Started from the bottom now we're here: assembling a small public library from start to finish
description
Transcript of Started from the bottom now we're here: assembling a small public library from start to finish
![Page 1: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/1.jpg)
Started from the bottom now we're here: assembling a small public library from start to finishBessie Sullivan, Haliburton County Public Library; Sandra Dupret, Fleming College; John Louie, Carr McLean
Photo credit: Fleming College
![Page 2: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/2.jpg)
Started from the bottom now we're here: assembling a small public library from start to finish
The bottom:
•Local Demographics
•Establishing need
•What we had
The assembly:
•Fleming College’s Sustainable Building and Design program
The finish:
•Layout and Design
•Moving the branch
•What we have now
Photo credit: Fleming College
![Page 3: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/3.jpg)
Wilberforce, Ontario
Municipality of Highlands East•~230 km NE of Toronto•1,493 year-round households (19.6% of Haliburton County)•3,249 year-round residents•4,374 private dwellings including seasonal•Average housing price $156,620 (range sub $100,000 to plus $700,000)•Median income $38,491 per household (average $47,161)
x
![Page 4: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/4.jpg)
SOLS Needs Assessment, 2003
“[The Wilberforce branch is a] stand-alone building that was not designed for library services. The building is inaccessible, dark, and cramped.”
![Page 5: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/5.jpg)
ARUPLO Guidelines
What we had
757 square feet
3,200 items
11.5 hours/week
What we should have
2,500 square feet
7,500 items
20 hours/week
Serving a user population of 1,000 – 5,000
![Page 6: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/6.jpg)
Accessibility for Ontarians with Disabilities Act
![Page 7: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/7.jpg)
“When fire trucks wear out you replace them. When libraries wear out you replace them.”
Joan Barton, Highlands East Councillor (Haliburton County Echo, November 27, 2012)
![Page 8: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/8.jpg)
“I am a firm believer that the only way to reduce costs for the Municipality is to build better, more sustainable buildings. Cutting programs and services can only continue for so long.”
Steve Kauffeldt, Highlands East Councillor
![Page 9: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/9.jpg)
“Not only is this building a gathering place, its construction became a community effort.” Bessie Sullivan, CEO/County Librarian HCPL
(Bancroft Weekly, June 24, 2014)
The Library Launchers
Photo credit: The Highlander
Photo credit: The Highlander
![Page 10: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/10.jpg)
“Highlighted in the Haliburton County Public Library’s statement of values is sustainability; this project with Fleming College’s Sustainable Building Design and Construction program fits beautifully into our mandate.”
Bessie Sullivan, CEO/County Librarian HCPL(Media Release, Fleming College, November 28, 2012)
![Page 11: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/11.jpg)
Sustainable Building Design and Construction
![Page 12: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/12.jpg)
What is Fleming College’s Sustainable Building Design and
Construction Program?
The program provides 26 students theoretical and hands-on experience with leading edge sustainable building practice through the actual construction of a full-scale, public building that incorporates the most sustainable options available
The buildings created are open to the public as functional, living examples of sustainable technologies, materials and philosophies in building science.
![Page 13: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/13.jpg)
Our Partnerships
Create functional, high performance, sustainable community buildings
Contribute significant labour to community projects Involve the community in the sustainable building process through education and participation Partner with local trades and suppliers to source all materials
and services locally
We engage in partnerships with municipalgovernments and not-for-profit agencies to:
![Page 14: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/14.jpg)
Curriculum to DO THIS
Intense 20 week Ontario One Year certificate; students are in class 45 hrs/week
Balance of classroom and job site time; 30% classroom and 70% construction site
Team based approach shared by faculty and students
Committed community partner and exciting project able to meet z
sustainable curriculum requirements Leading practitioners to teach, design and lead students through construction Complete a structure that exemplifies leading edge sustainable practices
![Page 15: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/15.jpg)
4C’s Food Bank and Thrift Shop - Haliburton
![Page 16: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/16.jpg)
Kinark Outdoor Living Centre - Carnarvon
![Page 17: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/17.jpg)
R.D. Lawrence Place - Minden
![Page 18: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/18.jpg)
Performing Arts Centre - Madoc
![Page 19: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/19.jpg)
Camp Kawartha Environment Centre at Trent
![Page 20: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/20.jpg)
Habitat for Humanity - Peterborough
![Page 21: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/21.jpg)
Camp Maple Leaf- Pigeon Lake
![Page 22: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/22.jpg)
Abbey Gardens – West Guilford
![Page 23: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/23.jpg)
Wilberforce Branch
![Page 24: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/24.jpg)
Start here:
![Page 25: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/25.jpg)
End here:
![Page 26: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/26.jpg)
So you want to build a library? Where do we start?
Initial discussions between Fleming College and the Municipality of Highlands East
Research involved touring Haliburton County Libraries and meeting with staff for discussions of pros and cons of existing facilities
Staff feedback, client needs, budget allocation and curriculum requirements contributed to the overall design
The design process involved Haliburton County Library CEO Bessie Sullivan, Havencraft Design, Fleming College Sustainable Building faculty and staff– Pat Marcotte, Ali Lam, Chris Lalonde, Ted Brandon, Levitt Goodman Architects, structural engineer Tim Krahn (Building Alternatives) and the Municipality of Highlands East Council
![Page 27: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/27.jpg)
![Page 28: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/28.jpg)
![Page 29: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/29.jpg)
What is a Sustainable Building?
Students are installing the Insulated Concrete Foundation (ICF)
Staining exterior siding using non-toxic finishes.
![Page 30: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/30.jpg)
Locally sourced, sustainable harvested post & beam frame
& timber frame features
![Page 31: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/31.jpg)
External features Passive solar design capturing the sun’s heat in winter and blocking heat in summer Clerestory roof design to allow natural sunlight to reach the entire floor area Structural Insulated Panel (SIP) roofing for highly efficient roof system Galvanized roofing for a cooler temperature roof and rainwater collection Rainwater collection cistern for landscaping/grounds maintenance usage Enviroshake (shingles made of recycled tires & rubber) siding as well as locally sourced board & baton Triple glazed fibreglass windows
Green roof on entry
![Page 32: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/32.jpg)
If these walls could talk…… Straw bale walls with hand applied local, natural clay & lime plaster
Interior wall board (drywall) made from recycled Tetra-paks insulated and resource efficient double stud walls with recycled newsprint (cellulose) insulation
OR
![Page 33: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/33.jpg)
What do we see?
Natural sunlight.
Both locally cut timbers and reclaimed timbers were used in construction.
Natural Marmoleum flooring made of linseed oil.
![Page 34: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/34.jpg)
Fully accessible and barrier free design.
![Page 35: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/35.jpg)
Artistic Features
![Page 36: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/36.jpg)
Usable Space
![Page 37: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/37.jpg)
![Page 38: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/38.jpg)
What’s next?
![Page 39: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/39.jpg)
BCT – Youth in Action Canteen
![Page 40: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/40.jpg)
![Page 41: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/41.jpg)
THANK YOU
Sustainable Building Design and Construction
Ted Brandon, Administrative CoordinatorPatrick Marcotte, Academic Coordinator and FacultyAli Lam, FacultyEric Lewis, Project Manager (current)
Chris Lalonde, Wilberforce Library Project Manager (past)
![Page 42: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/42.jpg)
Finishing touches
• September 2013– Fleming students wrap up their
program.– Local contractors hired to finish
trim, flooring, HVAC, mechanicals, etc.
– Determined that landscaping and paving would need to be completed in spring 2014.
• December 2013– Community survey to determine
new and expanded hours for new branch.
• February 2014– First batch of Carr McLean
furnishings arrived and assembled.
September 2013 – February 2014
![Page 43: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/43.jpg)
Layout and DesignCarr McLean's initial involvement in furnishing the Wilberforce Library started in July 2013. Tender was submitted based on the product descriptions and layout provided within the tender.
![Page 44: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/44.jpg)
Layout and Design
![Page 45: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/45.jpg)
Layout and Design
1. Circulation desk and or Information desk
2. Shelving
3. Tables and chairs for reading and computer areas
4. Children's area
5. Lounge seating
6. Display
Although the form and function of library spaces continue to evolve, all libraries of any scale still have commonalities with respect to furnishings.
![Page 46: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/46.jpg)
Layout and Design
![Page 47: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/47.jpg)
Layout and Design
3. The as-built site measurements of the library may affect spacing and location of furniture.
4. Accessibility to the actual locations of floor mounted electrical and data outlets may impact the placement of furnishings.
5. The actual locations of windows, window sills, switches, control panels, as well as electrical and data outlets may result in changes to quantity, size and location of shelving.
Typically the actual products supplied will vary from the initial scope of products specified.
1. The initial assessed needs may change.
2. Further discussion of product features and how they function may alter product selection.
![Page 48: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/48.jpg)
Layout and Design
![Page 49: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/49.jpg)
Finishing touches
• March 2014– Ontario Trillium Foundation
Grant awarded, allowing us to purchase additional furnishings.
• April 2014– Snow finally melts and
landscaping commences.• May 2014
– Book moving campaign begins.
• June 2014– Second batch of Carr
McLean furnishings arrives.– Moving into the new branch,
and opening.
March 2014 – June 2014
![Page 50: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/50.jpg)
“It’s getting them [the patrons] involved in a way that’s kind of fun.” Erin Kernohan-Berning, Branch Services Librarian HCPL
(Haliburton County Echo, May 27, 2014)
Wilberforce book moving campaign:
• Borrowed from a similar campaign in Bridgewater, Nova Scotia.
• Patrons were encouraged to check out a bag of books from the old branch and keep them until the new branch opened.
• Patrons returned books to new branch, and all fines were waived for 2 months after opening.
Saw approximately 50% increase in circulation during the campaign.
Photo credit: Haliburton County Echo
![Page 51: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/51.jpg)
Moving the Library
![Page 52: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/52.jpg)
ARUPLO GuidelinesWhat we have now
2,200 square feet
4,000 items
16 hours/week
What we should have
2,500 square feet
7,500 items
20 hours/week
Serving a user population of 1,000 – 5,000
What we had
757 square feet
3,200 items
11.5 hours/week
![Page 53: Started from the bottom now we're here: assembling a small public library from start to finish](https://reader036.fdocuments.in/reader036/viewer/2022070411/5681488d550346895db5a5b3/html5/thumbnails/53.jpg)
“We did it together. It does take a community to build a library. You guys are a part of it, you guys own it. Enjoy.” Dave Burton, Highland’s East Reeve
(The Highlander, June 26, 2014)
Photo credit: The Highlander