Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with...

55
2015 Opening Spokane Tribe GEOGRAPHIC INFORMATION SYSTEMS Tim Leach, MS GIS, GISP 509 • 626 • 4423

Transcript of Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with...

Page 1: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

2015

Opening

Spokane TribeGEOGRAPHIC INFORMATION SYSTEMS

Tim Leach, MS GIS, GISP509 • 626 • 4423

Page 2: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

An Overview of Spokane Tribe GIS

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 2

An Overview of Spokane Tribe GISIn 2010, Spokane Tribe GIS started on a new path beginning with the

formation of the Spokane Tribe GIS Planning and Executive Committees. A draft strategic plan began in 2010 with a comprehensive update in 2013. The program has evolved from 1000's of shapefiles to a centrally managed database with over 70 vector and raster layers. Projects have included efforts with GIS programs at the University of Washington and the University of Redlands. Tips, tricks, and lessons learned will be shared.

(We can see the “cloud” but we really can’t use it. We are in a remote location with limited bandwidth.)

Page 3: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Agenda

AgendaThe Beginning:

Enterprise GIS, Job Description, the GIS Mission Statement, Governance and the Strategic Plan

Geospatial Data

Overarching Themes: FATS, LOTS, and BASE

Products

University Outreach

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 3

Page 4: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

The Beginning

The Beginning: Enterprise GIS, Job Description, the GIS Mission Statement,

Governance and the Strategic Plan

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 4

Page 5: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Enterprise GIS

Enterprise GIS

Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Tip: Land ownership and roads are good examples of enterprise datasets that are used by many. It’s fairly easy to make the point that we don’t want multiple iterations of them developed independently per program or department.

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 5

Page 6: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

A vision of enterprise GIS implemented as Tribal GIS.

“Tribal GIS”

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 6

Page 7: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Aligned Job Description with Goal

Aligned Job Description with GoalSpokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 7

Page 8: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Aligned Job Description with Goal

Aligned Job Description with Goal

Additionally:

• Removed blanket statement “…performs other duties as assigned.”

• Reworked language to thwart map factory creation:

”Produces professional quality GIS display maps on request by the director” (prevents random requests from staff*)

“Assists program staff in map production as requested” (shift “map graphics” to data stewards)

* We have a GIS Coordinator that handles map requests, separately.

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 8

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 8

Page 9: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Performed Needs Analysis

Needs Analysis

In this case, the needs analysis was actually an interview with each program, department and business unit manager. I gathered and compiled information about what they do, how they use GIS (some did not) and where they may want to go.

Tip: Followed strategy outlined in “Proposal to Create an Enterprise GIS Strategic Plan” (Leach, 2008) available from: http://timleachgis.com/pdf/EGISProposal.pdf.

I summarized the information per unit and reviewed the summaries with managers and staff. Once signed-off, these became sections within the first iteration of the Spokane Tribe GIS Strategic Plan (2010).

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 9

Page 10: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Governance

GovernanceSpokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 10

Page 11: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Membership of the Spokane Tribe Planning Committee

Membership of the Spokane Tribe GIS Planning Committee

ExecutiveExecutive Director*

Director DNR Fish and WildlifeForest Manager

Advisor (Forestry Operations)*Tribal Council Advocate*

* - indirect participant (non-active executive)

RepresentativeForest Development

RealtyPre-SalesWildlife

Fuels & FireTribal Fish & Wildlife, Forest & Fish Regulations (TFW/FFR)

Air QualityWater Quality

FisheriesPreservation

Fire PreventionRange

Planning and Economic DevelopmentHousing Authority

Public Works

ProfessionalGIS Manager (DNR)

GIS Coordinator (IT/Admin)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 11

Page 12: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Mission Statement

Mission Statement

The Spokane Tribe's Geographic Information System (GIS) will support the vision of the Tribe: our mission is to expand the capability and capacity to manage geospatial information – from the past and into the future – about the land, resources, environment and people, to support the governance and sovereignty of the Tribe.

DNR Mission StatementPreserve, protect, manage and enhance the long term sustainability

of the Natural Resources for present and future generations, through an interdisciplinary process by developing and implementing Best Management Practices.

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 12

Page 13: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

The Strategic Plan

The Strategic Plan

Eight sections, 78 sub-sections, 60 pages, approved by GPC in draft form.

Eight sections, 114 sub-sections, references, appendices, 129 pages, approved by GPC in release form.

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 13

Page 14: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Geospatial Data

Geospatial Data

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 14

Page 15: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Geospatial Data Policy Guidelines

Geospatial Data Management Policy Guidelines

The policy items below were copied and adapted from “Data Steward Roles & Responsibilities” by Robert S. Seiner. Though they have not formally been adopted, we can view them as guidelines:

Tribal Geospatial Data is property of the Tribe and not owned by any individual or administrative unit.

Tribal Geospatial Data must be modeled and when possible according to standards across administrative units. Every effort must be made to share data across divisions, programs and offices, and not to maintain redundant data.

Tribal Geospatial Data must be maintained as close to the source as possible. Data quality standards shall be managed to actively promote reliability and use by other administrative units.

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 15

Page 16: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Geospatial Data Policy Guidelines

Geospatial Data Management Policy Guidelines(continued)

Tribal Geospatial Data will be maintained by data stewards; data stewards are individuals responsible for the definition, management, control, integrity, and maintenance of data resources within an administrative unit.

Tribal Geospatial Data must be safe and secured.

Metadata will be maintained with Tribal Geospatial Data.

Adapted for GIS from:

Seiner, R. (2005). Data Steward Roles and Responsibilities. (The Data Administration Newsletter). Retrieved 5 Oct. 2010 online from: http://www.tdan.com/view-articles/5236/.

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 16

Page 17: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Forestry Applications Tracking System (FATS)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 17

Over 1,100 data files – what’s where isn’t really documented

(coverages, shapefiles, personal geodatabases)...

Silos of data at different offices...

Fuels

Silv1

ADMINISTRATION GIS

PRESERVATION GIS

GIS Workstation

Wounded Elk

DNR GIS

OthersTribal GIS

LakeStreamSignage

Address/GeocodingStreet Centerline

Rights-of-WayParcel

Survey Control

Arc ServerImage ServerClient Server

LAN

UPGRADES

Centralized Data

FATS, LOTS and BASE Geospatial Data Reorganization

Page 18: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

GIS Automation or Life-Cycle Improvement Tools

Geospatial Data Life-CycleSpokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 18

Page 19: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

GIS Automation or Life-Cycle Improvement Tools

Layer File Geodatabase (Layer.gdb)Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 19

Page 20: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

GIS Automation or Life-Cycle Improvement Tools

Python Scripts for Feature Classes

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 20

Page 21: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Forestry Application Tracking System (FATS)

Overarching Themes:FATS, LOTS, and BASE

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 21

Page 22: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Forestry Application Tracking System (FATS)

Forestry Application Tracking System (FATS)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 22

Page 23: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Forestry Data Life-Cycle

Forestry Data Life-Cycle

Timber Sales

Forest Development

Pre-Sales (Silviculture)

TRIBAL GIS

FuelsGIS (DBA)

QA/QC

Rx{}, Tx{} model

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 23

Page 24: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Forestry Data Life-Cycle

The Rx{}, Tx{} Model

Dx = Diagnosis Rx = Prescription Tx = Treatment

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 24

Page 25: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Land Ownership Tracking System (LOTS)

Land Ownership Tracking System (LOTS)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 25

Page 26: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Land Ownership Tracking System (LOTS)

Land Ownership Tracking System (LOTS)

Prior to 2010

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 26

Page 27: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Land Ownership Tracking System (LOTS)

Land Ownership Tracking System (LOTS)

2010 - 2015

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 27

Page 28: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Land Ownership Tracking System (LOTS)

2010 - 2015

Land Ownership Tracking System (LOTS)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 28

Page 29: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Land Ownership Tracking System (LOTS)

2010 - 2015

Land Ownership Tracking System (LOTS)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 29

Page 30: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Land Ownership Tracking System (LOTS)

2010 - 2015

Land Ownership Tracking System (LOTS)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 30

Page 31: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Land Ownership Tracking System (LOTS)

Cool!

Land Ownership Tracking System (LOTS)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 31

Page 32: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

Base Application System Environment (BASE)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 32

Page 33: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

Base Application System Environment (BASE)Agricultural Land (p. 242) AgrLand1918 Allotments (USFS) Allot1918Big Game Winter Range (p. 198) BGWntRngPlBLM Survey Control BLMControlBuilding BuildingCampground CampgroundContour ContourCounty w/NOAA Vector Shoreline CountyNOAACounty WA DNR CountyWADNRDevelopment Areas (p. 99) DvlpmntPlAreas Protected from Housing and Development (p. 99) DvlpRstrctPlForest Stand Analysis DxStandElectrical Facilities ElecFacltyOverhead Lines ElecOHLnService Points (meters) ElecSvcPtUnderground Lines ElecUGLnExecutive Order 1881 ExecOrd1881Fire Management Units FirMgUnLegacy Forest Compartment Boundaries ForCbdForest Project Area Lines ForPALnForest Project Area Polygons ForPAPl

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 33

Page 34: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

Geology (UW) GeologyHardwood (Spokane Tribe) HardwoodHillshade HillShadeHousing Short List (p. 9) HsShrtLstPlLake (WA DNR) LakeInundation Analysis - Reservation Land Area (Lines) LRAnlysLnInundation Analysis - Reservation Land Area (Polygons) LRAnlysPlLake Roosevelt Bathymetric Survey 1947-49 LRBath1949Lake Roosevelt Preliminary Topography 1930 (Pre-Dam) LRTopo1930River Kilometer Segments (Columbia, Sanpoil, Lake Roosevelt, Spokane Arm) NHDRivKMLn

River Kilometer Locations (Columbia, Sanpoil, Lake Roosevelt, Spokane Arm) NHDRivKMPt

Ownership ParcelPlPre-Dam Columbia and Spokane Rivers PreDamRvPlPreserve All Future Uses (PAFU) (1999) (p. 242) PrsvFtrPlResource Management Zones (1994 IRMP) (p. 32) RsrcMgtZnRoad Road*

Base Application System Environment (BASE)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 34

Page 35: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

Section Lines SectionLnSection Polygons SectionPlSection Annotation SectionPlAnSoil (WA DNR) SoilStream (Spokane Tribe) StreamTownship Lines TownshipLnTownship Polygons TownshipPlTownship Annotation TownshipPlAnWA River Miles (WA ECY) USGSRivMiReservation Area 1:24000 Digital Raster Graphics (DRG) USGSTopo*Watershed (Spokane Tribe) WatershedMunicipalities (WA DOT) WDOTCityPlWellhead Protection Areas (p. 9) WellHdPAPlWildlife WildlifeWildlife Emphasis Areas (p. 198) WldEmphPl2008 1 ft Spokane Tribe RD20082009 1.5 m NAIP NAIP20092011 1 ft Digital Globe DG20112013 1 m NAIP NAIP2013

Base Application System Environment (BASE)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 35

Page 36: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

1918 US Forest Service Allotments

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 36

Page 37: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

1930 USGS Preliminary Topographic Maps

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 37

Page 38: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

River Kilometer Index

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 38

Page 39: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

Approximate Reservation Land Area

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 39

Page 40: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

Products

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 40

Page 41: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Products

Land Ownership Map 2011 with Wildlife Areas

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 41

Page 42: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Products

PageMap (ArcMap/Python Application)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 42

Page 43: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Products

Layer Themes

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 43

Page 44: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

Base Application System Environment (BASE)

Address Index (development)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 44

Page 45: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

University Outreach

University Outreach

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 45

Page 46: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

UW Certificate in GIS

University of WashingtonCertificate in GIS

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 46

Page 47: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

UW Certificate in GIS

UW Certificate in GIS

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 47

Page 48: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

University Outreach

Old Channel of the Columbia River

Aarin Sengsirirak, Chuck Soule, Diane Percefull, Megan Erickson and Simon Melo

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 48

Page 49: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

UW MS in Sustainability Management using Geographic Information Systems

University of WashingtonProfessional Masters Program in Geographic

Information Systems (Sustainability Management)

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 49

Page 50: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

University Outreach

Software and Hardware

Grant Novak and Jon Walker

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 50

Page 51: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

EWU CS

Eastern Washington UniversityComputer Science Program

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 51

Page 52: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

EWU Capstone Projects for the Lake Roosevelt Fisheries Evaluation Program (LRFEP)

Eastern Washington University

Jacob Schwartz, Joshua Ohm, Justin Breitenbach, Sarah Headley

Ralph Parkison, Stacy Carlson, Thomas Flores

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 52

Page 53: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

University of Redlands

University of RedlandsMS GIS Program

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 53

Page 54: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

University of Redlands

A GIS for Zooplankton Monitoring

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 54

Page 55: Spokane Tribe Geographic Information Systems · 2015-07-08 · Within introductory meetings with directors, program managers and others “Enterprise GIS” was made a clear goal.

That’s All Folks!

The End

Spokane Tribe ESRI Int'l Users Conf. 2015 GIS (DNR)

GIS (DNR) 6/23/15Spokane Tribe 55