STEP 1 STEP 2 - HOT TAP · Hot Tapping Fitting Split Tee Existing Pipe 1. Install Hot Tapping Split...

2
Hot Tapping Fitting Split Tee Existing Pipe 1. Install Hot Tapping Split Tee STEP 1 STEP 2 STEP 3 STEP 4 1. Install Butterfly Valve and plain ended pipe 1. Install Temporary Gate Valve (KGV)to hot tapping split tee 1. Install Tapping Machine to hot tapping split tee Existing Pipe UPT Hot Tapping Machine Existing Pipe Temporary Gate Valve (KGV) Butterfly Valve Existing Pipe Plain ended pipe

Transcript of STEP 1 STEP 2 - HOT TAP · Hot Tapping Fitting Split Tee Existing Pipe 1. Install Hot Tapping Split...

Page 1: STEP 1 STEP 2 - HOT TAP · Hot Tapping Fitting Split Tee Existing Pipe 1. Install Hot Tapping Split Tee STEP 1 STEP 2 STEP 3 STEP 4 1. Install Butterfly Valve and plain ended pipe

Hot Tapping FittingSplit Tee

Existing Pipe

1. Install Hot Tapping Split TeeSTEP 1 STEP 2

STEP 3 STEP 4

1. Install Butterfly Valve and plain ended pipe

1. Install Temporary Gate Valve (KGV)to hot tapping split tee 1. Install Tapping Machine to hot tapping split tee

Existing Pipe

UPT Hot Tapping Machine

Existing Pipe

Temporary Gate Valve (KGV)

Butterfly Valve

Existing Pipe

Plain ended pipe

Page 2: STEP 1 STEP 2 - HOT TAP · Hot Tapping Fitting Split Tee Existing Pipe 1. Install Hot Tapping Split Tee STEP 1 STEP 2 STEP 3 STEP 4 1. Install Butterfly Valve and plain ended pipe

EXISTING PIPE 2050

Completion Plug Machine

1. After Tapping close temporary valve. Then install completion plug machine

Completion Plug 1000mm

Temporary gate valve

Existing pipe 2050

1. Plug in Completion plug and remove temporary gate valve

Blind Flange

STEP 5

STEP 7

Existing pipe 2050

STEP 6

1. Install Blind Flange