Using DOEE’s Stormwater Database for Permit Review and Stormwater Incentives Matthew Espie Department of Energy and Environment

Transcript of Stormwater Management Database - doee...combination of on-site and off-site retention. Major...

Page 1: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Using DOEE’s Stormwater Database for

Permit Review and Stormwater Incentives

Matthew Espie

Department of Energy and Environment

Page 2: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Training Objectives

Become familiar with the Stormwater Database Understand how the Stormwater Database

supports DOEE plan review Be able to enter, modify, and submit stormwater

plan information to DOEE

Page 3: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Training Outline

Overview of DC Stormwater Programs and Stormwater Database

Using the Stormwater Database to submit plan information

Page 4: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Allows web-based entry and review of project data Incorporates and enhances existing compliance

calculations Allows project team to access data during design,

review, construction, and inspection Streamlines review of stormwater plans Generates green infrastructure reports for DOEE

About the Stormwater Database

Page 5: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Integrates with the SRC and RiverSmart Rewards programs to streamline applications Certify SRCs Transfer SRCs Use SRCs Retire SRCs Notification of in-lieu fee payment RiverSmart Rewards applications

Enables online submission of compliance information for an Off-site retention volume (Offv)

Provides Access to the SRC Registry

About the Stormwater Database

Page 6: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

2013 Stormwater Rule

Major land-disturbing activity

5,000 ft2 or more of land-disturbing activity.

Retain the first 1.2” of rainfall on site or through a combination of on-site and off-site retention.

Major substantial improvement activity

Renovation for which:

Cost exceeds 50% pre-project value of structure and Combined footprint of structure and land disturb ≥ 5,000 ft2.

Retain the first 0.8” of rainfall on site or through a combination of on-site and off-site retention.

Page 7: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

On-site retention ≥ 50% of Stormwater Retention Volume (SWRv).

Free to go off site.

On-site retention < 50% of SWRv. Must prove that on-site retention is

technically infeasible or environmentally harmful.

Minimum on-site retention requirement waived during Transition Period 2A (1/15/14 to 1/15/15). Transition Period 2B (1/15/14 to 7/14/15).

Allowable Use of Off-Site Retention

Page 8: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Offv = SWRv - On-Site

Retention Volume

10,000 gallons

5,000 gallons

5,000 gallons

Off-Site Retention Volume (Offv)

Page 9: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Two Options to Achieve Offv In-lieu fee (ILF) payment = $3.58 Paid to DOEE. Corresponds to 1 gallon of retention for 1 year. Achieves 1 gallon of Offv for 1 year.

Stormwater Retention Credits (SRCs) Privately tradable. 1 SRC corresponds to 1 gallon of retention for 1 year. 1 SRC achieves 1 gallon of Offv for 1 year. Each SRC has a unique serial number.

Page 10: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

DC Gov’t (DOEE) Stormwater Fee ($2.67/ERU for FY2015).

DC Water Impervious Area Charge ($20.30/ERU for FY2015). Two separate discount programs.

DOEE - 55% max discount for 1.2” retention from 1 ERU. DC Water - 4% max discount for 1.2” retention from 1 ERU.

RiverSmart Rewards Standard Application:

Available for all sites with Stormwater Management Practices A Simple Application is available for all sites with practices managing

2,000 sf of impervious surface or less

RiverSmart Rewards

Page 11: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Using the Database

Page 12: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Create a Stormwater Database Account

Visit the database landing page at doee.dc.gov/swdb

Request an account (DOEE will approve request) Create log in credentials DOEE communications may be sent from

[email protected]

Page 13: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 14: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 15: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 16: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 17: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 18: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 19: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 20: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Stormwater Management Plans

Page 21: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Enter Plan Information

Site Information Plan Information Site Drainage Area Information BMP Information Submit

Page 22: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 23: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 24: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 25: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 26: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 27: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 28: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 29: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 30: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 31: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Default values based on site and date

Defaul values based on site

Page 32: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 33: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 34: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 35: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 36: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Lot boundary

Site Drainage Area 2 LOD Site Drainage Area 1

Site Drainage Area 3

Site Drainage Area 4

Point of discharge from site

Point of discharge from site

Point of discharge from site

Sheet flow from site

Lot boundary

Site Drainage Areas

Page 37: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Total area must be equal post project and pre project

Page 38: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Calculated based on land cover

Add each BMP individually

Page 39: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

X and Y must be entered before plan is submitted

BMP Name is optional for identification

Total area post project and pre project must be equal.

Page 40: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 41: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 42: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 43: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 44: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 45: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 46: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 47: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

MS4

Page 48: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Map of Combined Sewer System (CSS)

Page 49: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Site Drainage Area Requirements (MS4 Only)

Retain or treat 50% of the SWRv 100% of Vehicular Access Area (VAA) must drain

to BMPs Retain or treat 50% of the SWRv from the entire

Vehicular Access Area

Page 50: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 51: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 52: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Treatment Trains

Page 53: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Treatment Trains

Enter information for the first BMP Enter information for the downstream BMP Create a connection between these two BMPs Update this connection as necessary

Page 54: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

BMP 1

Contributing Drainage Area to BMP 1

BMP 2

Contributing Drainage Area to BMP 2

Page 55: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 56: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 57: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 58: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 59: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 60: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

It may be necessary to periodically “refresh” a BMP in a treatment train if an upstream or downstream BMP changes

Page 61: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 62: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 63: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 64: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 65: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 66: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 67: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 68: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 69: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Submit the Plan

Page 70: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Necessary Steps Prior to Submittal

Request to be an Agent for the Site Owner Correct all Plan Errors Generate the Required Plan Compliance Sheet Submit the Plan

Page 71: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Agents

You can modify information in the database for Sites that you manage

You can modify information in the database for Sites that are managed by someone who has delegated authority to you

Page 72: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Project Engineer Site

Site Owner

Page 73: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 74: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 75: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 76: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 77: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 78: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 79: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 80: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 81: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 82: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Maintenance Responsibility and Offv

All Major Regulated Projects must have the person responsible for maintenance sign the Maintenance Responsibility Stamp online

All sites with Offv must have the person responsible for achieving Offv sign the Offv Stamp online

These stamps should be signed by the site owner or someone with responsibility for long-term management of the site.

These stamps are not typically completed by the project engineer

Page 83: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 84: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 85: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 86: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 87: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 88: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 89: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 90: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 91: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Next Steps

File the building permit application and go to the Permit Center at DCRA (1100 4th Street SW) to pick up an invoice for filing fees

Pay filing fees and upload a receipt to the Stormwater Database

Failure to complete this process will put review of your plan on hold

DOEE will provide review comments Revise the plan information, updating the record in

the Stormwater Database, and resubmit

Page 92: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Database shows assigned plan reviewer and review status

Inspection dates and documents can be accessed

Page 93: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Exemptions from GAR or Erosion and Sediment Control

Page 94: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 95: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 96: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 97: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 98: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 99: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Use the rainwater harvesting calculator to determine retention value

Page 100: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 101: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 102: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Public Right of Way

Page 103: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Public Right of Way

Meet requirements to the Maximum Extent Practicable (MEP)

“Type 1” roadway reconstruction projects Submit at 30%, 65%, 90%, and final design phases

“Type 2” parcel-based projects

Page 104: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Type 1

Page 105: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 106: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 107: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 108: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 109: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Type 2

Page 110: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 111: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 112: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 113: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Page 80 of the Stormwater Management Guidebook (doee.dc.gov/swguidebook)

Page 114: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 115: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 116: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 117: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Plans Vested Under Transition Period 1

Page 118: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 119: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Unregulated Plans

Page 120: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 121: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 122: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 123: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

More than one type of activity

Page 124: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

More Than One Type of Activity

Examples from Clarifications to the 2013 Rule and Guidebook

available at doee.dc.gov/swregs and doee.dc.gov/swguidebook

Page 125: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 126: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 127: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 128: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

BMP Contributing Drainage Area from an Off-Site Area

Page 129: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Off-Site BMP Contributing Drainage Area

For parcels, retaining volume from an off-site area does not contribute to meeting the SWRv.

Retaining volume from an off-site area may be eligible for Stormwater Retention Credit (SRC) certification

Page 130: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Lot Boundary

BMP

Contributing Drainage Area

Page 131: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 132: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 133: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 134: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Erosion and Sediment Control and GAR plans

Page 135: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 136: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 137: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value
Page 138: Stormwater Management Database - doee...combination of on-site and off-site retention. Major substantial improvement activity Renovation for which: Cost exceeds 50% pre-project value

Matthew Espie [email protected]

202-715-7644

To access DOEE’s Stormwater Database, visit doee.dc.gov/swdb.