ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN...

46
ST.JAMES PARK MASTERPLAN AND PARK IMPROVEMENTS Stakeholder Meeting 3 April 26, 2016 Team: PMA Landscape Architects Ltd. Lead Landscape Architects MASS LBP Public Facilitation Consultant RAW Design Architectural Consultant

Transcript of ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN...

Page 1: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST.JAMES PARKMASTERPLAN AND PARK IMPROVEMENTSStakeholder Meeting 3April 26, 2016

Team:PMA Landscape Architects Ltd. Lead Landscape Architects MASS LBP Public Facilitation ConsultantRAW Design Architectural Consultant

Page 2: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

INTRODUCTIONS

Page 3: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

PROJECT OVERVIEW

• Preserve and protect what is well-loved in the park• Celebrate the rich cultural heritage of the neighbourhood• Consider the short and long-term demands on the park• Integrate new playground• Integrate new pavilion in honour of Michael Comstock• Improve accessibility, circulation and overall functionality of the park• Support the cultural and social programming in the park

MASTER PLAN OBJECTIVES

The project scope of work includes the development of a master plan for St. James Park and establishing the scope towards the Phase 1 implementation.

Page 4: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

• Design and Public Consultation in 2016• Implementation* anticipated in 2017

*Phase 1 will include a new playground, pavilion and improvements to paving and walkways, at minimum.

TIMELINE

Page 5: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

MEETING OBJECTIVES

A: Present preferred concept

B: Confirmation of elements within preferred concept

Specific confirmation on:

• site planning and layout of major program elements (i.e. pavilion, playground, circulation)

• pavilion concept

• playground visioning

• typical entrance concept & heritage interpretation

• lighting

Page 6: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

What We HeardUnderstanding the Vision

Page 7: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

PMA Landscape Architects Ltd. • RAW Design • MASS LBP • St. James Park Master Plan and Site Improvements

CONCEPT 1 ST. JAMES PARK Master Plan and Site ImprovementsPublic Meeting #1

WALKWAY CONNECTION BY CATHEDRAL

SECONDARY WALKWAY

CENTRAL PLAZA

FORMAL GARDEN

PLAYGROUND

ENTRYPLAZA

ENTRYPLAZA

OPEN LAWN/EVENT SPACE

PAVILLION/STAGE

SECONDARY WALKWAY

ENTRYPLAZA

ENTRYPLAZA

TEMPORARYSTAGING AREA

DECONSTRUCTEDBERM

CONCEPT 2 ST. JAMES PARK Master Plan and Site ImprovementsPublic Meeting #1 - March 24th, 2016

PMA Landscape Architects Ltd. • RAW Design • MASS LBP • St. James Park Master Plan and Site Improvements

WALKWAY CONNECTION BY CATHEDRAL

SECONDARY WALKWAY

CENTRAL PLAZA

FORMAL GARDEN

PLAYGROUND

ENTRYPLAZA

ENTRYPLAZA

OPEN LAWN/EVENT SPACE

PAVILLION/STAGE

SECONDARY WALKWAY

ENTRYPLAZA

ENTRYPLAZA

SECONDARY WALKWAY

SECONDARY WALKWAY

Scale, scope and contextual reference of pavilion are important

Pavilion to focus on day-to-day use

Support upgrading and minor widening of primary circulation paths

Art, creativity, recreation and heritage to be included in design approach

Lighting to be subtle, functional, creative, flexible. safe and permanent

Prioritize preservation of open green

Connecting cathedral lands to park

Playground: consider themed and sculptural concepts that integrate nature and natural materials

WHAT WE HEARD FROM YOU

Page 8: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

UNDERSTANDING THE VISION

Celebrate and enhance the existing character: as an established and well-loved park that continues its role as a green oasis and meeting place, as well as a place to reveal the rich history about the neighbourhood

• Historic Heart

• The Retreat

• Where it Happens

• Family Fun

• Connected and Entertaining

*Gehl Architects & 8-80 cities, St. James Park: People Make Places, December, 2012

Page 9: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

DESIGN APPROACH

• Maintain the character of the park

• Pedestrian priority

• Ensure flexibility in programming

• Celebrate the neighbourhood, especially its history and identity as cultural epicentre

• Use quality materials and best-practices details to ensure longevity

• Use play as art or art as play

Page 10: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Preferred Master Plan Concept

Page 11: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

MASTER PLAN PREFERRED CONCEPT

SECONDARY WALKWAY

CENTRAL PLAZA/EVENT SPACE

FORMAL GARDEN

PLAYGROUND

ENTRYPLAZA

ENTRYPLAZA

OPEN LAWN

SECONDARY WALKWAY

ENTRYPLAZA

ENTRYPLAZA

KING STREET

ADELAIDE STREETCH

URCH

STR

EET

JARV

IS S

TREE

T

PAVILION/STAGE

Page 12: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Typical Entry Plaza, Northwest Entry, entering at Adelaide Street

Paving

Page 13: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Heritage PrecedentImpressed concrete/pavers Found at St. James Cathedral

Heritage interpretation to enhance park entry experience

Heritage PrecedentBronze/Brass inlayheritage mapping

Cathedral Creek (Lost River)

ST. JAMES PARK

Heritage PrecedentStreetbond application

St. James Park Rendering

Heritage PrecedentLaser cut & back-lit corten steel Old Town of York

Page 14: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Bird’s-eye from King Street

Page 15: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

View from Market Street

Page 16: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Plaza and Pavilion

Page 17: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Central plaza towards Pavilion

Page 18: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

View from Adelaide St. Northwest Corner

Page 19: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

View from Northwest Corner

Page 20: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

View from Adelaide St. and Jarvis St. Northeast corner

Page 21: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

View from Walkway to Plaza

Page 22: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

View from Jarvis St. across playground

Page 23: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

View from Southeast Entry Plaza

Page 24: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

View from King St. Southwest Corner

Page 25: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

View from Cathedral

Page 26: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

STATS

Formal and informal seating• 33 total 1.8m-length benches (currently approx. 33 benches)• 133 lin. m of continuous benches, seatwalls and terraces• approx. 216 - 321 seating

Tree canopy• 156 trees total• 8 are poor to fair condition• 28 trees to be removed • min. 8 can be transplanted• 6 of those are in poor conditioncurrently

Event capacity at central plaza• area ±380 sq. m/ 4115 sq. ft(currently plaza is ±150 sq. m)• max. capacity 510 people standing/ seated

Page 27: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Playground Concepts

Page 28: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

SIZE: Appropriate to overall size of park

AGE: Debate over the target age - some say only for young and some say all ages.

INTEGRATE: all ages - heard both “make it all ages” and “make it only for the young children”; Make it as all ages as possible (consider youth, consider aging population, entire family etc.)

Fitness elements within the play equipment or elements

SITING: Should be away from the street and away from the quieter areas of the park.

Preferred east quadrant to alleviate programming of north open green. Buffer required bwetween street and playground

ART: Support for artful heritage elements in the playground

SAFETY: concern with loitering and safety. Design must consider permeable site-lines

MATERIAL: Palette to integrate nature/ natural elements, colour

Use colour sparingly and in an elegant way that blends with the context

WHAT WE HEARD FROM YOU

Page 29: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

PLAYGROUND APPROACH

• Size the playground appropriately to the park- do not overwhelm

• East quadrant siting- buffer or fencing required between Jarvis St. and the playground

• Integrate nature and natural materials

• Use colour sparingly and in an elegant way that blends with the context

• Ensure the equipment is visually and physically permeable, for good sight lines and to

discourage loitering

• Integrate fitness elements within the play equipment or elements

• Consider elements that are educational, reference heritage, are interactive and engaging

• Integrate the ex. berms and trees into the playground- fantastic assets and opportunities

Page 30: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

MINI MARKET LANE THEME

PLAN

CAROUSEL MEZZANINE

SWINGS x3

LOG STEPS

STEPPING POSTS

SLIDESLIDE

SEE SAWS x2

MARKET FRAMES WITH PLAY PANELS

LOG POSTS

SAND BOX WITH SHADE STRUCTURE

FENCE

FENCE

PICNIC AREA

Page 31: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

MINI MARKET LANE THEME

PERSPECTIVE

MEZZANINECAROUSELMARKET FRAMES LOG POSTS

Page 32: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

PLAY AS SCULPTURE, SCULPTURE AS PLAY

PLAN

BALANCING DISCSRUBBER

MOUNDS

BIG ‘O’ SWINGCLIMBING

FUNNEL

SWINGS x3

RUBBER MOUNDS

SANDBOX WITH WATER

SPIGOT PICNICAREA

RIBBON PATTERN IN RUBBER

SURFACING

CLIMBING STRUCTURE

FENCE

FENCE

Page 33: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

PLAY AS SCULPTURE, SCULPTURE AS PLAY

PERSPECTIVE

CLIMBING STRUCTURE BALANCING DISCS RUBBER MOUNDS BIG ‘O’ SWING INTEGRATED SWINGS

Page 34: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

FENCING

Page 35: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Pavilion Concept

Page 36: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 2 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

CONCEPT 1PROJECT IN SITE

WHAT WE HEARD FROM YOU

Scale, scope and contextual reference of pavilion are important

Pavilion to focus on day-to-day use

Locate pavilion to preserve unprogrammed green space

The Cathedral architecture should be reflected in the pavilion architecture

Design to minimize loitering at night

Consider pigeons and design to discourage them

Too large, too modern, and not in keeping with the heritage feel of the park and pavilion

The proposed pavilion and programming infrastructure could result in the park being too busy and encroach on the central function of St James Park as a natural local refuge and green space for connecting with neighbours, decompressing, and unstructured play.

Needs of homeless should to considered in the design

Many believed that it should be primarily an area for rest, relaxation, group exercise classes and shelter for park-goers, while a few others felt that the pavilion could become an important event space for the neighborhood.

Ensure the pavilion will not bother residents surrounding the park

Page 37: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 2 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

CONCEPT 1PAVILION SKETCHES

Page 38: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 2 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

CONCEPT 1PROJECT IN SITE

Page 39: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

REFERENCE PROJECTS / LIGHTING

Page 40: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016 ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 2 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

CONCEPT 1

FABRIC

3D WELDED WIRE MESH

STONE

GLULAM STRUCTURE

BRICK

MATERIALITY

FABRIC

GLULAMWIRE MESH

MATERIALITYSTONE + BRICK

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 2 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

CONCEPT 1

FABRIC

3D WELDED WIRE MESH

STONE

GLULAM STRUCTURE

BRICK

MATERIALITY

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 2 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

CONCEPT 1

FABRIC

3D WELDED WIRE MESH

STONE

GLULAM STRUCTURE

BRICK

MATERIALITYST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 2 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

CONCEPT 1

FABRIC

3D WELDED WIRE MESH

STONE

GLULAM STRUCTURE

BRICK

MATERIALITY

Page 41: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Lighting Strategies

Page 42: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

WHAT WE HEARD FROM YOU

UPLIGHTING: Concern over uplighting and its effect on light pollution and birds

IN GROUND LIGHTING: is sophisticated and lovely

Design to be sophisticated and urban

Safety is a priority

Overlighting the park should be discouraged due to close adjacencies with residential towers

Lighting of Cathedral would help it become more integrated in the park

Fix pedestrian lights

Page 43: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

LIGHTING FUNCTIONAL & PERMANENT

FUNCTIONAL SEASONAL & PERMANENT

Page 44: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

Lighting the Cathedral and Park Pavilion by highlighting selected architectural features with spot lighting

LIGHTING: ARCHITECTURAL

Page 45: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS • Stakeholder Meeting 3 • PMA Landscape Architects Ltd. • RAW Design • MASS LBP April 26, 2016

LIGHTING: FEATURE

Page 46: ST.JAMES PARK · RAW Design . Architectural Consultant. INTRODUCTIONS. ST. JAMES PARK MASTER PLAN AND PARK IMPROVEMENTS Staeholder Meeting PMA Landscape Architects Ltd. RAW Design

ST.JAMES PARKMASTERPLAN AND PARK IMPROVEMENTSStakeholder Meeting 3April 26, 2016

Team:PMA Landscape Architects Ltd. Lead Landscape Architects MASS LBP Public Facilitation ConsultantRAW Design Architectural Consultant