Sprint 106 Review / Sprint 107 Planning May 06, 2013.

15
Sprint 106 Review / Sprint 107 Planning May 06, 2013

Transcript of Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Page 1: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 Review / Sprint 107 PlanningMay 06, 2013

Page 2: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint Resource Pages

• For this sprint, visit: https://developer.connectopensource.org/display/NHINProgress/Sprint+106+Progress+Summary

• For next sprint, visit:https://developer.connectopensource.org/display/NHINProgress/Sprint+107+Progress+Summary

• For information on the CONNECT 4.1 release visit: https://developer.connectopensource.org/x/q4CrBw

2

Page 3: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 Summary - Cumulative Flow

3

To Do

In Progress

QA

Done

Page 4: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 Summary - Burndown Chart

4

Page 5: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 Summary –Sprint Stats

• Points committed = 13.5– Initial points committed – 11

– 4 tickets added for 2.5 points of effort, totaling 13.5 points for sprint

• Tickets committed to sprint = 16

• Tickets completed = 15

• Points remaining (unclosed) at end of sprint = 0.5

• Points completed in sprint (velocity) = 13.0

5

Page 6: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 – Themes & Tasks

•4.2 Release– CMS-OFM 4.0 install on WAS 7 JDK 1.6 testing

– Design for Document Query specification version identification

• CONN-46 & CONN-15

•Participation in the Healtheway Certification pilot

•Partner and Community Support

6

Page 7: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 - What We are Showing Today

• CONNECT 4.2 Support adopters/federal partners that want to use

CONNECT with Java 6 (Feature request – CONN-350)

– CONN-383 – Test CONNECT on Solaris with WL 11g with Java JDK 1.6

– CONN-384 – Test CONNECT on RedHat Linux with WL 11g with Java JDK 1.6

– CONN-371 – Validate that CONNECT can be successfully installed in Java 1.7/WL 12c implementation environment

– CONN-370 – Validate that CONNECT can be successfully installed in IBM Java 1.7/WAS 8.5 implementation environment

7

Page 8: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 - What We are Showing Today

• CONNECT 4.2 - Continued Support adopters/federal partners that want to use

CONNECT with Java 6 (Feature request – CONN-350)

– CONN-368 – Validate that CONNECT can be successfully installed in Java 1.7/JBoss 7.1.1 implementation environment

– CONN-369 – Validate that CONNECT can be successfully installed on Java 1.7/GlassFish 3.1.2 implementation environment

– CONN-375 – Document design or implementation notes on wiki for supporting Java 1.6 environment

Demo

• https://developer.connectopensource.org/display/CONNECTWIKI/Supporting+Java+version+6

8

Page 9: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 - What We are Showing Today

• CONNECT 4.2 Provide adopters that support both versions of the specifications

(QD and RD) the service version of the message so that adapters can validate/further process the request and generate the version specific response (Feature request – CONN 46 & 15)

– Held responding design approach review on April 29th

– Link to responding design approach- https://developer.connectopensource.org/x/kYDvBw

– CONN-296 – Research design options to instruct the initiating gateway which specification version/endpoint to target for a QD or RD service

– Link to initiating design approach-

https://developer.connectopensource.org/x/GoA0C

9

Page 10: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 - What We are Showing Today

• Participation in the HealtheWay pilot– CONN-317 – Pre-test setup for pilot testing

– CONN-400 – Pilot Test: Add country code to PD response

– CONN-401 – Pilot Test: CONNECT throws exception if empty RelatesTo element is present in QD request

– CONN-402 – Empty relatesToList value on the Entity interfaces results in an empty but existent wsa:RelatesTo header

Demo

https://developer.connectopensource.org/display/CONNECTWIKI/Table+1+-+Test+Cases+%

28subset%29

10

Page 11: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 106 - What We are Showing TodayCustodial Agent and Community Support

• Community and Federal Partner Support– CONN-382 & 404 – Validate that CONNECT populates the

SMTP headers(SMTP TO and RCPT FROM) from the XDR metadata during SOAP to SMTP

– CONN-389 – Direct failing in JBoss 7.1.1 --Caused by: java.lang.SecurityException

• Custodial Agent Duties

11

Page 12: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 107 - Proposed Themes

• Continued Testing for Java 6 & Java 7 Support

– Testing on WebSphere 7

• Multi-Specification Identification for QD/RD (Initiating)

– Review initiating design approach with technical leads from Federal Partners (conference call)

– Begin development

• Run Healtheway certification pilot test cases for a vendor gateway

– Continue working on the updated list of Pilot test cases

https://developer.connectopensource.org/display/CONNECTWIKI/Table+1+-+Test+Cases+%28subset%29

– Pilot extended to May 31

12

Page 13: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

Sprint 107 – Other tasks

• Prepare for the May 21st CONNECT User Group Meeting

• Other tasks–Partner and Community Support

–Ongoing Custodial Agent Duties

• Product Backlog

https://issues.connectopensource.org/secure/VersionBoard.jspa?selectedProjectId=10140

13

Page 14: Sprint 106 Review / Sprint 107 Planning May 06, 2013.

CONNECT 4.0Community Announcements

• CONNECT Awareness

– Open sprint review and planning meetings Next sprint meeting will be May 20th

– CONNECT 4.0 Blogs and Forum posts– http://www.connectopensource.org/developer-resources/forums

– CONNECT User Group meeting May 21st

– Call for participation and abstracts underway

14