Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector...

19
1 Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov. P. Bonneau TS/CV/Detector Cooling USA15 condenser buffer stor age tank U SA15,ST/C V local P iping from U SA to the distribution racks S ervices from distribution racks to PP2 PP2 to the detector D istribution racks UX15 Si Tra cker Liquid line Vaporline PP2 CONTENTS CONTENTS Overall status Overall status Cooling plant in Cooling plant in USA15 USA15 Control unit in USA15 Control unit in USA15 Distribution racks in Distribution racks in UX15 UX15 Services Services Detector loop Detector loop Schedule Schedule

description

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling System design

Transcript of Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector...

Page 1: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

1

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

USA15

condenser

buffer

storage tank

USA15, ST/CV local

Piping from USA to thedistribution racks

Services fromdistribution racks to PP2

PP2 to the detector

Distribution racks

UX15

Si Tracker

Liquid line

Vapor line

PP2

CONTENTSCONTENTS

•Overall statusOverall status

•Cooling plant in USA15Cooling plant in USA15

•Control unit in USA15Control unit in USA15

•Distribution racks in UX15Distribution racks in UX15

•ServicesServices

•Detector loopDetector loop

•ScheduleSchedule

Page 2: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

2

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

• System design is almost completeSystem design is almost complete• R&D is finished and main components are qualifiedR&D is finished and main components are qualified• On detector loop manufacture is almost completedOn detector loop manufacture is almost completed• Manufacturing of the distribution racks is ongoingManufacturing of the distribution racks is ongoing• Orders of main components of the cooling plant are ready to Orders of main components of the cooling plant are ready to

be placedbe placed• Some drawings to be approved for installationSome drawings to be approved for installation• Commissioning and testing procedures to be worked out Commissioning and testing procedures to be worked out

Overall statusOverall status

Page 3: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

3

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

SCALE 1:1

CERN/TS/CV/DC

Global ArchitectureEvaporative cooling system

Ref. Document ATC-TL-EP-0001

WP: ATLAS COOLING SYSTEM /WU.1 BERRY S.BONNEAU P.

13/10/2004

186.15.501

SIZE: A1

Pneumatic unit - Return - BPRs control- USA 15 -

32 temperature set-points3/2

Distributionvalves

BPR-GroupPixServTop_A

setpoint2 circuits

BPR-GroupPixD_Asetpoint

12 circuits

BPR-GroupPixTop_1,2

setpoint22 circuits

BPR-GroupPixTop_Bsetpoint5 circuits

3/2Distribution

valves

BPR-GroupSCTTop_6,1

setpoint4 circuits

BPR-GroupSCTTop_6,2

setpoint3 circuits

BPR-GroupSCTBot_6,1

setpoint4 circuits

BPR-GroupSCTBot_6,2

setpoint3 circuits

BPR-GroupSDATop_2,8

setpoint14 circuits

Distribution racks- UX 15 -

Distribution racks- UX 15 -ATLAS Detector

(*) H = 65.80 [kJ/kg] assuming pre-expansion liquid at 0°C (sub-cooling with inlet quality = 0.26)and vapor quality = 0.9 at the exit.Note: Barrel SCT 6th layer and SCT End Cap disk 1 and disk 9 replace now the thermal enclosure.

Numbers ofcapillaries per circuit

Number ofcircuits

Nominal powerload [W]

Mass flow percircuit [g/s] (*)

Subtotal nominalpower load [kW]

Basic parameters and cooling capacity of the internal evaporative circuits

44 504 22.2 7.66

56 346.5 19.4 5.27

16 241.5 3.9 3.67

56 220 12.4 3.34

24 110 2.7 1.67

8 220 1.8 3.34

204 62.4 0.95 kg/s

2

3

2

1

1

1

SCT Barrel

SCT EC (3 sectors disk)

SCT EC (2 sectors disk)

Pixel Barrel

Pixel Disk

Pixel opto-boards

TOTAL Pneumatic unit - Inlet - PRs control -USA 15 -

18 flow set-points

Side channelcompressor

Mixed water

Storage tank700 liters

Exhaust

Vacumpump

Pumps unit- USA 15 -

On UPS

Liquid pump +Speed controller

SC32

SC31

NC

NC

NO

NO

PCVB21

PCVB20

MVA21

PVA22

TA21

PVA23PVA24

STR2

Chiller 12kW

CHA

MDP1

MDP2

DN32

STT2

C3F8

PVA25

DN32

DN32

MVA22

PVA25

PVA30

MVA32

MVA33

MVA34

MVA36

MVA37

MVA38

MVA26MVA27PVA111

REV.G113

REV.G112EVA115EVA116

REV.G111

VT1

TT112TT

111PT111

PT112

PVA110

MF10

COP1

PVA131

REV.G133

REV.G132EVA135EVA136

REV.G131

VT3

TT132TT

131PT131

PT132

PVA130

MF30

COP3

PVA121

REV.G123

REV.G122EVA125EVA126

REV.G121

VT2

TT122TT

121PT121

PT122

PVA120

MF20

COP2

OPTION

VT4

TT142COP

4PT141

PT142

TT141

REV.G143

EVA146

MF40

PVA140 PVA141

MVA35

MVA320MVA321

MVA310

MVA311

NCNC

PT32

DN12

DN12

MVA39

PT12

PT22

TT22

Deshydratingunit

DN12

MVA113

MVA123

MVA133

MVA143

HPX2

SCS2

PT26

TT52

Condenser

TT26

STR33

STR34

MVA41….MVA45

CF2

CF1

LFL

EI520

MVA520

MVA521

MVB522

REV.G21

MVB28

REV.G22

EI530

MVA530

MVA531

MVB532

REV.L50

REV.L51

REV.L52

REV.L53

MVA541

EI540

MVA540

REV.L54

REV.L55

MVB542

EI550

MVA550

MVA551

REV.L56

REV.L57

MVB552

PG20

PG10

PG50PT015

BOV1TT

012

TT011

EI38

EI37

EI27 DN32

DN25DN40

DN32

DN32

DN25

DN25DN25

DN25

DN40

DN40

DN40

DN65

DN40

DN25DN50

DN25DN80

DN65

DN12

MVA31

NC

NC

NC

NC

NC

NC

NC

NC

DN40

DN80PVA013

PVA010 PVA012

DN80

DN80

TT005

PT005

NC

NCNC

DN12

MVA014

MVA101

DN12

PG9

MVA102

DN12

VP1

DN15

DN12

Schrader 1/4

Swagelok 6

NW 16

DN15MCVA20CHV20

DN12

DN65

CHV10

EI001

MVA002

MVA001

PG8

PVA001

DN32

EI003

MVA004

MVA003

EI005

MVA006

MVA005

EI007

MVA008

MVA007

DN12

DN80

ATLASUSA15

UX15

C3F8 distribution to Tracker

US15

Q1

Side A

Side C

Y(52,53,54)-3; X1

Y(52,53,54)-2; X7

Y(35,36,37)-25; X1

Y(25,27,29)-24; X7

Q2

Q4Q3

Distribution racks:Details on drawing 186.15.50 and table 3.2

Pixel

PT10

SCT Barrel

PT9

SCT Disk A

PT8

SCT Disk C

PT7

PT1

TT1

Gas heater ....

BPR setpointQuantity: 13

Capilaire 01

Capilaire 02

staves 01 & 02

staves 03 & 04110 VAC

QUADRANT 1Distribution from Rack Level 7 / US side

Standard Circuits - Quantity: 44

PR setpointQuantity 6

PVA1

PT2

PR… BPR…TTheater

TTout

Gas heater ....

BPR setpointQuantity: 4

Capilaire 01

Capilaire 02

staves 01 & 02

staves 03 & 04110 VAC

QUADRANT 1Distribution from Rack Level 7 / US sideThermal enclosure Circuits - Quantity: 6

PR setpointQuantity 3

PVA2

PT3

PR… BPR…TTheater

TTout

EI14

EI15

EI16

EI17

SCT Barrel

PT9

SCT Disk A

PT8

SCT Disk C

PT7

EI15

EI16

EI17

TT2

Pixel

PT10

SCT Barrel

PT9

SCT Disk A

PT8

SCT Disk C

PT7

PT1

TT1

Gas heater ....

BPR setpointQuantity: 13

Capilaire 01

Capilaire 02

staves 01 & 02

staves 03 & 04110 VAC

QUADRANT 2Distribution from Rack Level 7 / USA side

Standard Circuits - Quantity: 46

PR setpointQuantity 6

PVA1

PT2

PR… BPR…TTheater

TTout

Gas heater ....

BPR setpointQuantity: 4

Capilaire 01

Capilaire 02

staves 01 & 02

staves 03 & 04110 VAC

QUADRANT 2Distribution from Rack Level 7 / USA sideThermal enclosure Circuits - Quantity: 5

PR setpointQuantity 3

PVA2

PT3

PR… BPR…TTheater

TTout

EI14

EI15

EI16

EI17

SCT Barrel

PT9

SCT Disk A

PT8

SCT Disk C

PT7

EI15

EI16

EI17

TT2

Pixel

PT10

SCT Barrel

PT9

SCT Disk A

PT8

SCT Disk C

PT7

PT1

TT1

Gas heater ....

BPR setpointQuantity: 13

Capilaire 01

Capilaire 02

staves 01 & 02

staves 03 & 04110 VAC

QUADRANT 3Distribution from Rack Level 1 / USA side

Standard Circuits - Quantity: 45

PR setpointQuantity 6

PVA1

PT2

PR… BPR…TTheater

TTout

Gas heater ....

BPR setpointQuantity: 4

Capilaire 01

Capilaire 02

staves 01 & 02

staves 03 & 04110 VAC

QUADRANT 3Distribution from Rack Level 1 / USA sideThermal enclosure Circuits - Quantity: 6

PR setpointQuantity 3

PVA2

PT3

PR… BPR…TTheater

TTout

EI14

EI15

EI16

EI17

SCT Barrel

PT9

SCT Disk A

PT8

SCT Disk C

PT7

EI15

EI16

EI17

TT2

Pixel

PT10

SCT Barrel

PT9

SCT Disk A

PT8

SCT Disk C

PT7

PT1

TT1

Gas heater ....

BPR setpointQuantity: 13

Capilaire 01

Capilaire 02

staves 01 & 02

staves 03 & 04110 VAC

QUADRANT 4Distribution from Rack Level 1 / US side

Standard Circuits - Quantity: 47

PR setpointQuantity 6

PVA1

PT2

PR… BPR…TTheater

TTout

Gas heater ....

BPR setpointQuantity: 4

Capilaire 01

Capilaire 02

staves 01 & 02

staves 03 & 04110 VAC

QUADRANT 4Distribution from Rack Level 1 / US sideThermal enclosure Circuits - Quantity: 5

PR setpointQuantity 3

PVA2

PT3

PR… BPR…TTheater

TTout

EI14

EI15

EI16

EI17

SCT Barrel

PT9

SCT Disk A

PT8

SCT Disk C

PT7

EI15

EI16

EI17

TT2

3/2Distribution

valves

PR-GroupInPixBotsetpoint

45 circuits

PR-GroupInSCTBot_6

setpoint7 circuits

PR-GroupInSDABot_1

setpoint2 circuits

PR-GroupInSDABot_9

setpoint2 circuits

3/2Distribution

valves

PR-GroupInPixTopsetpoint

43 circuits

PR-GroupInSCTTop_3,4,5

setpoint15 circuits

PR-GroupInSCTTop_6

setpoint7 circuits

PR-GroupInSDATop_2,8

setpoint14 circuits

PR-GroupInSDATop_1

setpoint2 circuits

PR-GroupInSDATop_9

setpoint2 circuits

Vacum linecompress air

15 bar

PressurecontrolVacuum

control

Vacum linecompress air

15 bar

Pressurecontrol Vacuum

control

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

IP

Pneumatic control:Details on drawing 186.15.511 and table 4.1

PR-GroupInSCTBot_3,4,5

setpoint15 circuits

PR-GroupInSDABot_2,8

setpoint14 circuits

PR-GroupInSDCBot_1

setpoint2 circuits

PR-GroupInSDCBot_9

setpoint2 circuits

PR-GroupInSDCTop_2,8

setpoint14 circuits

PR-GroupInSDCTop_1

setpoint2 circuits

PR-GroupInSDCTop_9

setpoint2 circuits

PR-GroupInSDCBot_2,8

setpoint14 circuits

BPR-GroupPixServTop_C

setpoint2 circuits

BPR-GroupPixD_Csetpoint

12 circuits

BPR-GroupPixServBot_A

setpoint2 circuits

BPR-GroupPixBot_1,2

setpoint23 circuits

BPR-GroupPixBot_Bsetpoint6 circuits

BPR-GroupPixServBot_C

setpoint2 circuits

BPR-GroupSCTTop_3

setpoint4 circuits

BPR-GroupSCTTop_4

setpoint5 circuits

BPR-GroupSCTTop_5

setpoint6 circuits

BPR-GroupSCTBot_3setpoint4 circuits

BPR-GroupSCTBot_4setpoint5 circuits

BPR-GroupSCTBot_5setpoint6 circuits

BPR-GroupSDATop_1

setpoint2 circuits

BPR-GroupSDATop_9

setpoint2 circuits

BPR-GroupSDABot_2,8

setpoint14 circuits

BPR-GroupSDABot_1

setpoint2 circuits

BPR-GroupSDABot_9

setpoint2 circuits

BPR-GroupSDCTop_2,8

setpoint14 circuits

BPR-GroupSDCTop_1

setpoint2 circuits

BPR-GroupSDCTop_9

setpoint2 circuits

BPR-GroupSDCBot_2,8

setpoint14 circuits

BPR-GroupSDCBot_1

setpoint2 circuits

BPR-GroupSDCBot_9

setpoint2 circuits

MVA018

MVA019

MVA158

MVA29

System designSystem design

Page 4: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

4

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Cooling plant in USA15Cooling plant in USA15

BoosterCompressors

CondenserCompressor

On UPS

Storagetank

Pumps on liquid

Liquid manifold Vapor

manifold

Drawing LHCF31250054

Page 5: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

5

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

• Compressors HAUG – Compressors HAUG – (IT-2884/EP/ATL) - We are late due to delay in SR1 plant – Should placed the order for 2nd compressor at the beginning of 2005.

• Booster – Booster – 73 suppliers contacted in the last 2 years. Only 2 positive offers (128 and 271 kCHF) far too expensive.

• Pump on liquid – Pump on liquid – After bad experience with selected supplier we start new survey. Already 5 offers in hand

• Storage tank – Storage tank – Suppliers identified. We have to finalize the design before sending the order.

• Condenser – Condenser – Order ready to be placed• Valves – Valves – Call for tender in the purchasing office• Piping – Piping – We are ready to send out a call for tender• Concrete basement –Concrete basement – Drawing to extract – Contact TS/CE

Cooling plant in USA15Cooling plant in USA15

Page 6: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

6

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Control unit in USA15Control unit in USA15

• PLC and Electr. – PLC and Electr. – Review of the last design done. 4 PLCs needed instead of 3. Nothing bought

• Pneumatic – Pneumatic – Order for E->P converters placed – 2/3 pneumatic valves selected. Installation drawing to be done.

• Compressor for 16b air – Compressor for 16b air – To be found• Vacuum – Vacuum – System to be designed

Page 7: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

7

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Distribution racks in UX15Distribution racks in UX15Envelop = 1800

600

Liquid lines Ø7053 + 7 spares Ø6mm

140

Ø12/14, 14/16, or 16/18mm

Vapor lines Ø200 53 + 7 spares Ø18mm

PIXEL22+1 BPRs

SCT Barrel8 or 9BPRs

SCT End-Cap A8 BPRs

Securedcircuits

5 or 6 BPRs

SCT End-Cap C8 BPRs

VAPOR SIDE: 53 BPRsLIQUID SIDE: 53 PRs

LIQUID SIDE: 53 PRsVAPOR SIDE: 53 BPRs

brass

brass

Danfosss dryerDCR 0489 - 1"

DN65DN40

DN20

Ø6/4mm

Ø14/16mm

DN40

Ø6/4mm

Ø6/4mm

DN

25 -

PN

10

Basic Specifications:C3F8 flow: 237 [g/s] liquid or 76 [m3/h] vapor at 20°C and 1.4 bar.a.Maximum pressure: 5.5 bar on vapor side and 15 bar on liquid side.Manifold in stainless steel, fluorinated plastic prohibited.All ball valves and relief valves with UHMW packing or Buna N seal.Pressure Regulator: TESCOM series 44-2211-242-1099.Back Pressure Regulator: TESCOM series 26-2310-28-206 or 208.Volume of Liquid C3F8 inside one rack: 4liters

Pneumaticcontrol line

Vacuum

Nitrogen

3 or 4channels

1 channel+ 1 spare

1 channel+ 1 spare

DN25DN25

DN15

DN15

DN25 DN15

DN25DN12Ø14/17.2

DN25

DN40

DN20

DN25

DN12

DN12

DN

65 -

PN10

Ø8/6mm

Ø8/6mm

Ø6/4mm

Page 8: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

8

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

• Racks – Frame and piping – Racks – Frame and piping – Construction on-going Specifications in https://edms.cern.ch/document/451597/5

Order DR-01631/TS/ATLAS

• Regulators TESCOM – Regulators TESCOM – 20% purchased – Waiting for this first batch to control the specs.Specifications in https://edms.cern.ch/document/391168/3

• RadHard pressure transmitter – RadHard pressure transmitter – Order placed through Cern Stores (for all ATLAS systems)Specifications in https://edms.cern.ch/document/508665/1

• Valves – Valves – Call for tender in the purchasing office• Pressure test – Pressure test – All fittings ready – Need to clarify where it will be

done.• Inlet and outlet channels –Inlet and outlet channels – Manifolds to be designed and

manufactured

Distribution racks in UX15Distribution racks in UX15

Page 9: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

9

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

ServicesServices

Piping in USA15Design completedReady for call for tender

Drawing LHCF31250054

Page 10: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

10

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

ServicesServices

Drawing LHCF31250055

Piping in ULX16Design completedReady for call for tender

Page 11: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

11

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

ServicesServices

Have to clarify who will do what for the Have to clarify who will do what for the installation of the services:installation of the services:•ATLAS TC CollaborationATLAS TC Collaboration•TS/CV Industrial contractTS/CV Industrial contract

Piping in UX15Design to be finalized and approved before going to tender

Page 12: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

12

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Detector loopDetector loopDesignDesign

to DCS (and interlock for the SCT)

to Heater control and

power supply

to interlock and DCS

to BPR

from PR

Temperature sensors on return tube (one of which is redundant)

Temperature sensors on modules

Sensor of the inlet liquid temperature after the HEX (to check efficiency)

Sensors of the vapor temperature after the heater

Heat exchanger

Detector structures

Hea

ter

Filter Capillary

Sensor of the inlet liquid temperature before the HEX (to check efficiency and margin to decrease the pressure)

Page 13: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

13

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Detector loopDetector loopHeatersHeaters

• Various prototypes tested• Stable operation:

– up to a power duty cycle of 95%

– with simple On/Off control• Temperatures of heating

element OK (max around 60 °C), far from max limit

• Design mature and ready for final prototype

• pressure drops and occupancy of extrapolated final size OK

Page 14: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

14

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Detector loopDetector loopHeat exchangerHeat exchanger

• Design is different for the three sub detectors due to different layout and geometrical constraints

• All countercurrent type• Pixel: parallel type external.

Al inlet and return tubes glued together over 1.5 m. Simple design, possible with small power load

• Barrel SCT: parallel type internal. Two inlet tubes are routed inside the return tube over a length of 1.5 m and parallel to the return tube axis

• EC SCT: inlet tube is coiled in spiral inside the return tube over less than 0.5 m.

Page 15: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

15

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Detector loop Detector loop CapillariesCapillaries

• Flow is function of: Dp, length, ID, inlet liquid T (HEX efficiency)

• Flow very sensitive to ID change: need test every capillary during production trimming the length to get the right flow

• Hundreds of data taken, but extrapolation is not easy, so need to check almost every geometry/condition

• Final capillaries for EC SCT are available. 2 IDs: 0.68 – 0.76 mm (we ordered enough quantities of the bigger ID sufficient also for barrel SCT if it will turn out to be correct)

• A test setup is being built to trim the capillaries to length

Pressure drop across against mass flow through capillary (ID=0.65)

P(6m)= 13.423x + 1.0074R2 = 0.9929

P(5m) = 11.48x + 1.7971R2 = 0.9905

P(4m) = 11.793x + 0.3135R2 = 0.9876

P(3m) = 9.6186x + 0.7636R2 = 0.9973

P(2m) = 8.725x + 0.0645R2 = 0.9969

7

8

9

10

11

12

13

14

15

16

0.35 0.55 0.75 0.95 1.15 1.35 1.55 1.75

Mass flow (g/s)

Pres

sure

acr

oss

capi

llary

(bar

)

6m (20)5m (20)4m (20)3m (20)2m (20)Linear (6m (20))Linear (5m (20))Linear (4m (20))Linear (3m (20))Linear (2m (20))

Page 16: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

16

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

ScheduleSchedule(extract from Marco Olcese talk – Oxford – 6 Nov.2004

• Distribution racks on platforms to be Distribution racks on platforms to be installed by June 2005installed by June 2005

• Heaters to be ready by September/October Heaters to be ready by September/October 20052005

• System from PP_1 outwards to be ready System from PP_1 outwards to be ready (installed and commissioned) by (installed and commissioned) by beginning 2006beginning 2006

• HEX installed with the detectors (except HEX installed with the detectors (except for pixel)for pixel)

Page 17: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

17

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Last…Last…

ATLAS Detector Cooling Work Package

ATLAS Project Document No: Institute Document No. Created: 24/10/2003 Page: 1 of 45

ATC-TL-EP-0001 Modified: 13/10/2004 Rev. No.: 3

Technical Specification

Evaporative Cooling System for ATLAS Inner Detector Silicon Trackers (Pixel and SCT): external part

WORK UNIT 1

EDMS N°391168

Prepared by: BONNEAU Pierre

Checked by:

Approved by:

Distribution List

Page 18: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

18

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Last…Last… WU.1 EQUIPMENT LOCATION

Control cubicle: PLC, SSR, Power supply, Inverter, SCADA, …

USA15 - CV local

Pneumatic rack: Electromagnetic valve, E->P converter

USA15 – CV local

Cooling station – evaporative: Compressor/pump, storage tank, pressure / temperature control, primary heat exchanger/condenser, fluid treatment, manifold, valve…

USA15- CV Local

Distribution rack: Manifold, valve, pressure / temperature transmitters

UX15 – platforms 1 and 7 – US and USA

side

SUB

-DE

TE

CT

OR

CO

OL

ING

PL

AN

T

Services (see second table): Piping, pneumatic, cabling between the cooling components

USA15, US15, ULX16, UX15

Detector’s distribution: Manifold / patch panel attached to the sub-detector, subcooling.

UX15 – sub-detector

Detector’s heat exchanger: Heat exchanger on electronic inside the sub-detector, heater, temperature and pressure sensor, ELMB.

UX15 – sub-detector

Power supply For heat exchanger inside sub-detector

USA15 / US 15

SUB

-DE

TE

CT

OR

CO

OLI

NG

SY

STE

M

OU

T O

F W

U.1

DCS: Sub-detector supervision, SCADA, specific transmitter.

USA15

Page 19: Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004 1 P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.

19

Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov.2004

P. Bonneau TS/CV/Detector Cooling

Last…Last…

SERVICES FROM / TO

Control cubicle to cooling station Electrical control, analog and digital signals

USA15 / USA15 CV Local

Control cubicle to pneumatic rack Electrical control, analog signals

USA15 / USA15 CV Local

Control cubicle to distribution rack: Analog and digital signals

USA15 / UX15 – platforms 1 and 7 – US and USA side

Pneumatic rack to cooling station: Pneumatic lines.

USA15 / USA15 CV Local

Pneumatic rack to distribution rack: Pneumatic lines.

USA15 CV Local / UX15

Cooling station to distribution rack: Piping.

USA15 / UX15 – platforms 1 and 7 – US and USA side

SUB

-DE

TE

CT

OR

CO

OLI

NG

PL

AN

T

Primary services: Chilled / mixed water to cooling station Nitrogene to cooling station

Control cubicle to detector’s distribution: Analog and digital signals

USA15 / UX15 sub-detector

Control cubicle to detector’s heat exchanger Analog and digital signals

USA15 / UX15 sub-detector

Power supply to detector’s heat exchanger: Power cables

USA15 and US15 / UX15 sub-detector

Distribution rack to detector’s distribution: Piping, patch panels

UX15 – platforms 1 and 7 – US and USA side / UX15 sub-

detector Detector’s distribution to detector’s heat exchanger: Piping, capillary, sub-cooling

UX15 sub-detector / UX15 sub-detector

Detector’s heat exchanger to DCS Analog and digital signals

UX15 sub-detector / USA15

SUB

-DE

TE

CT

OR

CO

OLI

NG

SY

STEM

SUB

-DE

TE

CT

OR

SPE

CIF

IC S

ER

VIC

ES

OU

T O

F W

U.1

Control rack to DCS: TCP/IP connexion.

USA15 / USA15