WELCOME & INTRODUCTION WELCOME & INTRODUCTION CHARLIE FLYNN
◦ DIRECTOR, ENERGY EFFICIENCY
JARRETT SIMON◦ MANAGER, PROGRAM IMPLEMENTATION
YOLANDA SLADE/SHEA RICHARDSON◦ PROGRAM MANAGER, STANDARD OFFER
PROGRAMS
ROXANNE MCFARLAND◦ ADMINISTRATION, RESIDENTIAL STANDARD OFFER
PROGRAMS
AGENDAAGENDA
2011 PROGRAM SUMMARY
2012 PROGRAM OVERVIEW
PROGRAM DESCRIPTIONS ˚ RESIDENTIAL
˚ HARD TO REACH
SUPPLIER DIVERSITY
SOP DATABASE
Q&A
DRAWING
LUNCH
2011 PROGRAM 2011 PROGRAM SUMMARYSUMMARY
YTD RESULTS◦6,323 TOTAL INSTALLS◦2,587 TOTAL KW SAVED◦6,242,476 TOTAL KWH SAVED◦$2,191,350 INCENTIVE DOLLARS
EOY GOALS◦3500 KW◦7,000,000 KWH◦$2,750,000 INCENTIVE
2011 PROGRAM 2011 PROGRAM SUMMARYSUMMARY
HTR YTD RESULTS◦ 1650 CUSTOMERS◦ 3563 INSTALLS◦ 1323 KW SAVED◦ 3,045,244 KWH SAVED◦ $1,266,539
INCENTIVES
EOY GOALS◦ 1,790 KW◦ 4,731,000 KWH◦ $1,650,000 INCENTIVE
RES YTD RESULTS◦ 514 CUSTOMERS◦ 1032 INSTALLS◦ 392 KW SAVED◦ 868,025 KWH SAVED◦ $216,959 INCENTIVES
EOY GOALS◦ 1,130 KW◦ 2,826,000 KWH◦ $600,000 INCENTIVE
2012 OVERVIEW 2012 OVERVIEW STANDARD OFFER PROGRAM
˚ FIRST COME / FIRST SERVED INCENTIVE DOLLARS DIVIDED INTO 3 CATEGORIES
INTERNET APPLICATION ONLY
PARTICIPATION LEVELS˚ ONE INCENTIVE BUCKET FOR EACH
CATEGORY RES HTR ASF
STANDARD OFFER PROGRAM STANDARD OFFER PROGRAM CNP PROVIDES A SET INCENTIVE
PAYMENT TO PROJECT SPONSORS FOR EACH KW AND KWH SAVED ◦ PROJECT SPONSORS AGREE TO DELIVER A
STIPULATED AMOUNT OF KW AND KWH SAVINGS◦ ALL PAYMENTS ARE BASED SOLELY UPON KW AND
ANNUAL KWH SAVINGS◦ EMPHASIS PLACED ON PEAK SUMMER DEMAND
SAVINGS◦ MEASURES MUST EXCEED CURRENT FEDERAL
MINIMUM EFFICIENCY STANDARD
PROGRAM ROLES PROGRAM ROLES
PROGRAM ADMINISTRATOR
PROJECT SPONSOR
CUSTOMER
PROGRAM ADMINISTRATOR -PROGRAM ADMINISTRATOR -CENTERPOINT ENERGYCENTERPOINT ENERGY
OVERSEE THAT PROGRAMS FOLLOW PUCT RULES
ADJUST PROGRAM BUDGETS AS NEEDED
REVIEW, APPROVE OR REJECT PROGRAM APPLICATIONS
VERIFY AND INSPECT THAT MEASURES MEET INTENDED PURPOSE
ADMINISTER INCENTIVE DOLLARS
PROJECT SPONSOR PROJECT SPONSOR IDENTIFY PROJECT OPPORTUNITIES
◦ ACCURATELY IDENTIFIES ENERGY EFFICIENCY MEASURES TO BE INSTALLED
◦ MARKETING VERIFY CUSTOMER ELIGIBILITY
◦CUSTOMER IN CNP ELECTRIC SERVICE TERRITORY
◦HTR CUSTOMERS’ ELIGIBILITY VERIFIED ACCORDING TO PUCT-APPROVED PROCEDURES
INSTALL AND DOCUMENT ENERGY SAVINGS
PROJECT SPONSOR PROJECT SPONSOR REQUIREMENTS REQUIREMENTS (CONT.)(CONT.)
PROJECT SPONSORS MUST HAVE:
◦ALL APPROPRIATE LICENSES/CERTIFICATIONS
◦EVIDENCE OF TECHNICAL AND MANAGERIAL CAPABILITIES AND EXPERIENCE
◦EVIDENCE OF FINANCIAL CAPABILITY◦ADEQUATE INSURANCE◦REFERENCES
CUSTOMER CUSTOMER CUSTOMER ELIGIBILITY:
◦RESIDENTIAL CNP ELECTRIC DISTRIBUTION CUSTOMER CUSTOMER MAY PURCHASE ELECTRICITY
FROM ANY SUPPLIER◦MULTI-FAMILY
INDIVIDUALLY METERED UNITS ◦AFFORDABLE SINGLE FAMILY
TARGET LOW INCOME MARKETSIGNS ACKNOWLEDGMENT FORM
CUSTOMER ELIGIBILITYCUSTOMER ELIGIBILITY
HARD-TO-REACH CUSTOMERS ARE DEFINED AS RESIDENTIAL CUSTOMERS WHO HAVE HOUSEHOLD INCOME AT OR BELOW 200% OF FEDERAL POVERTY GUIDELINES.
HARD TO REACH INCOME HARD TO REACH INCOME ELIGIBILITYELIGIBILITY
SIZE OF FAMILY ANNUAL INCOME
1 $21,780
2 $29,420
3 $37,060
4 $44,700
5 $52,340
6 $59,980
7 $67,620
8 $75,260
Each additional person:
$7,640
*INCOME GUIDELINES UPDATED EVERY APRIL
2012 RESIDENTIAL2012 RESIDENTIAL
SINGLE-FAMILY / MANUFACTURED HOMES RETROFIT
NO SHOWERHEADS NO SOLAR SCREENS
MULTI-FAMILYRETROFIT
DEEMED SAVINGSSIMPLIFIED M&VM&V
2012 HARD-TO-REACH 2012 HARD-TO-REACH RETROFITSINGLE-FAMILY / MULTI-FAMILYREQUIRES AN ENVELOPE MEASURE:
˚ AIR INFILTRATION˚ CEILING INSULATION˚ WALL INSULATION˚ FLOOR INSULATION˚ DUCT SEALING
DEEMED SAVINGS ONLYNEW CONSTUCTION
˚ AFFORDABLE SINGLE FAMILY
2012 HARD-TO-REACH 2012 HARD-TO-REACH (CONT.)(CONT.)
IF HOME QUALIFIES FOR ANY ENVELOPE MEASURE; THE FOLLOWING MEASURES ARE ALLOWED:◦SCREW IN CFL’S◦SOLAR SCREENS◦WINDOW A/C’S◦LOW FLOW SHOWERHEADS
HTR HTR COMPREHENSIVENESSCOMPREHENSIVENESS
TESTING◦ PRE & POST TESTING
DUCT EFFICIENCY AIR INFILTRATION
◦ CARBON MONOXIDE HOMES WITH COMBUSTION EQUIPMENT• EQUIPMENT MUST BE ON AND OPERATIONAL IN
ORDER TO COMPLETE ACCEPTABLE CO TEST
AFFORDABLE SINGLE-FAMILY AFFORDABLE SINGLE-FAMILY NEW CONSTRUCTIONNEW CONSTRUCTION
IN ORDER TO QUALIFY, THE HOME MUST:◦ BE CONSTRUCTED TO MEET ENERGY STAR®
STANDARDS, AS CERTIFIED BY A QUALIFIED HOME ENERGY RATER, AND
◦ TARGET POPULATIONS WITH INCOMES AT OR BELOW HTR INCOME GUIDELINES
◦ INCENTIVES ARE BASED ON PER-HOME KW AND KWH SAVINGS ESTIMATES DERIVED FROM CNP’S ENERGY STAR® NEW HOME PROGRAM
AFFORDABLE SINGLE-FAMILY AFFORDABLE SINGLE-FAMILY NEW CONSTRUCTIONNEW CONSTRUCTION
IF CONSTRUCTED UNDER THE FOLLOWING:◦ HABITAT FOR HUMANITY
◦ HOME
◦ CDC
◦ HOUSING TRUST FUNDS (STATE OR LOCAL)
APPLICATION FORMSAPPLICATION FORMS
THE FOLLOWING INFORMATION MUST BE SUBMITTED AS PART OF THE APPLICATION PROCESS:◦ PROJECT SPONSOR INFORMATION ◦ PROJECT DESCRIPTION◦ ESTIMATED IMPACTS◦ MARKETING PLAN◦ PROJECT SPONSOR’S QUALIFICATIONS◦ PROOF OF ADEQUATE INSURANCE◦ REFERENCES
PROGRAM PROCESSPROGRAM PROCESS
APPLICATION MADE BY SPONSORREVIEW BY CNPCOMPLETE WORK MANAGEMENT
SCHEDULE INSTALLATION OF MEASURES BY
SPONSORMEASURES INSPECTED BY
CNP/DESIGNEEPAYMENT MADE TO SPONSOR
PROJECT PROCESSPROJECT PROCESS
PROCESS:◦ SUBMIT SIGNED CONTRACT (IF NECESSARY)
◦ COMPLETE NECESSARY PAPERWORK AND INSURANCE REQUIREMENTS
◦ SET MILESTONE DATES: 25% BY APRIL 5, 2012 50% BY JUNE 5, 2012 75% BY SEPTEMBER 5, 2012
SOP PROGRAM SOP PROGRAM INCENTIVESINCENTIVES
ALL INCENTIVES ARE PAID DIRECTLY TO PROJECT SPONSOR, NOT THE CUSTOMER.
PROJECT SPONSOR IS NOT REQUIRED TO PASS ANY INCENTIVE PAYMENT TO CUSTOMER.
PUCT REQUIRES THAT THE HOST CUSTOMER AGREEMENT DISCLOSE THAT INCENTIVES ARE BEING MADE AVAILABLE TO THE PROJECT SPONSOR “THROUGH A RATEPAYER-FUNDED PROGRAM, MANUFACTURERS, OR OTHER ENTITIES.”
PAYMENT PROCEDURESPAYMENT PROCEDURES PROJECT SPONSORS SHOULD SUBMIT INVOICE
VIA DATABASE BY LAST DAY OF EACH MONTH ◦ MAILED HARD COPIES SHOULD BE
POSTMARKED NO LATER THAN 5TH OF FOLLOWING MONTH
CNP/DESIGNEE WILL INSPECT A RANDOM SAMPLE OF MEASURE INSTALLATIONS. INCENTIVE PAYMENTS MAY BE ADJUSTED BASED ON INSPECTION RESULTS.
FOR DEEMED SAVINGS OPTION, CNP/DESIGNEE PERFORMS INSPECTIONS, AND PAYS WITHIN 45 DAYS, PROVIDING INVOICE IS COMPLETE AND CORRECT.
2011 2011 PROGRAM CONCERNS CONCERNS
SPONSOR MUST HAVE CLEARLY MARKED VEHICLES AND EMPLOYEE IDENTIFICATION
INACCURATE PRE ASSESSMENTS, IE ATTIC INSULATION
NO “DO OVERS”, ALL INSPECTION FINDINGS ARE FINAL
HARRISBURG SERVICE CENTER IS DELIVERY SITE FOR SHOWERHEADS
MISSING 5 DAY WINDOW FOR INVOICE CORRECTIONS
CUSTOMERS NOT ALLOWING CNP INSPECTION TEAM ACCESS TO HOME
CASTING CNP IN A NEGATIVE LIGHT
CONTINUING FOR CONTINUING FOR 20122012
PROGRAM MANUALS ARE AVAILABLE FOR DOWNLOAD VIA INTERNET
PROGRAM OUTLINE AND PRESENTATION ARE AVAILABLE FOR DOWNLOAD VIA INTERNET
COMPLIANCE MEETING WILL BE HELD DECEMBER 15, 2011
CERTIFIED HERS RATER REQUIRED TO IMPLEMENT DUCT AND AIR INFILTRATION MEASURES
CONTINUING FOR 2012CONTINUING FOR 2012EXCESS OF 3 FAILURES FOR SAME
MEASURE WILL RESULT IN SUSPENSION OF FAILED MEASURE UNTIL FURTHER NOTICE◦ INCLUDING SUB-CONTRACTORS
INCENTIVE RATE CHANGES ON SELECTED MEASURES
NEW HOMES BUILT 2002 OR LATER ARE NOT ELIGIBLE FOR INCENTIVE
ENERGY STAR HOMES NOT ELIGIBLE FOR ENVELOPE MEASURES
CHANGES FOR 2012CHANGES FOR 2012 NEW HTR PROGRAM MANAGER: SHEA
RICHARDSON
LARGE & SMALL PROJECT DESIGNATIONS WILL BE ELIMINATED
MONTHLY MINIMUM & MAXIMUM INVOICES◦ HTR - $5,000◦ RES – $2,500
MILESTONES WILL BE ASSESSED ON A QUARTERLY BASIS
CHANGES FOR 2012 CHANGES FOR 2012 (CONT.)(CONT.)
NO FUNDING RESERVATION FOR SPONSORS
PROJECT SPONSORS MAY SUBCONTRACT FOR NO MORE THAN 5 COMPANIES
IF YOUR COMPANY HAS A SUBCONTRACTOR, YOU MAY NOT SUBCONTRACT FOR ANY OTHER COMPANY
ALL INSTALLATIONS MUST BE INVOICED NO LATER THAN 30 DAYS AFTER COMPLETION
ALL WORK MUST BE SCHEDULED DURING STANDARD BUSINESS HOURS (M-F 8-5PM) NO WEEKEND WORK
CHANGES FOR 2012 CHANGES FOR 2012 (CONT.)(CONT.)
DUCT EFFICIENCY TESTING METHOD MUST BE STATED IN PROJECT APPLICATION
REFER TO INSTALLATION STANDARDS FOR DUCT EFFICIENCY TESTING METHOD (SEE APPENDIX B)
INCENTIVE RATE CHANGES (CFL/DUCT EFFICIENCY)
CFL MAXIMUM OF 15 PER HOME
RES INCENTIVE RATESRES INCENTIVE RATESResidential Standard Offer Rates Demand (kW) Energy (kW)Standard (all other measures)
$265 $0.091
Ceiling Insulation $500 $0.20
Compact Fluorescent Lamps
$135 $0.05
Central AC and HP Replacements
$477 $0.16
Window AC Replacement Only
$494 $0.33
Window AC Replacement + Duct Sealing
$477 $0.284
HTR INCENTIVE RATESHTR INCENTIVE RATESHard-to-Reach Incentive Rates Demand (kW) Energy (kWh)Standard (all other measures) $477 $0.16
Ceiling Insulation $519 $0.35
Duct Sealing $395 $0.14
Compact Fluorescent Lamps $240 $0.08
Central AC and HP Replacements
$519 $0.35
Window AC Replacement Only
$519 $0.35
Window AC Replacement + Duct Sealing
$500 $0.300
Affordable Single Family Construction
$500 $0.20
PROGRAM REMINDERSPROGRAM REMINDERSFOR ALL INVOICE DISCREPANCIES, PROJECT
SPONSOR SHALL HAVE 5 BUSINESS DAYS TO SUBMIT CORRECTION
˚ FAILURE TO DO SO, WILL RESULT IN EXCLUSION OF THAT CUSTOMER
HARD COPIES OF THE INVOICE MUST BE POSTMARKED OR DELIVERED TO CNP OFFICE NO LATER THAN THE 5TH OF THE INVOICE MONTH
SUBMIT INVOICE REPORT PAGE FROM DATABASE WITH INVOICE
˚ CUSTOMERS SHOULD BE PLACED IN ORDER AS THEY APPEAR ON INVOICE PAGE
PROGRAM REMINDERS PROGRAM REMINDERS (CONT.)(CONT.)
MANDATORY DATABASE SCHEDULING
HOMES WITH WINDOW UNITS ARE NOT ELIGIBLE FOR DUCT EFFICIENCY, UNLESS REPLACED WITH ENERGY STAR UNIT
MUST PERFORM “WHOLE HOUSE” APPROACH; IE ALL STORIES
PROGRAM REMINDERS PROGRAM REMINDERS (CONT.)(CONT.)
FURNACE MUST BE ON & OPERATIONAL TO CONDUCT PROPER CO TEST
INFORM CUSTOMER THAT CNP MAY DO FIELD INSPECTION, IF CNP CANNOT GAIN ACCESS, IT BECOMES THE PROJECT SPONSORS RESPONSIBILTY TO GET PERMISSION, IF NOT, THAT HOME WILL BE COUNTED AS AN INSPECTION FAILURE
FILL-INS ARE ONLY ELIGIBLE ON DAYS WHEN WORK IS PREVIOUSLY SCHEDULED, CANNOT INCLUDE A FILL-IN ON A NON WORK DAY
PROGRAM WEBSITESPROGRAM WEBSITES
PROGRAM WEB SITE HAS:◦ PROGRAM ANNOUNCEMENTS ◦ PROGRAM MANUALS FOR DOWNLOAD◦ HELPER APPLICATIONS◦ FAQS◦ INFORMATION ON AVAILABLE FUNDING◦ PROGRAM CONTACTS AND LINKS
WWW.CENTERPOINTEFFICIENCY.COM
2012 PROGRAM BUDGETS2012 PROGRAM BUDGETS
RES˚RETROFITS
$500,000
HTR˚RETROFITS
$1,700,000˚AFFORDABLE
SINGLE FAMILY$50,000
2011PROGRAM 2011PROGRAM TIMELINETIMELINE
JUNE 5TH, 50% MILESTONE◦ 80% SPONSORS MET/EXCEED GOAL
SEPTEMBER 5TH, 80% MILESTONE◦ 90% SPONSORS MET/EXCEED GOAL
NOVEMBER 18, 2011◦ LAST WORK DAY
NOVEMBER 30, 2011◦ FINAL INVOICE DUE TO CNP OFFICES
2012 PROGRAM TIMELINE2012 PROGRAM TIMELINE
2012 HTR APPLICATIONS ˚ OPEN NOV. 10TH, SUBMIT NOV. 17TH @ 10AM, CST• AFFORDABLE SINGLE FAMILY, SUBMIT @ 2PM 11/18
2012 RES APPLICATIONS˚ OPEN NOV. 10TH, SUBMIT NOV. 17TH @ 2PM, CST
COMPLIANCE WORKSHOP˚ DEC. 15, 2011
JANUARY 2, 2012
˚ FIRST WORK DAY FOR 2012 SPONSORS
2012 PROGRAM TIMELINE 2012 PROGRAM TIMELINE (CONT.)(CONT.)
APRIL 5, 2012◦ 25% MILESTONE
JUNE 5, 2012◦ 50% MILESTONE
SEPTEMBER 5, 2012◦ 75% MILESTONE
NOVEMBER 16, 2012◦ LAST WORK DAY
NOVEMBER 30, 2011◦ FINAL INVOICE DUE TO CNP OFFICE
SUPPLIER DIVERSITYSUPPLIER DIVERSITY
SUPPLIER DIVERSITY SUPPLIER DIVERSITY POLICY STATEMENTPOLICY STATEMENT
CENTERPOINT ENERGY, INC. RECOGNIZES THE IMPORTANCE OF MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISES (MWBE) TO THE ECONOMIES OF THE NATION, THE STATE, AND THE COMMUNITIES IT SERVES, AS WELL AS THE CORPORATION ITSELF.
THEREFORE, WE ARE COMMITTED TO PURSUING BUSINESS RELATIONSHIPS WITH SUCH ENTERPRISES AND USING INNOVATIVE APPROACHES DESIGNED TO CONTINUALLY IMPROVE BUSINESS OPPORTUNITIES.
SUPPLIER DIVERSITY SUPPLIER DIVERSITY CENTERPOINT ENERGY
JEWEL SMITH, MANAGER OF SUPPLIER DIVERSITY (713)207- 6951; [email protected]
STEVE DUKES, SUPPLIER DIVERSITY COORDINATOR
(713)207- 3388; [email protected]
HOUSTON MINORITY BUSINESS COUNCIL
CONSTANCE JONES (713)271–7805; WWW.HMBC.ORG
WOMEN’S BUSINESS ENTERPRISE ALLIANCE
SUSAN REPKA (713)681–9232; [email protected]
CONTRACTING PROCESSCONTRACTING PROCESS SUPPLIER REGISTRATION - NEW VENDORS
PROGRAM APPLICATION & APPROVAL
INTERNAL REQUISITION SUBMITTED & APPROVED
SUPPLIER & VENDOR NUMBER VERIFIED
CREATE CONTRACT DOCUMENTS
STANDARD TERMS AND CONDITIONS
CONTRACT EXECUTION
PROJECT COMPLETION/VERIFICATION
INVOICE & PAYMENT
NEW VENDORSNEW VENDORSSUPPLIER REGISTRATION
◦ WWW.CENTERPOINTENERGY.COM/ABOUT/CONTACT/SUPPLIERS
VENDOR REGISTRATION
◦ IRS FORM W-9 (EMPLOYER IDENTIFICATION NO.)
◦ ELECTRONIC FUNDS TRANSFER AUTHORIZATION
◦ EID AND EFT INFORMATION IS VERIFIED BY A.P.
DATABASE UPDATESDATABASE UPDATES
MONITORED BY:
FRONTIER ASSOCIATES
REGISTER AS A NEW USERREGISTER AS A NEW USER
REGISTRATION FORMREGISTRATION FORM
APPLICATION LANDING PAGEAPPLICATION LANDING PAGE
SUBMIT AN APPLICATIONSUBMIT AN APPLICATIONALL APPLICATIONS SHOULD BE COMPLETE AND ACCURATE AND READY TO BE SUBMITTED ONE DAY PRIOR TO THE PROGRAM SUBMIT DATE.
YOUR APPLICATION WILL BE AVAILABLE FOR EDITING UP UNTIL THE TIME THE APPLICATION CAN BE SUBMITTED.
SUBMIT AN APPLICATIONSUBMIT AN APPLICATION
On the designated submit day, the “Submit” button for that program will become active after refreshing the screen at the program submit time.
RANDOM 4-DIGIT NUMBERRANDOM 4-DIGIT NUMBER
1. Enter the random 4-digit number as displayed on the screen in the box provided. 2. Click on the “Submit Application” button. This submits the application.
2012 DATABASE 2012 DATABASE NAVIGATIONNAVIGATION
Navigation Menu
NEW FEATURES IN 2012NEW FEATURES IN 2012
DOCUMENT UPLOAD FEATURE
CEILING INSULATION R-VALUE CALCULATOR
MILESTONE REMINDERS
DOCUMENT UPLOAD FEATURE - DOCUMENT UPLOAD FEATURE - UPLOAD SPONSOR DOCUMENTSUPLOAD SPONSOR DOCUMENTS
DOCUMENT UPLOAD DOCUMENT UPLOAD FEATURE –SPONSOR FEATURE –SPONSOR
DOCUMENTSDOCUMENTS
DOCUMENT UPLOAD DOCUMENT UPLOAD FEATURE – UPLOAD FEATURE – UPLOAD
CUSTOMER DOCUMENTSCUSTOMER DOCUMENTS
DOCUMENT UPLOAD FEATUREDOCUMENT UPLOAD FEATURE
CEILING INSULATION R-CEILING INSULATION R-VALUE CALCULATORVALUE CALCULATOR
2012 DUCT EFFICIENCY 2012 DUCT EFFICIENCY TOOL CHANGESTOOL CHANGES
NEW BUILDING TYPE◦“MULTI-FAMILY, SINGLE STORY” OPTION
NEW AIR HANDLER LOCATION◦SEMI-CONDITIONED SPACE
QUESTIONS?QUESTIONS?
DOOR PRIZESDOOR PRIZES
CONTACT INFORMATIONCONTACT INFORMATIONYOLANDA SLADE o PHONE: 713-207-7762o EMAIL –
SHEA RICHARDSONo PHONE: 713-207-3526o EMAIL –
ROXANNE MCFARLANDo PHONE: 713-207-3511o EMAIL –
WEBSITE:o WWW.CENTERPOINTEFFICIENCY.COM