STANDARD SUMMARY PROJECT FICHE
1. Basic Information
1.1 CRIS Number: 2003/005-004-01
1.2. Title: Reconstruction of the main road Nr. 4 between Fényeslitke andTiszabezdéd
1.2 Sector: Infrastructure development
1.3 Location: Hungary, Northern Great Plain Region, Szabolcs-Szatmár-BeregCounty
2. Objectives
2.1 Overall Objective:• Economic and social cohesion based on increased business activity in the
Hungarian Ukrainian border region• Increased economic, trade and cultural co-operation in the border region
2.2 Project Purpose:• Safe access to Záhony-Csap border station• Increased throughput of the main road Nr. 4.• Easy access to the Industrial Park in Tuzsér and the biggest railway relay
station and the “Euro Gate” truck terminal, the Logistic and Trade Centre.
2.3 Accession Partnership and NPAA priorityThe project complies with the Accession Partnership’s priorities and NPAAcriteria. Reinforce road transport capacity is one of the AccessionPartnership’s priorities. Expanding the reliability of the Záhony bordercrossing station is an NPAA criteria.
2.4 Contribution to National Development PlanThe objectives of the project reflect the NDP priorities, which are based onsectoral strategies and on the development strategies of the Northern GreatPlain Region. The development of access infrastructures is a key priority in theregion. Improved structures shall contribute to strengthen the economy of theregion and to realise its development potential as envisaged by the other PhareEconomic and Social Cohesion projects.
2.5 Cross Border ImpactThe proposed project will contribute to an easier, faster and safer crossing ofthe Hungarian-Ukrainian border, more intensive bilateral economic and socialrelations as well as a to develop co-operation between companies, institutions,and to increase the number of visitors. The proposed infrastructuredevelopment is in line with the 2nd priority of the Joint Hungarian UkrainianBorder Region Development Strategy (Infrastructure development, bordercrossing development) and within this priority it is consistent with the measure
2
– Development of roads in harmony with the development of EU corridor V.development.
3. Description
3.1 Background and justification:
As a result of measures taken to enhance economic development in the region a“Euro Gate” truck terminal was constructed. It serves the border crossing of120.000- 130.000 trucks a year and consequently several enterprises started tooperate in the region.
The Logistics, Trade and Business Center operates in Záhony and provides theenterprises involved in the east-west trade with business services. It providesoffices, meeting and negotiation rooms as well as exhibition halls. At the momentonly half of the offices are rented by Hungarian and international companies.Another factor aiming at accelerating the development of the region is theindustrial park in Záhony, which is currently under construction. In addition, it isworth noting that this border crossing is particularly important also because of itsrailway relay station, whose capacity is equal to the capacity of the port ofHamburg.The road Nr. 4. goes through Tuzsér - its industrial park is the only one in Hungarywhere the wide trans-Siberian gauge and the standard gauge European railwaysystems come together. The growing activity of the companies requires moretransport both by truck and by train. (Enclosed maps-Annex 9.)
The existing infrastructure places a barrier to possible further development: trafficis slowed down on the access road to the truck terminal and at the border station.Due to the unfavourable cross-section characteristics the access road is obstructingthe passengers’ transit and the freight-traffic.
Reconstruction of this road is essential since the safe accessibility of the borderstation will ensure that the trucks coming from Western Europe could use this roadand will not detour to the North avoiding the region.
The access road to the border station, at its present technical state, is not suitablefor growing international transport. Furthermore, it is not adequate to carry theincreased traffic generated by the border station. Therefore a reconstructionplanned is crucial for the growing traffic needs.
After the implementation of the project the carriageway will be strengthened to11,5 tons load on axle and levelled into the road profile with asphalt between pointof junction of Fényeslitke and point of junction of Tiszabezdéd (between 323+400and 336+580 km sections).
The project complies with the complex logistics development plan that is intendedto improve road transport, accessibility of the industrial park and of the Trade,Logistic and Business Centre.
The reconstruction is in line with the strategic aims of the following documents:• Development strategies of the villages concerned
3
• Development Plan of the County Road and Transport Network (1999)• Settlement Master Plan of Szabolcs-Szatmár-Bereg County (1999)• Szabolcs-Szatmár-Bereg County Development Program (2000)• Ukrainian-Hungarian Border Region Development Strategy (2003)• National Development Plan (2002)
3.2 Linked activities:• In 1995 the bridge linking Hungary with the Ukraine as well as the border
station were reconstructed and enlarged from EU funds in order to raise thelevel of border crossing services for the increased transit traffic.
• Truck terminals were constructed on both sides of the border, in order toprovide full customers services.
• The construction of the by-pass road (which is part of the highway road Nr.3.) for Nyíregyháza in the north of region, will soon begin.
• Reconstruction of the road Nr. 4. between Záhony and Tiszabezdéd which isunder construction. (Project number: HU 0008-06-02)
• The modernisation works of the Chop border post in the Ukrainian side,opposite to Zahony, have been funded under the 1999 Tacis CBCProgramme. The project was completed in September 2002.
• Reconstruction of the road from Chop in the Ukrainian side will be financedby Ukrainian national fund.
3.3 Results:The project will achieve the following result:
• Upgrading 13,18 km of main road Nr. 4., to 11,5 tons load on axle betweenpoint of junction of Fényeslitke and point of junction of Tiszabezdéd.(between 323+400 and 336+580 km sections)
• Easier access to the Záhony border station and to the Logistics, Trade andBusiness Centre and Tuzsér Industrial Park.
• Increased accessibility of the local population and the companies to theUkraine.
3.4 Activities:Upgrading 13,18 km of main road Nr. 4, to 11,5 tons load on axle between point ofjunction of Fényeslitke and point of junction of Tiszabezdéd
3.5 Lessons learned:The Road Management Company of Szabolcs-Szatmár-Bereg County successfullytook part in many projects financed by the PHARE Programme. Experiencesgained during implementation of previous project (HU 0008-06-02) had beenconsidered during project design.
4. Institutional Framework
The engineering tasks during the implementation will be carried out by theSzabolcs-Szatmár-Bereg County State Road Management Public Enterprise. TheMinistry of Economy and Transport Management delegates the right of the
4
ordering party to the Road Management and Co-ordination Directorate1, whichthus becomes the Employer. The Owner will be the Hungarian State.
5. Detailed BudgetM EURO
Phare SupportInvestmentSupport
InstitutionBuilding
Total Phare(=I+IB)
National Co-financing*
IFI* TOTAL
Contract 1 2,0 2,0 0,667 2,667Total 2,0 2,0 0,667 2,667
The project will be jointly co-financed between Phare and government resourcesto be provided by the Ministry of Economics and Transport. The rate of Pharesupport within the total funding will be 75 %, while the Hungarian governmentwill contribute 25 % (tax free). The ratio between the Phare and the nationalamount is binding and has to be applied to the “final contract price”.
6. Implementation Arrangements
6.1. Implementing AgencyThe project will be implemented under the co-ordination and supervision of thePrime Minister Office, whose representative, Lunk Tamás, will be designated asPAO.
The Prime Minister Office – through the National Agency for RegionalDevelopment (1016 Budapest, Gellérthegy u. 30-32) - is responsible for tendering,contracting, implementing and for the administrative and financial tasks.
6.2. TwinningNot applicable.
6.3. Non-standard aspectsThe rules of the PraG will be strictly followed.
6.4. ContractsThe project will be carried out in the framework of one open international workstendering and contracting operation. The contract net value will be 2,667 M EUR.The project will be implemented through 1 open international works tenderincluding 1 LOT. The procedure will be carried out according to the valid rules ofthe PraG.The Phare support will amount 2,0 M EURO the national co financing is0.667 M EURO
7. Implementation Schedule
7.1. Start of tendering/call for proposalsAugust 2003
1The Road Management and Co-ordination Directorate is based at the Ministry of Economics andTransport.
5
7.2. Start of project activityNovember 2003
7.3. Project CompletionJuly 2004
8. Equal OpportunityNot applicable.
9. EnvironmentAn environmental impact report is not required when strengthening public roadsaccording to Government Act Nr.152/1995. (XII.12.). In any case, after theimplementation of the project, since the throughput of the road will increase andthe waiting time at the border station will decrease, the level of noise, vibration anddust pollution will be measured.
10. Rates of returnIn this type of investment the calculation of the financial rates of return is notapplicable, since the project will not generate direct income. In any case, theeconomic internal rate of return is estimated at 14%.
11. Investment criteria
11.1. Catalytic effect:Faster and safer border crossing will improve the transit both on national andinternational level. At the same time easy access to Industrial Park in Tuzsér willassist national and foreign forwarding companies in making their operation in a moreeffective way, and it will accelerate economic development of the border region.
11.2. Co-financing:The Road Management Company of Szabolcs-Szatmár-Bereg County via the RoadManagement and Co-ordination Directorate will provide in total 0,667 M EURO asown contribution to the total project costs.
11.3. Additionality:Financial support provide by Phare will not displace any other funding.
11.4. Project readiness and Size:The plan and the detailed budget needed for the implementation of the project willbe available by 20 May 2003. Working design will be completed by July 2003.
The projects complies with minimum project size requirements. The Phare supportis 2,0 M EURO.
11.5 Sustainability:The economic benefits originated from the road reconstruction will over-compensate the costs of the project.The construction and the technology comply with EU norms and standards. Theproject has not adverse effects on the environment because of the increasedthroughput of the road. However, the level of air pollution, noise, vibration anddust pollution can be measured.After the construction the Road Management Company will take care of permanentmaintenance of the road.
6
11.6. Compliance with state aids provisionsAll actions financed by Phare will be carried out in line with the PraG and willrespect the state aid and competition provision of the Europe Agreement.
11.7. Contribution to National Development PlanThe project is in full compliance with the priorities of the Regional DevelopmentPlan and the priorities of the National Development Plan.
12. Conditionality and sequencingThe project beneficiary provides adequate guarantee of the availability of fundsfor the required co-finance contribution and for the subsequent operation andmaintenance.
7
ANNEXES TO PROJECT FICHE
1. Logical framework matrix in standard format (compulsory)2. Detailed implementation chart (compulsory)3. Contracting and disbursement schedule by quarter for full duration of programme
(including disbursement period) (compulsory)4. Reference to feasibility /pre-feasibility studies. For all investment projects, the
executive summary of the economic and financial appraisals, and the environmentalimpact assessment should be attached (compulsory)
5. Letter of commitment related to the own contribution6. List of relevant Laws and Regulations7. Reference to relevant Government Strategic plans and studies (Institution
Development Plan, Business plans, Sector studies etc)8. Information on the Phare Project HU 0008-06-02 “Road to the East West Gate”9. Maps of the Phare Project HU 0008-06-02 and of the proposed project
“Reconstruction of the main road N.4 between Fényeslitke and Tiszabezdéd” 10. Projects supported by the EU in Szabolcs-Szatmár-Bereg County
ANNEX NO. 1.
Phare log frame
LOGFRAME PLANNING MATRIX FORProject: Reconstruction of the main road Nr. 4 between Fényeslitke and Tiszabezdéd
Program name and number 2003/005-004-01
Contracting period expires 30 Nov 2005 Disbursement period expires30 Nov 2006
Total budget : 2,667 M EURO Phare budget : 2,0 M EURO
Overall objective Objectively verifiable indicators Sources of Verification• Economic and social cohesion based on
increased business activity in the HungarianUkrainian border region.
• Increased economic, trade and cultural cooperation in the border region.
• GDP/capita and employment grows in thecounty.
• Amount of new capital investment in thecounty.
• Number of business start-ups in thecounty.
• Annual data of the Hungarian CentralStatistical Office
• Annual company registry of the Courtof Registration
Project purpose Objectively verifiable indicators Sources of Verification Assumptions• Safe access to Záhony-Csap border station• Increased throughput of the main public road Nr. 4.• Easy access to the Industrial Park in Tuzsér and
the biggest railway relay station and the“Euro Gate” truck terminal, the Logistic andTrade Centre.
• Number of visitors.
• Number of transferred traffic willimprove.
• Annual statistics of the NationalHeadquarter of Customs and Duties
• No negative change in thepolicy of the two countries.
• Developing co-operationbetween Hungary and theUkraine
Results Objectively verifiable indicators Sources of Verification Assumptions• Strengthened 13,18 km of main road Nr. 4., to 11,5 tons load on axle between point of junction of
Fényeslitke and point of junction of Tiszabezdéd,(between 323+400 and 336+580 km sections)
• Easier access to the Záhony border station and tothe Logistics, Trade and Business Centre andTuzsér Industrial Park.
• Increased accessibility of the local population andthe companies to the Ukraine.
•
• Decreased travel time, faster and safeaccess to important destination in bothcountries.
• 13,18 km of road reconstructed by 2004
• Load on axle 11.5 t by 2004
• Interim and final report of Sz-Sz-BCounty Road Management Company
• Favourable business climate.
• Complementary promotionalefforts continue as planned.
Activities Means Assumptions• Road reconstruction: Strengthening of the
carriageway for 13,18 km to 11,5 tons load onaxle and leveled into the road profile with asphalt
• Engineering background is available• 2,0 M EURO PHARE support• 0,667 M EURO National cofinancing
• Normal climatic conditionsduring construction.
9
Preconditions
• The plans and owncontribution will beavailable by 20 May.
• Good quality tenderdocumentation
ANNEX NO. 2.
Detailed implementation chart
Year 2003 2004 2005Month J F M A MJ J A S O N D J F M A MJ J A S O N D J F M A M J J A S
Planning
Tendering andcontracting
Implementation anddisbursement
100%
11
ANNEX NO. 3.
CUMULATIVE CONTRACTING AND DISBURSEMENT SCHEDULE BY QUARTER FOR FULL DURATION OF PROGRAMME (MEUR)*
12/2002 03/2003 06/2003 09/2003 12/2003 03/2004 06/2004 09/2004 12/2004 03/2005 06/2005 09/2005 12/2005Contracting 2,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0 2,0Disbursement 0,5 1,5 2,0 2,0 2,0 2,0 2,0
*Only for Phare support
ANNEX NO. 4
Reference to Feasibility/Pre-feasibility Studies
The project selected for funding under the scheme will be supported by complete plansstudies. All necessary preparatory work and documents of the project are completed andthe necessary document has been sent to VÁTI TFI.
For reconstructing roads Feasibility Studies are not required according to Decree15/2000. (IX. 16.) KÖVIM of the Minister of transport and water management.
Name of the beneficiary: Szabolcs-Szatmár-Bereg Megyei Közútkezelo Kht. (RoadManagement Company of Szabolcs-Szatmár-Bereg County)Address: H-4400 Nyíregyháza, Búza tér 20.Phone: (36) 42 508-790Fax: (36) 42 504-308e-mail: [email protected]
13
ANNEX NO. 5
Letter of commitment related to the own contribution
The Road Management Company of Szabolcs-Szatmár-Bereg County via the RoadManagement and Coordination Directorate will provide in total 0,667 M EURO owncontribution to the total project costs.
14
ANNEX NO. 6
List of relevant laws and regulations
1. Act XXI/1996 on Regional Development and Spacail Planning;
2. Act XCII/1999 amending Act XXI/1996 on Regional Development and SpacialPlanning
3. According to the Act No. 8/1970. (XI.13.) KPM-ÉVM 2.§./2/ the activities outlinedin the authorizing plan documentation are not subject to permission.
4. According to the Government Act No. 152/1995. (XII.12.) an environmental impactreport is not required when strengthening public roads
15
ANNEX NO. 7
Reference to relevant Government Strategic plans and studies (may includeInstitution Development Plan, Business plans, Sector studies etc)
1. National Regional Development Plan.(2002.)
2. Regional Development Strategy and Development Program of Northern Great Plan(2002.)
3. Szabolcs-Szatmár-Bereg County Development Strategy (2000.)
4. Joint Hungarian-Ukrainian Border Region Development Strategy (2002.)
ANNEX NO. 8
The project implementation of “ Road to the East West Gate” (HU 0008-06-02)
The project will be finished by 30 July 2003. The following works has been made/beingmade:
• Construction of the hard shoulder on the left side between 339+845-341+403 kmsections
• Construction of the hard shoulder on the right side between 336+580-339+350 kmsections
• Widening and strengthening of the pavement of the road Nr. 4115 between 0+000-1+958 km sections
• Widening and strengthening of the pavement of the road Nr. 4115 between30+155-30+655 km sections
• Construction of the pavement and reconstruction of the road Baross Gábor• Reconstruction of the junction of the road Nr. 4-4115+4145
At present asphalt works are going on from the 336+580 to the cross border station.
ANNEX NO. 9
Maps of the Phare Project HU 0008-06-02 and of the proposed project “Reconstructionof the main road N.4 between Fényeslitke and Tiszabezdéd”
336+580
Baross Gábor út
30+155
EUROKAPU kamionterminál
Déli bekötöút339+845
1+958Határátkelôhely bôvítés
Hídszélesítés
Mederhíd felújítás341+958
340+705
30+655
Road to the East Weast Gate
Legends:
Hard shoulder on the right side of the main road Nr. 4 between 339+845-341+510 km sections
Truck terminal with junction
Widening of the bridge in Záhony (construction of single carriage way bridges)
Projects realised in 1997:
Realised projects:
Reconstruction of the river bridge in Záhony
Extension of the cross border station
Construction of the southern by-pass road in Záhony
Projects going on in 2002-2003:
Construction of the hard shoulder on the left side of the main road Nr. 4 between 339+845-341+403 km sectionsConstruction of the hard shoulder on the right side of the main road Nr. 4 between 336+580-339+350 km sections
Widening and strengthening of the pavement of the road Nr. 4115 between 30+155-30+655 km sections
Construction of the pavement and reconstruction of the road Baross Gábor
Widening and strengthening of the pavement of the road Nr. 4115 between 0+000-1+958 km sections
Reconstruction of the junction of the roads Nr. 4-4115-4145
0+35
8
0+000
0+130
0+000
0 +20 0
Planned project in 2004:Reconstruction of the road Nr. 4 between Fényeslitke and Tiszabezdéd
18
TI SZA
TISZA
Túr
S za mos
50
55
60
65
70
1555
30
35
40 4510
5
5
2025
30
45
50
5
5
270
10
5
15
15
10
5 30
5
35
40
35
30
5
510
5
55
30
5
35 510
5
40
45
25
55
5
205
10
15
20
255
3035
30
25
20 5
5
1510
15
10
5
10
5
5
15
10
25
20
15
50
15
10
10
5
5
5
5
20
15
10
10
20
25
15
545
70
105
5
40
15
1010
10
10
15
5
35
5
5
25
25
1020
15
30
5
300
295290
2855
10 1520
10
5
5
10
30
5
280
5
2010
10
25
10
10 10
5
5
55
15
15
15
35
5
30
25
5
40 45
520
5305
310
315
10
15
5
5
10
5
15
20
40
35
10
10520
15
25
30
255
5
10
5
10
5
325
330
335
1510
20
15 5
10
5
60
65
10
15
5
5
15
20
5
15
20
10
15
5 10
10
5
70
5
75
5
80
10
15
5
20
25
40
30
35
40
10
40
45
50
15
4550
35
30
5
25
5
3035
25
20
25
320
10
NYÍREGYHÁZA
Nagykálló
Napkor
Bakta-lóránt-háza
Deme- cser
Ibrány
Nagy-halász
Kótaj
Nyírtelek
Ajak
Mándok
VÁSÁROS- NAMÉNY
MÁTÉSZALKA
FEHÉR-GYARMAT
PorcsalmaCsenger- sima
Cse-göldSzamos-
sályiÖköritó- fülpös
Cégény-dányád
Jánkmaj- tis
Gacsály
Tisztaberek
Rozsály
TúrricseCsabolcVámosoroszi
Kisszekeres Nagy- szekeres
Penyige
Géber- jén
Tunyogmatolcs
Ópályi
Jármi
Papos
Nyírmeggyes
Nyírcsaholy
Nyírkáta
Or
Vaja
Hodász
Kántorjánosi
Nyírderzs
Nyírgyulaj
Ófehértó
Pócspetri
Nyírkércs
Nyíribrony
Levelek
Besenyod
Apagy
Sényo
Nyírtét
Magy
Nyírpazony
Kocsord
Szamos- újlak
Botpalád
SonkádKölcse
Túr-istvándi
Kömöro
Nagyar
Kisar
Szatmárcseke
Tiszakóród
Tiszabecs
Milota
Tarpa
Bereg-surányMárok-
papi
Csaroda
Gulács
JándGergelyiugornya
Tákos
Nyír-parasznya
Puszta- dobos
Nagydobos
Szamoskér
Szamos- szeg
Nyírmada
Ilk
Gemzse
Szabolcsbáka
Gyulaháza
Nyírkarász
Laskod
Petneháza
Rohod
Nyírjákó
Nyírtass
Ramocsa- háza
Berkesz
Gégény
Pátroha
Nyírbogdány
Nyírtura
Kemecse
Kék
Vasme- gyer
Tiszarád
Székely
Beszterec
Buj
Paszab
Rétközberencs
AnarcsLövopetri
Olcsva
Olcsvaapáti
Kis-varsányNagyvarsány
Gyüre
PapNyírlövo
Jéke Újkenéz
Tiszake-recseny
Tiszaadony
Barabás
VámosatyaGelénes
Bereg- daróc
TiszaszalkaTiszavid
Aranyosapáti
Fényes- litke
Mezo-ladány
Tornyospálca
Lónya
TiszamogyorósEperjeske
Zsurk
Tiszaszentmárton
Tisza-bezdéd
Komoró
Benk
Mátyus
Hetefe-jércse
Kérsemjén
Panyola
Nábrád
Petofi-tanya
Tisza-csécse
Magosliget
Kis-palád
Fülesd
Nemes borzova
Mánd
KisnaményDarnóZsarolyán
RápoltGyügye
Szamos-angyalos
Császló
Szamos- tatárfalva
Zajta
MéhtelekGarbolc
Kishódos
Nagyhódos
Szamos becs
Felsosima
Oros
Sóstóhegy
Nyírszolos
SÁTORALJA- ÚJHELY
SÁROS-PATAK
Domb-rád
Cigánd
Alsóberecki
Vaj-dácska
Bodrog-halom
Karcsa
Pácin
Tisza-csermely
Tisza-karádGyörgytarló
Tisza-bercel
Nagy-rozvágy
Láca- cséke
Ricse
Rév-leányvár
Zemplénagárd
Záhony
Szabolcs-veres-mart
Tuzsér
KékcseTisza-kanyár
Újdombrád
Tiszatelek
Felso-berecki
Karos
KisrozvágySemjén
Dámóc
Dorkó
Gyortelek
UszkaTivadar
Fülpös-daróc
Hermán-szeg
Gyoröcske
Döge
KISVÁRDA
49331
4127
41138
4114141142
4138
4923
41124
4128
411364146
41334
4142
4138
41139
4137
4136
4143
49336
41122
4922
49333
49332
4918493284917
49128
4915649323
4927
4928
4926
49124
4102
491149158
49154
3531335130
35123
3317
3317
35127
3636
3612738133
38146
36128
36129 36124
3813436132
36121
38144
38314
3834
38147
4101
3829
3823
3827
4102
4103
41102
41105
4105
491534105
4104
4107
41101
413114116
4106
410641324
4116
41323
4118
4120
4118
4119
4117
4117
4118
4132741326
4127
4129
4127
41332
4133
4134
4141
4133
4132
4144
41131
4143
4143
41133
4143
4132
4139
4129
4131
41125
41294130
4127
4126
4113
4125
41117
4132241143
4107
4108 4113
4106
4105
411033833
3831
38316
38263824 38138 38319
38321
3827
3823
38135
38148 3825
38136
38149
38313
3834
38031
38139
41104
4108
4109
4111
41107
4115
4113
4113
3807
3811
3814
3805
381438112
3806
38113
3804
3807
3827
382738137
3814
3814
3834
3832
38323830
3804
3809
381213807
3804
4145
38308
38143 38323
4145
38007
3807
38304
38306
381073808
3811
38312
3821 3823
383438145
381503826
38273828
41118 41116
41154122
4124 4127
41244123
4121
4122
4121
4130741144
38142 38324
411124112
41313
41108
4113 41111
41109
411541308
4915749158
35128
38151
4143
4133541135
4932749335
49337
4136
41329
41331
41134
41125
41318
41317
41316
4109
41315
41106
41301
38325
4145
4108
41314
38106
36135
36136
S Z L OI
V Á K A
38
41
4
471
49
414
4
49
491
37
Cross border station supported by Phare program
“Road to the East West Gate” project HU 0008-06-02
Planned project - Reconstruction of the road Nr. 4 between Fényeslitke and Tiszabezdéd
U
K
RA
J
N
A
19
ANNEX 10
Projects supported by the EU in Szabolcs-Szatmár-Bereg County
• Projects supported by the Phare CBC Hu-Ro 1996 programme
Nr Name of beneficiary Title of Project PHARE(EUR)
Ownresource(EUR)
Together(EUR)
1. The four municipalitiesalong the border
Development concept ofHungarian- Romanianborder region
270 000 90 000 360 000
2. National Headquarters ofCustoms and Excise
Development of bordercrossing at Csengersima,Phase I.
1 295 250 431 750 1 727 000
3. Municipality of Sz-Sz-BCounty
Feasibility Study of agrotechnology innovationcentre in Csenger
18 000 6 000 24 000
Altogether: 1 583 250 527 750 2 111 000
• Projects supported by Phare CBC 1996 Small Project Facility (HU9605-04)
Nr. Name of beneficiary Title of Project Support(EUR)
Ownresources
(EUR)
Together(EUR)
1. Chamber of commerce andindustry Szabolcs-Szatmár-Bereg County, Nyíregyháza
Set up of a BusinessInformation Office bySzabolcs and Satu-MareCounties
10 000 1 000 11 000
2. Municipality of Vállaj Cultural and sportscooperation in Hungarian –Romanian border region
7 852 873 8 725
3. Castle Theatre andArts of Kisvárda
10th Festival of Hungariantheatres beyond the borders
9 800 39 170 48 970
4. PRIMOM Szabolcs-Szatmár-BeregCounty EnterprisePromotion Agency,Nyíregyháza
Business guide 10 000 6 200 16 200
5. Sz-Sz-B CountyDevelopment Agency
Methodology of RegionalDevelopment Strategy
9 000 1 000 10 000
6. Chamber of Commerce andIndustry Szabolcs-Szatmár-Bereg County, Nyíregyháza
Building a businessinformation bridge betweenNagyvárad and Debrecen
7 700 793 8 593
Altogether: 54 352 49 036 103 488
20
• Projects supported by Phare CBC 1997
Name of beneficiary Title of Project Phare(EUR)
Ownresource(EUR)
Together(EUR)
1. Municipality of Szabolcs-Szatmár-Bereg County
Initial phase of theimplementation of territorialplanning and informationsystem
240 000 134 000 374 000
2. Szatmár VidékDevelopment Company
Cross border agro-integrationdevelopment pilot model
286 000 95 000 381 000
3. Ady Endre Grammarand VocationalSchool, Csenger
Cross border cooperation insecondary vocational training
374 000 125 000 499 000
Altogether: 900 000 354 000 1 254 000
• Projects supported by Phare CBC Small Project Facility 1997
Nr. Name of beneficiary Title of Project Grant(EUR)
Ownresources
(EUR)
Together(EUR)
1. Elso NyírségiDevelopmentAssociation
Complex tourismdevelopmentprogramme
10 000 4 400 14 000
2. Castle theatreKisvárda
Festival of Hungarian theatresbeyond the borders
10 000 2 096 12 096
3. Sz-Sz-B CountyDevelopment Agency
Methodology of RegionalDevelopment Strategy
8 500 1 000 9 500
4. PRIMOM Szabolcs-Szatmár-BeregCounty EnterprisePromotion Agency
Business Guide ‘99 10 000 3 600 13 600
5. Szatmár DevelopmentAssociation
4th Szatmár Expo 10 000 7 400 17 400
Altogether: 48 500 18 496 66 596
• Projects supported by Phare CBC Hu-Ro 2000.
Nr. Name of beneficiary Title of project Phare(EUR)
Ownresource(EUR)
Together(EUR)
1. National Headquartersof Customs and Excise
Modernisation of border crossingat Csengersima-Petea Phase II.
2 250 000 5 270 000 7 520 000
Altogether: 2 250 000 5 270 000 7 520 000
21
• Projects supported by PHARE 2000 HU008-02 „Support for transition from training towork”
Nr. Name of beneficiary Title of project Grant(EUR)
Ownresources
(EUR)
Together(EUR)
1. Vasvári Pál PrimarySchool, Tiszavasvári
Development of themodul system trainingprogramme inTiszavasvári
55 052 6 120 61 172
2. Rétközi VocationalSchool and People’sCollege, Kék
Support of successfulinvolvement of the pupils tosecondary schools
95 534 2 015 97 549
3. Nyíregyháza College Competence based trainingprogram for development ofthe personal effectiveness incommunication
39 999 4 445 44 444
4. Nyíregyháza College Competence based specialtraining for backward children
40 000 4 720 44 720
5. Nyíregyháza College Quality management basedtraining for SME-s
21 810 6 800 28 610
6. Nyíregyháza College Competence based training ofPR assistances
40 000 6 000 46 000
7. Nyíregyháza College Competence based practiceorientated IT training
60 000 7 000 67 000
Altogether: 352 395 37 100 389 495
• PHARE 2000. Hu0008-03 „Support for employability and long-term employment of peoplewith multiple disadvantages”
Nr. Name of beneficiary Title of project Grant(EUR)
Ownresource(EUR)
Together(EUR)
1. MTESZ County Office,Nyíregyháza
Family support 187 282 22 520 209 802
Altogether: 187 282 22 520 209 802
PHARE 2001. Hu 0105-02 „Support for handicapped people to access labour market”
Nr. Name of beneficiary Title of project Grant(EUR)
Ownresource(EUR)
Together(EUR)
1. Göllesz Viktor SpecialVocational and PrimarySchool in Nyíregyháza
“Chance for complete life” 380 525 64 092 444 617
Altogether: 380 525 64 092 444 617
22
• PHARE 2001 Hu 0105-03 “Development of entrepreneurial skills in secondary anduniversity education”
Nr. Name of beneficiary Title of project Grant(EUR)
Ownresource(EUR)
Together(EUR)
1. County Teaching , PublicEducation Institute andTraining Centre,Nyíregyháza
Active training for activeknowledge 79 744 8 874 88 618
2.
Nyíregyháza College
Development of teachingmodul of entrepreneurialand economic inNyíregyháza College
99 985 11 112 111 097
3. Regional Human RecourseDevelopment and TrainingCentre, Nyíregyháza
Secondary school teachersfor the feature of SME-s 99 000 11 798 110 798
4. Sipkay Barna Trade,Catering Trade and TourismVocational School,Nyíregyháza
Creative 87 170 10 550 97 720
Altogether 365 899 42 334 408 233
• PHARE 2001. HU0105-07 Infrastructure development
Nr. Name of beneficiary Title of project Grant(EUR)
Ownresource(EUR)
Together(EUR)
1. Municipality of Ibrány-Nagyhalász
Reconstruction of sewagesystem and sewagetreatment plant
2 250 000 2 400 000 4 650 000
Altogether 2 250 000 2 400 000 4 650 000
• Projects supported by PHARE CBC HU-Ro Small Project Facility 2002
Nr. Name of beneficiary Title of project Grant(EUR)
Ownresources
(EUR)
Together(EUR)
1. Sz-Sz-B County NationalRoad Management Company
Upgrading of road betweenNyírbátor-Vállaj
2 115 000 1 500 000 3 615 000
Altogether: 2 115 000 1 500 000 3 615 000