Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. ·...
Transcript of Steam turbine power generation arrangement overview and … gen vibration.pdf · 2013. 8. 26. ·...
Steam turbine power generationarrangement overview and vibration type and location
Sensor type Tag initial IDD-xxxx Eddy current, vibration signal was retreived from vibration console and captured by Bentley Nevada ADRE DAIU-208 and Technekon STD-3300V-xxxx Velocity, vibration signal was retreived from vibration console and captured by Bentley Nevada ADRE DAIU-208 and Technekon STD-3300A-xxxx Acceleration, separated ICP vibration sensor, signal was detected by Portable vibration analyzer, Technekon STD-3300
Steam tutbine and HS pinion shaft speed, 5791 RPMGear, HS gear 43 T X-spectrum X-spectrum X-spectrum X-spectrumGear, LS gear 166 T Y-spectrum Y-spectrum Y-sepctrum Y-spectrumGen and LS shaft speed 1500 rpm Orbit Orbit Orbit OrbitGear service factor AGMA 421-06>1.3 Waterfall 160-5791rpm Waterfall 160-5791rpm Waterfall 160-5791rpm Waterfall 160-5791rpmPower 43 MW Waterfall 0-160 rpm Waterfall 0-160 rpm Waterfall 0-160 rpm Waterfall 0-160 rpm
DC gap 160-5791 rpm DC gap 160-5791 rpm DC gap 160-5791 rpm DC gap 160-5791 rpmPlease move cursor over the Text block DC gap 0-160 rpm DC gap 0-160 rpm DC gap 0-160 rpm DC gap 0-160 rpmto see vibration details Trend 160-5791 rpm Trend 160-5791 rpm Trend 160-5791 rpm Trend 160-5791 rpm
Trend 0-160 rpm Trend 0-160 rpm Trend 0-160 rpm Trend 0-160 rpm
HS-NDE HS-DEWaveform WaveformSpectrum Spectrum
Waveform Waveform Waveform WaveformSpectrum Spectrum Spectrum Spectrum
LS-DE LS-NDEWaveform WaveformSpectrum Spectrum
C
C'
Turning motor
Oil pump
NDE-1DE-1DE-2NDE-2A
A'
Top view
Top viewA A'
C C'
B B'
HS
LS
NDE-3DE-3DE-4NDE-4
B
B'
X Y
YX
D D'
D
D'
TREND PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 1POINT: Channel 2
45 Left45 Right
DIRECTDIRECT
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
0
20
40
60
80
10:1923JUL2013
10:2123JUL2013
10:2323JUL2013
10:2523JUL2013
10:2723JUL2013
10:2923JUL2013
10:3123JUL2013
TIME: 30 Secs /div
0
20
40
60
80
100
1.04 micro m pp0.980 micro m pp23JUL201310:18:24.0
POINT: Channel 3POINT: Channel 4
45 Left45 Right
DIRECTDIRECT
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
0
20
40
60
80
10:1923JUL2013
10:2123JUL2013
10:2323JUL2013
10:2523JUL2013
10:2723JUL2013
10:2923JUL2013
10:3123JUL2013
TIME: 30 Secs /div
0
20
40
60
80
100
1.04 micro m pp0.914 micro m pp23JUL201310:18:24.0
POINT: Channel 5POINT: Channel 6
45 Left45 Right
DIRECTDIRECT
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
0
50
100
150
10:1923JUL2013
10:2123JUL2013
10:2323JUL2013
10:2523JUL2013
10:2723JUL2013
10:2923JUL2013
10:3123JUL2013
TIME: 30 Secs /div
0
20
40
60
1.04 micro m pp0.914 micro m pp23JUL201310:18:24.0
POINT: Channel 7POINT: Channel 8
45 Left45 Right
DIRECTDIRECT
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
0
50
100
150
200
10:1923JUL2013
10:2123JUL2013
10:2323JUL2013
10:2523JUL2013
10:2723JUL2013
10:2923JUL2013
10:3123JUL2013
TIME: 30 Secs /div
0
50
100
0.914 micro m pp0.914 micro m pp23JUL201310:18:24.0
COMMENTS
BENTLYNEVADA
R
TREND PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 1POINT: Channel 2
45 Left45 Right
GAPGAP
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
-10
-8
-6
-4
-2
0
10:1923JUL2013
10:2123JUL2013
10:2323JUL2013
10:2523JUL2013
10:2723JUL2013
10:2923JUL2013
10:3123JUL2013
TIME: 30 Secs /div
-10
-8
-6
-4
-2
0
-10.2 Volts-10.1 Volts23JUL201310:18:24.0
POINT: Channel 3POINT: Channel 4
45 Left45 Right
GAPGAP
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
-8
-6
-4
-2
0
10:1923JUL2013
10:2123JUL2013
10:2323JUL2013
10:2523JUL2013
10:2723JUL2013
10:2923JUL2013
10:3123JUL2013
TIME: 30 Secs /div
-8
-6
-4
-2
0
-8.59 Volts-9.47 Volts23JUL201310:18:24.0
POINT: Channel 5POINT: Channel 6
45 Left45 Right
GAPGAP
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
-10
-8
-6
-4
-2
0
10:1923JUL2013
10:2123JUL2013
10:2323JUL2013
10:2523JUL2013
10:2723JUL2013
10:2923JUL2013
10:3123JUL2013
TIME: 30 Secs /div
-10
-8
-6
-4
-2
0
-11.5 Volts-11.5 Volts23JUL201310:18:24.0
POINT: Channel 7POINT: Channel 8
45 Left45 Right
GAPGAP
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
-10
-8
-6
-4
-2
0
10:1923JUL2013
10:2123JUL2013
10:2323JUL2013
10:2523JUL2013
10:2723JUL2013
10:2923JUL2013
10:3123JUL2013
TIME: 30 Secs /div
-10
-8
-6
-4
-2
0
-10.7 Volts-10.4 Volts23JUL201310:18:24.0
COMMENTS
BENTLYNEVADA
R
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 1POINT: Channel 2
45 Left45 Right
REF: -10.2 Volts REF: -10.1 Volts
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
20 micro m /div
-100
0
100
200
300
-200 -100 0 100 200
(not orbit or polar plot) UP
00(0, 0)
COMMENTS
BENTLYNEVADA
R
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 3POINT: Channel 4
45 Left45 Right
REF: -8.59 Volts REF: -9.47 Volts
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
20 micro m /div
-100
0
100
200
300
-200 -100 0 100 200
(not orbit or polar plot) UP
00(0, 0)
COMMENTS
BENTLYNEVADA
R
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 5POINT: Channel 6
45 Left45 Right
REF: -11.5 Volts REF: -11.5 Volts
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
20 micro m /div
-100
0
100
200
300
-200 -100 0 100 200
(not orbit or polar plot) UP
00(0, 0)
COMMENTS
BENTLYNEVADA
R
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 7POINT: Channel 8
45 Left45 Right
REF: -10.7 Volts REF: -10.4 Volts
MACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:43.1 Startup
20 micro m /div
-100
0
100
200
300
-200 -100 0 100 200
(not orbit or polar plot) UP
00(0, 0)
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 1 45 LeftMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
10:30:13.1 16010:28:13.1 160
10:26:13.1 16010:24:13.1 160
10:22:13.1 16010:20:13.1 160
10:18:24.8 160 rpm
10:18:24.8
POINT: Channel 2 45 RightMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
10:30:13.1 16010:28:13.1 160
10:26:13.1 16010:24:13.1 160
10:22:13.1 16010:20:13.1 160
10:18:24.8 160 rpm
10:18:24.8
POINT: Channel 3 45 LeftMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
10:30:13.1 16010:28:13.1 160
10:26:13.1 16010:24:13.1 160
10:22:13.1 16010:20:13.1 160
10:18:24.8 160 rpm
10:18:24.8
POINT: Channel 4 45 RightMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
10:30:13.1 16010:28:13.1 160
10:26:13.1 16010:24:13.1 160
10:22:13.1 16010:20:13.1 160
10:18:24.8 160 rpm
10:18:24.8
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: Bently Nevada Corp. PLANT: EGGO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 5 45 LeftMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
10:30:13.1 16010:28:13.1 160
10:26:13.1 16010:24:13.1 160
10:22:13.1 16010:20:13.1 160
10:18:24.8 160 rpm
10:18:24.8
POINT: Channel 6 45 RightMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
10:30:13.1 16010:28:13.1 160
10:26:13.1 16010:24:13.1 160
10:22:13.1 16010:20:13.1 160
10:18:24.8 160 rpm
10:18:24.8
POINT: Channel 7 45 LeftMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
10:30:13.1 16010:28:13.1 160
10:26:13.1 16010:24:13.1 160
10:22:13.1 16010:20:13.1 160
10:18:24.8 160 rpm
10:18:24.8
POINT: Channel 8 45 RightMACHINE: MachineFrom 23JUL2013 10:18:24.8 To 23JUL2013 10:31:13.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
10:30:13.1 16010:28:13.1 160
10:26:13.1 16010:24:13.1 160
10:22:13.1 16010:20:13.1 160
10:18:24.8 160 rpm
10:18:24.8
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 1 45 LeftMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm
18:20:25.4
1.83@ 96 Hertz
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 1 45 LeftMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm
18:26:31.1
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 2 45 RightMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm
18:18:25.4
2.74@ 192 Hertz
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 2 45 RightMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm
18:26:31.1
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 3 45 LeftMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm
18:12:25.4
1.18@ 25 Hertz
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 3 45 LeftMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm
18:26:31.1
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 4 45 RightMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm
18:16:25.4
0.784@ 25 Hertz
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 4 45 RightMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm
18:26:31.1
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 5 45 LeftMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm
18:16:25.4
10.1@ 96 Hertz
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 5 45 LeftMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm
18:26:31.1
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 6 45 RightMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm
18:25:55.4
7.18@ 14 Hertz
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 6 45 RightMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm
18:26:31.1
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 7 45 LeftMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm
18:25:55.4
3.00@ 14 Hertz
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 7 45 LeftMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm
18:26:31.1
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 8 45 RightMACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:25:55.4 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
18:25:25.4 16018:24:25.4 16018:23:25.4 16018:22:25.4 16018:21:25.4 16018:20:25.4 16018:19:25.4 16018:18:25.4 16018:17:25.4 16018:16:25.4 16018:15:25.4 16018:14:25.4 16018:13:25.4 16018:12:25.4 16018:11:25.4 16018:10:25.4 16018:09:25.4 16018:08:25.4 16018:07:25.4 16018:06:25.4 16018:05:25.4 16018:04:25.4 16018:03:25.4 16018:02:25.4 16018:01:25.4 16018:00:25.4 16017:59:25.4 16017:58:25.4 16017:57:25.4 16017:56:25.4 16017:55:25.4 16017:54:25.4 16017:53:25.4 16017:52:25.4 16017:51:25.4 16017:50:25.4 16017:49:25.4 16017:48:25.4 16017:47:25.4 16017:46:25.4 16017:45:25.4 16017:44:25.4 16017:43:25.4 16017:42:25.4 16017:41:25.4 16017:40:25.4 16017:39:25.4 16017:38:25.4 16017:37:25.4 16017:36:25.4 16017:35:25.4 16017:34:25.4 16017:33:25.4 16017:32:25.4 16017:31:25.4 16017:30:25.4 16017:29:25.3 160 rpm
18:25:55.4
3.53@ 14 Hertz
COMMENTS
BENTLYNEVADA
R
HALF SPECTRUM WATERFALL PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 8 45 RightMACHINE: MachineFrom 23JUL2013 18:26:31.1 To 23JUL2013 19:18:01.1 StartupWINDOW: None SPECTRAL LINES: 400 RESOLUTION: 1.25 Hertz
0 100 200 300 400 500FREQUENCY: 20 Hertz/div
19:18:01.1 16019:17:01.1 16019:15:31.1 16019:14:31.1 16019:13:31.1 16019:12:31.1 16019:11:31.1 16019:10:31.1 16019:09:31.1 16019:08:31.1 16019:07:31.1 16019:06:31.1 16019:05:31.1 16019:04:31.1 16019:03:31.1 16019:02:31.1 16019:01:31.1 16019:00:31.1 16018:59:31.1 16018:58:31.1 16018:57:31.1 16018:56:31.1 16018:55:31.1 16018:54:31.1 16018:53:31.1 16018:52:31.1 16018:51:31.1 16018:50:31.1 16018:49:31.1 16018:48:31.1 16018:47:31.1 16018:46:31.1 16018:45:31.1 16018:44:31.1 16018:43:31.1 16018:42:31.1 16018:41:31.1 16018:40:31.1 16018:39:31.1 16018:38:31.1 16018:37:31.1 16018:36:31.1 16018:35:31.1 16018:34:31.1 16018:33:31.1 16018:32:31.1 16018:31:31.1 16018:30:31.1 16018:29:31.1 16018:28:31.1 16018:27:31.1 16018:26:31.1 160 rpm
18:26:31.1
COMMENTS
BENTLYNEVADA
R
TREND PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 1POINT: Channel 2
45 Left45 Right
DIRECTDIRECT
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
0
5
10
15
20
17:3023JUL2013
17:4023JUL2013
17:5023JUL2013
18:0023JUL2013
18:1023JUL2013
18:2023JUL2013
TIME: 2 Mins /div
0
10
20
10.9 micro m pp10.6 micro m pp23JUL201317:29:25.0
POINT: Channel 3POINT: Channel 4
45 Left45 Right
DIRECTDIRECT
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
0
5
10
15
20
17:3023JUL2013
17:4023JUL2013
17:5023JUL2013
18:0023JUL2013
18:1023JUL2013
18:2023JUL2013
TIME: 2 Mins /div
0
5
10
15
20
8.49 micro m pp9.08 micro m pp23JUL201317:29:25.0
POINT: Channel 5POINT: Channel 6
45 Left45 Right
DIRECTDIRECT
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
0
20
40
60
17:3023JUL2013
17:4023JUL2013
17:5023JUL2013
18:0023JUL2013
18:1023JUL2013
18:2023JUL2013
TIME: 2 Mins /div
0
20
40
60
23.4 micro m pp18.4 micro m pp23JUL201317:29:25.0
POINT: Channel 7POINT: Channel 8
45 Left45 Right
DIRECTDIRECT
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
0
10
20
30
40
17:3023JUL2013
17:4023JUL2013
17:5023JUL2013
18:0023JUL2013
18:1023JUL2013
18:2023JUL2013
TIME: 2 Mins /div
0
5
10
15
20
25
39.2 micro m pp20.6 micro m pp23JUL201317:29:25.0
COMMENTS
BENTLYNEVADA
R
TREND PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 1POINT: Channel 2
45 Left45 Right
GAPGAP
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
-10
-8
-6
-4
-2
0
17:3023JUL2013
17:4023JUL2013
17:5023JUL2013
18:0023JUL2013
18:1023JUL2013
18:2023JUL2013
TIME: 2 Mins /div
-8
-6
-4
-2
0
-9.69 Volts-9.35 Volts23JUL201317:29:25.0
POINT: Channel 3POINT: Channel 4
45 Left45 Right
GAPGAP
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
-6
-4
-2
0
17:3023JUL2013
17:4023JUL2013
17:5023JUL2013
18:0023JUL2013
18:1023JUL2013
18:2023JUL2013
TIME: 2 Mins /div
-8
-6
-4
-2
0
-7.69 Volts-8.47 Volts23JUL201317:29:25.0
POINT: Channel 5POINT: Channel 6
45 Left45 Right
GAPGAP
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
-10
-8
-6
-4
-2
0
17:3023JUL2013
17:4023JUL2013
17:5023JUL2013
18:0023JUL2013
18:1023JUL2013
18:2023JUL2013
TIME: 2 Mins /div
-10
-8
-6
-4
-2
0
-10.4 Volts-11.2 Volts23JUL201317:29:25.0
POINT: Channel 7POINT: Channel 8
45 Left45 Right
GAPGAP
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
-8
-6
-4
-2
0
17:3023JUL2013
17:4023JUL2013
17:5023JUL2013
18:0023JUL2013
18:1023JUL2013
18:2023JUL2013
TIME: 2 Mins /div
-8
-6
-4
-2
0
-8.84 Volts-9.84 Volts23JUL201317:29:25.0
COMMENTS
BENTLYNEVADA
R
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 1POINT: Channel 2
45 Left45 Right
REF: -9.69 Volts REF: -9.35 Volts
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
20 micro m /div
-100
0
100
200
300
-200 -100 0 100 200
(not orbit or polar plot) UP
00(0, 0)
COMMENTS
BENTLYNEVADA
R
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 3POINT: Channel 4
45 Left45 Right
REF: -7.69 Volts REF: -8.47 Volts
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
20 micro m /div
-100
0
100
200
300
-200 -100 0 100 200
(not orbit or polar plot) UP
00(0, 0)
COMMENTS
BENTLYNEVADA
R
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 5POINT: Channel 6
45 Left45 Right
REF: -10.4 Volts REF: -11.2 Volts
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
20 micro m /div
-100
0
100
200
300
-200 -100 0 100 200
(not orbit or polar plot) UP
00(0, 0)
COMMENTS
BENTLYNEVADA
R
SHAFT AVERAGE CENTERLINE PLOT PLOT NO._______COMPANY: ESSGROUP PLANT: EGCO cogenerationMACHINE TRAIN: Steam turbine JOB REFERENCE: Steam turbine
POINT: Channel 7POINT: Channel 8
45 Left45 Right
REF: -8.84 Volts REF: -9.84 Volts
MACHINE: MachineFrom 23JUL2013 17:29:25.3 To 23JUL2013 18:26:01.4 Startup
20 micro m /div
-100
0
100
200
300
-200 -100 0 100 200
(not orbit or polar plot) UP
00(0, 0)
COMMENTS
BENTLYNEVADA
R
NDE-1
DE-1
DE-2
NDE-2
16 microns
4 microns
Notice. Sensor orientation 45°set up is not available, these images are attempted to rotate 45°.
DE-1 & NDE-1 Vibration signal was band pass filtered 40-300 Hz, while 1X is 96 Hz
DE-2 & NDE-2 Vibration signal was band pass filtered 40-300 Hz, while 1X is 96 Hz
Orbit plots are not subtracted slow roll. Only Band pass filter 40-300 Hz for DE-1 & NDE-1, and 40-200 Hz for DE-2 & NDE-2 Orbit group DE-1& NDE-1 and DE-2 & NDE-2 are not scale.