Muhammad El-Hedaby Sr. Mechanical Engineer - Egyptian Mob.: +2012 88 55 44 24 E_mail: [email protected] Tel.: +2066 32 505 69 Address: 26 Al-Horreiya Area, Port Said, Egypt ABOUT ME: Mechanical Engineer in senior level works in construction field in the applications of power plants, petroleum fields and industry projects looking for join to professional team in reverend firm. SKILLS KEYWORDS: Cost estimating– Planning & Scheduling – Negotiate effectively – Project Management – Coordinating – Contracts review – communication skills & leadership qualities – risk analysis – Primavera & MS Project – AutoCAD – steel structure– Piping isometrics – Bill of materials – Atmospheric storage tanks Design - Firefighting systems Design - Microsoft Office – Fluent English speaking & writing. IMPORTANT PROJECTS: South Helwan Supercritical power plant 3X650 MW units (Tank Yard Package) Design and estimation of storage tanks shell, bottom roof, roof structure and their attachments includes venting calculations, Overturning stability & sliding check due to seismic & wind, Hoop stress calculation, and Anchor bolts & chair design according to API650 12 ED., AWWA D100 & API 2000 7 th ED. for the following atmospheric storage tanks: - 3X26000 m3 + 1X3400 m3 network capacity carbon steel fuel oil storage tank. 3X1000 m3 + 1X4500 m3 network capacity stainless steel demineralized water storage tank. 1X2700 m3 + 1X 4500 m3 network capacity carbon steel filtered water storage. Giza North 1500MW Combined Cycle Power Plant (Tank Yard Package) Planning & Scheduling includes Preparation of the project control document includes Milestones plan, project summary schedules, WBS, Project detailed schedule, Baseline schedule, Progress curves & Reporting by Primavera, Evaluate scope changes, cost trend and additional work orders for the following atmospheric storage tanks: - 2X25820 m3 carbon steel solar tanks. X1500 m3 stainless steel demi-water tanks. 1X2000 m3 carbon steel filtered water tank. Banha 750 MW Combined Cycle Power Plant (Tank Yard Package) Planning & Scheduling includes Preparation of the project control document includes Milestones plan, project summary schedules, WBS, Project detailed schedule, Baseline schedule, Progress curves & Reporting by Primavera, Evaluate scope changes, cost trend and additional work orders for the following atmospheric storage tanks: - 2X10600 m3 carbon steel solar tanks. 2X1025 m3 stainless steel demi-water tanks. 1X1000 m3 carbon steel filtered water tank.

Transcript of Sr. Mechanical Engineer

Page 1: Sr. Mechanical Engineer

Muhammad El-Hedaby Sr. Mechanical Engineer - Egyptian

Mob.: +2012 88 55 44 24 E_mail: [email protected] Tel.: +2066 32 505 69 Address: 26 Al-Horreiya Area, Port Said, Egypt

ABOUT ME: Mechanical Engineer in senior level works in construction field in the applications of power plants, petroleum fields and industry projects looking for join to professional team in reverend firm.

SKILLS KEYWORDS: Cost estimating– Planning & Scheduling – Negotiate effectively – Project Management – Coordinating – Contracts review – communication skills & leadership qualities – risk analysis – Primavera & MS Project – AutoCAD – steel structure– Piping isometrics – Bill of materials – Atmospheric storage tanks Design - Firefighting systems Design - Microsoft Office – Fluent English speaking & writing.

IMPORTANT PROJECTS:

South Helwan Supercritical power plant 3X650 MW units (Tank Yard Package)

Design and estimation of storage tanks shell, bottom roof, roof structure and their attachments includes venting calculations, Overturning stability & sliding check due to seismic & wind, Hoop stress calculation, and Anchor bolts & chair design according to API650 12 ED., AWWA D100 & API 2000 7th ED. for the following atmospheric storage tanks: - 3X26000 m3 + 1X3400 m3 network capacity carbon steel fuel oil storage tank. 3X1000 m3 + 1X4500 m3 network capacity stainless steel demineralized water storage tank. 1X2700 m3 + 1X 4500 m3 network capacity carbon steel filtered water storage.

Giza North 1500MW Combined Cycle Power Plant (Tank Yard Package) Planning & Scheduling includes Preparation of the project control document includes Milestones plan,

project summary schedules, WBS, Project detailed schedule, Baseline schedule, Progress curves & Reporting by Primavera, Evaluate scope changes, cost trend and additional work orders for the following atmospheric storage tanks: - 2X25820 m3 carbon steel solar tanks. X1500 m3 stainless steel demi-water tanks. 1X2000 m3 carbon steel filtered water tank.

Banha 750 MW Combined Cycle Power Plant (Tank Yard Package)

Planning & Scheduling includes Preparation of the project control document includes Milestones plan, project summary schedules, WBS, Project detailed schedule, Baseline schedule, Progress curves & Reporting by Primavera, Evaluate scope changes, cost trend and additional work orders for the following atmospheric storage tanks: - 2X10600 m3 carbon steel solar tanks. 2X1025 m3 stainless steel demi-water tanks. 1X1000 m3 carbon steel filtered water tank.

Page 2: Sr. Mechanical Engineer

TCI Sanmar Chemicals S.A.E. – Egypt. Preparing the maintained equipment as built drawings for PVC unit.

Manage the Vertical vessels installation activities for RVCM unit. Prepare the steel frame workshop drawing for vessels & equipment installation for RVCM unit. Part of team for EDC plant piping isometrics drawing.

Royal Chemicals Co. Modification of H. P. boiler system and loading & unloading network for CMB refinery plant: -

piping systems repair and/or replace its damaged components. Installing a new high pressure boiler and apply modification for the high-pressure piping system

includes fabrication & erection of a new pipe racks. Installing a new loading & unloading pumps and apply modification for piping network for the tanks

yard includes fabrication & erection a new piping networks. Apply modification in the crude oil piping system for the CMB plant.

Suez Canal container terminals Plan and schedule mechanical works activities includes required resources & coordinate with the other

departments - Cost estimation for all activities & preparing offers and/ or tenders for: - Supply, fabricate, assembly & painting of steel frames & steel cages carrier for piling for Phase II. Erection & assembly of reefer stands (steel frames) for Phase II. Apply modification & repairs for Rubber tired gantry crane Steel frames for Phase I. Apply modification & repairs for Ship to Shore Crane Steel frames for Phase I.

OTHER PROJECTS General Petroleum Company (GPC). Supply & Erection Polyethylene pipeline 1.2Km length in Ras-Ghareb – East dessert.

Complete rehabilitation for deferent storage tanks sizes in Ras-Ghareb – East dessert. Supply & Erection 1000 m3 Firefighting storage tank with Firefighting Polyethylene pipeline 2.15Km

includes but not limited to cathodic, lightening protection and earthing system in - west dessert. Suez oil company (SUCO). Complete rehabilitation for deferent storage tanks sizes in Zeit Bay & Ras Badran. Amreya Petroleum Refining Co (APRC). Extension the new firefighting carbon steel piping network 3rd Stage 4 KM 18”.

Firefighting & early alarm system for HF gas. Cairo Electricity production company. Complete rehabilitation and replacement of Firefighting piping networks for Shubra Elkheima power

plant. TRAINING & COURSES: Project Management Misr Business Academy - Cairo, Egypt. May 2010

GPA: Excellent licensed with number 25032013230 by Cambridge training college (www.ctcbritain. com).

Welding science and technology Tibeen Institute for Metals and Studies, Cairo, Egypt. August 2008.

Workshop Technology Canal Naval Construction Company, Port Said, Egypt. August 2000

Page 3: Sr. Mechanical Engineer

Firefighting systems Design includes: - Elite program - Hydraulic calculations - Automatic sprinklers system - Automatic Co2 or fm200 system- Explanation of the global code of NFPA fire.

HVAC Design includes: - Estimation of cooling load (manual-HAP software) - Systems of air conditioning (all water system-all air system-air water system) - Duct design (manual-software – ductlator) - Ventilation design (kitchens- baths…….) - Air diffuser selection - Air handling unit selection - Fan design - Piping design - Pump design - Hock up of chillers and AHU and FCU - Chilled water system - How to read drawing of HVAC - HVAC installation -BMS - VAV VRV systems.

Plumbing system design includes: - Calculation of draining system - Building cold water supply system - Building hot water supply system - Hydraulic calculation - Principle of piping system - Calculation of static pressure of pump Swimming pool design.

WORK HISTORY March 2012 – Present Senior Technical office engineer - The Port Said Engineering Works

Egypt.

March 2009 – March 2012: Senior Technical office engineer - East Port Said for Industrial Projects (EPSIP), "Mohamed Nasr El-Kotby Establishment" Egypt.

February 2008 - March 2009: Technical office engineer - Al-Basmalah for trading & contracting Cairo, Egypt

June 2005 - February 2008: Technical office engineer - ROYAL CHEMICALS (CMB Refinery Plant) Port Said, Egypt

December 2003 - June 2005: Technical office engineer - ELKOTBY FOR ENG. IND. CO. Port Said, Egypt

EDUCATION Suez Canal University, Port Said branch, Egypt B. Sc. Degree in production engineering and mechanical design – July 2002 - GPA: Pass