Status of the Advanced LIGO PSL development
LSC Virgo meeting, Caltech, March 2008
LIGO G080143-00-Z
Benno Willke
for the PSL team
![Page 2: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/2.jpg)
2
Advanced LIGO prestabilized laser
mediumpowerstage
highpowerstage
NPRO
referencecavity
AOM
pre-modecleaner
to interferometer
![Page 3: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/3.jpg)
3
Innolight Mephisto
all 8 Master lasers (2W NPROs) are delivered
they have a special interface and specially selected LDs
characterization program power, slope, power in p-pol RIN:
noise spectrum 1Hz – 100kHz, time series (60min) rms
frequency noise spectrum 1Hz – 100kHz upper limit for drift
PZT and slow actuator calibration beam quality
higher order mode content beam pointing
LDs power is de-rated by 30% to increase their lifetime and give headroom for power adjust
![Page 4: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/4.jpg)
4
Advanced LIGO prestabilized laser
mediumpowerstage
highpowerstage
NPRO
referencecavity
AOM
pre-modecleaner
to interferometer
![Page 5: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/5.jpg)
5
PMC design
first prototype fabricated at AEI Finesse 46 / 383 since Jan 2008 operated in
s-pol with 35W injected (60% higher circulating power than in AdvLIGO)
PZT FSR ↔ 140V first resonance @ 10kHz
aluminium spacer to allow for long range thermal actuator
in sealed housing, probably no vacuum required
rf filtering 4dB @9MHz, sufficient to meet
AdvLIGO requirements
![Page 6: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/6.jpg)
6
frequency stabilization
shutter
mediumpowerstage
highpowerstage
NPRO
referencecavity
AOM
spatialfilter
cavity
shutter
variableattenuatorwith powermeter
AOM
EOM FI FI
101
102
103
104
10-2
10-1
100
Frequency (Hz)
Fre
qu
ency
No
ise
(Hz/
Hz1
/2)
![Page 7: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/7.jpg)
7
diagnostic bread board
shutter
mediumpowerstage
highpowerstage
NPRO
referencecavity
AOMPSL internalDiagnostic
spatialfilter
cavity
shutter
variableattenuatorwith powermeter
powermeter
shutter
AOM
EOM FI FI
![Page 8: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/8.jpg)
beam diagnostic tool
Kwee et al, Rev. Sci. Instrum. 78, 073103 (2007)
diagnostic tool to measure power noise (low f and rf) frequency noise higher order mode content beam pointing (differential
wavefront sensing) fully automated
automatic length and alignment control
can switch from lock to scan mode performs complete beam analysis
without human interaction (at night during long term test)
allows fast turn around between laser optimization and characterization
![Page 9: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/9.jpg)
9
NPRO (filtered by a fiber and PMC)
Finesse: 366 ±5higher order mode power: 0.56% ±0.3%
![Page 10: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/10.jpg)
10
Advanced LIGO prestabilized laser
mediumpowerstage
highpowerstage
NPRO
referencecavity
AOM
pre-modecleaner
to interferometer
![Page 11: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/11.jpg)
PSL / IO Table layout
11
real estate on the PSL table is currently negotiated between IO and PSL
layout sketch above will change
PSL table more crowded than in inital LIGO
table size probably just big enough
can DBB be used for IO diagnostic purposes ?
cleanliness, easy access, small number of componets in 180W laser path
![Page 12: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/12.jpg)
12
Advanced LIGO PSL setup
![Page 13: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/13.jpg)
PSL control
13
![Page 14: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/14.jpg)
laser diode room location
14
![Page 15: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/15.jpg)
laser diode room
15
![Page 16: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/16.jpg)
PSL control
16
![Page 17: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/17.jpg)
DBB control with RTLinux/Epics system
17
RTLinux/Epics system was installed at AEI
length and alignment control of ring cavity in DBB via digital control
now used to control FSS
next step: automate lock acqisition for ref. cavity and include PMC
![Page 18: Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008](https://reader036.fdocuments.in/reader036/viewer/2022062301/568159e6550346895dc72f57/html5/thumbnails/18.jpg)
next steps
finalize functional prototype of 180W laser and move to engineering prototype
measure free running noise and actuator transferfunctions to design Pstab loop
continue long term performance measurements and integration test at AEI LIGO provides additional DAC/ADC hardware implement PMC and ISS loop install automation and measure cross couplings between
loops find phase delay in FSS and test different sensing points
PSL preliminary design review in summer
18