Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
USA15
condenser
buffer
storage tank
USA15, ST/CV local
Piping from USA to thedistribution racks
Services fromdistribution racks to PP2
PP2 to the detector
Distribution racks
UX15
Si Tracker
Liquid line
Vapor line
PP2
CONTENTSCONTENTS
•Overall statusOverall status
•Cooling plant in USA15Cooling plant in USA15
•Control unit in USA15Control unit in USA15
•Distribution racks in UX15Distribution racks in UX15
•ServicesServices
•Detector loopDetector loop
•ScheduleSchedule
2
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
• System design is almost completeSystem design is almost complete• R&D is finished and main components are qualifiedR&D is finished and main components are qualified• On detector loop manufacture is almost completedOn detector loop manufacture is almost completed• Manufacturing of the distribution racks is ongoingManufacturing of the distribution racks is ongoing• Orders of main components of the cooling plant are ready to Orders of main components of the cooling plant are ready to
be placedbe placed• Some drawings to be approved for installationSome drawings to be approved for installation• Commissioning and testing procedures to be worked out Commissioning and testing procedures to be worked out
Overall statusOverall status
3
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
SCALE 1:1
CERN/TS/CV/DC
Global ArchitectureEvaporative cooling system
Ref. Document ATC-TL-EP-0001
WP: ATLAS COOLING SYSTEM /WU.1 BERRY S.BONNEAU P.
13/10/2004
186.15.501
SIZE: A1
Pneumatic unit - Return - BPRs control- USA 15 -
32 temperature set-points3/2
Distributionvalves
BPR-GroupPixServTop_A
setpoint2 circuits
BPR-GroupPixD_Asetpoint
12 circuits
BPR-GroupPixTop_1,2
setpoint22 circuits
BPR-GroupPixTop_Bsetpoint5 circuits
3/2Distribution
valves
BPR-GroupSCTTop_6,1
setpoint4 circuits
BPR-GroupSCTTop_6,2
setpoint3 circuits
BPR-GroupSCTBot_6,1
setpoint4 circuits
BPR-GroupSCTBot_6,2
setpoint3 circuits
BPR-GroupSDATop_2,8
setpoint14 circuits
Distribution racks- UX 15 -
Distribution racks- UX 15 -ATLAS Detector
(*) H = 65.80 [kJ/kg] assuming pre-expansion liquid at 0°C (sub-cooling with inlet quality = 0.26)and vapor quality = 0.9 at the exit.Note: Barrel SCT 6th layer and SCT End Cap disk 1 and disk 9 replace now the thermal enclosure.
Numbers ofcapillaries per circuit
Number ofcircuits
Nominal powerload [W]
Mass flow percircuit [g/s] (*)
Subtotal nominalpower load [kW]
Basic parameters and cooling capacity of the internal evaporative circuits
44 504 22.2 7.66
56 346.5 19.4 5.27
16 241.5 3.9 3.67
56 220 12.4 3.34
24 110 2.7 1.67
8 220 1.8 3.34
204 62.4 0.95 kg/s
2
3
2
1
1
1
SCT Barrel
SCT EC (3 sectors disk)
SCT EC (2 sectors disk)
Pixel Barrel
Pixel Disk
Pixel opto-boards
TOTAL Pneumatic unit - Inlet - PRs control -USA 15 -
18 flow set-points
Side channelcompressor
Mixed water
Storage tank700 liters
Exhaust
Vacumpump
Pumps unit- USA 15 -
On UPS
Liquid pump +Speed controller
SC32
SC31
NC
NC
NO
NO
PCVB21
PCVB20
MVA21
PVA22
TA21
PVA23PVA24
STR2
Chiller 12kW
CHA
MDP1
MDP2
DN32
STT2
C3F8
PVA25
DN32
DN32
MVA22
PVA25
PVA30
MVA32
MVA33
MVA34
MVA36
MVA37
MVA38
MVA26MVA27PVA111
REV.G113
REV.G112EVA115EVA116
REV.G111
VT1
TT112TT
111PT111
PT112
PVA110
MF10
COP1
PVA131
REV.G133
REV.G132EVA135EVA136
REV.G131
VT3
TT132TT
131PT131
PT132
PVA130
MF30
COP3
PVA121
REV.G123
REV.G122EVA125EVA126
REV.G121
VT2
TT122TT
121PT121
PT122
PVA120
MF20
COP2
OPTION
VT4
TT142COP
4PT141
PT142
TT141
REV.G143
EVA146
MF40
PVA140 PVA141
MVA35
MVA320MVA321
MVA310
MVA311
NCNC
PT32
DN12
DN12
MVA39
PT12
PT22
TT22
Deshydratingunit
DN12
MVA113
MVA123
MVA133
MVA143
HPX2
SCS2
PT26
TT52
Condenser
TT26
STR33
STR34
MVA41….MVA45
CF2
CF1
LFL
EI520
MVA520
MVA521
MVB522
REV.G21
MVB28
REV.G22
EI530
MVA530
MVA531
MVB532
REV.L50
REV.L51
REV.L52
REV.L53
MVA541
EI540
MVA540
REV.L54
REV.L55
MVB542
EI550
MVA550
MVA551
REV.L56
REV.L57
MVB552
PG20
PG10
PG50PT015
BOV1TT
012
TT011
EI38
EI37
EI27 DN32
DN25DN40
DN32
DN32
DN25
DN25DN25
DN25
DN40
DN40
DN40
DN65
DN40
DN25DN50
DN25DN80
DN65
DN12
MVA31
NC
NC
NC
NC
NC
NC
NC
NC
DN40
DN80PVA013
PVA010 PVA012
DN80
DN80
TT005
PT005
NC
NCNC
DN12
MVA014
MVA101
DN12
PG9
MVA102
DN12
VP1
DN15
DN12
Schrader 1/4
Swagelok 6
NW 16
DN15MCVA20CHV20
DN12
DN65
CHV10
EI001
MVA002
MVA001
PG8
PVA001
DN32
EI003
MVA004
MVA003
EI005
MVA006
MVA005
EI007
MVA008
MVA007
DN12
DN80
ATLASUSA15
UX15
C3F8 distribution to Tracker
US15
Q1
Side A
Side C
Y(52,53,54)-3; X1
Y(52,53,54)-2; X7
Y(35,36,37)-25; X1
Y(25,27,29)-24; X7
Q2
Q4Q3
Distribution racks:Details on drawing 186.15.50 and table 3.2
Pixel
PT10
SCT Barrel
PT9
SCT Disk A
PT8
SCT Disk C
PT7
PT1
TT1
Gas heater ....
BPR setpointQuantity: 13
Capilaire 01
Capilaire 02
staves 01 & 02
staves 03 & 04110 VAC
QUADRANT 1Distribution from Rack Level 7 / US side
Standard Circuits - Quantity: 44
PR setpointQuantity 6
PVA1
PT2
PR… BPR…TTheater
TTout
Gas heater ....
BPR setpointQuantity: 4
Capilaire 01
Capilaire 02
staves 01 & 02
staves 03 & 04110 VAC
QUADRANT 1Distribution from Rack Level 7 / US sideThermal enclosure Circuits - Quantity: 6
PR setpointQuantity 3
PVA2
PT3
PR… BPR…TTheater
TTout
EI14
EI15
EI16
EI17
SCT Barrel
PT9
SCT Disk A
PT8
SCT Disk C
PT7
EI15
EI16
EI17
TT2
Pixel
PT10
SCT Barrel
PT9
SCT Disk A
PT8
SCT Disk C
PT7
PT1
TT1
Gas heater ....
BPR setpointQuantity: 13
Capilaire 01
Capilaire 02
staves 01 & 02
staves 03 & 04110 VAC
QUADRANT 2Distribution from Rack Level 7 / USA side
Standard Circuits - Quantity: 46
PR setpointQuantity 6
PVA1
PT2
PR… BPR…TTheater
TTout
Gas heater ....
BPR setpointQuantity: 4
Capilaire 01
Capilaire 02
staves 01 & 02
staves 03 & 04110 VAC
QUADRANT 2Distribution from Rack Level 7 / USA sideThermal enclosure Circuits - Quantity: 5
PR setpointQuantity 3
PVA2
PT3
PR… BPR…TTheater
TTout
EI14
EI15
EI16
EI17
SCT Barrel
PT9
SCT Disk A
PT8
SCT Disk C
PT7
EI15
EI16
EI17
TT2
Pixel
PT10
SCT Barrel
PT9
SCT Disk A
PT8
SCT Disk C
PT7
PT1
TT1
Gas heater ....
BPR setpointQuantity: 13
Capilaire 01
Capilaire 02
staves 01 & 02
staves 03 & 04110 VAC
QUADRANT 3Distribution from Rack Level 1 / USA side
Standard Circuits - Quantity: 45
PR setpointQuantity 6
PVA1
PT2
PR… BPR…TTheater
TTout
Gas heater ....
BPR setpointQuantity: 4
Capilaire 01
Capilaire 02
staves 01 & 02
staves 03 & 04110 VAC
QUADRANT 3Distribution from Rack Level 1 / USA sideThermal enclosure Circuits - Quantity: 6
PR setpointQuantity 3
PVA2
PT3
PR… BPR…TTheater
TTout
EI14
EI15
EI16
EI17
SCT Barrel
PT9
SCT Disk A
PT8
SCT Disk C
PT7
EI15
EI16
EI17
TT2
Pixel
PT10
SCT Barrel
PT9
SCT Disk A
PT8
SCT Disk C
PT7
PT1
TT1
Gas heater ....
BPR setpointQuantity: 13
Capilaire 01
Capilaire 02
staves 01 & 02
staves 03 & 04110 VAC
QUADRANT 4Distribution from Rack Level 1 / US side
Standard Circuits - Quantity: 47
PR setpointQuantity 6
PVA1
PT2
PR… BPR…TTheater
TTout
Gas heater ....
BPR setpointQuantity: 4
Capilaire 01
Capilaire 02
staves 01 & 02
staves 03 & 04110 VAC
QUADRANT 4Distribution from Rack Level 1 / US sideThermal enclosure Circuits - Quantity: 5
PR setpointQuantity 3
PVA2
PT3
PR… BPR…TTheater
TTout
EI14
EI15
EI16
EI17
SCT Barrel
PT9
SCT Disk A
PT8
SCT Disk C
PT7
EI15
EI16
EI17
TT2
3/2Distribution
valves
PR-GroupInPixBotsetpoint
45 circuits
PR-GroupInSCTBot_6
setpoint7 circuits
PR-GroupInSDABot_1
setpoint2 circuits
PR-GroupInSDABot_9
setpoint2 circuits
3/2Distribution
valves
PR-GroupInPixTopsetpoint
43 circuits
PR-GroupInSCTTop_3,4,5
setpoint15 circuits
PR-GroupInSCTTop_6
setpoint7 circuits
PR-GroupInSDATop_2,8
setpoint14 circuits
PR-GroupInSDATop_1
setpoint2 circuits
PR-GroupInSDATop_9
setpoint2 circuits
Vacum linecompress air
15 bar
PressurecontrolVacuum
control
Vacum linecompress air
15 bar
Pressurecontrol Vacuum
control
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
Pneumatic control:Details on drawing 186.15.511 and table 4.1
PR-GroupInSCTBot_3,4,5
setpoint15 circuits
PR-GroupInSDABot_2,8
setpoint14 circuits
PR-GroupInSDCBot_1
setpoint2 circuits
PR-GroupInSDCBot_9
setpoint2 circuits
PR-GroupInSDCTop_2,8
setpoint14 circuits
PR-GroupInSDCTop_1
setpoint2 circuits
PR-GroupInSDCTop_9
setpoint2 circuits
PR-GroupInSDCBot_2,8
setpoint14 circuits
BPR-GroupPixServTop_C
setpoint2 circuits
BPR-GroupPixD_Csetpoint
12 circuits
BPR-GroupPixServBot_A
setpoint2 circuits
BPR-GroupPixBot_1,2
setpoint23 circuits
BPR-GroupPixBot_Bsetpoint6 circuits
BPR-GroupPixServBot_C
setpoint2 circuits
BPR-GroupSCTTop_3
setpoint4 circuits
BPR-GroupSCTTop_4
setpoint5 circuits
BPR-GroupSCTTop_5
setpoint6 circuits
BPR-GroupSCTBot_3setpoint4 circuits
BPR-GroupSCTBot_4setpoint5 circuits
BPR-GroupSCTBot_5setpoint6 circuits
BPR-GroupSDATop_1
setpoint2 circuits
BPR-GroupSDATop_9
setpoint2 circuits
BPR-GroupSDABot_2,8
setpoint14 circuits
BPR-GroupSDABot_1
setpoint2 circuits
BPR-GroupSDABot_9
setpoint2 circuits
BPR-GroupSDCTop_2,8
setpoint14 circuits
BPR-GroupSDCTop_1
setpoint2 circuits
BPR-GroupSDCTop_9
setpoint2 circuits
BPR-GroupSDCBot_2,8
setpoint14 circuits
BPR-GroupSDCBot_1
setpoint2 circuits
BPR-GroupSDCBot_9
setpoint2 circuits
MVA018
MVA019
MVA158
MVA29
System designSystem design
4
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Cooling plant in USA15Cooling plant in USA15
BoosterCompressors
CondenserCompressor
On UPS
Storagetank
Pumps on liquid
Liquid manifold Vapor
manifold
Drawing LHCF31250054
5
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
• Compressors HAUG – Compressors HAUG – (IT-2884/EP/ATL) - We are late due to delay in SR1 plant – Should placed the order for 2nd compressor at the beginning of 2005.
• Booster – Booster – 73 suppliers contacted in the last 2 years. Only 2 positive offers (128 and 271 kCHF) far too expensive.
• Pump on liquid – Pump on liquid – After bad experience with selected supplier we start new survey. Already 5 offers in hand
• Storage tank – Storage tank – Suppliers identified. We have to finalize the design before sending the order.
• Condenser – Condenser – Order ready to be placed• Valves – Valves – Call for tender in the purchasing office• Piping – Piping – We are ready to send out a call for tender• Concrete basement –Concrete basement – Drawing to extract – Contact TS/CE
Cooling plant in USA15Cooling plant in USA15
6
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Control unit in USA15Control unit in USA15
• PLC and Electr. – PLC and Electr. – Review of the last design done. 4 PLCs needed instead of 3. Nothing bought
• Pneumatic – Pneumatic – Order for E->P converters placed – 2/3 pneumatic valves selected. Installation drawing to be done.
• Compressor for 16b air – Compressor for 16b air – To be found• Vacuum – Vacuum – System to be designed
7
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Distribution racks in UX15Distribution racks in UX15Envelop = 1800
600
Liquid lines Ø7053 + 7 spares Ø6mm
140
Ø12/14, 14/16, or 16/18mm
Vapor lines Ø200 53 + 7 spares Ø18mm
PIXEL22+1 BPRs
SCT Barrel8 or 9BPRs
SCT End-Cap A8 BPRs
Securedcircuits
5 or 6 BPRs
SCT End-Cap C8 BPRs
VAPOR SIDE: 53 BPRsLIQUID SIDE: 53 PRs
LIQUID SIDE: 53 PRsVAPOR SIDE: 53 BPRs
brass
brass
Danfosss dryerDCR 0489 - 1"
DN65DN40
DN20
Ø6/4mm
Ø14/16mm
DN40
Ø6/4mm
Ø6/4mm
DN
25 -
PN
10
Basic Specifications:C3F8 flow: 237 [g/s] liquid or 76 [m3/h] vapor at 20°C and 1.4 bar.a.Maximum pressure: 5.5 bar on vapor side and 15 bar on liquid side.Manifold in stainless steel, fluorinated plastic prohibited.All ball valves and relief valves with UHMW packing or Buna N seal.Pressure Regulator: TESCOM series 44-2211-242-1099.Back Pressure Regulator: TESCOM series 26-2310-28-206 or 208.Volume of Liquid C3F8 inside one rack: 4liters
Pneumaticcontrol line
Vacuum
Nitrogen
3 or 4channels
1 channel+ 1 spare
1 channel+ 1 spare
DN25DN25
DN15
DN15
DN25 DN15
DN25DN12Ø14/17.2
DN25
DN40
DN20
DN25
DN12
DN12
DN
65 -
PN10
Ø8/6mm
Ø8/6mm
Ø6/4mm
8
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
• Racks – Frame and piping – Racks – Frame and piping – Construction on-going Specifications in https://edms.cern.ch/document/451597/5
Order DR-01631/TS/ATLAS
• Regulators TESCOM – Regulators TESCOM – 20% purchased – Waiting for this first batch to control the specs.Specifications in https://edms.cern.ch/document/391168/3
• RadHard pressure transmitter – RadHard pressure transmitter – Order placed through Cern Stores (for all ATLAS systems)Specifications in https://edms.cern.ch/document/508665/1
• Valves – Valves – Call for tender in the purchasing office• Pressure test – Pressure test – All fittings ready – Need to clarify where it will be
done.• Inlet and outlet channels –Inlet and outlet channels – Manifolds to be designed and
manufactured
Distribution racks in UX15Distribution racks in UX15
9
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
ServicesServices
Piping in USA15Design completedReady for call for tender
Drawing LHCF31250054
10
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
ServicesServices
Drawing LHCF31250055
Piping in ULX16Design completedReady for call for tender
11
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
ServicesServices
Have to clarify who will do what for the Have to clarify who will do what for the installation of the services:installation of the services:•ATLAS TC CollaborationATLAS TC Collaboration•TS/CV Industrial contractTS/CV Industrial contract
Piping in UX15Design to be finalized and approved before going to tender
12
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Detector loopDetector loopDesignDesign
to DCS (and interlock for the SCT)
to Heater control and
power supply
to interlock and DCS
to BPR
from PR
Temperature sensors on return tube (one of which is redundant)
Temperature sensors on modules
Sensor of the inlet liquid temperature after the HEX (to check efficiency)
Sensors of the vapor temperature after the heater
Heat exchanger
Detector structures
Hea
ter
Filter Capillary
Sensor of the inlet liquid temperature before the HEX (to check efficiency and margin to decrease the pressure)
13
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Detector loopDetector loopHeatersHeaters
• Various prototypes tested• Stable operation:
– up to a power duty cycle of 95%
– with simple On/Off control• Temperatures of heating
element OK (max around 60 °C), far from max limit
• Design mature and ready for final prototype
• pressure drops and occupancy of extrapolated final size OK
14
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Detector loopDetector loopHeat exchangerHeat exchanger
• Design is different for the three sub detectors due to different layout and geometrical constraints
• All countercurrent type• Pixel: parallel type external.
Al inlet and return tubes glued together over 1.5 m. Simple design, possible with small power load
• Barrel SCT: parallel type internal. Two inlet tubes are routed inside the return tube over a length of 1.5 m and parallel to the return tube axis
• EC SCT: inlet tube is coiled in spiral inside the return tube over less than 0.5 m.
15
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Detector loop Detector loop CapillariesCapillaries
• Flow is function of: Dp, length, ID, inlet liquid T (HEX efficiency)
• Flow very sensitive to ID change: need test every capillary during production trimming the length to get the right flow
• Hundreds of data taken, but extrapolation is not easy, so need to check almost every geometry/condition
• Final capillaries for EC SCT are available. 2 IDs: 0.68 – 0.76 mm (we ordered enough quantities of the bigger ID sufficient also for barrel SCT if it will turn out to be correct)
• A test setup is being built to trim the capillaries to length
Pressure drop across against mass flow through capillary (ID=0.65)
P(6m)= 13.423x + 1.0074R2 = 0.9929
P(5m) = 11.48x + 1.7971R2 = 0.9905
P(4m) = 11.793x + 0.3135R2 = 0.9876
P(3m) = 9.6186x + 0.7636R2 = 0.9973
P(2m) = 8.725x + 0.0645R2 = 0.9969
7
8
9
10
11
12
13
14
15
16
0.35 0.55 0.75 0.95 1.15 1.35 1.55 1.75
Mass flow (g/s)
Pres
sure
acr
oss
capi
llary
(bar
)
6m (20)5m (20)4m (20)3m (20)2m (20)Linear (6m (20))Linear (5m (20))Linear (4m (20))Linear (3m (20))Linear (2m (20))
16
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
ScheduleSchedule(extract from Marco Olcese talk – Oxford – 6 Nov.2004
• Distribution racks on platforms to be Distribution racks on platforms to be installed by June 2005installed by June 2005
• Heaters to be ready by September/October Heaters to be ready by September/October 20052005
• System from PP_1 outwards to be ready System from PP_1 outwards to be ready (installed and commissioned) by (installed and commissioned) by beginning 2006beginning 2006
• HEX installed with the detectors (except HEX installed with the detectors (except for pixel)for pixel)
17
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Last…Last…
ATLAS Detector Cooling Work Package
ATLAS Project Document No: Institute Document No. Created: 24/10/2003 Page: 1 of 45
ATC-TL-EP-0001 Modified: 13/10/2004 Rev. No.: 3
Technical Specification
Evaporative Cooling System for ATLAS Inner Detector Silicon Trackers (Pixel and SCT): external part
WORK UNIT 1
EDMS N°391168
Prepared by: BONNEAU Pierre
Checked by:
Approved by:
Distribution List
18
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Last…Last… WU.1 EQUIPMENT LOCATION
Control cubicle: PLC, SSR, Power supply, Inverter, SCADA, …
USA15 - CV local
Pneumatic rack: Electromagnetic valve, E->P converter
USA15 – CV local
Cooling station – evaporative: Compressor/pump, storage tank, pressure / temperature control, primary heat exchanger/condenser, fluid treatment, manifold, valve…
USA15- CV Local
Distribution rack: Manifold, valve, pressure / temperature transmitters
UX15 – platforms 1 and 7 – US and USA
side
SUB
-DE
TE
CT
OR
CO
OL
ING
PL
AN
T
Services (see second table): Piping, pneumatic, cabling between the cooling components
USA15, US15, ULX16, UX15
Detector’s distribution: Manifold / patch panel attached to the sub-detector, subcooling.
UX15 – sub-detector
Detector’s heat exchanger: Heat exchanger on electronic inside the sub-detector, heater, temperature and pressure sensor, ELMB.
UX15 – sub-detector
Power supply For heat exchanger inside sub-detector
USA15 / US 15
SUB
-DE
TE
CT
OR
CO
OLI
NG
SY
STE
M
OU
T O
F W
U.1
DCS: Sub-detector supervision, SCADA, specific transmitter.
USA15
19
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004
P. Bonneau TS/CV/Detector Cooling
Last…Last…
SERVICES FROM / TO
Control cubicle to cooling station Electrical control, analog and digital signals
USA15 / USA15 CV Local
Control cubicle to pneumatic rack Electrical control, analog signals
USA15 / USA15 CV Local
Control cubicle to distribution rack: Analog and digital signals
USA15 / UX15 – platforms 1 and 7 – US and USA side
Pneumatic rack to cooling station: Pneumatic lines.
USA15 / USA15 CV Local
Pneumatic rack to distribution rack: Pneumatic lines.
USA15 CV Local / UX15
Cooling station to distribution rack: Piping.
USA15 / UX15 – platforms 1 and 7 – US and USA side
SUB
-DE
TE
CT
OR
CO
OLI
NG
PL
AN
T
Primary services: Chilled / mixed water to cooling station Nitrogene to cooling station
Control cubicle to detector’s distribution: Analog and digital signals
USA15 / UX15 sub-detector
Control cubicle to detector’s heat exchanger Analog and digital signals
USA15 / UX15 sub-detector
Power supply to detector’s heat exchanger: Power cables
USA15 and US15 / UX15 sub-detector
Distribution rack to detector’s distribution: Piping, patch panels
UX15 – platforms 1 and 7 – US and USA side / UX15 sub-
detector Detector’s distribution to detector’s heat exchanger: Piping, capillary, sub-cooling
UX15 sub-detector / UX15 sub-detector
Detector’s heat exchanger to DCS Analog and digital signals
UX15 sub-detector / USA15
SUB
-DE
TE
CT
OR
CO
OLI
NG
SY
STEM
SUB
-DE
TE
CT
OR
SPE
CIF
IC S
ER
VIC
ES
OU
T O
F W
U.1
Control rack to DCS: TCP/IP connexion.
USA15 / USA15