June 8, 2015 City Commission Special Meeting
Utility Fund
-
Agenda
-
2015 Baseline Assessment
City of St. Augustine Report Card Grade
Assisted by: Applied Technology & Management, Inc.
-
Grade C
Replacement Value $36,000,000 Refurbishment Cost $15,350,000
WTP Capacity: 6.5 mgd Lime: 4.5 mgd RO: 2 mgd Supply: 7 Deep Wells + 1 Surficial Well Storage: 3.5 Million Gallons
Water Treatment Plant
-
Grade C Replacement Value $26,500,000 Rehabilitation Cost $11,600,000
Wastewater Treatment Plant
Capacity: 4.95 mgd Secondary Treatment Surface Water Discharge Permit 2019
-
Grade
C
Gravity Mains 79 Mi
Force Mains 61 Mi
Manholes 2100 Ea
Lift Stations 75 Ea
Replacement Value $176,900,000 Rehabilitation Cost $32,354,000
Sewer Collection
-
Grade C
13,000 Accounts 200 Miles of Pipelines 30% Cast Iron Pipe
Replacement Value $182,600,000 Replace Cast/Galvanized $59,855,000
Water Distribution
-
Water Meters 13,000 Accounts
>2,000 Meters Over 20 Yrs
41%
33%
26%
Meter Age
20 years
-
Public Works Asset Condition Status (2015)
Service Asset Replacement
Value
Overall Asset Condition Grade
Estimated Asset Rehabilitation
Cost
Water Distribution
$182,600,000 C $59,855,000
Water Treatment $36,000,000 C+ $15,350,000
Sewer Collection $176,900,000 C $32,354,000
Wastewater Treatment
$26,500,000 C $11,600,000
Overall $389,600,000 $139,806,000
-
Accomplishments
-
$-
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
Water Sewer WTP WWTP
Utility Capital Investments
2011-Present
Reserves
2012 Bond
2011 Bond
$18.8 Million Completed or Underway
-
Summary Major Projects
-
Charlotte Street Reconstruction
Charlotte between King & Bridge 870 L.F. Replace watermain, sewer refurbishment Surface stormwater Base restoration and historic bricks
FY 2016 General Fund $ 629,290 Stormwater Fund $ 25,000 Utility Fund $ 425,000 Total $1,079,290
King Street
Bridge Street
-
San Marco Watermain Replacement
San Marco between Cinncinnati & Piccolata 6,000 LF 10-inch Cast Iron Replace with 12-inch PVC
FY 2016 Design $ 290,000 FY 2017 Construction $2,900,000 Total Project: $3,190,000
-
Water Conservation Pilot Area
Phase 1 FY2015/2016 $292,050 Total Project
Rate Study Conservation Rate Structure (FY14)
Meter Change-Out Pilot Area Heritage Park
SJRWMD Grant ($89,760)
City Cost $202,290
-
Questions/Discussion? .........Next.......
The Financial Plan