Strawberry Point School ModernizationSummer 2012

Page 2: Strawberry Point School Modernization Summer 2012.

New entry, landscape, trench drain, and playground striping

Before AfterLandscape and playground striping

Page 3: Strawberry Point School Modernization Summer 2012.

New ducts, paint, and playground striping

Before AfterLeaking roof top ducts, playground striping

Page 4: Strawberry Point School Modernization Summer 2012.

Raised tree canopy for better site lines, new waiting area, new entry gate, new waiting area for pick up

Before AfterEntry gate, and landscape

Page 5: Strawberry Point School Modernization Summer 2012.

New light poles, entry portico, locking gates, new flagpole, new paint, new display board, new sidewalk

Before AfterMain entry , rolling gate, flagpole

Page 6: Strawberry Point School Modernization Summer 2012.

New paving and paint

Before AfterDecomposed granite

Page 7: Strawberry Point School Modernization Summer 2012.

New portico, paving, fence, locking gate, and flagpole

Before AfterMain entry

Page 8: Strawberry Point School Modernization Summer 2012.

New paint, paving, fence, locking gate, and portico

Before AfterEntry

Page 9: Strawberry Point School Modernization Summer 2012.

New integrated entry matts, new paint interior and exterior

Before AfterEntry matts

Page 10: Strawberry Point School Modernization Summer 2012.

New playground striping, paint, flagpole and entry

Before AfterPlayground, and entry

Page 11: Strawberry Point School Modernization Summer 2012.

Raised tree canopy, expanded planter area, new black top patching, new playground striping

Before AfterLandscape and blacktop

Page 12: Strawberry Point School Modernization Summer 2012.

New covered walkway, new paint, new playground striping

Before AfterClassrooms, playground striping

Page 13: Strawberry Point School Modernization Summer 2012.

New mechanical venting, new lighted exit signage

Before AfterPassive venting in hallway

Page 14: Strawberry Point School Modernization Summer 2012.

New carpet with abrasive action inserts at entry doors

Before AfterPortable classrooms carpet

Page 15: Strawberry Point School Modernization Summer 2012.

New carpet with rubber transition strips

Before AfterOld carpet and metal transition strips

Page 16: Strawberry Point School Modernization Summer 2012.

New paint, and cubbies

Before AfterCoat hooks

Page 17: Strawberry Point School Modernization Summer 2012.

Sheet metal flashing to have continuous rain protection at portable classrooms

Before AfterGaps between overhangs at portables\

Page 18: Strawberry Point School Modernization Summer 2012.

New covered walkway, railings, and paint

Before AfterWalkway from main building to portable classrooms

Page 19: Strawberry Point School Modernization Summer 2012.

New covered walkway, ADA compliant water fountain and paint

Before AfterWalkway from main building to portable classrooms and restrooms

Page 20: Strawberry Point School Modernization Summer 2012.

New fence, gate and paint

Before AfterKindergarten area

Page 21: Strawberry Point School Modernization Summer 2012.

New paint, fence, asphalt, playground striping, walkways and sandbox

Before AfterKindergarten play area

Page 22: Strawberry Point School Modernization Summer 2012.

New paint, fence, asphalt, playground striping, walkways and sandbox

Before AfterWindows, Paint, Roof, Doors, Lights, Gutter, Landscape, Ramp, Stairs, RailingsKindergarten play area

Page 23: Strawberry Point School Modernization Summer 2012.

Converted to new custodial closet

Before AfterCloset

Page 24: Strawberry Point School Modernization Summer 2012.

New tiles

Before AfterWater damaged ceiling tiles

Page 25: Strawberry Point School Modernization Summer 2012.

New projector, screen, speakers, and clock

Before AfterTypical classroom