    PUBLIC PROCUREMENT

    MARKET

    ITS SPECIFICITY

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    2/65

    5/16/2013 2

    ..

    IT IS PUBLIC NEEDS (SERVICES,SUPPLY,WORKS)FINANCED BY PUBLIC MONEY

    PUBLIC PROCUREMENTS REPRESENT 16% OF EU GDP

    CONTRARY TO CONSUMER MARKET AND INDUSTRIALMARKET

    - P.P MARKET HAS A MAJOR CHARACTERISTIC:THEREGULATION OF THE PROCUREMENT PROCESS BYLOCAL REGIONAL NATIONAL OR INTERNATIONALAUTHORITIES

    -NON DISCRIMINATION AND OPEN COMPETITION AREPRIME OBJECTIVES

    THESE OBJECTIVES MAY REDUCE OPPORTUNITIES FORSUPPLIERS TO DEVELOP LONG TERM CONTRACTUALRELATIONSHIP WITH PUBLIC AUTHORITIES

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    3/65

    5/16/2013 3

    .......

    PROCUREMENT POLICY IS NOT ONLY

    ABOUT IMPOSING CONSTRAINTS ON

    AWARDING AUTHORITIES.

    IT IS ALSO ABOUT PROVIDING THENECESSARY INCENTIVES FOR TO

    ACTIVELY PURSUE CONTRACT

    OPPORTUNITIES.

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    4/65

    5/16/2013 4

    .

    DRIVING FORCE BEHIND PUBLICPROCUREMENT:

    THE NEED FOR GOVERNMENTS TO MAINTAINAND DEVELOP THE TYPE OF SOCIETY

    DEMANDED BY CITIZENS. PRIME MOTIVE IS SERVICE TO CITIZEN

    TWO SETS OF RULES HAVE TO BE FOLLOWED:

    -RULES OF THE TREATY(for all type ofcontract)

    -RULES OF THE PROCUREMENTDIRECTIVES(in the case of contracts of a certainamount)

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    5/65

    5/16/2013 5

    BASIC PRINCIPLES AND

    OBJECTIVES OF P.P.

    OBTAIN BEST VALUE FOR MONEY

    FAIR COMPETITION,NON

    DISCRIMINATION

    SOUND FINANCIAL

    MANAGEMENT(economy,efficiency and

    effectiveness)

    ACCOUNTABILITY (record keeping)

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    6/65

    5/16/2013 6

    WHY A E.U. LEGISLATION FOR

    PUBLIC PROCUREMENT ?

    TO CREATE A SINGLE MARKET FOR P.P. SO THAT

    EUROPEANS COMPANIES MAY HAVE ACCESS TO

    CONTRACTS WITHOUT DISCRIMINATION

    IN ACCORDANCE WITH THE TREATY WHICH AIMS

    AT INSTALLING:

    * FREE MOVEMENT OF GOODS

    * FREE MOVEMENT OF SERVICES

    INCREASING THEREFORE COMPETITIVENESSTHROUGH BETTER FUNCTIONING OF THE MARKET

    AND OBTAINING BEST VALUE FOR MONEY

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    7/65

    5/16/2013 7

    .......

    TO HAVE FAIR , TRANSPARENT AND

    PREDICTABLE PROCEDURES

    EQUAL ACCESS TO

    OPPORTUNITIES,EQUAL TREATMENTAND NON DISCRIMINATION FOR AA EU

    SUPPLIERS

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    8/65

    5/16/2013 8

    .

    TO THAT END THE COMMUNITY HAS DECIDED TOCOORDINATE THE PROCUREMENT PROCEDURESFOLLOWED IN DIFFERENT COUNTRIES.

    E.U. LEGISLATION OFFERS A WIN-WIN SITUATION TO BOTHCONTRACTING AUTHORITIES AND CONTRACTORS

    * INCREASED COMPETITION OFFERS THE POSSIBILITY TOC.A. TO HAVE BETTER VALUE FOR MONEY* OPENING OF MARKETS OFFERS CHANCES TOCOMPETITIVE CONTRACTORS TO WIN

    -EITHER CROSS BORDER CONTRACTS

    -OR HOME MARKET CONTRACTS THROUGHCONSORTIA, JOINT VENTURE, SUBCONTRACTING ORPARTNERSHIP

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    9/65

    5/16/2013 9

    .

    P.P. WHICH ARE EXEMPT FROM THESE RULES(i.e whose contract amounts are below thelevel)MUST STILL RESPECT TREATYPRINCIPLES OF NON DISCRIMINATION ON

    GROUND OF NATIONALITY,EQUALTREATMENT,TRANSPARENCY.

    THESE CONTRACTS WILL BE SUBJECT TOCOMPETITION USING PUBLICATION AS

    APPROPRIATE BUT PUBLICATIONS ARE NOT REQUIREDTO

    APPEAR IN O.J.EU

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    10/65

    5/16/2013 10

    THE SUPPLIER S PERSPECTIVEHOW TO INCREASE OPPORTUNITIES

    AT STRATEGIC STAGE

    DEFINING YOUR PRODUCT IN THE PUBLICMARKET

    HAVING A MARKETING STRATEGY

    TARGETING YOUR MARKET

    ASSESSING THE POTENTIAL BARRIERS TOMARKET ENTRY

    -REGULATORY

    -TECHNICAL -ECONOMIC

    -CULTURAL

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    11/65

    5/16/2013 11

    ........

    ASSESSING REGULARLY CUSTOMER

    EXPECTATIONS WILL HELP YOU IMPROVE

    YOUR OVERALL COMPETITIVENESS.A CLEAR

    PICTURE OF CUSTUMER EXPECTATIONS

    QUALITY RELATIVE TO PRICE

    DELIVERY

    TECHNICAL HELP

    ALL ROUND CUSTOMER SERVICE

    WILL ALSO MAKE FOR MORE EFFECTIVE BIDS

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    12/65

    5/16/2013 12

    .AT BIDDING STAGE

    READ CAREFULLY THE REQUIREMENTS STATED IN THETENDER DOSSIER NOT ONLY TECHNICAL BUT ALSOADMINISTRATIVE(MANY CASES OF REJECTION OCCURFOR ADMINISTRATIVE NON COMPLIANCE).OFFERS DONOT INCLUDE WHAT WAS ASKED FOR.

    EXPLOIT THE POSSIBILITY OF

    *CONSORTIA ,JOINT VENTURE OR PARTNERSHIP

    *SUBCONTRACTING TO LOCAL FIRMS

    OR BEING SUBCONTRACTOR TO FOREIGN FIRM

    *ALLOTMENT

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    13/65

    5/16/2013 13

    .......

    DO NOT LEAVE THE PREPARATION OF YOUR OFFER

    TO THE LAST MOMENT.LEARNING LOCAL

    REGULATION(ON CUSTOMS TAXES ORLABOUR)CREATION OF CONSORTIA,JOINT

    VENTURE,OR SUBCONTRACTING MAY BE TIME

    CONSUMING.

    INVOLVE ALL MANAGERS IN WRITING OF BID.BIDSUBMITTED BY SALES MANAGER ALONE COULD

    CONTAIN DISASTROUS ERRORS OR PROMISES

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    14/65

    5/16/2013 14

    USE THE LANGUAGE OF THE COUNTRY OFC.A.(IF NOT OTHERWISE STATED) WHEN YOURESPOND TO TENDER;THE FACT THAT EUR.O.J. PUBLICATIONS ARE TRANSLATED INTOMEMBER STATE LANGUAGES MAY MISLEADREADERS AS TO THE APPROPRIATELANGUAGE FOR TENDERING.

    LOCAL PRESENCE HAS MANYADVANTAGES.IN PARTICULAR SUB-

    THRESHOLD OPPORTUNITIES,WHICH ARE NOTREQUIRED TO BE ADVERTISED IN THE O.J.,CAN OFTEN ONLY BE IDENTIFIED BY HAVINGTHIS PRESENCE.

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    15/65

    5/16/2013 15

    HOW TO BE INFORMED

    A P.P. INFORMATION SYSTEM(SIMAP) HASBEEN LAUNCHED BY THE COMMISSION INCOLLABORATION WITH THE MEMBER STATES

    HTTP://WWW.SIMAP.EU.INT

    THIS NEW ELECTRONIC TOOL IMPROVESQUALITY OF INFORMATION ON P.P. ANDMAKES P.P. MORE EFFICIENT FORCONTRACTING AUTHORITIES AND FORSUPPLIERS:

    http://www.simap.eu.int/http://www.simap.eu.int/
  • 7/30/2019 Specificul Pietei de Achizitii Publice

    16/65

    5/16/2013 16

    SIMAP

    EASY ON-LINE ACCESS

    *TO TENDER OPPORTUNITIES

    FOR SUPPLIERS

    *TO STANDARDISED NOTICES

    FOR C.A.

    IT PROVIDES

    *ON-LINE VERSION OF O.J.

    PUBLICATIONS OF TENDERS:

    TENDER ELECTRONIC DAILY(T.E.D.)

    *PROCUREMENT OPPORTUNITIES

    DATABASES(BY COUNTRY,INTERN

    ATIONAL AND EUROPEAN INSTITUTIONS)

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    17/65

    5/16/2013 17

    .

    *COMMON PROCUREMENT CODE(C.P.V.)

    *FORMS OF THE O.J. FOR CONTRACTNOTICE,PRIOR INFORMATION AND CONTRACTAWARD

    *SUPPORT FOR PROBLEM SOLVING

    THROUGH

    *THE EUROPEAN PUBLIC

    NETWORK(PPN) CONTACT POINT *THE SOLVIT CENTER IN YOUR

    COUNTRY

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    18/65

    5/16/2013 18

    .

    THE C.P.V. IS A CODE WHICH

    *FACILITATES THE PROCESSING OF INVITATION TOTENDER PUBLISHED IN THE O.J. BY MEANS OF A SINGLECLASSIFICATION SYSTEM TO DESCRIBE THE SUBJECTMATTER OF PUBLIC CONTRACT.

    *IMPROVES THE TRANSPARENCY.

    *HELPS THE SUPPLIERS TO IDENTIFY QUICKLY THEOPPORTUNITIES.

    *HELPS THE C.A. TO BROADEN COMPETITION.

    *WILL BECOME COMPULSURY WITH THE ADOPTION OFTHE REVISED EUROPEAN DIRECTIVES.

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    19/65

    5/16/2013 19

    OTHER SOURCES OF

    INFORMATION

    DIRECT LINK TO OFF. JOURNAL OF E.C.

    TED HTTPP://TED.EUR.OP.EU.INT

    TAILORED SERVICES

    EURO INFO CENTERS(EIC) WHICH

    PROVIDE SPECIALISED INFO AND

    ADVISORY SERVICES TO HELP

    COMPANIES TO DEVELOP BUSINESS INE.U.(FINDING PARTNERS MARKET

    INFO)

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    20/65

    5/16/2013 20

    .....

    EUROPEAN ORGANISATION FOR TESTING AND

    CERTIFICATION(EOTC) HTTPP://WWW.EOTC.BE

    TRADE ASSOCIATIONS CAN BE VERY

    HELPFUL.CAN GIVE DEEPER INSIGHT INTOLEGAL ISSUES PERTAINING TO

    P.P.(CONTRACTS,STANDARDS) WITHIN YOUR

    SECTOR

    CEN(HTTPP://CENORM.BE) ANDCENELEC(HTTPP://CENELEC.BE)FOR

    STANDARDS

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    21/65

    5/16/2013 21

    COMMON PRACTICE IN P.P.

    DIRECTIVES LEAVE TO NAT. AUTH. THE CHOICE OFFORMS AND METHODS TO BE INCLUDED IN NAT.LEGISLATION TO ACHIEVE THE OBJECTIVES THEY FIXE

    DIRECTIVES DO NOT GIVE CODES OF PROCEDURE.THEYFIXE CERTAIN RULES TO BE APPLIED

    THE EU LEGISL. DOES NOT REPLACETHE NAT. LEGISL.ITDEFINES THE FRAMEWORK IN WHICH THE NAT.LEGISL.MUST APPLY AND AUTH.MUST OPERATE.IT ISTRANSPOSED IN THE NAT. LEGISL.

    IT LEAVES ROOM HOWEVER TO DIFFERENT NAT. P.P.

    PRACTICES/IMPLEMENTATION MEASURES

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    22/65

    5/16/2013 22

    STAGES OF PUBLIC PROCUREMENTPROCESS

    1. JUSTIFICATION & PREPARATION OF ACTIONSSUBJECT TO P.P. PLANNING

    2. CHOICE OF PROCEDURES

    3. ELABORATION OF TENDER DOSSIER

    4. INFORMATION/PUBLICATION

    5. INVITATION TO TENDER

    6. SUBMISSION & OPENING OF OFFERS

    7. EVALUATION OF OFFERS

    8. AWARD OF CONTRACT

    9. IMPLEMENTATION OF CONTRACT MANAGEMENT

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    23/65

    5/16/2013 23

    PHASE 1 AIMS AT ASSESSING THE NEEDS ANDDEFINING THE BEST SOLUTION TO FULLFILTHESE NEEDS

    PHASES 2 TO 8 IS THE TENDER PROCEDURE

    PROPER PHASE 9 AIMS AT MONITORING AND

    CONTROLING THE CONTRACT

    PHASE 1 AND/OR PHASE 9 CAN BE

    OUTSOURCED TO A CONSULTANT/EXPERTWHICH AT THE SAME TIME MUST KNOW WELLTHE MARKET AND BE INDEPENDANT

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    24/65

    5/16/2013 24

    1) JUSTIFICATION & PREPARATIONOF ACTIONS SUBJECT TO P.P.

    GENERAL OUTLINE & TECHNICAL DEFINITION(to say if it is part of astrategy/define time scale)

    START ADMIN.&LEGAL CLEARANCE(permit to build orsupply)BEFORE LAUNCHING TENDERS

    INVOLVEMENT OF STAKEHOLDERS

    TOTAL COST EVALUATION/assessment of the choice of

    contract(fixed or revisable prices) ECONOMIC & SOCIAL JUSTIFICATION OF THE INVESTMENT

    (INCLUDING WHOLE LIFE COST OF INVESTMENT)

    ENVIRONMENTAL IMPACT & CHOICE OF TECHNOLOGY

    PREPARE BUDGET DECISION TO FINANCE THE PROJECT

    PROJECT MANAGEMENT ORGANISATION(staff/team)

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    25/65

    5/16/2013 25

    .

    ELABORATION OF TECHNICAL SPECIFICATIONS(REQUIRED

    CHARACTERISTICS OF A PRODUCT OR A SERVICE) IS AN

    IMPORTANT ELEMENT OF THE PREPARATION

    TECHNICAL SPEC. CAN BE

    EITHER FIXED OR MUST MEET A MINIMUM LEVEL

    OR MAY BE FORMULATED IN TERMS OF PERFORMANCE /

    FUNCTIONAL REQUIREMENTS

    TECHNICAL SPEC. MUST BE CLEARLY WRITTEN

    VARIANTS CAN BE ADMITTED WHEN THE AWARD CRITERIONIS THE MOST ECONOMICALLY ADVANTAGEOUS

    SUB-CONTRACTING CAN BE ADMITTED

    TENDER CAN BE DIVIDED INTO LOTS

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    26/65

    5/16/2013 26

    RECOMMANDATIONS

    !!Any advice may be used in the preparation oftechnical specifications provided that it doesnot have the effect of precludingcompetition.

    !!Any involvment of one potential contractor inthe preparation of a tender excludes itautomatically from participating to the sametender

    !! In the case of works contracts or importantsupply contracts the role of the supervisormust be clearly defined

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    27/65

    5/16/2013 27

    !! technical spec. shall not have the effect

    of creating unjustified obstacles to the

    opening of p.p. to competition

    !! technical spec. shall not refer tospecific make or service. In exceptional

    cases such reference shall be

    accompagnied by the word orequivalent .Idem when reference is made

    to a specific norm or standard.

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    28/65

    5/16/2013 28

    !! Project cannot be fractionned in

    different tenders.It is not possible to

    disagregate.It can only be divided into

    lots !! Mandatory national technical rules can

    be applied to the extent that they are

    compatible with community law.

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    29/65

    5/16/2013 29

    .

    TECHNICAL BARRIERS ARE A REALITY OFEUROPEAN MARKET

    DIFFERENCES IN NATIONAL STANDARDS ANDTHE CONFORMITY CERTIFICATION

    PROCEDURES ARE A MAJOR OBSTACLE EC P.P. PROCUREMENT LEGISLATION

    PROMOTES THE USE OF RELEVANTEUROPEAN STANDARDS WHERE THEY EXIST

    ! !NATIONAL STANDARDS CANNOT BE USEDTO DISCRIMINATE AGAINST OTHER EC ORIGINPRODUCTS

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    30/65

    5/16/2013 30

    2) CHOICE OF P.P. PROCEDURES

    To award procurement contracts:choice

    between

    -OPEN PROCEDURE (OP)

    -RESTRICTED PROCEDURE (RP) -NEGOTIATED PROCEDURE (NP)

    -ACCELARATED PROCEDURE as an exception

    And in the future(new directive)

    -FRAMEWORK CONTRACT

    -COMPETITIVE DIALOGUE

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    31/65

    5/16/2013 31

    3) ELABORATION OF TENDERDOSSIER

    1. Instructions to Tenderer(content of tender, lots, period of validity, variant solutions,pre-tender visit)2. Special Conditions(amendments to general conditions or ad hoc clauses)

    3. General Conditions (include legal and administrative provisions)

    4. Technical Specifications(either fixed or must meet a minimum level or meetperformance/functional requirements)

    5. Bill of quantities, price breakdown

    6. Bank Guarantee Models(for submission, for advance payments, for performance)

    7. Note of General Information (concerning customs, tax and price laws andregulations)

    8. Procedural Rules on Conciliation and Arbitration of Contracts(usually included in the general conditions)

    9. Informations asked to tenderers to assess their qualification10. Must indicated if it is a fixed non revisable price contract or

    revisable price contract with price revision formula.

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    32/65

    5/16/2013 32

    4) INFORMATION/PUBLICATION

    OBLIGATION FOR CONTRACTING AUTHORITIES : TO INFORM THE WISH TO AWARD PUBLIC CONTRACTS OR

    FRAMEWORK AGREEMENTS: yearly indicative notices & invitationto tenders

    TO INFORM RESULTS OF PROCEDURE OF AWARD (48 days afteraward of contracts or conclusion of a framework agreement)

    BEYOND THE THRESHOLDS OF THE E. U. DIRECTIVE ALLTENDERS MUST BE PUBLISHED TO THE EU O.J.:SERVICES & SUPPLIES CONTRACTS: 162.000 OR 249.000

    depending on the type of Public Authority listed in annex to thedirective

    WORKS CONTRACTS: 6.242.000

    BELOW THE THRESHOLDS ADEQUATE PUBLICITY MUST BE

    DONE TO ENSURE FAIR COMPETITION

    !! DO NOT LAUNCH A TENDER BEFORE THE BUDGET ISSECURED.

    ! !BEFORE THE ACTUAL TENDER PROCEDURE C.A. MAYISSUE A PRE-INFORMATION NOTICE.ITIS NOT AN INVITATIONTO CONTRACTORS TO TENDER

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    33/65

    5/16/2013 33

    5)CONTRACT NOTICE / INVITATIONTO TENDER

    CONTRACT NOTICE INDICATES

    .AWARD PROCEDURE CHOOSEN(OP,RP..)

    .FORM OF CONTRACT (service,supply,works)

    .LANGUAGE

    .CRITERIA OF THE AWARD OF CONTRACT

    .INFORMATIONS REQUESTED CONCERNING

    SUPPLIERS PERSONAL POSITION

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    34/65

    5/16/2013 34

    ..

    FOR O.P.

    PLACE WHERE CONTRACT

    DOCUMENT MAY BE REQUESTED

    FINAL DATE FOR RECEIPT OF

    TENDERS

    DATE ,TIME ,PLACE OF OPENING

    VALIDITY PERIOD OF THE BID

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    35/65

    5/16/2013 35

    .

    FOR R.P. FINAL DATE FOR RECEIPT TO

    PARTICIPATE

    ENVISAGED Nb OR RANGE OF SUPPLIERS

    WHO WILL BE INVITED TO TENDER FINAL DATE FOR DISPATCH OF

    INVITATION TO TENDER

    IN THAT CASE THE INVITATION TOTENDER WILL BE MADE IN WRITING AND SENTSIMULTANEOUSLY TO ALL SELECTEDCANDIDATES TOGETHER WIYHBTHE TENDERDOCUMENT

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    36/65

    5/16/2013 36

    ..........

    THREE CATEGORIES OF CRITERIA

    BIDDER RELATED CRITERIA:FOR

    SELECTION AND QUALIFICATION.

    TENDER RELATED CRITERIA: FOR

    EVALUATION OF OFFERS.

    AWARD CRITERIA: ONLY TWO

    -THE LOWEST OFFER

    -OR THE MOST ECONOMICALLY

    ADVANTAGEOUS OFFER.(best overall

    combination of price and quality)

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    37/65

    5/16/2013 37

    ..

    CRITERIA AND/OR THEIR RELATIVE

    WEIGHTING CANNOT BE CHANGED

    AFTER OFFERS HAVE BEEN SUBMITTED

    IF THEY ARE CHANGED AFTERPUBLICATION AND BEFORE

    SUBMISSION,DATE OF SUBMISSION

    MUST BE POSTPONED

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    38/65

    5/16/2013 38

    6)SUBMISSION& OPENING OF

    OFFERS

    This applies only for open procedure(OP)andrestricted procedure(RP)

    TIME LIMITS from the date contract notice issent:(regulation 1182/71/EEC governs time limit

    calculation) -for OP:52 days to submit an offer

    -for RP:37 days to submit a request toparticipate

    40 days after invitation to participate issent to submit an offer

    OPENING(generally public)

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    39/65

    5/16/2013 39

    7) EVALUATION OF OFFERS

    MADE BY AN EVALUATION COMMITTEE WHICH ELABORATES AN ENDOF EVALUATION REPORT WITH A PROPOSAL TO AWARD THECONTRACT

    SELECTION OF PARTICIPANTS

    PRINCIPAL SELECTION OR QUALIFICATION CRITERIA USED:

    - SUBJECTIVETECHNICAL AND/OR PROFESSIONAL CAPACITY

    ECONOMIC AND FINANCIAL STANDING

    -OBJECTIVE

    RESPONSIVENESS TO ADMIN. AND TECHN. REQUIREMENTS

    PERSONAL SITUATION OF TENDERER,SUCH AS BANKRUPT,CORRUPTION,PROFESSIONALMISCONDUCT

    ADMINISTRATIVE DOSSIER UNCOMPLETE

    CONFLICT OF INTEREST

    ! ! In the case of RP this selection is made at the pre-qualification level, i.e. before sending the tenderdossier. A minimum of 5 candidates invited to submit a tender is required.

    !! In the case of NP a minimum of 3 candidates invited to negotiate

    is required

    !! Only selected participants/bids are evaluated

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    40/65

    5/16/2013 40

    . AWARD CRITERIA

    eitherTHE LOWEST PRICEtender administratively and technically compliant

    orTHE MOST ECONOMICALLY ADVANTAGEOUS TENDER ( Based onevaluation criteria such as quality, price, technical merit, functionalcharacteristics, environmental characteristics, running costs, cost-effectiveness, after sales service and technical assistance, delivery date or

    period of completion).! ! Relative weighting given to each criteria must be specified in the invitation

    to tender notice

    ! ! Techn. Spec. are selection criteria if they are fixed requirementsare evaluation criteria if they must meet with a min.

    level

    ! ! Changing criteria or even a change in relative importance of criteria isnot permitted

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    41/65

    5/16/2013 41

    WRITTEN REPORT SHALL INCLUDE:

    NAMES OF TENDERERS ADMITTED AND REASONS

    NAMES OF TENDERERS REJECTED AND REASONS

    NAME OF TENDERER TO WHICH IT IS PROPOSED TO AWARD THE

    CONTRACT! ! ABNORMALLY LOW TENDER

    Before rejection, explanations are requested and analysis is made

    taken into consideration:

    ECONOMICS OF PROCESS

    TECHNICAL SOLUTIONS CHOOSENEXCEPTIONALLY FAVOURABLE CONDITIONS AVAILABLE

    ORIGINALITY OF SUPPLIES, SERVICES, WORKS PROPOSED

    STATE AID

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    42/65

    5/16/2013 42

    ..

    ForSupply and Civil Works Contract the evaluation of the

    most economically advantageous offer is made through a

    matrix including the evaluation criteria, their scores &

    their relative weights

    Offer 1 Offer 2Evaluation criteria A score (1-100) B weight (%) (AxB) (AxB)

    -------------- ------------- -------- ------ -------

    -------------- ------------- -------- ------ -------

    -------------- ------------- -------- ------ -------

    Total = 100 Total= Total =

    The contract is awarded to the highest score

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    43/65

    5/16/2013 43

    . FOR SERVICE CONTRACTS THE EVALUATION OF

    THE MOST ECONOMICALLY ADVANTAGEOUS

    OFFER IS MADE BY WEIGHTING QUALITY & COST

    FOLLOWING A CERTAIN RATIO (FOR EX. 80/20) SCORES GIVEN TO TECHNICAL OFFER ARE MULTIPLIED BY

    0,80

    SCORES GIVEN TO FINANCIAL OFFER ARE MULTIPLIED BY

    0,20

    THE CONTRACT IS AWARDED TO THE OFFER

    HAVING THE HIGHEST FINAL SCORE ( addition of

    technical score & financial score)

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    44/65

    5/16/2013 44

    HOW TO SCORE TECHNICAL & FINANCIAL OFFERS?

    TECHNICAL OFFER:EACH EVALUATOR SCORES IT (up to a maximum of 100 points)

    TAKING INTO ACCOUNT RELATIVE WEIGHT OF EACH FACTOR BY

    WHICH THE QUALITY CAN BE ASSESSED (methodology, staff profile)

    AVERAGE TECHNICAL SCORE IS THEN ATTRIBUTED TO EACH

    OFFER

    ONLY TECHNICAL OFFERS HAVING REACHED SCORE > 80 ARE

    RETAINED

    THE FINAL TECHNICAL SCORE OF EACH RETAINED OFFER IS

    DETERMINED AS FOLLOWS: (AVERAGE TECHNICAL SCORE OF THE OFFER / AVERAGE

    TECHNICAL SCORE OF THE BEST TECHNICAL OFFER) x 100

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    45/65

    5/16/2013 45

    .FINANCIAL OFFER:

    ONLY FINANCIAL OFFER OF THE TECHNICAL OFFERS RETAINED

    ARE CONSIDEREDSCORE OF 100 IS GIVEN TO THE LOWEST FINANCIAL OFFER

    FINANCIAL SCORE OF OTHER OFFERS IS DETERMINED AS

    FOLLOWS:

    (COST OF THE LOWEST OFFER / COST OF THE OFFER) x 100

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    46/65

    5/16/2013 46

    8) AWARD OF CONTRACT

    THERE ARE ONLY 2 CRITERIA TO AWARD CONTRACTS:LOWEST PRICE

    MOST ECONOMICALLY ADVANTAGEOUS TENDER

    COMPOSITION OF A CONTRACT:

    PART I + PART II + TECHNICAL ANNEXES

    Special Conditions General Conditions Technical Specifications,(ad hoc clauses or (no modifications Tenderer offer (comprising

    amendments to possible), among others

    general conditions) modalities of execution and

    price)

    Order of precedence of contract documents must be indicated.Minutes of

    information meetings and site visits are part of the contract document

    CONTRACT SENT BY CONTRACTING AUTHORITY TOCONTRACTORS FOR SIGNATURE

    INFORMATION TO ALL CANDIDATES OF RESULTS OF

    PROCEDURE OF AWARD

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    47/65

    5/16/2013 47

    9) IMPLEMENTATION OFCONTRACT

    A CONTRACT IS A LEGAL COMMITMENT BETWEEN CONTRACTINGAUTHORITY (C.A.) & CONTRACTOR . C.A. MUST PROCEED WITH:

    CONTINUOUS SUPERVISION OF THE EXECUTION TO ENSURE THATCONTRACTOR FULLFILL THE TERMS(LEGAL, ADMIN.&TECNICAL)OF THE CONTRACT

    QUALITY CONTROL

    COST CONTROL

    MONITORING OF IMPLEMENTATION TIMETABLE (Delays)

    CHECKING THE BILL OF QUANTITIES

    DEALING WITH VARIATION ORDERS

    VERIFICATION OF PAYMENT ORDERS

    MANAGEMENT OF BANK GUARANTEES

    PENALTIES CALCULATION (IF NECESSARY)

    CLAIMS ANALYSIS/ ARBITRATION, CONCILIATION MANAGEMENT ( IFNECESSARY) PROVISIONAL ACCEPTANCE

    FINAL ACCEPTANCE

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    48/65

    5/16/2013 48

    10) MAIN FACTORS OF RISK(I)

    UNCOMPLETE PREPARATION OF ACTIONSTAKEHOLDERS NOT OR NOT ENOUGH INVOLVED

    WRONG COST EVALUATION

    WRONG ENVIRONMENTAL IMPACT ASSESSMENT AND CHOICE

    OF TECHNOLOGYWEAK OR WRONG ECONOMIC/SOCIAL JUSTIFICATION

    MISSING TO CONSIDER WHOLE LIFE COST OF INVESTMENT

    TENDER DOCUMENT

    TECHNICAL SPECIFICATIONS NOT CLEAR ENOUGH

    DOSSIER UNCOMPLETE OR TOO VAGUE ON ADMINISTRATIVE

    & LEGAL ISSUES (delays, penalties, bank guarantees)

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    49/65

    5/16/2013 49

    10) MAIN FACTORS OF RISK(II)

    EVALUATION OF OFFERSWRONG ASSESSMENT OF TECHNICAL CAPABILITY & ECONOMIC &

    FINANCIAL STANDING OF CONTRACTOR

    IMPLEMENTATION OF CONTRACT

    CONTRACTING AUTHORITY DOESNT FULFILL ITS OBLIGATION

    WEAK SUPERVISION INSUFFICIENT QUALITY CONTROL

    COST CONTROL

    TIMETABLE CONTROL

    POSSIBLE RISKS ARE:

    Cost overuns / Quality not up to Standards / Delays / Breach of

    contract/ Claims / Arbitration / Termination of contract.

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    50/65

    5/16/2013 50

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    51/65

    5/16/2013 51

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    52/65

    5/16/2013 52

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    53/65

    5/16/2013 53

    OPTIONAL MOD L

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    54/65

    5/16/2013 54

    OPTIONAL MODULE

    EVALUATION OF TENDERS A For supply and works contracts

    1-Assessment of the tenderers capacity to execute the contract(financialsituation as well as technical and professional capacities)

    2-Evaluation of technical offers

    .administrative compliance(yes or no grid)

    .technical compliance(to assess whether or not the competing tenders meetthe minimum technical requirements criteria)

    3-Evaluation of financial offers(arithmetical errors ,if any,are corrected.If thetender procedure contains several lots, financial offers are compared for eachlot.The financial evaluation will have to identify the best financial offer for eachlot)

    4-Choice of contractor

    For works contracts the tender offering best value for money is the leastexpensive tender classified astechnically compliantduring technical

    evaluation. For supply contracts the tender offering best value for money is selected using a

    matrix including evaluation criteria(such as functionalcharacteristics,environmental characteristics,running costs,after sales serviceand technical assistance,delivery date).The contract is awarded to the tenderachieving the lowest score.

    OPTIONAL MODULE

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    55/65

    5/16/2013 55

    OPTIONAL MODULE

    EVALUATION OF TENDERSB For service contracts

    Technical offers and financial offers must be put in two separate sealed envelopes.Theevaluation procedure starts with the evaluation of technical offers.

    1-Evaluation of technical offers

    Each evaluator awards each offer a score out of a maximum 100 points in accordancewith the technical evaluation grid.The aggregate final score is the arithmetic average of theindividual scores.Any tender falling short of the 80 point threshold is automatically rejected.

    The committee considers only tenders that have obtained at least 80 points.Of thesetenders,the best technical offer is then awarded 100 points.The others receive pointscalculated by means of the following formula:

    Points=(initial score of the tender in question / initial score of the best technical offer)x100

    2-Evaluation of financial offers

    Arithmetic errors,if any,are corrected.

    The lowest financial offer receives 100 points.The others are awarded points by means ofthe formula:

    Points=(lowest financial offer /financial offer considered)x100

    3-Choice of contractor The tender offering best value for money is selected using an 80/20 weighting

    distribution between technical quality and price.This is done by multiplying:

    the scores awarded to the technical offers by 0.80

    the scores awarded to the financial offers by 0.20

    The resulting technical and financial scores are then added together, and the contract isawarded to the tender achieving the highest score.

    OPTIONAL MODULE

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    56/65

    5/16/2013 56

    OPTIONAL MODULE

    EVALUATION OF TENDERS

    GENERAL CONSIDERATIONS IN ALL ABOVE CASES

    A Selection and award criteria should be precise, non-

    discriminatory and not prejudicial to fair competition

    B The chairman of the evaluation committee must check that nomember has a potential conflict of interest with any of the

    tenderers

    C The entire tender procedure is confidential from the end of the

    tender opening session to the signature of the contract by both

    parties.

    OPTIONAL MODULE

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    57/65

    5/16/2013 57

    OPTIONAL MODULE

    CONTENT OF A TENDER DOSSIER

    A For works and supply contracts

    1- Instruction to tenderers

    2- Additional notice to tenderers

    3-Tender submission form

    4-Contract form

    5-Special conditions

    6-General conditions7-Technical Specifications

    8-Description of tender evaluation system giving the criteria for evaluation

    and the weight attached to each individual criteria

    9-Financial offer(model) price schedule and breakdown,bill of quantities

    10-Tender guarantee (form)

    11-Performance guarantee (form)

    12-Prefinancing payment guarantee (form)

    The tender must clearly state whether or not the tender must be made

    fixed,non-revisable price.If not,the tender dossier must lay down the formula

    for revising prices during the life time of the contract.

    OPTIONAL MODULE

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    58/65

    5/16/2013 58

    OPTIONAL MODULE

    CONTENT OF A TENDER DOSSIERDETAILS OF EACH ABOVE ITEMS (only main issues to be included are mentionned here below.For full

    information about procedure,standard dossiers,templates, models and forms please consult thefollowing web page:http://europa.eu.int/comm./europeaid/tender/gestion/index en.htm. )

    1-Financing,participation,timetable,period of validity of tenders,variant solutions,lots,clarification

    meeting/site visit,opening of tenders,criteria of selection and award with their weighting,joint

    venture/consortium,subcontracting

    2-General information about the tenderer,financial statement,financial identification form,technical

    qualifications

    For works tender dossier:Overview of tenderers personnel,personnel to be employed on thecontract,professional experience of key personnel,plant ,workplan and programme,design documents

    and drawings

    5-Period of execution,commencement order, contractors drawings,and any conditions which

    amplify,supplement or derogate from the general conditions and,when they conflict,override them.

    For works tender dossier: Supervisor,variations and modifications,

    For supply tender dossier: Inspection and testing,delivery,after sales service,warranty

    6-Consult the above mentioned web page for standard text.

    Includes legal and administrative issues among others obligations of the contracting authority and

    of the contractor,breach of contract and termination,dispute settlement.This document is kept as it is.

    7-To be specified by the contracting authority

    3-4-9-10-11-and 12- Consult the above web page for models and forms

    OPTIONAL MODULE

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    59/65

    5/16/2013 59

    OPTIONAL MODULE

    CONTENT OF A TENDER DOSSIER

    B For service contracts

    1-Instructions to tenderers

    2-Shortlist of candidates

    3-Special conditions

    4-General conditions

    5-Terms of reference

    6-Budget breakdown7-Tender submission form

    8-Contract form

    9-Format for a guarantee for pre-financing payments

    DETAILS OF EACH ABOVE ITEMS(only main issues to be included are mentioned here

    below)

    1-Selection and award criteria and their weightings,whether interviews of key experts

    will be held,whether variants are allowed,whether subcontracting is permitted,maximum

    budget available for the contract

    2-Stipulate that candidates cannot form alliances

    5-Provisional timetable

    PROCUREMENT PROCESS

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    60/65

    5/16/2013 60

    PROCUREMENT PROCESS

    INVITATION TO TENDER(Notice)

    TENDER DOSSIER

    (Contents of tender dossier,Clarification of tender

    information,Amendments to tender dossier)

    INSTRUCTIONS TO TENDERERS(Contents of tender,Lots,Independence of tenderers,Pricing of

    tenders,Period of validity,Tender guarantee,Variant solutions,Pre-

    tender visit,Signing of tenders

    EXAMINATION OF TENDERS

    (Opening of tenders,Evaluation of tenders,Annulment of tender

    procedure)

    AWARD OF CONTRACT

    (Notification of award)

    GENERAL CONDITIONS FOR

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    61/65

    5/16/2013 61

    GENERAL CONDITIONS FOR

    CONTRACTS1 GENERAL CONDITIONS FOR CONTRACTS

    PRELIMINARY PROVISIONSSuch as law of the contract

    Order of precedence of contract documents

    Sub-contracting

    OBLIGATIONS OF THE CONTRACTING AUTHORITY

    Such as -supply of documents-access to site

    OBLIGATIONS OF THE CONTRACTOR

    Such as -performance guarantee

    -insurance

    -performance programme

    -detailed breakdown of prices

    -contractors drawings

    -staff

    -patents and licences

    GENERAL PROVISIONS FOR

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    62/65

    5/16/2013 62

    GENERAL PROVISIONS FOR

    CONTRACTSCOMMENCEMENT AND DELAYS

    Such as -commencement orders

    -period of performance

    -delays in performance

    -variations

    -suspension

    MATERIALS AND WORKMANSHIPSuch as -quality of supplies,works and materials

    -inspection and testing

    -rejection

    PAYMENTS

    Such as -advances-retention sums

    -revision of prices

    -interim payments

    -final statement of account

    GENERAL PROVISIONS FOR

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    63/65

    5/16/2013 63

    GENERAL PROVISIONS FOR

    CONTRACTSACCEPTANCE

    Such as -delivery

    -test on completion

    -provisional acceptance

    -after sales service

    -final acceptance

    BREACH OF CONTRACT AND TERMINATIONSuch as -breach of contract

    -termination by the contracting authority

    -termination by the contractor

    -force majeure

    SETTLEMENT OF DISPUTES2 PROCEDURAL RULES ON CONCILIATION AND ARBITRATION

    OF CONTRACTS

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    64/65

    5/16/2013 64

  • 7/30/2019 Specificul Pietei de Achizitii Publice

    65/65

    .