![Page 1: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/1.jpg)
Stillwater Bridge, Old Town, Maine
Beam End Treatment
Topside the bridge appeared to
have dropped ¾”. Beam webs
were deteriorated to point they were
collapsing – or sliding past itself.
Nicknamed “The Clasp”, a pair of
boomerang shaped pieces with a leg
bent 90 degrees, nestled nicely
against the web & flange securing
everything together.
After strengthening all 6 beams
ends, the last 15 feet, including
the bearings, were blasted and
coated.
MaineDOT maintenance crews completed
this repair without disrupting traffic in less
than 3 weeks, just ahead of the deadline of
students returning to University of Maine,
Orono.
In order to accomplish a smooth ride over
the roadway finger joint, six - 100 ton
hydraulic jacks were used to precisely lift
each beam in order for shim plates to be
placed between the bearing plate and the
girder. Page 1 of 4
![Page 2: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/2.jpg)
Procedure for Structural Beam End Treatment – Stillwater Bridge
A ¾” drop from
collapsing webs.
A smooth ride
after shimming
up beneath
rocker plates.
BEFORE AFTER
1
2
3 4
Page 2 of 4
![Page 3: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/3.jpg)
Shop Drawing Material
Bulge & collapse
of web(s).
Miscellaneous
Installation over bearing.
2A
Tightening against web.
Page 3 of 4
![Page 4: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/4.jpg)
Shop Drawing for Repair Parts
Page 4 of 4
![Page 5: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/5.jpg)
Hollis, Maine – Deteriorated Gusset Plate
![Page 6: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/6.jpg)
The “Iron Boot” – a series of steel plates configured to
tie the chord, gusset and diagonal together.
![Page 7: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/7.jpg)
Martin’s Point Falmouth Maine - Deteriorated &
Collapsing Beam Webs
![Page 8: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/8.jpg)
Saddle, Shoe & Wedge – a pair of c-channels
supporting a precisely bent plate designed to re-support
beam webs. Installed at 53 locations.
Wedge
Martin’s
Point
Repair
Shoe
Saddle
![Page 9: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/9.jpg)
Martin’s Point
Repair Plan
Saddle
Boomerang-shaped
plates bent 90
degrees. (Shoe)
Steel Wedge Pack,
changing the load path
![Page 10: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/10.jpg)
New Sharon –
Sandy River
Bridge
Deteriorated Brgs &
Bottom Flanges.
![Page 11: Stillwater Bridge, Old Town, Maine Beam End …...Stillwater Bridge, Old Town, Maine Beam End Treatment Topside the bridge appeared to have dropped ¾”. Beam webs were deteriorated](https://reader034.fdocuments.in/reader034/viewer/2022043009/5f9a09de12ca7f23c65bd221/html5/thumbnails/11.jpg)
Sandy River Br Repair – new bearings & added 1” steel
reinforcing plate – split lengthwise to accommodate traffic.