;. O=&,

    >-->N&

    % % % 32,)03,500.00

    C. CA;=& % % % 14,502,500.00

    D. D>-?>;6->ON, CON-?O=/ &A?-=>N&&=

  • 8/10/2019 Street Light Rehabilitation-general

    14/47

    6;%-O-A= 9A%: % % % 77,537,500.00

    A- 95J: % % % 3,7),75.00

    -O-A= -O CO==&C->ON % % % 1,414,375.00

    MOE/ST. REH/ AHMADU BELLO /PG.

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    A. CIVIL WORKS

    A1. Digging of foundation pit for

    poles in normal areas

    4 NO. 3,500.00 14,000.00

    A2. Casting of poles bases !i"!

    s!all in"lude t!e folloing items

    of or#$

    % &'"a(ation of !ole )00 ' )00 '

    1200mm for all t*pes of soil

    in"luding !ard ro"#

    % +ooden form or# to standard

    spe"ifi"ations

    % 100#g of "ement

    % 25mm diam. - foundation

    bolt / nuts

    % 100mm diam. C pipe

    "omplete it! a""essories

    % aggregate granite "!ippings

    % !arp sand

    % +ater et".

    4

    ets ),000 272,000.00

    A3. Digging and ba"# filling oftren"! 300mm ' )00mm to

    allo for la*ing of "able

    150 250.00 4)2,500.00

  • 8/10/2019 Street Light Rehabilitation-general

    15/47

    A4. -!rust boring underneat!

    a"ross asp!alt road and la*ing

    of 6C pipes under t!e road

    a*

    100 15,000.00 1,500,000.00

    A5. Constru"tion of transformer

    plint!

    0 0 0.00 0.00

    A). Constru"tion of lig!ting

    #ios#A-%panel plint!

    1 ets 225,000.00 225,000.00

    A7. Allo for t!e "onstru"tion of

    "ustomi8ed al#%in "ubi"le to

    a""ommodate t!e 50#(a

    generator, Automati" -ransfer

    it"! 9A-: s*n"!roni8ing

    panel and street lig!t #ios#.

    1 ets 1,500,000.00 1,500,000.00

    CIVIL WORKS SUBTOTAL % % % +"*+"%%.%%

    MOE/ST. REH/ WAHAB FOLAWIYO /PG.#

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    ;. POLES" FITTINGS ANDACCESSORIES

    ;1. .0 Double arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    4 No. 125,000 500,000.00

    ;2. .0 single arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    3 No. 115,000 345,000.00

    ;3. )0 ' 30 ' 1)0mm, 115 atts

    ) ' 1 Cree=umileds ?ebel=&D 9= @ ): lig!ting fitting

    "omplete it! installation

    a""essories

    52 No. 175,000.00 ,100,000.00

    ;4. )0100A C "onne"tor 2 #t 4,500.00 12),000.00

    ;5. 3 t*pe C insulation tape 1 ?oll 3,500.00 )),500.00

    ;). 5A C; industrial brea#er 9A;;: 52 No. 1,500.00 7,000.00

    ;7. undr* items s!all in"lude bolt,

    nuts and ot!er ne"essar*

    materials

    =O- um % 50,000.00

    ;. ainting of poles and repairs ofarms

    30 No. ),500.00 15,000.00

    FITTINGS & ACCESSORIES SUB #%",!%"%%.%%

  • 8/10/2019 Street Light Rehabilitation-general

    16/47

    TOTAL

    C. CA;=& $ A== ;&

    N>N O? A;&&-A=

    C1. 4 ' 25.0mm C+AC

    underground armoured "able

    250 tr. 4,500.00 1,125,000.00

    C2. 4 ' 1).0mm C+AC

    underground armoured "able

    175 tr. 3,750.00 ),731,250.00

    C3. 2.5sB.mm tin it! eart!

    CC "able 9N+C:

    1 Coils 1,500.00 333,000.00

    C4. Cable a""essories to in"lude

    "able lugs et"

    =O- um % 15,000.00

    CABLE SUM TOTAL $"'%,"'%.%%

    MOE/ST. REH/ WAHAB FOLAWIYO/PG'

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &

    EARTHLING

    D1 uppl* and installation of purpose

    built 50#(a diesel generator indoor

    t*pe floor mounted free standing A

    panel made of 4.0mm "orrosion

    resistan"e s!eet dul* a"id treated!a(ing t!e folloing arrangements$

    % 1 No ' 100A -/N CC; 9A;;: as

    in"omer

    % 2 No ' 100A -/N "ontra"tor 9A;;:

    %etering(oltage meter rela*

    %OffAuto sele"tors sit"!

    %ets of "ontrol rela*s

    %ets of prote"ting fuses

    %ets of Au'iliar* "ontra"tor

    %ets of pin rela*%ets of -imer

    %ets of pilot lamps

    %Digital ammeter

    %Digital (oltmeter

    %Digital attmeter

    &n"losed in 1200 ' 750mm, 4.0mm

    t!in# metal s!eet. -!e panel s!all be

    ele"tri"all* insulated it! pro(ision for

    bottom and top "able entr*. All "ontrol

    "able s!all be 4.0mm CC

    9Niger"!in: "able

    1 ets 1,5,000 1,5,000.00

    D2. uppl* and installation of purpose

    built standard street lig!t #ios# made

  • 8/10/2019 Street Light Rehabilitation-general

    17/47

    of 4mm "orrosion resistan"e s!eet

    dul* a"id treated !a(ing t!e folloing

    arrangements$

    % 1 No. 100A - /N CC; 9A;;:

    brea#er as in"omer

    % 2 No. 100A "ontra"tor

    % 2 No. ' )0A -/N CC; 9A;;:

    brea#er as out goings

    % anualAuto sele"tor sit"!

    % ig!=o (oltage rela* sensor

    1 ets 550,000550,000.00

    MOE/ST.REH/ WAHAB FOLAWIYO/PG+

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able

    D3. &art!ling s*stem s!all in"lude

    100mm !ea(* dut* t*pe gal(ani8ed

    eart! rod "lamp it! 1)sB.mm C

    "able as eart! "ontinuit* "ondu"tor.

    =ot um % 55,000.00

    DIST. CONTROL & EARTHLING

    SUBTOTAL

    '"%%"%%%.%%

    &. #%%KVA" ##/%.,# TRANSFORMER

    S/S

    &1 Allo for t!e "omplete ser(i"ing of t!e

    e'isting 100A, 110.415#( oilimmersed transformer !i"! s!all

    in"lude t!e under listed items of or#$

    % ?epla"ement of / fuse !olders

    "omplete it! fuse element

    %C!anging of transformer oil

    % >mpro(ement of eart!ling s*stem to

    obtain a minimum of 5 0!ms eart!

    resistan"e test

    % C!anging of "ross lin#ed

    pol*et!*lene "able "omplete it!

    terminating #its

    % ?e"onstru"tion of transformer plint!

    !ere desirable

    . % % 175,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    18/47

    &2. uppl* / installation of 100A,

    110.415 -ransformer 9&==O:

    0 0 0.00 0.00

    &3. Allo pa*ments of statutor*Non%

    statutor* fee to CN in"luding loss

    of re(enue !ere appli"able

    =ot um % 1,250,000.00

    &4. Allo for testing and

    "ommissioning

    =ot um % 250,000.00

    #%%KVA" ##/%.,# SUBTOTAL #"!"%%%.%%

    MOE/ST. REH/WAHAB FOLAWIYO/PG,

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR

    1. uppl* and installation of 50A,

    415( 1500?, 50E Cummins Auto

    mains failure starting prime "ontinuous

    dut* generating sets, brus!less

    re(ol(ing field t*pe, 4%poles self%

    regulating A? it! t!e folloing$

    % &ngine and alternator full prote"tion% Current "ompounded e'"itation

    support s*stem

    % =arge terminal !ousing on ant

    (ibration units, "omplian"e it!

    ;2)13, ;4, ; 5000, - 111,

    >&C 34%1, &D0530 and N&A

    -!e generator set s!all be ordered

    it! t!e folloing additional fa"ilities

    in%built from t!e fa"tor*$

    % ea(* dut* air filters

    % Oil sump pump for eas* e(a"uation

    of aste oil

    % tarting batteries it! "ables and

    bra"#et

    % ;atter* isolator

    % uel pre%ilter+ater separator

    inis!ed in Cummins traditional

    unsell green "olour

    1 Nos. 3,75,000 3,75,000.00

    2. O(erseas a"tor* >nspe"tion to

    itness t!e a"tor* A""eptan"e -est

    9A-: of t!e

  • 8/10/2019 Street Light Rehabilitation-general

    19/47

    it! 100A main "ir"uit brea#er for

    "omplete monitoring of all t!e sets

    t!res!old arning indi"ators

    4. 4 ' 1 ' 35sB.mm CC non

    armoured "able for suppl* from

    generator set to Auto mati" transfer

    sit"! 9A-: and main panel

    1 5,50.00 107,100.00

    MOE/ST. REH./ WAHAB FOLAWIYO/PG

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT5. &art!ling s*stem s!all in"lude$% )5mm diam. ea(* dut* eart!ele"trode of 3050m lengt!% 50#g salt% 100#g "!ar"oal% &'"a(ation in all t*pes of soil in"luding!ard ro"# of si8e 00mm ' 00mm,putting t!e eart!ling it! t!e suppl* ofs!arp sand. &art! pit "!amber s!all be450 ' 450mm "onstru"ted it! bri"#and "omplete it! "on"rete eart! pit"o(er

    =O- 6 25,000.00 25,000.00

    ). Complete too# #it for t!e maintenan"e

    of poer plants as des"ribed in t!e

    te"!ni"al spe"ifi"ations and as

    re"ommended b* t!e manufa"turers

    1 ets 500,000 500,000.00

    7. abri"ate and install an insulated metal

    !ood to du"t t!e generator radiator !ot

    air e'!aust to t!e outside t!roug! t!e

    metal in t!e all to super(ising

    &ngineerFs detail

    1 ets 225,000 225,000.00

    . uppl* and install plate mounted a'ial

    fan e'tra"tor "omplete it! industrial

    fan "ontroller and air operated =ou(re

    s!utters and 4%pole, single p!ase motor

    to >55.

    1 ets 55,000 55,000.00

    . 1500= 9litre: diesel fuel storage da* tan#

    of re"tangular ma#e it! s!eet steel of

    4mm t!i"#ness on a 1000mm !ig!

    pedestal "omplete it! fuel line pipe

    or#, su"! as gate (al(es and

    a""essories et"

    1 ets )00,000 )00,000.00

    10. 2+ 92.: Gdut*standb*H diesel tuel

    pump "omplete it! "ontrol panel, dut*sele"t sit"! and fuel pipe

    or#a""essories

    2 Nos. 55,000 110,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    20/47

    11. >nstallation a""essories s!all in"lude

    "able tra*s, unistru"t et". and ot!er

    ne"essar* materials

    =ot um 100,000.00

    12. Allo for t!e operation and

    maintenan"e it!in t!e first )%mont!s of

    defe"t liabilit* period after t!e

    "ommissioning of t!e proIe"t

    % % 1,750,000.00

    %KVA C-0 G10 S12

    SUB TOTAL

    $"%'"#%%.%%

    MOE/ST. REH/ WAHAB FOLAWIYO/PG.!

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WAHAB FOLAWIYO ROAD (UNITY R/ABOUT TAIWO JUNCTION)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTSUMMARY

    A. C>>= +O? % % % 3,73,500.00

    ;. O=&,

    >-->N&

    % % % 10,4)0,500.00

    C. CA;=& % % % ,204,250.00

    D. D>-?>;6->ON, CON-?O=/ &A?-=>N&&=ON % % % 3),)2,)17.50

    MOE/ST. REH/ WAHAB FOLAWIYO/PG.

  • 8/10/2019 Street Light Rehabilitation-general

    21/47

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WESTERN RESERVOIR ROAD

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTA. CIVIL WORKS

    A1. Digging of foundation pit for

    poles in normal areas

    25 NO. 3,500.00 7,500.00

    A2. Casting of poles bases !i"!

    s!all in"lude t!e folloing items

    of or#$

    % &'"a(ation of !ole )00 ' )00 '

    1200mm for all t*pes of soil

    in"luding !ard ro"#

    % +ooden form or# to standard

    spe"ifi"ations

    % 100#g of "ement

    % 25mm diam. - foundation

    bolt / nuts

    % 100mm diam. C pipe

    "omplete it! a""essories

    % aggregate granite "!ippings

    % !arp sand% +ater et".

    25 ets ),000 1,700,000.00

    A3. Digging and ba"# filling of

    tren"! 300mm ' )00mm to

    allo for la*ing of "able

    375 250.00 3,750.00

    A4. -!rust boring underneat!

    a"ross asp!alt road and la*ing

    of 6C pipes under t!e road

    a*

    200 15,000.00 3,000,000.00

    A5. Constru"tion of transformer

    plint!

    0 0 0.00 0.00

    A). Constru"tion of lig!ting

    #ios#A-%panel plint!

    2 ets 225,000.00 450,000.00

    A7. Allo for t!e "onstru"tion of

    "ustomi8ed al#%in "ubi"le to

    a""ommodate t!e 50#(a

    generator, Automati" -ransfer

    it"! 9A-: s*n"!roni8ing

    panel and street lig!t #ios#.

    2 ets 1,500,000.00 3,000,000.00

    CIVIL WORKS SUBTOTAL % % % *"'+#"'%.%%

    MOE/ST. REH/ WESTERN RESERVOIR ROAD /PG.#

  • 8/10/2019 Street Light Rehabilitation-general

    22/47

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WESTERN RESERVOIR ROAD

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    ;. POLES" FITTINGS ANDACCESSORIES

    ;1. .0 Double arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    25 No. 125,000 3,125,000.00

    ;2. .0 single arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    0 No. 0.00

    ;3. )0 ' 30 ' 1)0mm, 115 atts

    ) ' 1 Cree=umileds ?ebel

    =&D 9= @ ): lig!ting fitting

    "omplete it! installation

    a""essories

    200 No. 175,000.00 35,000,000.00

    ;4. )0100A C "onne"tor )2 #t 4,500.00 27,000.00

    ;5. 3 t*pe C insulation tape 42 ?oll 3,500.00 147,000.00

    ;). 5A C; industrial brea#er 9A;;: 200 No. 1,500.00 300,000.00

    ;7. undr* items s!all in"lude bolt,

    nuts and ot!er ne"essar*

    materials

    =O- um % 100,000.00

    ;. ainting of poles and repairs of

    arms

    101 No. ),500.00 )5),500.00

    FITTINGS & ACCESSORIES SUB

    TOTAL

    +*"!%"%%.%%

    C. CA;=& $ A== ;&

    N>N O? A;&&-A=

    C1. 4 ' 25.0mm C+AC

    underground armoured "able

    200 tr. 4,500.00 00,000.00

    C2. 4 ' 1).0mm C+ACunderground armoured "able

    4375 tr. 3,750.00 1),40),250.00

    C3. 2.5sB.mm tin it! eart!

    CC "able 9N+C:

    42 Coils 1,500.00 777,000.00

    C4. Cable a""essories to in"lude

    "able lugs et"

    =O- um % 15,000.00

    CABLE SUM TOTAL #$"%*$"'%.%%

    MOE/ST. REH/ WESTERN RESERVOIR ROAD /PG'

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

  • 8/10/2019 Street Light Rehabilitation-general

    23/47

    WESTERN RESERVOIR ROAD

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &

    EARTHLING

    D1 uppl* and installation of purpose

    built 50#(a diesel generator indoort*pe floor mounted free standing A

    panel made of 4.0mm "orrosion

    resistan"e s!eet dul* a"id treated

    !a(ing t!e folloing arrangements$

    % 1 No ' 100A -/N CC; 9A;;: as

    in"omer

    % 2 No ' 100A -/N "ontra"tor 9A;;:

    %etering(oltage meter rela*

    %OffAuto sele"tors sit"!

    %ets of "ontrol rela*s

    %ets of prote"ting fuses

    %ets of Au'iliar* "ontra"tor

    %ets of pin rela*

    %ets of -imer

    %ets of pilot lamps

    %Digital ammeter

    %Digital (oltmeter

    %Digital attmeter

    &n"losed in 1200 ' 750mm, 4.0mm

    t!in# metal s!eet. -!e panel s!all be

    ele"tri"all* insulated it! pro(ision for

    bottom and top "able entr*. All "ontrol

    "able s!all be 4.0mm CC

    9Niger"!in: "able

    2 ets 1,5,0003,70,000.00

    D2. uppl* and installation of purpose

    built standard street lig!t #ios# made

    of 4mm "orrosion resistan"e s!eet

    dul* a"id treated !a(ing t!e folloing

    arrangements$

    % 1 No. 100A - /N CC; 9A;;:

    brea#er as in"omer% 2 No. 100A "ontra"tor

    % 2 No. ' )0A -/N CC; 9A;;:

    brea#er as out goings

    % anualAuto sele"tor sit"!

    % ig!=o (oltage rela* sensor

    2 ets 550,000 1,100,000.00

    MOE/ST.REH/WESTERN RESERVOIR ROAD /PG+

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONGWESTERN RESERVOIR ROAD

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

  • 8/10/2019 Street Light Rehabilitation-general

    24/47

    % 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able

    D3. &art!ling s*stem s!all in"lude

    100mm !ea(* dut* t*pe gal(ani8ed

    eart! rod "lamp it! 1)sB.mm C

    "able as eart! "ontinuit* "ondu"tor.

    =ot um % 25,000.00

    DIST. CONTROL & EARTHLING

    SUBTOTAL

    ,"*#"%%%.%%

    &. #%%KVA" ##/%.,# TRANSFORMER

    S/S

    &1 Allo for t!e "omplete ser(i"ing of t!e

    e'isting 100A, 110.415#( oil

    immersed transformer !i"! s!all

    in"lude t!e under listed items of or#$

    % ?epla"ement of / fuse !olders

    "omplete it! fuse element

    %C!anging of transformer oil

    % >mpro(ement of eart!ling s*stem to

    obtain a minimum of 5 0!ms eart!

    resistan"e test

    % C!anging of "ross lin#ed

    pol*et!*lene "able "omplete it!terminating #its

    % ?e"onstru"tion of transformer plint!

    !ere desirable

    . % % 350,000.00

    &2. uppl* / installation of 100A,

    110.415 -ransformer 9&==O:

    0 0 0.00 0.00

    &3. Allo pa*ments of statutor*Non%

    statutor* fee to CN in"luding loss

    of re(enue !ere appli"able

    =ot um % 2,500,000.00

    &4. Allo for testing and

    "ommissioning

    =ot um % 500,000.00

    #%%KVA" ##/%.,# SUBTOTAL +"+%"%%%.%%

    MOE/ST. REH/WESTERN RESERVOIR ROAD /PG,

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WESTERN RESERVOIR ROAD

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR

  • 8/10/2019 Street Light Rehabilitation-general

    25/47

    1. uppl* and installation of 50A,

    415( 1500?, 50E Cummins Auto

    mains failure starting prime "ontinuous

    dut* generating sets, brus!less

    re(ol(ing field t*pe, 4%poles self%

    regulating A? it! t!e folloing$% &ngine and alternator full prote"tion

    % Current "ompounded e'"itation

    support s*stem

    % =arge terminal !ousing on ant

    (ibration units, "omplian"e it!

    ;2)13, ;4, ; 5000, - 111,

    >&C 34%1, &D0530 and N&A

    -!e generator set s!all be ordered

    it! t!e folloing additional fa"ilities

    in%built from t!e fa"tor*$% ea(* dut* air filters

    % Oil sump pump for eas* e(a"uation

    of aste oil

    % tarting batteries it! "ables and

    bra"#et

    % ;atter* isolator

    % uel pre%ilter+ater separator

    inis!ed in Cummins traditional

    unsell green "olour

    2 Nos. 3,75,000 7,50,000.00

    2. O(erseas a"tor* >nspe"tion to

    itness t!e a"tor* A""eptan"e -est

    9A-: of t!e

  • 8/10/2019 Street Light Rehabilitation-general

    26/47

    % 50#g salt% 100#g "!ar"oal% &'"a(ation in all t*pes of soil in"luding!ard ro"# of si8e 00mm ' 00mm,putting t!e eart!ling it! t!e suppl* ofs!arp sand. &art! pit "!amber s!all be450 ' 450mm "onstru"ted it! bri"# and

    "omplete it! "on"rete eart! pit "o(er

    =O- 6 25,000.00 25,000.00

    ). Complete too# #it for t!e maintenan"e of

    poer plants as des"ribed in t!e te"!ni"al

    spe"ifi"ations and as re"ommended b*

    t!e manufa"turers

    2 ets 500,000 1,000,000.00

    7. abri"ate and install an insulated metal

    !ood to du"t t!e generator radiator !ot air

    e'!aust to t!e outside t!roug! t!e metal

    in t!e all to super(ising &ngineerFs detail

    2 ets 225,000 450,000.00

    . uppl* and install plate mounted a'ial fan

    e'tra"tor "omplete it! industrial fan

    "ontroller and air operated =ou(res!utters and 4%pole, single p!ase motor to

    >55.

    2 ets 55,000 110,000.00

    . 1500= 9litre: diesel fuel storage da* tan#

    of re"tangular ma#e it! s!eet steel of

    4mm t!i"#ness on a 1000mm !ig!

    pedestal "omplete it! fuel line pipe or#,

    su"! as gate (al(es and a""essories et"

    2 ets )00,000 1,200,000.00

    10. 2+ 92.: Gdut*standb*H diesel tuel

    pump "omplete it! "ontrol panel, dut*

    sele"t sit"! and fuel pipe

    or#a""essories

    2 Nos. 55,000 110,000.00

    11. >nstallation a""essories s!all in"lude "able

    tra*s, unistru"t et". and ot!er ne"essar*

    materials

    =ot um 100,000.00

    12. Allo for t!e operation and maintenan"e

    it!in t!e first )%mont!s of defe"t liabilit*

    period after t!e "ommissioning of t!e

    proIe"t

    % % 3,500,000.00

    %KVA C-0 G10 S12

    SUB TOTAL

    #"$!#"!%%.%%

    MOE/ST. REH/ WESTERN RESERVOIR ROAD /PG.!

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    WESTERN RESERVOIR ROAD

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    SUMMARY

    A. C>>= +O? % % % ,231,250.00

  • 8/10/2019 Street Light Rehabilitation-general

    27/47

    ;. O=&,

    >-->N&

    % % % 3,)07,500.00

    C. CA;=& % % % 1,0,250.00

    D. D>-?>;6->ON, CON-?O=

    / &A?-=>N&&=ON % % % 5,)1),70.00

    MOE/ST. REH/ WESTERN RESERVOIR ROAD /PG.

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTA. CIVIL WORKS

    A1. Digging of foundation pit for

    poles in normal areas

    NO. 3,500.00 2,000.00

    A2. Casting of poles bases !i"!

    s!all in"lude t!e folloing items

    of or#$

    % &'"a(ation of !ole )00 ' )00 '

    1200mm for all t*pes of soil

    in"luding !ard ro"#

    % +ooden form or# to standard ets ),000 544,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    28/47

    spe"ifi"ations

    % 100#g of "ement

    % 25mm diam. - foundation

    bolt / nuts

    % 100mm diam. C pipe

    "omplete it! a""essories% aggregate granite "!ippings

    % !arp sand

    % +ater et".

    A3. Digging and ba"# filling of

    tren"! 300mm ' )00mm to

    allo for la*ing of "able

    1200 250.00 3,000,000.00

    A4. -!rust boring underneat!

    a"ross asp!alt road and la*ing

    of 6C pipes under t!e road

    a*

    100 15,000.00 1,500,000.00

    A5. Constru"tion of transformer

    plint!

    0 0 0.00 0.00

    A). Constru"tion of lig!ting

    #ios#A-%panel plint!

    1 ets 225,000.00 225,000.00

    A7. Allo for t!e "onstru"tion of

    "ustomi8ed al#%in "ubi"le to

    a""ommodate t!e 50#(a

    generator, Automati" -ransfer

    it"! 9A-: s*n"!roni8ing

    panel and street lig!t #ios#.

    1 ets 1,500,000.00 1,500,000.00

    CIVIL WORKS SUBTOTAL % % % !"*"%%%.%%

    MOE/ST. REH/ BALOGUN FULANI /PG.#

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    ;. POLES" FITTINGS ANDACCESSORIES

    ;1. .0 Double arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    No. 125,000 1,000,000.00

    ;2. .0 single arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    0 No. 0.00 %

    ;3. )0 ' 30 ' 1)0mm, 115 atts

    ) ' 1 Cree=umileds ?ebel

    0 No. 175,000.00 14,000,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    29/47

    =&D 9= @ ): lig!ting fitting

    "omplete it! installation

    a""essories

    ;4. )0100A C "onne"tor 3 #t 4,500.00 171,000.00

    ;5. 3 t*pe C insulation tape 22 ?oll 3,500.00 77,000.00

    ;). 5A C; industrial brea#er 9A;;: 0 No. 1,500.00 120,000.00

    ;7. undr* items s!all in"lude bolt,

    nuts and ot!er ne"essar*

    materials

    =O- um % 50,000.00

    ;. ainting of poles and repairs of

    arms

    40 No. ),500.00 2)0,000.00

    FITTINGS & ACCESSORIES SUB

    TOTAL

    #"!$"%%%.%%

    C. CA;=& $ A== ;&

    N>N O? A;&&-A=

    C1. 4 ' 25.0mm C+AC

    underground armoured "able

    100 tr. 4,500.00 450,000.00

    C2. 4 ' 1).0mm C+AC

    underground armoured "able

    145 tr. 3,750.00 5,)0),250.00

    C3. 2.5sB.mm tin it! eart!

    CC "able 9N+C:

    1 Coils 1,500.00 333,000.00

    C4. Cable a""essories to in"lude

    "able lugs et"

    =O- um % 15,000.00

    CABLE SUM TOTAL !",%,"'%.%%

    MOE/ST. REH/ BALOGUN FULANI/PG'

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &

    EARTHLING

    D1 uppl* and installation of purpose

    built 50#(a diesel generator indoor

    t*pe floor mounted free standing Apanel made of 4.0mm "orrosion

    resistan"e s!eet dul* a"id treated

    !a(ing t!e folloing arrangements$

    % 1 No ' 100A -/N CC; 9A;;: as

    in"omer

    % 2 No ' 100A -/N "ontra"tor 9A;;:

    %etering(oltage meter rela*

    %OffAuto sele"tors sit"!

    %ets of "ontrol rela*s

    %ets of prote"ting fuses%ets of Au'iliar* "ontra"tor

    %ets of pin rela*

    1 ets 1,5,000 1,5,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    30/47

    %ets of -imer

    %ets of pilot lamps

    %Digital ammeter

    %Digital (oltmeter

    %Digital attmeter

    &n"losed in 1200 ' 750mm, 4.0mm

    t!in# metal s!eet. -!e panel s!all be

    ele"tri"all* insulated it! pro(ision for

    bottom and top "able entr*. All "ontrol

    "able s!all be 4.0mm CC

    9Niger"!in: "able

    D2. uppl* and installation of purpose

    built standard street lig!t #ios# made

    of 4mm "orrosion resistan"e s!eet

    dul* a"id treated !a(ing t!e folloing

    arrangements$

    % 1 No. 100A - /N CC; 9A;;:brea#er as in"omer

    % 2 No. 100A "ontra"tor

    % 2 No. ' )0A -/N CC; 9A;;:

    brea#er as out goings

    % anualAuto sele"tor sit"!

    % ig!=o (oltage rela* sensor

    1 ets 550,000 550,000.00

    MOE/ST.REH/ BALOGUN FULANI/PG+

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)

    NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able

    D3. &art!ling s*stem s!all in"lude

    100mm !ea(* dut* t*pe gal(ani8ed

    eart! rod "lamp it! 1)sB.mm C

    "able as eart! "ontinuit* "ondu"tor.

    =ot um % 25,000.00

    DIST. CONTROL & EARTHLING

    SUBTOTAL

    '",%"%%%.%%

    &. #%%KVA" ##/%.,# TRANSFORMER

    S/S

    &1 Allo for t!e "omplete ser(i"ing of t!e

    e'isting 100A, 110.415#( oil

  • 8/10/2019 Street Light Rehabilitation-general

    31/47

    immersed transformer !i"! s!all

    in"lude t!e under listed items of or#$

    % ?epla"ement of / fuse !olders

    "omplete it! fuse element

    %C!anging of transformer oil

    % >mpro(ement of eart!ling s*stem to

    obtain a minimum of 5 0!ms eart!

    resistan"e test

    % C!anging of "ross lin#ed

    pol*et!*lene "able "omplete it!

    terminating #its

    % ?e"onstru"tion of transformer plint!

    !ere desirable

    . % %175,000.00

    &2. uppl* / installation of 100A,

    110.415 -ransformer 9&==O:

    0 0 0.00 0.00

    &3. Allo pa*ments of statutor*Non%

    statutor* fee to CN in"luding lossof re(enue !ere appli"able

    =ot um % 1,250,000.00

    &4. Allo for testing and

    "ommissioning

    =ot um % 250,000.00

    #%%KVA" ##/%.,# SUBTOTAL #"!"%%%.%%

    MOE/ST. REH/BALOGUN FULANI/PG,

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR

    1. uppl* and installation of 50A,

    415( 1500?, 50E Cummins Auto

    mains failure starting prime "ontinuous

    dut* generating sets, brus!less

    re(ol(ing field t*pe, 4%poles self%

    regulating A? it! t!e folloing$

    % &ngine and alternator full prote"tion

    % Current "ompounded e'"itation

    support s*stem

    % =arge terminal !ousing on ant

    (ibration units, "omplian"e it!

    ;2)13, ;4, ; 5000, - 111,

    >&C 34%1, &D0530 and N&A

    -!e generator set s!all be ordered

    it! t!e folloing additional fa"ilitiesin%built from t!e fa"tor*$

    % ea(* dut* air filters

    1 Nos. 3,75,0003,75,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    32/47

    % Oil sump pump for eas* e(a"uation

    of aste oil

    % tarting batteries it! "ables and

    bra"#et

    % ;atter* isolator

    % uel pre%ilter+ater separator

    inis!ed in Cummins traditional

    unsell green "olour

    2. O(erseas a"tor* >nspe"tion to

    itness t!e a"tor* A""eptan"e -est

    9A-: of t!e

  • 8/10/2019 Street Light Rehabilitation-general

    33/47

    fan "ontroller and air operated =ou(re

    s!utters and 4%pole, single p!ase motor

    to >55.

    . 1500= 9litre: diesel fuel storage da* tan#

    of re"tangular ma#e it! s!eet steel of

    4mm t!i"#ness on a 1000mm !ig!

    pedestal "omplete it! fuel line pipeor#, su"! as gate (al(es and

    a""essories et"

    1 ets )00,000 )00,000.00

    10. 2+ 92.: Gdut*standb*H diesel tuel

    pump "omplete it! "ontrol panel, dut*

    sele"t sit"! and fuel pipe

    or#a""essories

    1 Nos. 55,000 55,000.00

    11. >nstallation a""essories s!all in"lude

    "able tra*s, unistru"t et". and ot!er

    ne"essar* materials

    =ot um 100,000.00

    12. Allo for t!e operation and

    maintenan"e it!in t!e first )%mont!s ofdefe"t liabilit* period after t!e

    "ommissioning of t!e proIe"t

    % % 1,750,000.00

    %KVA C-0 G10 S12

    SUB TOTAL

    $"%#"#%%.%%

    MOE/ST. REH/ BALOGUN FULANI/PG.!

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    BALOGUN FULANI ROAD (EMIR RD. JUCT. GAMBARI JNCT.)S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    SUMMARY

    A. C>>= +O? % % % ),77,000.00

    ;. O=&,

    >-->N&

    % % % 15,)7,000.00

    C. CA;=& % % % ),404,250.00D. D>-?>;6->ON, CON-?O=

    / &A?-=>N&&=ON % % % 43,03,417.00

    MOE/ST. REH/ BALOGUN FULANI/PG.

  • 8/10/2019 Street Light Rehabilitation-general

    34/47

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    ALIMI ROAD (IDI APE FGC" ILORIN)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    A. CIVIL WORKS

    A1. Digging of foundation pit for

    poles in normal areas

    2) NO. 3,500.00 1,000.00

    A2. Casting of poles bases !i"!

    s!all in"lude t!e folloing items

    of or#$

    % &'"a(ation of !ole )00 ' )00 '1200mm for all t*pes of soil

    in"luding !ard ro"#

    % +ooden form or# to standard

    spe"ifi"ations

    % 100#g of "ement

    % 25mm diam. - foundation

    bolt / nuts

    % 100mm diam. C pipe

    "omplete it! a""essories

    % aggregate granite "!ippings

    % !arp sand

    % +ater et".

    2) ets ),000 1,7),000.00

    A3. Digging and ba"# filling of

    tren"! 300mm ' )00mm to

    allo for la*ing of "able

    2000 250.00 500,000.00

    A4. -!rust boring underneat!

    a"ross asp!alt road and la*ing

    of 6C pipes under t!e road

    a*

    400 15,000.00 ),000,000.00

    A5. Constru"tion of transformer

    plint!

    0 0 0.00 0.00

  • 8/10/2019 Street Light Rehabilitation-general

    35/47

    A). Constru"tion of lig!ting

    #ios#A-%panel plint!

    4 ets 225,000.00 00,000.00

    A7. Allo for t!e "onstru"tion of

    "ustomi8ed al#%in "ubi"le to

    a""ommodate t!e 50#(a

    generator, Automati" -ransferit"! 9A-: s*n"!roni8ing

    panel and street lig!t #ios#.

    4 ets 1,500,000.00 ),000,000.00

    CIVIL WORKS SUBTOTAL % % % #"'*"%%%.%%

    MOE/ST. REH/ ALIMI ROAD/PG.#

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    ALIMI ROAD (IDI APE FGC" ILORIN)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    ;. POLES" FITTINGS ANDACCESSORIES

    ;1. .0 Double arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    No. 125,000 1,125,000.00

    ;2. .0 single arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    17 No. 115,000 1,55,000.00

    ;3. )0 ' 30 ' 1)0mm, 115 atts

    ) ' 1 Cree=umileds ?ebel

    =&D 9= @ ): lig!ting fitting

    "omplete it! installation

    a""essories

    324 No. 175,000.00 5),700,000.00

    ;4. )0100A C "onne"tor 10 #t 4,500.00 10,000.00

    ;5. 3 t*pe C insulation tape ?oll 3,500.00 343,000.00

    ;). 5A C; industrial brea#er 9A;;: 324 No. 1,500.00 4),000.00;7. undr* items s!all in"lude bolt,

    nuts and ot!er ne"essar*

    materials

    =O- um % 200,000.00

    ;. ainting of poles and repairs of

    arms

    17 No. ),500.00 1,215,500.00

    FITTINGS & ACCESSORIES SUB

    TOTAL

    !'"$+,"%%.%%

    C. CA;=& $ A== ;&

    N>N O? A;&&-A=

    C1. 4 ' 25.0mm C+AC

    underground armoured "able

    400 tr. 4,500.00 1,00,000.00

    C2. 4 ' 1).0mm C+AC 7500 tr. 3,750.00 2,125,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    36/47

    underground armoured "able

    C3. 2.5sB.mm tin it! eart!

    CC "able 9N+C:

    Coils 1,500.00 1,13,000.00

    C4. Cable a""essories to in"lude

    "able lugs et"

    =O- um % 30,000.00

    CABLE SUM TOTAL +#"!$"%%%.%%

    MOE/ST. REH/ ALIMI ROAD/PG'

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    ALIMI ROAD (IDI APE FGC" ILORIN)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &

    EARTHLING

    D1 uppl* and installation of purpose

    built 50#(a diesel generator indoort*pe floor mounted free standing A

    panel made of 4.0mm "orrosion

    resistan"e s!eet dul* a"id treated

    !a(ing t!e folloing arrangements$

    % 1 No ' 100A -/N CC; 9A;;: as

    in"omer

    % 2 No ' 100A -/N "ontra"tor 9A;;:

    %etering(oltage meter rela*

    %OffAuto sele"tors sit"!

    %ets of "ontrol rela*s

    %ets of prote"ting fuses

    %ets of Au'iliar* "ontra"tor

    %ets of pin rela*

    %ets of -imer

    %ets of pilot lamps

    %Digital ammeter

    %Digital (oltmeter

    %Digital attmeter

    &n"losed in 1200 ' 750mm, 4.0mm

    t!in# metal s!eet. -!e panel s!all be

    ele"tri"all* insulated it! pro(ision for

    bottom and top "able entr*. All "ontrol

    "able s!all be 4.0mm CC

    9Niger"!in: "able

    4 ets 1,5,0007,50,000.00

    D2. uppl* and installation of purpose

    built standard street lig!t #ios# made

    of 4mm "orrosion resistan"e s!eet

    dul* a"id treated !a(ing t!e folloing

    arrangements$

    % 1 No. 100A - /N CC; 9A;;:

    brea#er as in"omer% 2 No. 100A "ontra"tor

    % 2 No. ' )0A -/N CC; 9A;;:

    4 ets 550,0002,200,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    37/47

    brea#er as out goings

    % anualAuto sele"tor sit"!

    % ig!=o (oltage rela* sensor

    MOE/ST.REH/ALIMI ROAD/PG+

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    ALIMI ROAD (IDI APE FGC" ILORIN)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!% Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plateit! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able

    D3. &art!ling s*stem s!all in"lude

    100mm !ea(* dut* t*pe gal(ani8ed

    eart! rod "lamp it! 1)sB.mm C

    "able as eart! "ontinuit* "ondu"tor.

    =ot um % 50,000.00

    DIST. CONTROL & EARTHLING

    SUBTOTAL

    *"$+%"%%%.%%

    &. #%%KVA" ##/%.,# TRANSFORMER

    S/S

    &1 Allo for t!e "omplete ser(i"ing of t!e

    e'isting 100A, 110.415#( oil

    immersed transformer !i"! s!all

    in"lude t!e under listed items of or#$

    % ?epla"ement of / fuse !olders

    "omplete it! fuse element

    %C!anging of transformer oil

    % >mpro(ement of eart!ling s*stem to

    obtain a minimum of 5 0!ms eart!

    resistan"e test

    % C!anging of "ross lin#edpol*et!*lene "able "omplete it!

    terminating #its

    % ?e"onstru"tion of transformer plint!

    !ere desirable

    . % % 700,000.00

    &2. uppl* / installation of 100A,

    110.415 -ransformer 9&==O:

    0 0 0.00 0.00

    &3. Allo pa*ments of statutor*Non%

    statutor* fee to CN in"luding loss

    of re(enue !ere appli"able

    =ot um % 3,500,000.00

    &4. Allo for testing and"ommissioning

    =ot um % 1,000,000.00

  • 8/10/2019 Street Light Rehabilitation-general

    38/47

    #%%KVA" ##/%.,# SUBTOTAL "'%%"%%%.%%

    MOE/ST. REH/ALIMI ROAD/PG,

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    ALIMI ROAD (IDI APE FGC" ILORIN)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL

    GENERATOR

    1. uppl* and installation of 50A,

    415( 1500?, 50E Cummins

    Auto mains failure starting prime"ontinuous dut* generating sets,

    brus!less re(ol(ing field t*pe, 4%

    poles self%regulating A? it! t!e

    folloing$

    % &ngine and alternator full prote"tion

    % Current "ompounded e'"itation

    support s*stem

    % =arge terminal !ousing on ant

    (ibration units, "omplian"e it!

    ;2)13, ;4, ; 5000, - 111,

    >&C 34%1, &D0530 and N&A

    -!e generator set s!all be ordered

    it! t!e folloing additional fa"ilities

    in%built from t!e fa"tor*$

    % ea(* dut* air filters

    % Oil sump pump for eas* e(a"uation

    of aste oil

    % tarting batteries it! "ables and

    bra"#et

    % ;atter* isolator

    % uel pre%ilter+ater separatorinis!ed in Cummins traditional

    unsell green "olour

    4 Nos. 3,75,000 15,00,000.00

    2. O(erseas a"tor* >nspe"tion to

    itness t!e a"tor* A""eptan"e -est

    9A-: of t!e

  • 8/10/2019 Street Light Rehabilitation-general

    39/47

    generator set to Auto mati" transfer

    sit"! 9A-: and main panel

    MOE/ST. REH./ ALIMI ROAD/PG

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    ALIMI ROAD (IDI APE FGC" ILORIN)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT5. &art!ling s*stem s!all in"lude$

    % )5mm diam. ea(* dut* eart!ele"trode of 3050m lengt!% 50#g salt% 100#g "!ar"oal

    % &'"a(ation in all t*pes of soil in"luding!ard ro"# of si8e 00mm ' 00mm,putting t!e eart!ling it! t!e suppl* ofs!arp sand. &art! pit "!amber s!all be450 ' 450mm "onstru"ted it! bri"# and"omplete it! "on"rete eart! pit "o(er

    =O- 6 % 50,000.00

    ). Complete too# #it for t!e maintenan"e of

    poer plants as des"ribed in t!e te"!ni"al

    spe"ifi"ations and as re"ommended b*

    t!e manufa"turers

    4 ets 500,000 2,000,000.00

    7. abri"ate and install an insulated metal

    !ood to du"t t!e generator radiator !ot air

    e'!aust to t!e outside t!roug! t!e metal

    in t!e all to super(ising &ngineerFs detail

    4 ets 225,000 00,000.00

    . uppl* and install plate mounted a'ial fan

    e'tra"tor "omplete it! industrial fan

    "ontroller and air operated =ou(re

    s!utters and 4%pole, single p!ase motor to

    >55.

    4 ets 55,000 220,000.00

    . 1500= 9litre: diesel fuel storage da* tan#

    of re"tangular ma#e it! s!eet steel of

    4mm t!i"#ness on a 1000mm !ig!

    pedestal "omplete it! fuel line pipe or#,

    su"! as gate (al(es and a""essories et"

    4 ets )00,000 2,400,000.00

    10. 2+ 92.: Gdut*standb*H diesel tuel

    pump "omplete it! "ontrol panel, dut*

    sele"t sit"! and fuel pipe

    or#a""essories

    Nos. 55,000 440,000.00

    11. >nstallation a""essories s!all in"lude "able

    tra*s, unistru"t et". and ot!er ne"essar*

    materials

    =ot um 100,000.00

    12. Allo for t!e operation and maintenan"e

    it!in t!e first )%mont!s of defe"t liabilit*

    period after t!e "ommissioning of t!e

    proIe"t

    % % 7,000,000.00

    %KVA C-0 G10 S12

    SUB TOTAL

    +#"*,"#%%.%%

  • 8/10/2019 Street Light Rehabilitation-general

    40/47

    MOE/ST. REH/ ALIMI ROAD/PG.!

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    ALIMI ROAD (IDI APE FGC" ILORIN)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    SUMMARY

    A. C>>= +O? % % % 15,25,000.00

    ;. O=&,

    >-->N&

    % % % )2,34,500.00

    C. CA;=& % % % 31,7),000.00

    D. D>-?>;6->ON, CON-?O=/ &A?-=>N&&=ON % % % 1)),70,0.00

    MOE/ST. REH/ ALIMI ROAD /PG.

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONGMICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)

  • 8/10/2019 Street Light Rehabilitation-general

    41/47

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    A. CIVIL WORKS

    A1. Digging of foundation pit for

    poles in normal areas

    12 NO. 3,500.00 42,000.00

    A2. Casting of poles bases !i"!

    s!all in"lude t!e folloing items

    of or#$

    % &'"a(ation of !ole )00 ' )00 '

    1200mm for all t*pes of soil

    in"luding !ard ro"#

    % +ooden form or# to standard

    spe"ifi"ations

    % 100#g of "ement

    % 25mm diam. - foundation

    bolt / nuts% 100mm diam. C pipe

    "omplete it! a""essories

    % aggregate granite "!ippings

    % !arp sand

    % +ater et".

    12

    ets ),000 1),000.00

    A3. Digging and ba"# filling of

    tren"! 300mm ' )00mm to

    allo for la*ing of "able

    3200 250.00 00,000.00

    A4. -!rust boring underneat!

    a"ross asp!alt road and la*ing

    of 6C pipes under t!e road

    a*

    200 15,000.00 3,000,000.00

    A5. Constru"tion of transformer

    plint!

    0 0 0.00 0.00

    A). Constru"tion of lig!ting

    #ios#A-%panel plint!

    2 ets 225,000.00 450,000.00

    A7. Allo for t!e "onstru"tion of

    "ustomi8ed al#%in "ubi"le to

    a""ommodate t!e 50#(agenerator, Automati" -ransfer

    it"! 9A-: s*n"!roni8ing

    panel and street lig!t #ios#.

    2 ets 1,500,000.00 3,000,000.00

    CIVIL WORKS SUBTOTAL % % % $"#%$"%%%.%%

    MOE/ST. REH/ MICHEAL IBRU RD./PG.#

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    MICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

  • 8/10/2019 Street Light Rehabilitation-general

    42/47

    ;. POLES" FITTINGS ANDACCESSORIES

    ;1. .0 Double arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    12 No. 125,000 1,500,000.00

    ;2. .0 single arm standard street

    lig!t pole "omplete it!

    installation materials

    9&D:

    2 No. 115,000 230,000.00

    ;3. )0 ' 30 ' 1)0mm, 115 atts

    ) ' 1 Cree=umileds ?ebel

    =&D 9= @ ): lig!ting fitting

    "omplete it! installation

    a""essories

    10 No. 175,000.00 31,500,000.00

    ;4. )0100A C "onne"tor ) #t 4,500.00 30),000.00

    ;5. 3 t*pe C insulation tape 4 ?oll 3,500.00 171,500.00

    ;). 5A C; industrial brea#er 9A;;: 10 No. 1,500.00 270,000.00

    ;7. undr* items s!all in"lude bolt,

    nuts and ot!er ne"essar*

    materials

    =O- um % 100,000.00

    ;. ainting of poles and repairs of

    arms

    0 No. ),500.00 55,000.00

    FITTINGS & ACCESSORIES SUB

    TOTAL

    +,"!!'"%%.%%

    C. CA;=& $ A== ;&

    N>N O? A;&&-A=

    C1. 4 ' 25.0mm C+AC

    underground armoured "able

    200 tr. 4,500.00 00,000.00

    C2. 4 ' 1).0mm C+AC

    underground armoured "able

    3500 tr. 3,750.00 13,125,000.00

    C3. 2.5sB.mm tin it! eart!

    CC "able 9N+C:

    2 Coils 1,500.00 51,000.00

    C4. Cable a""essories to in"lude

    "able lugs et"

    =O- um % 15,000.00

    CABLE SUM TOTAL #,"$"%%%.%%

    MOE/ST. REH/ MICHEAL IBRU RD./PG'

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    MICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNTD. DISTRIBUTION" CONTROL &

    EARTHLING

    D1 uppl* and installation of purpose

    built 50#(a diesel generator indoor

  • 8/10/2019 Street Light Rehabilitation-general

    43/47

    t*pe floor mounted free standing A

    panel made of 4.0mm "orrosion

    resistan"e s!eet dul* a"id treated

    !a(ing t!e folloing arrangements$

    % 1 No ' 100A -/N CC; 9A;;: as

    in"omer

    % 2 No ' 100A -/N "ontra"tor 9A;;:

    %etering(oltage meter rela*

    %OffAuto sele"tors sit"!

    %ets of "ontrol rela*s

    %ets of prote"ting fuses

    %ets of Au'iliar* "ontra"tor

    %ets of pin rela*

    %ets of -imer

    %ets of pilot lamps

    %Digital ammeter

    %Digital (oltmeter%Digital attmeter

    &n"losed in 1200 ' 750mm, 4.0mm

    t!in# metal s!eet. -!e panel s!all be

    ele"tri"all* insulated it! pro(ision for

    bottom and top "able entr*. All "ontrol

    "able s!all be 4.0mm CC

    9Niger"!in: "able

    2 ets 1,5,0003,70,000.00

    D2. uppl* and installation of purpose

    built standard street lig!t #ios# made

    of 4mm "orrosion resistan"e s!eetdul* a"id treated !a(ing t!e folloing

    arrangements$

    % 1 No. 100A - /N CC; 9A;;:

    brea#er as in"omer

    % 2 No. 100A "ontra"tor

    % 2 No. ' )0A -/N CC; 9A;;:

    brea#er as out goings

    % anualAuto sele"tor sit"!

    % ig!=o (oltage rela* sensor

    2 ets 550,000 1,100,000.00

    MOE/ST.REH/ MICHEAL IBRU RD./PG+

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    MICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT% 5A10A p!oto "ell sit"!

    % Digital (oltmeter% Digital AmmeterAll t!e abo(e are to be en"losed in1200mm ' 750mm, 4.0mm t!i"# plate

  • 8/10/2019 Street Light Rehabilitation-general

    44/47

    it! pro(ision for D meter and"ables. 4.0mm CC 9Niger"!in:"able s!all be used as "ontrol "able

    D3. &art!ling s*stem s!all in"lude

    100mm !ea(* dut* t*pe gal(ani8ed

    eart! rod "lamp it! 1)sB.mm C"able as eart! "ontinuit* "ondu"tor.

    =ot um % 25,000.00

    DIST. CONTROL & EARTHLING

    SUBTOTAL

    ,"*#"%%%.%%

    &. #%%KVA" ##/%.,# TRANSFORMER

    S/S

    &1 Allo for t!e "omplete ser(i"ing of t!e

    e'isting 100A, 110.415#( oil

    immersed transformer !i"! s!all

    in"lude t!e under listed items of or#$

    % ?epla"ement of / fuse !olders

    "omplete it! fuse element%C!anging of transformer oil

    % >mpro(ement of eart!ling s*stem to

    obtain a minimum of 5 0!ms eart!

    resistan"e test

    % C!anging of "ross lin#ed

    pol*et!*lene "able "omplete it!

    terminating #its

    % ?e"onstru"tion of transformer plint!

    !ere desirable

    . % % 350,000.00

    &2. uppl* / installation of 100A,110.415 -ransformer 9&==O: 0 0 0.00 0.00

    &3. Allo pa*ments of statutor*Non%

    statutor* fee to CN in"luding loss

    of re(enue !ere appli"able

    =ot um % 2,500,000.00

    &4. Allo for testing and

    "ommissioning

    =ot um % 500,000.00

    #%%KVA" ##/%.,# SUBTOTAL +"+%"%%%.%%

    MOE/ST. REH/MICHEAL IBRU RD./PG,

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT AND

    EVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    MICHEAL IBRU ROAD (EMIRS PALACE JUNCTION MARABA)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT. % KVA" ,#V DIESEL GENERATOR

    1. uppl* and installation of 50A,

    415( 1500?, 50E Cummins Auto

    mains failure starting prime "ontinuous

    dut* generating sets, brus!less

  • 8/10/2019 Street Light Rehabilitation-general

    45/47

    re(ol(ing field t*pe, 4%poles self%

    regulating A? it! t!e folloing$

    % &ngine and alternator full prote"tion

    % Current "ompounded e'"itation

    support s*stem

    % =arge terminal !ousing on ant

    (ibration units, "omplian"e it!

    ;2)13, ;4, ; 5000, - 111,

    >&C 34%1, &D0530 and N&A

    -!e generator set s!all be ordered

    it! t!e folloing additional fa"ilities

    in%built from t!e fa"tor*$

    % ea(* dut* air filters

    % Oil sump pump for eas* e(a"uation

    of aste oil

    % tarting batteries it! "ables and

    bra"#et% ;atter* isolator

    % uel pre%ilter+ater separator

    inis!ed in Cummins traditional

    unsell green "olour

    2 Nos. 3,75,000 7,50,000.00

    2. O(erseas a"tor* >nspe"tion to

    itness t!e a"tor* A""eptan"e -est

    9A-: of t!e

  • 8/10/2019 Street Light Rehabilitation-general

    46/47

    450 ' 450mm "onstru"ted it! bri"#and "omplete it! "on"rete eart! pit"o(er

    ). Complete too# #it for t!e maintenan"e

    of poer plants as des"ribed in t!e

    te"!ni"al spe"ifi"ations and as

    re"ommended b* t!e manufa"turers

    2 ets 500,000 1,000,000.00

    7. abri"ate and install an insulated metal

    !ood to du"t t!e generator radiator !ot

    air e'!aust to t!e outside t!roug! t!e

    metal in t!e all to super(ising

    &ngineerFs detail

    2 ets 225,000 450,000.00

    . uppl* and install plate mounted a'ial

    fan e'tra"tor "omplete it! industrial

    fan "ontroller and air operated =ou(re

    s!utters and 4%pole, single p!ase motor

    to >55.

    2 ets 55,000 110,000.00

    . 1500= 9litre: diesel fuel storage da* tan#of re"tangular ma#e it! s!eet steel of

    4mm t!i"#ness on a 1000mm !ig!

    pedestal "omplete it! fuel line pipe

    or#, su"! as gate (al(es and

    a""essories et"

    2 ets )00,000 1,200,000.00

    10. 2+ 92.: Gdut*standb*H diesel tuel

    pump "omplete it! "ontrol panel, dut*

    sele"t sit"! and fuel pipe

    or#a""essories

    4 Nos. 55,000 220,000.00

    11. >nstallation a""essories s!all in"lude

    "able tra*s, unistru"t et". and ot!erne"essar* materials

    =ot um 100,000.00

    12. Allo for t!e operation and

    maintenan"e it!in t!e first )%mont!s of

    defe"t liabilit* period after t!e

    "ommissioning of t!e proIe"t

    % % 3,500,000.00

    %KVA C-0 G10 S12

    SUB TOTAL

    #!"%#*"'%%.%%

    MOE/ST. REH/ MICHEAL IBRU RD./PG.!

    PROJECT TITLE: BILL OF ENGINEERING MEASUREMENT ANDEVALUATION FOR THE REHABILITATION OF STREET LIGHT ALONG

    MICHEAL IBRU ROAD (EMIRS PALACE JUNTION MARABA)

    S/NO DESCRIPTIONS QTY. UNIT RATE AMOUNT

    SUMMARY

    A. C>>= +O? % % % ,10,000.00

    ;. O=&,

    >-->N&

    % % % 34,))2,500.00

  • 8/10/2019 Street Light Rehabilitation-general

    47/47

    C. CA;=& % % % 14,55,000.00

    D. D>-?>;6->ON, CON-?O=/ &A?-=>N&&=ON % % % 5,)3,335.00