Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2...

66
Us Use Case e Ca es ses 1 / 66

Transcript of Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2...

Page 1: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Us

Use Case

e Ca

es

ses

1 / 66

Page 2: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Table of

1  INTRO

2  SCOP

3  SYSTE

4  USE C

5  CUST

5.1.1 5.1.2 5.1.3 5.1.4 

6  APPLI

6.1.1 6.1.2 6.1.3 6.1.4 

7  ENER

7.1  SCE

7.1.1 7.1.2 Foreca7.1.3 7.1.4 

7.2  SCE

8  INTER

8.1  SCE

8.1.1 8.1.2 

9  OVER

9.1  3.1

9.1.1 9.1.2 9.1.3 9.1.4 9.1.5 

9.2  SCE

10  POWE

10.1  DET

END OF PO

11  DEVIC

11.1  SCE

11.1.1 11.2  SCE

11.2.1 11.2.2 

11.3  SCE

11.3.1 11.3.2 

12  ENER

contents

ODUCTION

E ..................

EM ARCHIT

CASES ..........

OMER AWA

Scenario 1:Scenario 2:Scenario 3:Scenario 4:

IANCE REG

CoordinateSelf ManagScenario 1:Scenario 2:

RGY PRODU

ENARIO 1: VIS

Inverter daPlant Forec

ast data acquisForecast daUser visual

ENARIO 2: PEA

RACTION B

ENARIO 1: AC

Request of AResult of AD

RLOAD MAN

SCENARIO 1:

Power profPower profOverload WOverload WNotification

ENARIO 2: OV

ER LOSS NO

TECTION OF A

OWER LOSS E

CES MONIT

ENARIO 1: DEV

InitializaENARIO 2: DEV

Phase 1Phase 2

ENARIO 3: DEV

Phase 1Phase 2

RGY@HOME

......................

......................

TECTURE ....

......................

ARENESS ....

: Visualization: Visualization: Alarm ..........: Other energy

GULATION ..

ed Managemengement applian: Home Doma: Optimize ene

UCTION/STO

SUALIZATION

ta acquisitioncast registratiisition .............ata acquisitionlization ..........AKS/COSTS OP

BETWEEN C

TIVE DEMAND

AD service ....D service .......

NAGEMENT

OVERLOAD M

file schedulingfile is unschedWarning notifiWarning Clearn of the Overl

VERLOAD MAN

OTIFICATIO

A POWER LOSS

EVENT PHASE .

TORING AND

VICE INITIALI

ation descriptVICE MONITO

: Monitoring d: Monitoring eVICE CONTRO

: Setup ...........: Command ...

E PROVISIO

......................

......................

......................

......................

......................

n of current enn of historical......................y information

......................

nt appliances nces regulatio

ain Overload mergy cost in ca

ORAGE .........

OF PRODUCT

n .....................ion .......................................n .........................................PTIMIZATION

EMS AND T

D AND ENERG

......................

......................

T .....................

MANAGEMENT

g ....................duled ..............ication sent froredUp notificaoad Warning NAGEMENT EX

ON AND ANA

S EVENT PHAS

......................

D CONTROL

IZATION ........tion ................ORING ............disabled ........enabled .........OL .............................................................

ONING AND

Use Case

......................

......................

......................

......................

......................

nergy and powl data.......................................................

......................

regulation ....on ..................management .ase of multi-ta

......................

TION INFORMA

.....................

.....................

.....................

.....................

.....................

.....................

THE AGGRE

GY SYSTEM IN

.....................

.....................

......................

T EX-ANTE ..............................................om the Meteration sent fromEvent to the UX-POST .........

ALYSIS ........

SE ........................................

L ...................

...........................................

................................................................

................................................................

MAINTENA

es

......................

......................

......................

......................

......................

wer data ..........................................................................

......................

......................

......................

......................ariff contract .

......................

ATION ................................................................................................................................................

EGATOR ......

NTERACTION .............................................

......................

......................

......................

......................

......................m the Meter ...User .....................................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

ANCE ............

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

2 / 66

................... 4

................... 5

................... 6

................. 10

................. 10

................. 10

................. 15

................. 15

................. 16

................. 17

................. 17

................. 17

................. 18

................. 20

................. 23

................. 24

................. 24

................. 26

................. 27

................. 28

................. 28

................. 29

................. 30

................. 31

................. 33

................. 35

................. 36

................. 37

................. 39

................. 40

................. 41

................. 42

................. 43

................. 44

................. 45

................. 46

................. 47

................. 48

................. 49

................. 50

................. 52

................. 53

................. 54

................. 56

................. 57

................. 57

................. 60

0 5 5 6 

7 7 8 0 

4 4 6 7 8 8 9 

 3 5 

7 9 0  

2 3 4 

6 7 

9 0 2 3 4 6 7 7 

Page 3: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

12.1.1 12.1.2 12.1.3 

13  REVIS

14  GLOS

Add a neRemove Mainten

SIONS ..........

SSARY ..........

ew device .......a device ........

nance ..............

......................

......................

......................

......................

......................

......................

......................

Use Case

.....................

.....................

.....................

......................

......................

es

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

......................

3 / 66

................. 60

................. 60

................. 60

................. 60

................. 62

0 0 0 

Page 4: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

1 IntroEnergy@hfor energy communicbased on thSmart Grid The AssocIndesit Commembers fappliances telecommuIntecs), mithe inverteMario Boeand Urmet

The Energytransform tthe electrictelecommudevices to domestic eThe activitof architecthe regulatspecificatioEnergy@hintegrates d

Inforenco

Enerwitho

oductiohome is a no

efficiency iation. Its gohe collaborad.

iation was fmpany and from differe

manufacturunications (Ticro-electronr and storag

ella) and smt).

y@home aithe home enc meter, houunications, sbe integrate

energy systeties of the Atures and te

tory environons.

home is an adevices, fun

rmation in thuraged to re

rgy@home rout any prio

on o-profit assoin the homeoal is to proation of the

founded on it is open to

ent industrierers (ElectrTelecom Itanics vendorge systems (

mall/medium

ims to use thnvironment usehold appsmall renewed in a smarem, and giviAssociation echnical spenment, expe

acknowledgnctionalities

his documeeview and p

reserves theor notice.

ociation thate, for the bemote the deappliances

July 2012 bo new membes: the electrolux, Indesialia and Vodrs (Freescale(Power-One

m-sized comp

he new infoin an eco-s

pliances, elewable powerrt way, increing consumare organiz

ecifications,erimenting w

ed contribus and use ca

ent is prelimprovide com

commen

e right to pu

Use Case

t aims to deenefit of the evelopment within the h

by Telecommbers. At the

rical systemit Companydafone), ICe, Renesas ae), as well a

mpanies (Fly

ormation tecsystem of deectrical syster plant and eeasing ener

mers more ined into wor, include thewith pilot pr

utor to the Zases of Ener

minary and smments at th

nts@energy

ublish future

es

evelop & proenvironmenand widesp

household a

m Italia, Elece time of wr

m industry (Ey, WhirlpooT companieand ST Micas research i-By, Flexgr

chnologies aevices that cem, and theenergy storargy efficiencnformation arking groupse analysis orojects and

ZigBee Homrgy@home.

subject to chhe following

y-home.it

e versions o

omote technnt, based uppread of proand their int

ctrolux, Eneriting, the AEnel and Edl, and Aristoes (Altran, Fcroelectronicinstitutes (Isrid, Eurothe

and electroncommunicatnetwork of

age. Commucy, reliabilitand power os and, in adf the use cathe dissemi

me Automati

hange, howeg e-mail add

of these spec

nologies anpon device toducts and stegration wi

el DistribuzAssociation cdison), houston Thermo)Flash Replycs) and a costituto Supe

erm, MAC,

nic equipmeate with eachf broadband

munication alty and securof choice. ddition to theases and the ination of th

ion 1.2 stan

ever anyonedresses:

cifications

4 / 66

d services to device services ith the

ione, and counts 22 sehold ),

y, and ompany for eriore Gemino,

ent’s to h other’s: d llows these rity of the

e definitionimpact on

he

ndard that

e is

n

Page 5: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

2 ScoThe purpoAssociationThis documaim to exadditional created takintegrated developmesupplemenpoints of v

pe ose of this dn vision. ments reprextend the E

types of seking into ac

Home Areent of thentary categoview.

document i

esents the sE@h architervices are count the eea Networke project, ories of serv

is to provid

second releatecture folldefined w

xperience ok. Further whenever

vices for clie

Use Case

de a set of

ase of “Enelowing con

with respect of the partneversions opartners

ents also tak

es

use cases

ergy@homensumers an

of the firsers and con

of the docushall identking into ac

for implem

e Use Cased grid nee

st version. Tnstitutes a neument are tify the cccount addi

menting Ene

es” documeeds. In theThis releas

new step towenvisaged

chance to itional expe

5 / 66

ergy@home

nt with thee documentse has beenward a fully

during theimplement

riences and

e

e t n y e t d

Page 6: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

3 SystFollowing flexible desupport of flexibility tConnectionThe generiCustomer a

The functiosystems anbe mappedshown in Fenergy conarchitecturinterests of

1 Developed Reference: h

tem Arcthe Europemand and gan efficientthat a custon Point”, thic architectuand the Grid

Figure 1: Flex

onal compond devices. Id in the EnerFigure 2, pronsumption are is expectef the Energy

by the “Smart

http://ec.europa

chitectuan roadmap

generation at integration

omer could oat represent

ure that descd actors is r

xibility function

onents repreIn this docurgy@home oviding to tawareness, ued to increay@home m

t Grid Coordina.eu/energy/g

ure p for the impare taken intn of renewaboffer to the ts the physiccribes the fureported in F

nal architectur

esented in thument it wil

architecturhe customeup to a fullyse in scope embers.

nation Group”as_electricity/

Use Case

plementatioto account,

able energy Smart Gridcal and logiunctions invFigure 1

re from SGCG

his figure col be shown

re. The Assoers new valuy integrated as a result o

” as requested/smartgrids/do

es

on of the Smone of the csources into

d actors throical interfacvolved in th

G (source Smar

ould be imphow this ge

ociation adoue added ser

energy manof the ongo

d by the Europoc/xpert_grou

mart Grid1, wcornerstone o the energyugh a so ca

ce from the che interactio

rt Grid Coordi

lemented/ageneric functopted the syrvices ranginagement sying collabor

pean Commissup1_sustainabl

where conce requiremeny system is talled “Smartcustomer to

ons between

ination Group

ggregated intional architystem architing from simystem. The ration activ

sion, mandatele_processes.p

6 / 66

epts like nt for the the t Grid o the grid. n the

)

n different tecture can ecture

mple

vities and

e M/490. pdf

Page 7: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

In a Home Network), through corequiremeninterfaces a Devices inAutomatioEnergy@hlevels of cobetween thmultiple ve The HAN wprovides m(Enel DistrNetwork anreceived fr The HAN devices thaPlug. In Ento receive eon/off remthe type ofand controas well as tinformationscheduling

Domain, thall the acto

ommunicationts of indooand service

n the HAN con version 1home and ofommunicatihe user deviendors.

will interfacmeasuremenribuzione) pnd it commrom the all t

devices are at do not imnergy@homenergy data

motely. Smarf load (e.g., l the start anthe transmisn of the app

g algorithm

hat includesrs (home deon mechani

or platform as provided o

communicat.2 develope

fficially ratiion includinces. This en

ce with the nt data recorpower-line p

municates usthe DSO me

divided intmplement anme have beea and instantrt devices artype of appnd the statussion of statpliance. Evethat uses th

Figure 2: E

s both the Hevices, CEMsm. The aimand it is expoutside the

te with eached in collabofied in July

ng the syntansures full in

DSO meterrded by the protocol. Oning the ZigBeters and ca

to "legacy dny communin defined ataneous powre connecte

pliance, suppus of operatitistical inforery electricahe data struc

Use Case

Energy@home

HAN (HomeMS, Smart Im of Energypressly out oHome Dom

h other via toration betw

y 2013. Thesax and semanteroperabi

r using a smelectronic mn the other Bee protocoan be querie

devices" andication skill

all the messawer, and whd devices foplier name, ion, to commrmation andal load of a cture defined

es

architecture

e Area NetwInfo and Cuy@home is of the scope

main.

the wirelessween the Zigse internatioantics of appility betwee

mart meterinmeter commside, this deol: it can be ed in polling

d " smart dels and can oages neededhere the loador which thefirmware v

municate ind the tunnelsmart devicd in Power

work) and thstomer Inteto identify

e the definit

protocol ZigBee Allianonal specificplication men systems a

ng gateway (municating wevice is partconfigured

g to acquire

vices”. Thenly be contr

d to configurd permits, toe messages

version, etc.)nformation ting of manu

ce can be plaProfile.

he HN (Homerfaces) can and describtion of the o

igBee Homnce and cations defiessages excand devices

(Smart Infowith it via tht of the Hom

d to send puon-demand

e first are tratrolled throuure these smo control thare defined) as well as to diagnose ufacturer pranned throu

7 / 66

me cooperate

be the other

me

ine all hanged from

o) that he DSO me Area sh data

d data.

aditional ugh a Smart

mart plugs, he switch d to identify

to monitor problems

roprietary ugh a

t

y

Page 8: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

The Powerwashing mschedulablestimated tschedulingschedulingthe total desubject to aavailability The main a Smart

their poo

o o

o

In asupthe exashaSmsomconbe c

Customo

o

o

The CupossibiinterfacpreviouTypicaentertaimplem(e.g. th

r Profile is amachine eachle phase nottime require

g the phase. g algorithm emand in terany restrictiy of energy

actors in the

Applianceossible newDisplay toinstant powDispatch inAutonomocoming frobeyond a thCooperativload shiftin

any case, thpervision, sh

correct exeample, a small assure the

mart plugs (mehow incluntrol over thcontrolled bmer Interfa

Display ininformatioevery singinterface isTransmit behavior Configure computer utime slots)

ustomer Inteility to havece, but the dusly stated. al Customer inment syst

ments the ushe Home Ga

a vector whh element ot interruptibed, the expeThe CEMSto calculaterms of maxion set by thfrom power

e Home Dom

es: an evoluw functionalio the customwer, etc.) n the HAN

ously adapt om the houhreshold) vely operateng and load

he load contrhall be perfoecution of itart washinge result of thable to provuded in the he effect of rby Smart Pluaces: see henformation n and simil

gle smart aps freely deficontrol me

Smart Appused to con

erface, frome Customer definition of

Interfaces atems, in-houser interfaceateway) and

ich represenf the vector

ble describedected energyS collects the the delay oimum powehe client (sur plants and

main are the

tion of the aities: mer informa

informationtheir behav

use. (e.g. re

e with othershedding

rol operatioormed undets working pg machine, whe washing vide remoteSmart Applremote contugs

ereunder somon energy

lar, from thppliance. Tined by everessage to S

pliances to mnfigure a th

m this perspeInterfaces af this interfa

are personause monitore, could be ld accessed th

Use Case

nts the enerr represents d by 4 fieldy consumed

he Power Proof each stager and hourluch as the tid storage sy

e following

actual and s

ation on th

n on their envior accord

educe their

r entities in

ons either peer the complprocedure awhen reque

g cycle. e metering aliances catetrol activitie

me of their pusage like

he whole hoThe level ofry device Smart Appl

modify theirhermostat to

ective, is coaccessing thface is out o

al computersr and similalocal in the hrough web

es

gy needs ofa phase of s: the maxim

d and, finallyofile of all d

ge for each dly cost of enime of termistems in the

g ones:

standard wh

heir energy

nergy consuding to inforload when

n order to op

erformed aulete control nd its resultsted to mod

and to be remegory althoues. In partic

possible fune instant poouse (cominf details an

liances to

r power cono activate th

onnected in he house frof the scope

s, Smart Phar. The softwdevice or re

b-services.

f a device, inthe washingmum powery, the maximdevices condevice; this nergy that, oination of a e home.

hite goods;

consumptio

umptions rmation on global hou

ptimize the

utonomouslyof the appli

ts and perfodify its cons

motely contugh they cancular, Smart

nctionalitiesower, historng from the nd graphica

request a

nsumption phe controlle

the HN/HAom the WANof the Ener

ones, PDAsware applicaemotely hos

n the case og. Each elemr required, tmum delay

nnected and permits to oof course, is

a wash) and

see hereund

ons (e.g. us

n energy conuse consump

energy usa

y or under aiance, whic

ormances. Fsumption be

trolled) coun provide not Appliance

s: rical data, Smart Info

al layout of

modificatio

profile (e.g.ed load only

AN; it is foreN through argy@home p

s, ad hoc disation, whichsted in anoth

8 / 66

of a ment is a the allowed performs a optimizes s always to the

der some of

sed energy,

nsumptionsptions goes

age through

an external ch assures For ehavior,

uld be o direct s will not

contractualo) and fromf their user

on of their

. a personaly in certain

eseen the a specific project as

splays, h her device

f

,

s s

h

l m r

r

l n

Page 9: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Customcommuinternebased minimureceivecan hanthese toNote thcontrol

Smart informHome could b(sampldevice,by third

Outstandin WSN-C

HAN dapplica

ElectridifferenMoreovof the m

Aggregthe ADoffers t

Please notedevices in functionaliwith a richthe same wto perform

mer Energunication fuet). The CE

on signals um performed from conndle generao the connehat multipllled.

Info: it iation into tElectricity be possiblyed at of ab, likely embd parties an

ng compone

C: Wirelessdevices an

ations. icity Metentiated regver, the memeter. gator: med

D buyers, pto the marke

e that the prthe Home Dities from m

h user interfaway, while ty

m such opera

gy ManagunctionalitieEM is a log

received mance standannected devial or dedicatected devicee loads/gen

is the elemthe HAN. PMeter, hen generated bout 1 Hertbedded insi

nd used to di

ents outside

s Sensor Nd provides

er: An elegisters, and eter should

diator betwepools flexibets.

roposed clasDomain, wit

more than a cface, could aypical smar

ations, shoul

ger Systemes, it is the ggical functifrom the gards. The Cices; especited load andes. It providneration res

ment, proviPublished dnce the Sma

by the Smatz frequencde the Smaispatch data

the Home D

etwork Censervice or

ctric metercapable o

provide bi-

een consumilities of co

ssification ithout any licategory. Aalso implemrt applianceld be consid

Use Case

m (CEMSgateway beon optimizgrid, consu

Customer Enially the in-d generationdes vice vesources can

ided by thdata are a sart Info actsart Info itsecy or higheart Info. Ada generated

Domain are

nter: it manriented inte

r, able to of transmitt-direction c

mers and ADonsumers to

is mainly inimitation to

As an exampment functioes are smart dered an app

es

) The CEetween the Hzing energy umer’s settinergy Manahome/buildn managemrsa informa

n be combin

he DSO, wsub-set of ths like a proelf. Noticeaer) should bdditional ele

by other me

e:

nages, togeterfaces for

measure ating such ommunicat

D buyers, co build Act

ntended to idthe possibi

ple, an advannalities typiwhite goodpliance from

EMS is CHAN, the H

consumptiings and cager collectsding sector h

ment commaation towardned in the

which dispahose alread

oxy of the mably, near rebe acquiredements (SI’)eters into th

her with ththe develo

and record data to cenion to allow

ollects requtive Deman

dentify the mlity for a denced Smart ical of a Cu

ds, also a perm this persp

CEM integHN and the ion and or contracts, as messages has to be mands and theds the “gridCEM to b

atches enerdy availablemeter. Addeal-time insd by anothe) can also bhe HAN.

he Home Gaopment of

d usage daentral utilitiw remote m

uests and sind services

main categoevice to impt Appliance,ustomer Inteersonal comppective.

9 / 66

rated withWAN (e.g.production

and devicessent to andentioned. Iten forwardsd / market”.be mutually

rgy relatede inside theitional datastant powerer meteringbe provided

ateway, thethird-party

ata in timeies system.

management

ignals fromand makes

ories of plement , provided erface. In puter, able

h .

n s d t s .

y

d e a r g d

e y

e . t

m s

Page 10: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

4 UseUse cases number in We define

Cus App

Moreover maintenancLet’s descr

5 CusThe goal oconsumptioto the custo

5.1.1 ScThe aim ofher/his con Title

Description

SProvides a scontained inand, eventucalculated banother devData are disand in case slowly chanSmart Info pelaboration

cases have been order to madifferent in

stomer Awapliance Reg

it will be ce of the Neribe all of th

stomer aof this first lon by displomer any re

cenario 1:f following nsumptions.

n

Smart Info sub-set of dan the Smart Mally, instant

by the SI itsevice connectespatched upoof transition

nging data). Tperforms no over the dat

organized ake them eancremental l

areness gulation

important etwork itselhem in deta

awarenelevel of funaying someelated action

: Visualizuse cases is

ata Meter power,

elf or ed to it. on request n (only for The

a

into clusterasily identifilevels of fun

to define lf, not strictlil:

ess nctionalitiese useful enern.

ation of cs to provide

1.1 Visualizaand DSO The customeenergy consuInfo, which rthose data wAmong the dprovided, hethe active tar“current” mehours or daynumbers, graCustomer Innecessary; itdescribed in

Hosts a Webcollects dataorganizes thepresentation

Exposes a wHN that can applications current data visualization

Use Case

rs of scenarfiable. nctionalities

some auxily related to

is to enhanrgy related

current ene customer w

ation of glob

er is presenteumption of hretrieved the

with near realdata coming ence any referiff at the moeans near rea

ys. Data can baphics, table

nterface. In thts presence w the CEMS c

Roles CEMS

b applicationa from HAN em for a use

n.

web-based APbe used by 3that wishes and provide

n.

es

rios and the

s of the Ene

iliary use co the Energy

nce customedata. The a

nergy andwith inform

bal current m

ed with inforhis/her houseem from the M-time powerform the Me

erence to the oment, but nal time data abe presenteds, etc.) in thhis Use Casewould allow acolumn.

n that devices and r-friendly

PI over IP 3rd party to elaborate s a different

ey maintain

ergy@Home

cases relatey Managem

er awarenesappliance w

d power dation on the

metering data

rmation aboue. Data are prMeter and, p, measured beter no informcurrent tarifot the pricingand the consu

in different he Smart App the CEMS ia number of

SmReceive ovSmart Infometering denergy conDisplay a data, depeof its user

n a unique i

e System:

ed to the ment of the h

ss about herwill not sugg

data e current sit

from Smart

ut the global rovided by thpossibly, inteby an extra mmation aboutff shows just g. In this conumptions of formats (pla

pliance or in is not strictlyextra functio

mart Applianver the HANo) global curdata and totansumption. sub-set of av

ending on theinterface

10 / 66

incremental

set up andhouse.

r/his energygest directly

tuation of

Meter

current he Smart egrates module. t costs are which is

ntext last few

ain the

y onalities

nces N (from rrent al in-house

vailable e richness

l

d

y y

Page 11: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

retrieved bythe basic prretrieve, valdispatch theprofile shallthe same levavailable inminutes). Ato change Mor to integrapower, shaldevice whiccustomer.

Title Description

SAt least the In addition, use (TOU) pInfo can emwhenever a taking place

y the Meter, erocessing reqlidate, memoem. For examl be dispatchvel of resolu

n the meter (eAny operationMeter data resate them withl be perform

ch displays d

n

Smart Info same as UC in case of tipricing, the S

mit signal in ttariff chang

e. (see notes

except quired to orize and mple, load hed with tion

e.g. 15 n needed solution h instant

med by the data to the

C 1.1 me-of-Smart the HAN, e is below).

A

Implements Environmenfor Java) applications elaborate cua different v

Implements manage all sHAN; this fuimplementedthe WSN-C

Implements with the WSand providescommunicatbundles and Platform.

1.2 VisualizaThis Use Caof the used eDSO could Energy Retaclients. (see

Same as UC

The CEMS halgorithm, thAlgorithm, toobtaining (eior a proper for a remote winformation)Moreover, imweb applicatand energy caddition, thisprovide a wakWh. The extariff changeby the Smartcould also repossible diffand Meter re

Distributes othe cost infodevices.

Use Case

an nt (e.g. OSGi

to host that

urrent data anvisualization.

a Trust Agensecurity keysunctionality d via collaboService Plat

the communSN-C Services APIs to metion betweenWSN-C Ser

ation of globase extends Uenergy. Acconot be allow

ailer the onlynotes below

Roles CEMS

C 1.1

hosts a dediche Energy Coo evaluate enither via a prform to be filweb site to g) the cost infmplements ation to displaconsumptions interface shay to obtain txact momente occurs can t Info (this oequire to evaference betweal-time cloc

over the HANormation to in

es

Execution i framework

3rd party wishes to nd provides

nt to s of the can be

oration with form

nication e Platform ediate n local rvice

bal current mUC 1.1 addinording to rule

wed to providy subject entitw).

cated ost nergy costs roper code lled by user

gather the formation. a proper ay both cost

n. In hall also the cost per t when a be obtained

operation aluate the

ween CEMS cks)

N network nterested

metering data ng also informes imposed bde such informtled to define

SmSame as Uinformatioavailable (

+ cost informmation aboutby the Authomation, beine final rates

mart ApplianUC 1.1 + coston if this last(see notes be

11 / 66

mation t the cost rity, the

ng the for

nces t t info is elow)

Page 12: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Title

Description

SAt least the In addition, power inforprovided in Appliances consumptio

Title

Description

SSame as UC

Title

Description

SSame as UC

n

Smart Info same as UC near real tim

rmation is to order to alloto calibrate i

ons.

n

Smart Info C 1.2 plus UC

n

Smart Info C 1.3

C 1.1 me instant

be ow Smart its energy

C 1.3

1.3 VisualizaAppliances+In this Use Cconsumptionand quality oshould be potogether withperformed b

Same as UC

Provides to upoint of contrespective cuconsumption

1.4 VisualizaAppliances +Similar to U

Same as UC

Same as UC

1.5 VisualizaAppliances aOne of the mconsumer inher/him theirwill be pressinformation,achieved on The Smart Aduring its nealso about ththe CEMS toMoreover, inreceives info

Provide the Habout energycosts and clo

Use Case

ation of curr+ global curreCase, the cusns of the singof data couldossible for clh total house

by Customer Roles CEMS

C 1.1

user applianctact to publisurrent energyn information

ation of curr+ global met

UC 1.3 with inRoles CEMS

C 1.2

C 1.3

ation of estimand its cost b

most importan selecting thr costs and esed. Many st, a energy cothe single ap

Appliances esext operationhe energy coo perform enn case of timormation abo

Roles CEMS

HAN with iny tariff profilock time.

es

rent energy cent meteringstomer is alsogle applianced be differentients to displ

e consumptioInterfaces.

ces a single sh their y n.

rent energy ctering data + nformation o

mated energybefore startinant goals of the parameters

energy consuudies show t

onsumption sppliance. stimate the e

n (ex: cycle). st and the ne

nergy cost evme-of-use (TOout which tar

nformation les, energy

onsumptions data

o informed oe. The level ot among diffelay such disa

ons; such fun

SmEach appli displays

consumdata

dispatchconsum

receivesSmart Inenergy

displaysenergy

onsumptionscost informa

on costs

SmSame as Uinformatioavailable (

y consumptiong to run his use case is of the cycleumption, befothat, only by aving of 10-

nergy that wIf possible, t

ext operation valuation.. OU) pricing, riff is current

SmThe Smart estimate

consumnext op

s and power

on the currentof detail, freqferent devicesaggregated dnctionality sh

mart Applianiance s its own ene

mption/power

hes it own enmption data o

s over HAN Info) the totaconsumptions the total hoconsumption

s and power ation

mart ApplianUC 1.3 + coston if this last(see note bel

on of Smart

is to educatees feedbackinore the start bdisplaying t

-15 % could b

will be consumthey give inf

n cost by req

the applianctly in use.

mart Appliant Appliancese the energy

med to performperation

12 / 66

of Smart

t energy quency s. It

data hall be

nces

ergy r drawn

nergy ver HAN (from

al house n ouse n

of Smart

nces t t info is low)

e the ng button this be

med formation

quiring to

ce

nces s:

to be m the

Page 13: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Title

Description

SSame as UC

Notes: In a fully rates and metering by the EnItaly, TOUaccordingtimetable (i.e. each Usually epossible fenergy (aflat rates on previoconsumptmaximumRetailer s To evaluaanother dEnergy Cto 19:00)

n

Smart Info C 1.3

“unbundledto bill finaactivity, kn

nergy RetaiU schedule

g to the reqfor electrictime slot).

energy is prfor the ener

already avaithe concept

ous consumtions in a gi

m peak of phall rely on

ate the pricdevice, whicCost Algorith

replicating

d” framewoal customernows all theiler on the (number oquirement sc offers, bein

riced highergy providelable in thet itself of eu

mptions, foriven billingower in a g

n the meterin

e of used ech shall imphm calculate

g the conditi

1.6 Visualizanot sufficienThe Smart Aconsumed duIf the total avSmart Appli

ork, the DSOrs. Neverthee metering dbasis of the

of tariff andset out by ng each ene

er during peer to chargee market) simuro-per-kWr example

g time (e.g. given periodng data prov

energy, the plement a des the priceions applied

Use Case

ation of a want to run a SmAppliance esturing its nexvailable powiance notifies

Roles CEMS

O (owner ofeless, the Ddata neededese meterin

d start and sthe AEEG

ergy retailer

eak time ane every tarimilar to tele

Wh itself is min case tha year). Mo

d (e.g. a davided by the

Smart Info dedicated ale of energy ad by the En

es

arning if avamart Appliantimates the m

xt operation (wer in the homs the user

f the SI) is nDSO, being d for billing,ng data sentstop time) is

G. In this wr free to dec

nd lower iniff the sameecommunicmeaninglesshe rate chaoreover, they). Whichee DSO.

shall provilgorithm, that a given ti

nergy Retail

display value

receivesenergy

display

ilable total pnce maximum powex: cycle). me is not suf

SmThe Smart estimate

to be cothe next

receive total avhome th

display if it is n

eventuainformapossibleHAN

not in chargthe subject

, being the ft by the DSs pre-config

way, the AEide the pric

n off-peak; e, or even ocation rates s). The pricnges accore price coulever the con

ide the metehe Energy Cime (e.g. € pler. The Ene

the estimate

s the informacost throughthis cost

power (in the

wer that will

fficient to run

mart Appliant Appliancese the maximonsumed to pt operation the informat

vailable powehrough HANa warning to

not possible tally send the ation that it ie to run throu

ge of definint entitled tofinal price eSO. For exagured into tEEG has frce for energy

however offer a flat (note that i

ce could alsrding to thld increase nditions, th

ering informCost Algoriper kWh froergy Cost A

13 / 66

ed energy

ation of h HAN

e home) is

l be

n, the

nces s: um power

perform

tion of er in the

N o the user to run

s not ugh the

ng energy o perform evaluated ample, in the Meter rozen the y in tariff

it is also rates for

in case of o depend e overall given the

he Energy

mation to thm. The om 08:00 Algorithm

Page 14: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

to get theEnergy CEnergy reinterfacesparameterparameter

T T T

se O

vi The outpu

Th An

. Every actoffered by A simplifProfile toshall provtariff offecorresponTariff Protariff, sucTariff Properform aIt should case no ac A commocompletedwith typic

e price couldCost Algoritetailer as a “s of the Enrs. For exars are:

The content The time bouThe time ineparate indi

Other additioia a direct m

ut of the Enhe estimatedn estimation

tor in the Hy the CEMS

fied mechano be exchanvide enoughers. A possibndent price (ofile shall ach as currenofile could bapproximate

be noted thctor in the H

on requiremd within a cal man-to-m

d be quite cthm shall b“plug-in” dnergy Cost ample, to es

of all meterundaries of n which theication of thonal data shmachine-to-

ergy Cost Ad price in eun error (perc

HAN shall hS.

nism, withonged in theh flexibilityble content (in euros peautonomousnt time or dbe provideded evaluatiohat this solHAN is able

ment, for botime compamachine int

complex, anbe hosted ondedicated to

Algorithmstimate the

ring registerthe differene energy c

he different hould be comachine co

Algorithm couros centage of e

have access

out a CEMe HAN. They in order tof the Simp

er kWh) for sly take intdifferences d by an actoons of the enution shoule to offer th

oth cost evaatible with terface resp

Use Case

nd, in any cn the CEMprice evalushall be dprice of a

rs from the nt TOU tarifconsumptionTOU tariffs

ollected by onnection to

ould be a pa

estimated pr

to the Ener

MS, could be Simplifiedto evaluate

plified Tariffr each time sto account between w

or present innergy cost.ld be conside Energy C

aluation methe proposonse.

es

case, definedMS and shouuation. In thdefined by a forecasted

Smart Meteffs ns is goings the Energy

o the Energy

air, includin

rice)

rgy Cost Alg

be envisaged Tariff Pr

e, with suffiff Profile is aslot. The acall the rele

working andn the HAN

dered as a Cost Algorith

echanism, issed services

d by each Euld be ideahe scope of detailing th

d consumpti

er

g to take p

y Cost Algory Retailer se

ng:

gorithm via

d defining ofile shall b

ficient accura sequence

ctor that proevant factord holiday da

and used b

sub-optimahm.

s that the es. In particu

Energy Retaally provideEnergy@H

he input antion, possi

place, possi

rithm itselferver.

a a dedicate

a Simplifiebe standardracy, most of time slot

ovides the Srs that influays. The Sby any othe

al one, to be

evaluation pular, it shal

14 / 66

ailer. The ed by the Home, the nd output ble input

ibly with

f possibly

ed service

ed Tariff dized and

common ts and the implified

uence the Simplified r actor to

e used in

process is ll comply

Page 15: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

5.1.2 ScThe aim oftheir energfrom the SmTitle

Description

SRetrieves, fravailable hiin-house popossibly intinstant powresolution asamples coumeter configInfo itself doperations tresolution othe Meter. Aoperation, oadditional dperformed bInterface de Title Description

SSame as UC

Title Description

SSame as UC

5.1.3 ScTitle

cenario 2:f the followgy consumptmart Applia

n

Smart Info from the Metstorical data

ower profile) ternally gene

wer samples. Dand number ould vary, accguration. Th

does not perfoto change timof data cominAny needed or integrationdata, shall be by the Customevice.

n

Smart Info C 2.1

n

Smart Info C 2.1

cenario 3:

: Visualizwing use case

tion, disaggances.

ter, (i.e. the and

erated Data of cording to he Smart orm

me ng from

n with

mer

: Alarm

ation of hes is to prov

gregating the

2.1 Visualizahouse and SmThe customeenergy durin

The access tallows the stsingle appliaconsumptionaccess and apresent themBrowser. The CEMS aapplications the stored da

2.2 VisualizaThe customeother customreferences.

Guarantee a application ito enable comusers.

2.3 VisualizaThe customecommunities

Guarantee a application icompare thecommunity o

3.1 Notificat

Use Case

historicalvide custome global ene

ation of histomart Applianer may accesng time.

Roles CEMS

to the networtorage of theance’s energyn. The CEMaggregate thom to the user

allows externin the HN to

ata

ation of histoers may com

mers to be ab

Roles CEMS

simple accein the networmparison wi

ation of histoers may coms

Roles CEMS

simple accein the networe energy usagof users.

tion of Home

es

data mers historicergy time va

orical data fonces) ss the historic

rk platform, total and y

MS can ose data to through a

nal o retrieve

orical data compare their ow

le to check th

ss to the rk in order ith other

orical data compare their ow

ss to the rk to ge with a

e Domain Ov

cal and statisariations wi

or the single

cal data and v

SmThe Smartdisplay soconcerningconsiderinlimitationsInterface It will provinformatioconsumpti

ompared withwn energy coheir behavio

SmNone

ompared withwn energy co

SmNone

verload

stical informith the one c

customer (G

verify how h

mart Appliant Appliances

ome specific g their energ

ng the intrinss of their Use

ovide to the Hon on energyion.

th a benchmaonsumptions or against virt

mart Applian

th a user comonsumptions

mart Applian

15 / 66

mation on coming

Global in-

he used

nces s can data

gy usage, sic er

HAN its y

ark with tuous

nces

mmunity with user

nces

Page 16: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Description

SThe Smart IMeter, or gepower-alarmpower is beythreshold. Tconsequentlthe HAN toInterfaces, Sto the CEMindication aof power beavailable). It should bealarm is to bdevices or ohave been pfor receivinalarm couldthan once, bopens the br Title Description

SIn case of bInfo will noMeter, hencdedicated mHAN.

5.1.4 Sc The Execucustomer aclients withrenewable

n

Smart Info Info receivesenerates itselm, indicatingyond a contr

The Smart Inly, emits an a

o all the CustSmart Applia

MS, providingabout the pereyond the thr

e defined whebe sent to allonly to those previously reng the alarmsd be emitted mbefore the Mreaker.

n

Smart Info lack out the

ot be able to rce it shall notmessage towa

cenario 4:

ution Enviroawareness. Fh the energsources, the

s from the lf, a max-

g that ractual fo, alarm in omer ances and g centage reshold (if

ether the l paired which

egistered . The more eter

Smart reach the t emit any ard the

: Other en

onment, avaFor example

gy sources me CO2 footp

The customeexceeds the mOverload. ThThe custome

It can activatthrough an inallows the usfor the housealarm activadishwasher m

3.2 Black ouIn case of enguarantee ththe customer

Activate a Salarm

nergy info

ailable in thee, the energmix used to print and sim

Use Case

er is promptlmaximum avhe notificatioer can also ac

Roles CEMS

ate the local an house TI teser to set thee device/app

ation (i.e. TI tmachine, ect

ut nergy black ohe correct actr about the e

Roles CEMS

MS or a voic

ormation

e CEMS, engy retailer co

supply his/milar inform

es

ly informed wvailable powon shall be nccess to an h

alarm erminal. It e priorities pliance terminal, t.)

out the CEMtivity for a mvent with an

ce call

nables furthould deploy/her applianmation.

when the ovewer, hence caunotified local historical view

SmThe appliageneral ala

S, equipped minimum timen alarm (e.g S

SmNone

er applicatioy an applicatnce, specifyi

erall power dausing a Hom alarms (e.g.w of any alar

mart Appliaances can echarm

with an UPSe (< 60 sec.)SMS, phone

mart Applia

ons dedicatation able toing the perc

16 / 66

drawn me Domain

acoustic). rm.

nces ho the

S, is able to . It can alert call)

nces

ted to provide

centage of

Page 17: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

6 App The appliasystem comoperated acustomer aof the hous

6.1.1 CoIn this conbehavior athe regulatthe type ocoordinateDomain Syinvolved atime variab

6.1.2 SeIn this coninformationperformed the regulatSince in thpower conof the systebe consideother Smaraccepting o

pliance r

ance regulatmplexity: aautonomousautomaticallse.

oordinatenfiguration,

according totion is needeof applianced and harmystem, the

algorithms wble energy s

elf Managnfiguration, n of the hoby the appl

tion is needehis level thernsumption (aem could no

ered as suggrt Appliancor not the su

regulati

tion can bea coordinatly by the Sly with sugg

d Manage all the Sm

o global eneed. The type. The regumonized. Ofull perform

will be the states of the

ement apthe single S

ouse, such aliance coulded. No coopre is no cooand of otheot be guaran

gestions: theces and indeuggestions f

ion

e performedted regulatioSmart Applgestions and

ement apmart Appliaergy informe of regulat

ulation logicOnly knowinmances of tmost comp

e Smart App

ppliancesSmart Applas current id vary accoperation wi

ordination wer independenteed; this ie customer nependent elefrom the sys

Use Case

d accordingon among tliances. Thed assistance

ppliancesances in the

mation of thetion performc could be ng the entthe system

plex, havingpliances and

s regulatioliance regulinstant powording to theith other appwith other Sment electricais why the oneverthelesectrical loastem.

es

g to 2 increthe devicese goal of be on how to

s regulatioe house cooe house, themed by the a

centralizedire energy could be g

g to take intd standard e

on lates its beh

wer and enere type of appliances is imart Appliaal loads of

output of thes will be in d of the ho

easing levelof the HA

oth approac improve th

on operate togeeir current sappliance cod or distribu

and powerguaranteed; to consideralectrical loa

havior accorrgy price. Tpliance andinvolved. ances and ththe house),e use cases charge of cuse. She/he

ls of perforAN or a self

ches is to phe energy m

ether to regstate and priould vary a

buted but inr status of on the oth

ation the diads in the ho

rding to gloThe type ofd its current

hus knowled, the full peof this scencoordinatinge will alway

17 / 66

rmance andf-regulationprovide the

management

gulate theiriority when

according ton any cases

the Homeer side, theifferent andouse.

obal energyf regulationt state when

dge of theirerformancesnario shouldg the use ofys decide if

d n e t

r n o s e e d

y n n

r s d f f

Page 18: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

6.1.3 ScIn this scenof followinavoid overmanageme Title

Description

SSame as UC

cenario 1:nario, the sng use caserloading. T

ent regulatio

n

Smart Info C 1.3 + UC 3

: Home Dingle applia

es is to fostThe power on as indica

S

3.1

omain Ovance regulatter the use tpeak manated in the u

5.1 Home Dsmart appliaThe Energy@avoid Home

CoordinatedThe customestrategies in and non-smapower disconunit located alarm (e.g. acritical condIn order to siconsidered.The Smart Athe whole se

Self manageWhile workimodifying itconsumption

CoordinatedThe CEMS hthat allows thOverload Mafunctionaliti Allow th

its own oapplianc

Allow thassociatenon-smaconnecte

Receive info’s abappliancprogramCustome

Coordinorder to conditio

Use Case

verload mtes its behathe applianagement ca

use cases.

Domain Overlances @Home syste Domain Ov

d managemeer can definecase of a Ho

art appliancennection prioinside the ho

acoustic) candition. implify the p

Appliances caet of devices

ement: ing, the Smats behavior inn to the overa

Roles CEMS

d managemehosts the appthe Home Doanagement. ies could be:he Customer overload ruleces priority)he Customer e to the Smaart applianceed to the HAfrom Smart

bout the estimce power pro

m activated byer

nate the appliavoid the ov

on

es

managemavior upon hces when than leverage

load manage

tem can optimverload.

ent: e/modify the ome Domaines (Smart Pluorities for noouse will imp

n be generate

process, defa

an activate ena maximum

art Appliancen order to redall status of t

ent: plication omain The macro

to define es (i.e.

to art Plug a (not yet

AN) Appliances

mated ofile of the y the

iances in verload

ment home powerhere is enoue both on

ement in case

mize the use

load sheddinn Overload, tougs could be on-smart appplement the cd to notify to

ault configura

nhanced featenergy cons

e can performduce or adapthe house.

SmCoordinatThe Smart receives

coordin execute

as a fun displays

the user before s

central uapplianc

Self manaThe Smartfrom HANin the Homthis informbehavior bshedding anotifies itsprofile cha

r availabilitugh power coordinated

e of smart an

of power in

ng priorities o be applied used to man

pliances). A ccoordinationo the custom

ations could

tures that gusumption (pe

m load sheddpt its power

mart Applianted managemt Appliance s through HA

nation signalses the relativenction of its ss an informar starting, infounit about th

nce power pro

agement: t Appliance r

N the availabme Domain. mation, it adaby some loadactions. In ads appliance pange in the H

18 / 66

ty. The aimin order to

d and self-

nd non-

order to

and to smart age central n logic. An

mer the

be

arantee to eak limit).

ing,

nces ment:

AN the s e actions, status ation to

orms the he ofile

receives ble power Using apts its d ddition, it power HAN and,

m o -

Page 19: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Title

Description

SSame as UC

n

Smart Info C 1.3

S

S

S

Inform tactivatedwarning

…. The CEMS acustomer intfunctionaliti

Self manageThe CEMS smodified behprofile changAppliance.

5.2 Request not sufficienThe Energy@Customer if

CoordinatedThe Energy@home is not power profilprofile and oAppliance no

Self manageThe Smart Anext operatioIf the total avSmart Appliconfirmation

CoordinatedThe CEMS hthat allows thcoordinate thaccording toand to knowactivity scheAppliances ipre-program

Self manageThe CEMS sstate of the S

Use Case

the Customerd action (i.e.

g)

also providesterface for thies.

ement: should be nohavior (applige) of the Sm

of confirmatnt to run a Sm@Home systthe use of a

d manageme@Home systsufficient to le estimationon the currenotifies the C

ement: Appliance eston (ex: cyclevailable powiance notifiesn to start

Roles CEMS

d managemehosts the appthe Customerhe Smart Ap

o the availablwledge of the edules of othin the HAN (

mmed schedu

ement: should be noSmart Applia

es

r about any acoustic

s a web hese

otified of the iance power mart

tion to start imart Appliantem may requSmart Appli

ent: tem checks ifrun the Sma

n, on other Smnt total in houustomer and

timates the ae). wer in the homs the user and

ent: plication r to

ppliances le power potential er Smart (e.g. due to les).

otified of the ance.

if possible

if available pnce uire explicit iance may lea

f the total avart Appliancemart Applianuse consumpasks the con

ppliance pow

me is not sufd asks to the

SmCoordinatThe Smart sends th

power punit andinformaoverloa

interactavoid stcase of asking f

Self manaSee UC1.6Interacts wavoid startof potentiafor confirm

e, in its UI.

power (in the

confirmationad to power

vailable powee, dependingnces estimateption. The Smnfirmation to

wer profile a

fficient to rune customer th

mart Applianted managemt Appliance: he estimated profile to thed receives froation about thad risk ts with the cutarting the cypotential ovfor confirma

agement 6 with the custoting the cyclal overload bmation.

19 / 66

e home) is

n from the overload.

er in the g on its ed power mart o start.

about its

n, the he

nces ment

appliance e central om it the he power

ustomer to ycle in erload by

ation

omer to e in case

by asking

Page 20: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

6.1.4 ScIn this scenThe optimias indicate Title

Description

SCoordinateSelf managSame as UC

cenario 2:nario the E@ization of ed in the use

n

Smart Info d manageme

gement: C 1.4

: Optimize@H system

energy cost e cases.

S

ent and

e energy m performs a

can leverag

6.1 Multi-tarsmart appliaThe Energy@usage in ordtariffs. This activated by as a washingexception is

CoordinatedThe customeoptimizationappliances thinterval allowcould be usesmart appliadefault confiThe Smart Athe whole sevariable tarif

Self manageThe customea washing prthe lowest enuntil the give

CoordinatedThe CEMS hthat allows thoptimize thefunctionaliti Allow th

for each priority from 19the wash

Allow ththe Smarappliancthe HAN

Receive info’s ab

Use Case

cost in cactions in oge both on

riff energy uances @Home syst

der to optimizUse Case is the custome

g machine, othe fridge, w

d managemeer can definen in case of she customer wed for the ded to manageances (e.g. a bfigurations coAppliances caet of devices ffs.

ement: er prepares throgram) and nergy price ten condition

Roles CEMS

d managemehosts the appthe Customere energy use.ies could be:he Customer

h time intervaappliances li:00 to 23:00 hing machinehe user to assart Plug a nonce (not yet coN)

from Smart bout the estim

es

case of morder to reducoordinated

use optimizat

tem providesze energy comeaningful

er and perforven and dish

which operate

ent: e/modify the single or mucan set paramdevice (e.g. fe operational boiler). In orould be consian activate ento minimize

he Smart Apsets the need

time. The Smn is met.

ent: plication r to The macro

to define al the ist (i.e. priority to

e) sociate to n-smart onnected to

Appliances mated

ulti-tariff uce and optd and self-m

ion in case o

s an optimizast according for all those m a specific

hwasher. Thees continuou

house rules fltiple applianmeters like thfrom 6:00 to time interva

rder to simpliidered. nhanced featuser cost ac

pliance for itded condition

mart Applianc

SmCoordinatThe appliainforms thits estimatreceived aprofile datcentral uniwhen the a(accordingdesiderataavailabilitypolicy). Self-regulThe Smart Possibly

activitie

contracttimize the e

management

of smart and

ation of applito the variabappliances woperating cy

e most imporusly.

for the energnces. For anythe operation

24:00). Smaal for a set ofify the proce

tures that guccording to th

ts operating n for activatice automatic

mart Applianted regulatioance before she central united power prappliance powta are used bit to calculatappliance cag to the user a, the total poty and the tar

lation: t Appliance: y performs thes as in UC 1

20 / 66

t energy cost.t regulation

non-

iances ble energy which are ycle, such rtant

gy costs y

nal time art Plugs f non-ess,

arantee to he

cycle (i.e. ion, e.g. cally waits

nces on: starting it about ofile: the wer y the

te the time n start

ower riff

he same 1.5.

. n

Page 21: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Title

Description

n

S

S

appliancprogramCustome

Control to optimlife qual

…. The CEMS acustomer intfunctionaliti

Self-regulatSame as UCAs a functionthe optimizathe Smart Apsoftware in tthe determinstart time.

6.2 AutomatAppliance foThis Use Caits specific fuinside the cy

Coordinated

The coordinneeds in termconsiderationoptimize the

Self manageThe single Sits own costs

Use Case

ce power prom activated byer. the applianc

mize energy clity

also providesterface for thies.

tion: C 1.5

n of the comation algorithppliance, somthe CEMS conation of the

tic time shiftor favorable ase foresees Sfunctions (eitycle) accordi

d manageme

ation betweems of power n the overall

e energy cost

ement: Smart Applias.

es

ofile of the y the

ces in order costs and

s a web hese

mplexity of hm and of me specific ould help optimal

ting of some economic co

Smart Appliather activatedng to current

ent:

en the differeconsumption

l power consts and preven

ances regulate

Implemthe CEMimplemdetermi

Offer topossibildelayedcan be pways anof compthe builcapabilisimple ajust a buwhen thused. Aappliancinterfacprofile icustomestart.

If the cudelayedApplianrequired

Displayrequiredrelevanteconom(dependits User

phases or fuonditions ances’ capabd by the custt tariff and en

ent actors in tn will allow tumption fore

nt overloads.

es time shifts

ments or delegMS the

mentation of tination logic o the customlity to activad start. This operformed innd with diffeplexity accorlt-in User Intities. For exaappliance cautton for starhe lowest tar

A more compnce can offer ce showing thin time and ler to choose

ustomer acced start, the Smnce waits untd condition iy the actual cd cycle and tt “delayed st

mical saving ding on the rr Interface)

unctions of th

bility to delaytomer or autonergy cost.

the house antake into ecast and thu

s its phase op

21 / 66

gates to

the delay

er the te a operation n several erent level rding to terface ample, a an have rting iff is lex a rich he tariff letting the when to

epts the mart til the is met. cost of the the tart”

ichness of

he Smart

y some of omatic

nd their

us better

ptimizing

Page 22: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

SSame as UC

Smart Info C 6.1

S

CoordinatedThe CEMS hthat allows thenergy cost.

Self manageSame as UCAs a functionthe optimizathe Smart Apsoftware in tthe determinstart time.

Use Case

Roles CEMS

d managemehosts the appthe user to op

ement: C 1.5

n of the comation algorithppliance, somthe CEMS conation of the

es

ent: plication ptimize the

mplexity of hm and of me specific ould help optimal

Sm

Possiblactivitie

The cusabout thchoices

CoordinatThe Smarcoordinatfind the border to pthe phaseto preven

Self manaThe Smartautonomoushift or adsome specaccording

mart Applian

ly performs tes as in UC stomer is wahe appliances.

ted managemrt Appliancete together inbest overall sperform the se to optimize nt overloads.

agement: t Appliancesusly the logi

dapt part of itcific function

to the energ

22 / 66

nces

the same 1.5.

arned e’s

ment: s

n order to strategy in shifting of costs and

s decide ic to time ts cycle or nalities gy cost.

Page 23: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

7 EneThe goal othe storage This integrmonitor frsystem: cuOn the oththe algorithCurrently tThis integr

The storaginverter/stozigbee modService.

rgy proof this use ce systems th

ration aims rom a user

urrent powerher hand infhm that defithis algorithration will p

ge componenorage_systedule. The C

oductioncase is to inhat could be

to have a dr-friendly inr, energy prformation afines the beshm includesproduce a m

1- Prod

nt is installeem will comCEMS will b

n/storagtegrate the linked to a

dual benefitnterface alloduction, b

about currenst executions only curren

more accurat

duction and sto

ed inside themmunicate Pbe able to re

Use Case

ge production

a PV plant in

t for the finl the signifbattery state nt and forecn time in whnt and expete result for

orage architect

e inverter anPV plant andetrieve forec

es

from domen the Energy

nal user: on ficant quantof charge, f

casted energhich an applected consum

users with

ture in Energy

nd it is mand storage incast informa

estic photovy@Home ar

the one hantities that rforecast datgy productiiance shoulmptions of tdomestic PV

@Home

naged by invformation toation invoki

voltaic (PV)architecture.

nd user wilregard the ta, etc… ion will be ld start. the other apV plants.

verter contrto the CEMSking a remot

23 / 66

) plants and.

l be able toproduction

used inside

ppliances.

roller. The S through ate Web

d

o n

e

a

Page 24: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

7.1 SThe aim ofof her/his p Title Description

InverterProvides a sby photovolstatus and, pstorage systsystem is ininverter, so communicastorage and dispatched usent by inveexclusively CEMS will keep histori

7.1.Sequence

Scenario f this scenarplant produc

n

r/Storage_syset of data reltaic plant prpossibly, by tem. The storncluded insid

there is direcation between

the CEMS. upon requesterter represencurrent valustore these d

ical data.

1 Invertediagram

1: Visuario is to proction.

ystem etrieved roduction the rage

de the ct n the Data are t. Data nts ues, so data to

er data ac

alization vide custom

1.1 VisualizaThe customeenergy produand the forecSpecifically,provided to tFrom the inv

Cur Ove Cur Inst

Pow

From the for Exp

CEMS will pproper databby the custom

Hosts a Webcollects dataforecast servfor a user-fri

Data collectithe CEMS pcertain amouon the componce a day fominute for th

cquisition

Use Case

of produmer with inf

ation of proder is presenteuction of hiscast service., the followinthe customerverter: rrent powererall energy rrent energytantaneous pwer One)

recast servicepected PV poperiodically

base in order mer, and to k

Roles CEMS

b applicationa from Invertvice and orgaiendly presen

ion will be trperiodically eunt of time, dponent to quefor the forecahe inverter).

n

es

uction infformation on

duction infored with infors/her house. D

ng informatior:

produced by available inpower availa

e: ower from nretrieve thesto be immed

keep historic

n that ter and anizes them ntation.

riggered by every a depending ery (e.g. ast, once a

formation the curren

rmation rmation abouData are prov

on will be se

by the plant n storage (ifable from th

now up to 72e data and m

diately retrievcal informatio

ForecMakes avawhen invocollection power valuinstalled in The servicvalues, onnext 72 ho

on nt/expected

ut the global vided by the

ent to the CE

f present) he battery (n

2 hours maintain themved when reon.

cast Web Seailable a servoked returns of expected ues for the pn a specific h

ce gives 72 pnce an hour foours.

24 / 66

situation

current Inverter

EMS and

note from

m in a quested

ervice vice that a plant

plant home.

power for the

Page 25: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

DescriptioPeriodicallthe Inverte

Cur Ove Cur Inst

The invertethem be av Message eID message

 1 

 2 

 3 

 4 

 5 

 6 

on of the phly the CEMer asking forrrent PV poerall energyrrent energytantaneous

er respondsvailable by u

exchange e  From 

 CEMS 

 Inverter 

 CEMS 

 Inverter 

CEMS  

 Inverter 

CEMS 

Inverter 

hase S starts the r: ower y produced by available ipower avail

to these requser when h

to 

 Inverter 

CEMS  

 Inverter 

CEMS  

 Inverter 

CEMS  

Inverter 

CEMS 

inverter dat

by the plantin storage (ilable from th

quests with he/she reque

Description

CEMS querpower  

Inverter re

CEMS querproduction

Inverter reproduction

CEMS queravailable e

 Inverter re(if any) 

CEMS Asksavalaible fr

Inverter refrom the b

Use Case

ata acquisitio

t if present) he battery

4 values thests the plan

ries the Inver

turns the cu

ries the Invern 

turns the cun 

ries the Invernergy 

eturns the St

s for the instarom the batt

turns the Peattery 

es

on process:

hat are storednt productio

rter for the c

rrent PV pow

rter for the P

rrent PV Ene

rter for the S

torage availa

antaneous ptery (if any)

eak power de

the CEMS

d by CEMSon informati

current PV 

wer 

PV Energy 

ergy 

Storage 

ble energy 

ower 

eliverable 

makes 4 re

S in a databaion.

paramete

 None 

 Current p 

  None 

Total Eneproductio

  None 

 Storage aenergy (k

None 

Peak powbattery 

25 / 66

quests to

ase to let

ers 

power (kW)

ergy on (kWh) 

available kWh) 

wer from the 

Page 26: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

ID Messagis used, infa storage sythe home p600W loadIt is imporGateway (system). Insystem neeit in the badomestic lo

7.1.2The CEMSregister his

Sequence When the uForecast Se

ge 7 and 8 cformation reystem is usepower need

d for 3h but rtant that th(and in genn fact, the eds to knowattery for fuoads on the

2 Plant FS User Inters/her PV pla

diagram user submitervice by us

could be incelated to theed, both datds. (e.g. Avnot a 900W

he Power Oneral in per

battery maw if the cost-uture use. Ob

basis of inf

Forecast rface is expeant. An exam

Figur

ts the registrsing an iden

cluded in 5 e energy stota are needevaliable ene

W load for 2hne storage rspective caanagement-effectivenebviously, thformation m

registratected to promple is repo

re 3 - Example

ration form,ntifier of the

Use Case

and 6 respeored, or peaed in order tergy = 1.8kh) system hasan "sniff" tis the resp

ess is in hirihe CEM wilmade availab

tion ovide a regisorted in the

e of the PV pla

, the CEMSe CEMS its

es

ectively: If aak power froto evaluate tkWh, Peak

s access to tthe state of

ponsibility oing the enerll contributeble from the

stration formfollowing F

nt registration

S is requiredelf.

a “classicalom the battethe storage power = 60

the rates off the variouof the Powrgy producee to the effie inverter or

m where theFigure

n form

d to send all

l” PV or Wiery, will besystem con00W ca

f the DSO tus compon

wer One loged to the hoiciency modr system sto

e user is req

l data to the

26 / 66

ind inverter missing. If

ntribution toan sustain a

through theents of the

gic and ouruse or keepdulating theorage.

quested to

PV

r f o a

e e r p e

Page 27: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

As a resultreferences.Forecast Se

ForecastSequence

DescriptioPeriodicallthe ForecaForecast seCEMS in productionThe Foreca Message eID message

C

t of the regis. The CEMService.

t data acqdiagram

on of the phly the CEMst Web Servervice retura database

n informatioast service r

exchange e  From 

CEMS

stration, theS is required

quisition

hase MS starts the

vice asking rns a sequee to let it on. returns 72 p

to

InsertP

e Forecast Sd to store th

e forecast dfor the exp

ence of expbe availab

power value

Descriptio

Plant(PlantIn

OK(Plant

Use Case

Service is gohis PlantID

data acquisipected plant pected poweble by user

es, once an h

on

nfo, UID)

tID)

es

oing to returand use it fo

ition procespower of th

ers in a sper when he/

hour for the

ForeServ

rn a PlantIDfor any furth

ss: the CEMhe next hourecific date /she request

next 72 hou

paramete

ecast vice

D to be usedher requests

MS makes ars. time that i

sts the expe

ours.

ers 

27 / 66

d for further to the

a request to

s stored byected plant

r

o

y t

Page 28: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

 1 

 2 

7.1.3Sequence

DescriptioPeriodicallthe ForecaForecast seCEMS in productionThe Foreca Message eID message

 1 

 2 

7.1.4Sequence

 CEMS 

ForecastService 

3 Forecadiagram

on of the phly the CEMst Web Servervice retura database

n informatioast service r

exchange e  From 

 CEMS 

ForecastService 

4 User vdiagram

 Forecast Service 

t CEMS 

ast data a

hase MS starts the

vice asking rns a sequee to let it on. returns 72 p

to 

 Forecast Service 

t CEMS 

isualizati

CEMS asksthe curren

Forecast seexpected p

acquisitio

e forecast dfor the exp

ence of expbe availab

power value

Descriptio

CEMS asksthe curren

Forecast seexpected phours 

on

Use Case

s the forecasnt PV power

ervice returnplant power

on

data acquisipected plant pected poweble by user

es, once an h

on 

s the forecasnt PV power

ervice returnplant power 

es

t service for 

ns the 

ition procespower of th

ers in a sper when he/

hour for the

t service for 

ns the for next 72 

St St St

qu Da

 Sequence 

Stqu

Dati

Do

ss: the CEMhe next hourecific date /she request

next 72 hou

paramete

 None 

Sequence expected 

tring plantring UID tring uantityTypateTime da

 of: tring uantityTypateTime imestamp

ouble valu

MS makes ars. time that i

sts the expe

ours.

ers 

 of 72 [Date power(kW)] 

28 / 66

ntID

pe ate

pe

ue

a request to

s stored byected plant

time, 

o

y t

Page 29: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

DescriptioUser requeGateway wCEMS sho Message eID message

 1 

 2 

7.2 SThe aim ofestablish thconsumptio Title Description

on of the phests informaweb applicatows this info

exchange e  From 

 User 

CEMS 

Scenario f this scenarhe best execon peaks.

n

hase ation about htion. ormation in

to 

 CEMS 

User 

2: peaksrio is to embcution time

his/her Ener

a user-frien

Descriptio

User requethe Energy

CEMS showuser‐friend

s/costs obed plant prfor smart ap

1.1 peaks/coThis scenarthe existingIt is simplyappliances CEMS (duedatabase thparticular:

Cur Ove Cur Exp

CEMS has existing use

Use Case

rgy Product

ndly interfa

on 

ests informay Production

ws this infordly interface

optimizatroduction inppliances st

osts optimizario doesn’t ng messages.y an updatinexecution tie to the prev

he productio

rrent powererall energy rrent energypected PV poto use theseed informat

es

tion System

ce.

tion about  System 

mation in a  

tion nformation itarting, in o

ation need any fu

ng of the algime. vious scena

on informati

produced by available inower from ne new informion, such as

m to the CEM

paramete

 None 

 None 

in the existirder to optim

urther messa

orithm that

rio) has alreon required

by the plant n storage (ifnow up to 72mation in ads appliances

MS through

ers 

ing algorithmize costs a

age in additi

establishes

eady stored d in the algo

f present) 2 hours ddition to ths current an

29 / 66

h the Home

hms to and reduce

ion of

s the best

in its orithm, in

he nd

Page 30: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Sequence

Message eThis scena

8 Inter With the dunpredictabcommerciato have the For a descr

Aggthe - Tmar- PomarIt shTheof dActsystby p

diagram

exchange ario doesn’t

raction b

developmentbility and tal and domee active part

ription of thgregator: itother powe

The aggregarkets/AD buools “flexibrket. hould be eme aggregatordemand. tive Demantem marketparticipatin

need any fu

between C

t of renewathis could bestic consumticipation of

his use case t is the key er system paator collect uyers.

bilities” of c

mphasize thr sells a dev

nd (AD): itts and in the

ng in AD ser

expected co

urther messa

CEMS an

able resourcbe managedmers. In thif domestic c

we recall somediators b

articipants othe request

consumers to

at the “flexiviation from

t is the actie provision rvice.

Use Case

onsumption

age in addit

nd the ag

ces, supply ed by usingis context, iconsumers t

ome definitbetween theon the otherts and sign

o build Act

ibility” is prm the foreca

ive participof flexibili

es

n and overal

tion of the e

ggregato

energy is bethe aggreg

it is always to balance s

tions: e consumersr side: als for AD

tive Demand

rovided shisted level o

ation of resity to the di

l home cons

existing mes

or

ecoming mogated flexib

more plausservices.

s on one sid

-based serv

d services a

fting consumf demand, a

sidential cofferent pow

sumption.

ssages

ore difficulbility offeresible in the

de and the m

vices comin

and makes o

mers’ consuand not a sp

onsumers inwer system p

30 / 66

t due to theed by small

near future

markets and

ng from the

offers to the

umption. pecific level

n the powerparticipants

e l e

d

e

e

l

r s

Page 31: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

ADpowactu

This use caflexibility ancillary se This use coperator anfor the man In this use which the A We will nneeded to a The figure

8.1 S Title Description

D service: iwer level in ually consum

ase only conof small coervices.

case doesn’tnd it doesn’nagement o

case will bAD program

not consideranswer to th

below show

Scenario

n

s a request a period of

med) for th

nsiders the mmercial a

t consider t’t consider n

of the dynam

be not analyms are gene

r also the phe aggregato

ws the actor

1: Active

sent from f time. The e fulfillmen

services ofand domesti

the direct mnetwork ser

mic tariff of

yzed the relaerated and se

planning anor requests.

rs and their

e Deman

1.1 AD and

Today, Thurprofile of itsrequest to reFriday.

The CEMS a

Mary leave toptimize the

On Friday atwashing mamachine overeassesses th

Use Case

the aggregaggregator

nt of the pro

ffered by theic consumer

managementrvices that r

f electricity.

ationship beent to the co

nd optimiza. These activ

relationship

nd and E

Energy Syst

rsday mornins customers, educe electric

alert Mary an

the Energy@e power cons

t 17 John reaachine and foerriding the she optimizati

es

gator to the will give an

ogram.

e aggregators and sell i

t of the elecrequires rea

etween aggonsumers.

ation activitvities are de

ps needed to

Energy S

em Interactio

ng, the aggresend to a selc consumptio

nd John abou

@home systemsumption in t

alizes that heorces the mansignal sent byion of the ele

consumersn incentive

or. It will prt in the ma

ctrical equipal-time answ

regators and

ties carriedeveloped in

o carry out t

System In

on

gator, based ection of its on between 1

ut the reques

m in automattheir house.

urgently neenual operatioy the aggregaectrical loads

s to maintai(€ as a func

rovide to agarket for bal

pment by twers and ev

d DSO and

d out withinn other use c

this use cas

nteractio

on the consucustomers an

17.30 to 18.0

st received.

atic mode and

eds to start thon of the wasator. CEMS s of the house

31 / 66

in a certainction of kW

ggregate thelancing and

the networkven services

d the way in

n the HANcases.

se.

on

umption n AD

00 on

d it can

he shing

e and

n W

e d

k s

n

N

Page 32: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Smart InThe Smart Mcustomer coSmart Meteas a commuuser devicespremises.

The use ca

Id Phase

1 Reque

nfo / Smart Meter providonsumption. er uses the Smunication brids in the cons

ases is descr

e Name

est of AD ser

Meter des The

mart Info dge to the umers

ribed throug

rvice

optimizes enreceived by

At 18 Mary smart info.

Mary was abof AD fulfillinformation payment to M

John fails to CEMS closeaggregator.

It collect ADAggregator aAD service f

It collects daand optimizefriendly pres

It implementthe overall ctakes care ofHAN deviceforecast algoimplementatare outside thspecification

Implements manage all sHAN; this fuimplementeda Service Pla

Implements logics with athe cloud.

gh a set of p

Descriptio

Describes hactivate the

Use Case

nergy consumthe washing

and John’ C

ble to meet thlment to the coming fromMary.

meet the ADes the activity

Roles CEMS

D requests froand send to Afulfillment.

ata from HANe them for a sentation.

ts the logics customer systf dispatchinges. It can exporithms, the tion of these the scope of tns.

a Trust Agensecurity keysunctionality d via collaboatform in the

the communa Service Pla

phases, each

on

how the aggre AD program

es

mption takingmachine.

EMS acquire

he AD servicaggregator. A

m DSO, the a

D service reqy and does n

om Aggregator

N devices user-

decision of tem and it

g events to ploit

algorithms these

nt to s of the can be

oration with e cloud.

nication atform in

h phase is de

regator sendsm.

g into accoun

e the consum

ce and her CEAfter verificaggregator w

quest sent byot send any s

AIt collects signals forcoming frobuyers It pools thconsumersand makes It manageswith its cu It sells “fledifferent pparticipantor bilatera

escribed by

s to the custo

nt the load cu

mption data f

EMS sends acation of the dwill carry out

y the aggregasignal to the

Aggregatorthe requests

r AD-based som the mark

he “flexibilitis to build ADs offers to th

s the AD requstomer.

exibilities” tpower systemnts through thal contracts.

a sequence

omer the sign

32 / 66

urve

from the

a message data with the

ator.

r s and services

kets/AD

ies” of D services he market.

quests

o the m he markets

e diagram.

nal to

Page 33: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

2 Result

8.1.Sequence

Descriptio The aggreg The signal a defined t An exampl

AD ser

Message ID

Customer I

Activation t

Duration 

Combined vsignal 

Less than 0

0,6 kW<=Po

More than 

The unit omultiples othat period

t of AD serv

1 Requesdiagram

on of the ph

gator sends

contains thime interva

le:

rvice request

time 

volume and 

0,6 kW 

ower< 0,9 kW

0,9 kW 

of time is mof 15 minuted.

ice

st of AD s

hase

to its custom

he value of tal within a ra

Xxx 

Yyyy 

hh:m

xx mi

price  Incen

Incen

W  Incen

No in

multiple of es. The pow

Describes hconsumers fulfillment

service

mers the sig

the incentivange of pow

 

mi   yyyy/mm/

in 

ntive of X € (k

ntive of X € (k

ntive of X € (k

ncentive 

15 minuteswer of the 15

Use Case

how the CEMpreferences message.

gnal to activ

ves offered twer.

/dd 

kW) 

kW) 

kW) 

s. Power m5 minute pe

es

MS follow thand at the en

vate an AD

to customer

easurementeriod is calc

he signal sentnd of the serv

request.

s if consum

t and incentulated on th

t by the aggrvice send an

mption is ma

tives are cahe energy co

33 / 66

regator and AD

aintained in

alculated inonsumed in

n n

Page 34: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Consumersthe absolut CEMS schset by the c Message e

ID messag

  

22 N.B. This In alternativepower profile

s will receivte values if

hedule the Econsumers.

exchange

ge  From 

CEMS 

HAN 2Device

CEMS 

 

approach suppe, we can imple is simply no

ve an incentthey will fo

Energy@hom

to 

HAN device 

e  CEMS 

HAN Device 

 

poses that the lement an app

otified to the sm

tive (€ as a ollow the sig

me system

descripti

The CEMrequest tHAN devto reducabsorbedpower atgiven timthe futur

Sends a npowerPr

With thismessageCEMS nothat it wnot able find a safschedulethis powprofile 

 

smart applianproach where tmart applianc

Use Case

function of gnal sent by

in order to

ion  para

MS the vice e its d t a me in re 

Watteven0=all1=reqreduemer2=emTimetime reduDuraduratredu

new rofile 

OldPthe pbefochanNewthe npowe

s e the otifies as to fe e for wer 

None

 

nce has the capthis reasoning

ce es

f actually coy the aggreg

follow the

meters 

t: Severity oft (0\1\2).  is ok; quest for ction but norgency mergency e: starting for this ction tion: tion of the ction 

owerProfile:power profilere this ge ProfileProfilenew changeder profile 

pability to reag capability is

onsumed kWgator.

AD progra

Acknowleany)  

Aknowledappliancethe sever0 \Ack no1 \ appliaand % po2 \ appliaand % po

: e 

e: d 

ACK need

ACK is req

 

ason about anddirectly done

W) with no r

am and the p

edgment me

dge messagee varies accority of requeot needed ance replies yower reductioance replies yower reductio

ded 

quired 

d modify its pe by the CEMS

34 / 66

reference to

preferences

essage (if 

e from the ording to st: 

yes\no on yes\no on 

power profile. S and the new

o

s

w

Page 35: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

8.1.2Sequence

Descriptio At the ADsignals sento optimize At the end are in linefulfillment An exampl

AD serv

Message ID

Customer I

Activation t

Duration 

Measure: 

1‐15 minut

2‐15 minut

3‐15 minut

4‐15 minut

5‐15 minut

AfterwardsAD reques

2 Result diagram

on of the ph

D activationnt by the age the receiv

d of AD serve with the rt message to

le.

vice fulfillme

time 

e max powe

e max powe

e max powe

e max powe

e max powe

s the aggregst. Looking

of AD se

hase

n time, CEMgregator, aced request.

vice CEMSrequest dono the aggreg

nt 

Xxx 

Yyyy 

hh:m

xx mi

er  xx W

er  xx W

er  xx W

er  xx W

er  xx W

gator will reat the actua

ervice

MS, accordictivates elec

acquires dane by the aggator.

 

mi   yyyy/mm/

in 

equest to thal consumpt

Use Case

ing with thctrical devic

ata consumggregator. I

/dd 

he DSO the tion of the c

es

he preferencces and man

mption from If it was tr

consumer cconsumers

ces set by thnage power

the Smart Irue CEMS

consumptiobased on th

the consumr consumpti

Info and chsends the A

on during thhe measurem

35 / 66

ers and theion in order

eck if theyAD request

he period ofments made

e r

y t

f e

Page 36: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

by the mecustomer. Message e

ID message

9 OveThis use caso called porder to taresidential As a matte • Ex-ante

situatio(when is beinevent, border thow thcontrac

The usmethodnotify t

eter and acq

exchange

e  From 

CEMS 

erload Mases manag

peak overloaake any apelectrical lo

er of fact, th

e. This is thon or the caany compo

ng exceededbe it the useo better und

he overloadcted peak po

The meter of time, i.eThe meter limited amThe meter amount of Finally, ifreasons, th

se case inteds and notifthe overload

quired by th

to 

Aggregat

Managemges those scad managemppropriate aoads, provid

he use case d

he case whese when the

onent/deviced) and the ber, or the Hderstand th

d is regulateower: allows for

e. no warninallows for

mount of timallows for time (usual

f the meterhe breaker imends to adfications did warning.

he DSO, th

descript

tor AD servifulfillme

ment enarios relament. The paction suchding a repor

distinguishe

en the systeere is enouge of the ovebreaker disc

Home Energye sequence ed in Italy

an excess ong up to 3.3ka current ab

me (usually 2a current ab

lly 2 minuter measures mmediately

dopt an apprectly sent

Use Case

he aggregat

tion  para

ice ent 

AD sfulfil(mesCustDuraAverin eaminuinterserv

ated to the mpurpose of th as alertinrt to the use

es among th

em exploitsgh time betwerall systemconnection,y Managemdiagrams iby using a

of 10% of tkW of absobsorption be2 hours), aftabsorption bes), after thi

a current y disconnectproach wheby the met

es

tor will pro

ameters 

service llment ssage ID, tomer ID, ation, rage power ach 15 utes rvals of AD ice …) 

maximum cthe use case

ng the user,er related to

he following

a forecast ween the ovnotices tha

, i.e. there ment Systemin the follows an examp

the contractorbed poweretween 3.3 ter this timebetween 4.1is time the babsorption

ts. ere a combter is used

ovide to pay

Acknowledany)  

ACK neede

contracted pe is to mana, reducing this event.

g sub-cases:

algorithm tverload warnat the maximis time suff

m, or a smarwing pages,ple a typica

ted peak forr. kW and 4.1

e the breake kW and 14

breaker dischigher tha

bination of in order to

ay the incen

dgment mes

ed 

power beingage a peak peak consu

to prevent aning notificmum contrafficient to rrt appliance , it is worthal contract

r an unlimi

1 kW (i.e. +er disconnec4 kW for aconnects an 14 kW,

consumptioo prevent as

36 / 66

ntive to the

ssage (if 

g exceeded,overload inumption of

an overloadcation eventacted powereact to thisto react. In

h to remindwith 3 kW

ited amount

+25%) for acts a very short

for safety

on forecasts well as to

e

, n f

d t r s n d

W

t

a

t

y

t o

Page 37: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

• Ex-posthe sys

• Post-manalysibecausanalysiorder tspecific

9.1 3.1 Title Description

Smart In

The Smart Minformationthe contractand the curralso notifieswhen the toconsumptiomaximum c

st. This scentem notifies

mortem. In tis in order te the washiis is useful o avoid it cc specificat

Scenario

n

nfo / Smart

Meter providn to the systemted maximumrent absorptis a warning e

otal house on exceeds thcontracted po

nario deals ws the user an

this scenarito estimate ing machinboth to edu

can happen ion for new

o 1: Ove

Meter

des useful m such as

m power on. It event

he ower.

with what hnd the devic

io the Homwhy the ev

ne and the hucate the usagain in th

w message ex

rload ma

1.1 OverloadAt 8:00 AM on the washithe hair dryecontracted pThere is no nhas smart apflexibilities tconsumptionphases (e.g. and prevent degrading thWhen Mary that the eventhe washing

The same evno smart appSystem of Jobuzzer, text user to manusee the notifswitches off times happenon again the app remindsproblem.

Customer

It collects daand organizefriendly pres

Generally spthe decision customer sysdispatching

Use Case

happens afteces in the H

me Energy vent happenhair dryer wsers as wellhe future. Txchanges b

anageme

d managemeM Mary, the en

ing machineer. The total hpower and theneed to get th

ppliances (flethe CEMS isn and\or postthe start of athe blackout

he quality of will launch

nt was well mmachine.

vents happenpliance. Therohn decides tmessaging)

ually switchefication sent bf the hair driened that John

e meter locates John that a

Roles Energy Ma

System ata from HANes them for asentation.

peaking, it imlogics of the

stem and it tevents to HA

es

er the breakHAN that thi

Managemenned, e.g. thewere runninl as to train

This scenarioetween user

ent ex-an

ent ex-ante nd user of th. After half ahouse consue system nothe attention oexible HAN ds able to autotpone the staa water heatint without anythe washing again the CE

managed auto

ned at the Johrefore, the Cuto use the usin order to ges off some lby a text meer to prevent n was not qued in the bassmart applia

anagement

N devices a user-

mplements e overall akes care of

AN devices.

ker disconneis event hap

nt System e contractedng at the samn an automao seems nor devices.

nte

his story, wakan hour, her dmption exceifies this eveof Mary becadevices) andomatically rerting of highng phase in ay user interve

cycle. EMS app, theomatically th

hn’s house prustomer Eneer notificatioet the user atoads. John wssage (SMS)the blackout

uick enough aements; in thnce would h

Sm

They provinformatioprofile. They can adegree of requests frreduce the

ection happppened.

makes a pd power waame time. Tatic learningot to require

kes up and swdaughter swi

eeds the maxient. ause fortuna

d thanks to theduce their poh power absoa washing mention and w

e app will telhanks to the s

remises but Jergy Manageon devices (ettention and

was quick eno) on his mobt. But, severaand he had tohis case the Chave avoided

mart Device

vide to the CEon about thei

also exhibit flexibility torom the CEMe power abso

37 / 66

ened, when

ost-mortemas exceededThis type ofg system ine so far any

witches itches on imum

tely Mary heir ower

orbing machine) without

ll Mary support of

John has ement e.g. ask the ough to ile and al other o switch CEMS such a

es

EMS ir load

some o react to MS to orption at

n

m d f n y

Page 38: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

The Smart MInfo as a coto the user dpremises.

The use csequence d

Id Phase

1 Power

2 UnschProfile

3 Overlo

4 Overloup

5 User N

Meter uses thmmunicationdevices in th

cases is desdiagram.

e Name

r Profile sche

hedulable Poe

oad Warning

oad warning

Notification

he Smart n bridge e home

scribed thro

eduling

wer

g

cleared

It can exploithe implemealgorithms athese specifi

Implements manage all sHAN; this fuimplementeda Service Pla

Implements logics with athe cloud.

ough a set

Descriptio

An HAN dphase showschedule. Wcycle poweload can bedepends oneven if the not mean th

An HAN dphase showschedule

The Smart

The Smart cleared up

The CEMSto notify thWhen an HCEMS

Use Case

it forecast algentation of thare outside thications.

a Trust Agensecurity keysunctionality d via collaboatform in the

the communa Service Pla

of compos

on

device requesws the case wWhen a new er profile whe reduced or n the type of load can be

he appliance

device requesws the case w

Meter notifi

Meter notifiand the situa

S requests thehe user of a gHAN device g

es

gorithms, hese he scope of

nt to s of the can be

oration with e cloud.

nication atform in

sable phase

sts the CEMSwhen the CEM

cycle is planhere for each

not. How muproduct and reduced in a will comply

sts the CEMSwhen the CEM

es the CEMS

es the CEMSation is now

e HAN devicgiven event (igets the user

different lelevel. At the starannounce capabilitiethe registralso to indto get the ua display, message).

s, each pha

S to scheduleMS is able tonned, the appblock of the uch the load the manufaccertain part

y with the req

S to scheduleMS is NOT a

S that there i

S that the oveback to the n

ces with userin this case thattention, it

evels down t

rtup time, theand register

es with the Cration phase tdicate their cuser attentioa buzzer, a t

ase is desc

e a power proo return a safpliance will p cycle is repocan be reduc

cturer choiceof the cycle

quest.

e a power proable to return

is an overloa

verload warninormal funct

r notificationthe overload notifies back

38 / 66

to ‘pause’

ey their

CEMS. At they have apability n (e.g. via

text

cribed by a

ofile. This fe provide the orted if ced

e. NOTE , it does

ofile. This n a safe

d warning

ing was tioning

n capability warning). k the

a

Page 39: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

9.1.Sequence

Descriptio An HAN dschedule. eventually planned, theload can bemanufacturethe applianc Message e This use caexchange n

1 Power diagram

on of the ph

device sendThe CEMSuses a fore

e appliance we reduced orer choice. Nce will comp

exchange

ase is alreadneed to be s

profile sc

hase

ds to the CES retrieves ecast algoritwill provide r not. How m

NOTE even ifply with the r

dy covered bspecified so

cheduling

EMS a requvia the S

thm, and retthe cycle po

much the lof the load carequest.

by current Efar.

Use Case

g

uest to schSmart Info turns a safeower profilead can be re

an be reduced

Energy@ho

es

edule a newthe curren

e power prowhere for e

educed deped in a certain

ome specific

w power prt total hou

ofile scheduleach block ofends on the tn part of the

cations, no n

rofile, or touse power ule. When a n

f the cycle itype of prod

e cycle, it do

new messag

39 / 66

o change itsabsorption,new cycle iss reported ifduct and theoes not mean

ge

s , s f e n

Page 40: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

9.1.2Sequence

Descriptio This is a slCEMS is nflexible HAschedule, t

2 Power diagram

on of the ph

light variantnot able to rAN devicesthe CEMS r

profile is

hase

t of the prevreturn a safes to change runs again th

s unsched

vious phasee schedule ftheir sched

he schedulin

Use Case

duled

e. In this casfor this powdule if possing algorithm

es

se the forecawer profile. ible. If an Hm and try to

ast & schedTherefore t

HAN deviceo find a safe

duling algorthe CEMS re accepts toe schedule

40 / 66

rithm of therequests theo change its

e e s

Page 41: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

9.1.3Sequence

Descriptio The Smart Meter is rdisconnect Notice thatcondition c

- The- The

Message e

ID message

3 Overlodiagram

on of the ph

Meter, throrequested totion.

t the Smart changes: e time before overload w

exchange

e  From 

Smart Meter 

oad Warni

hase

ough the Smo provide t

Meter is re

re disconnewarning is c

to 

CEMS 

ing notifi

mart Info, nowo parame

equested to

ction changcleared up a

descriptio

Overload warning 

Use Case

cation se

otifies the Ceters: the m

do its best

ges because and the syst

on  param

Watt: powerTime: discon

es

ent from t

CEMS that measured po

effort to no

a new alarmem can retu

meters 

measured r  time to nnection (in 

the Meter

there is an oower absorp

otify again t

m thresholdurns to its no

Acknowledany)  

Ack neede

r

overload wption, the t

the CEMS

d was reacheormal state

dgment mes

41 / 66

arning. Thetime before

when some

ed

ssage (if 

e e

e

Page 42: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

9.1.4Sequence

Descriptio The Smartup and the Message e

ID message

4 Overlodiagram

on of the ph

t Meter, thrsystem is r

exchange

e  From 

Smart Meter 

oad Warni

hase

ough the Smeturned to i

to 

CEMS 

ing Clear

mart Info, nits normal st

descriptio

Overload warning Cleared U

Use Case

second

redUp not

notifies the tate.

on  param

p Watt: power

es

ds) 

tification

CEMS tha

meters 

measured r  

sent from

at the overlo

Acknowledany)  

Ack neede

m the Met

oad warning

dgment mes

42 / 66

ter

g is cleared

ssage (if 

d

Page 43: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

9.1.5Sequence

Descriptio The CEMSdevice (or It is responto avoid th Message e

ID message

5 Notificdiagram

on of the ph

S notifies awhich set o

nsibility of the CEMS sc

exchange

e  From 

CEMS 

cation of t

hase

an Event toof HAN devthe HAN de

cales up the

to 

HAN Device 

the Overlo

o the user. Ivices) shouldevice, if it gnotification

descriptio

Notifies anEvent to tuser 

Use Case

oad Warn

It is respond be requesgets the usern to another

on  param

n he 

Event.Warnireprestwo paWatt: power

es

ning Even

nsibility of ted to notifyr attention, r notification

meters 

 The ng Event is sented by arameters: current r absorption

nt to the U

the CEMS y the user. to notify ban device.

Acknowledany)  

Ack neede

User

to select w

ack the CEM

dgment mes

43 / 66

which HAN

MS in order

ssage (if 

N

r

Page 44: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

9.2 S Descriptio This case iunhealed oThe CEMSevent as de

HAN Device 

Scenario

on

is expected overload. S could senescribed in u

CEMS 

2: Overl

to occur wh

d to the cususe case 4,

The user wnotified 

oad Man

hen the sys

stomer a repPower Los

Use Case

Time: disconsecond

was None

nagemen

stem wakes

port about hss Notificat

es

time to nnection (in ds) 

nt ex-pos

up after the

home and aption and An

none 

st

e trip of the

ppliances conalysis.

e circuit bre

onsumption

44 / 66

eaker due to

n before the

o

e

Page 45: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

10 PowThe aim ofand to mantrip of the cscenario of Title Description

Smart In

None duringevent At the end oMeter provialert occurreCEMS will to calculate type of the ethe grid/circThe Smart MInfo as a coto the user dpremises.

wer Lossf following nage proper circuit breaf the Overlo

n

nfo / Smart

g the power

of the event tides to the Ced before thehave the posthe duration

event (blackocuit breaker tMeter uses thmmunicationdevices in th

s Notificuse case is load recove

aker due to uoad Manage

Meter

loss

the Smart EMS the e event. ssibility

n and and out on trip) he Smart n bridge e home

cation ato help the ery after it.unhealed ovement use ca

Power LossThe Customcustomer to the event thehome and apeventually ch

Customer

The CustomSystem sendcustomer if iotherwise pocould be perserver, e.g. ainactivity.

Use Case

and Anacustomer toThe event c

verload or oase.

s Notificatiomer Energy M

inform him te CEMS restppliances conhoose to do

Roles Energy Ma

System mer Energy Mds an SMS toit has UPS caower loss detrformed by aafter ½ hour

es

alysis o understandcould be a bther causes

on and AnalManagement S

that a powertarts sending nsumption besomething to

anagement

Management o the apabilities tection

an external of gateway

d the cause blackout on . This is typ

lysis System sendloss event oto the custom

efore the eveo reduce the

Sm

The Smart before t

send coCEMS

at the ento the stthe even

of a power the externa

pically the “

ds an SMS tooccurred. At tmer a report ent; the user loads.

mart Device

t Appliancesthe event rou

onsumption d

nd of the evetatus they went.

45 / 66

loss event al grid or a “ex-post”

the the end of about can

es

s: utinely data to the

ent return ere before

Page 46: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

10.1 DSequence

DescriptioBefore the SmartInfo Customer EGateway) iIf UPS capserver, e.g. Message e

ID message

Detectiondiagram

on of the phpower lossroutinely seEnergy Manif has UPS c

pability is no. after ½ ho

exchange

e  From

 measloadsplugs

smartmeteSmar 

CEMS

n of a pow

hase s measurableends global nagement Scapabilitiesot availableur of gatew

m  to 

surable s/smart s 

 CE 

t er/ rtInfo   CE

 

S  Cus

wer loss

e loads routconsumptio

System (so f switches to

e or fail, powway inactivit

desc

MS 

 routconsdata

MS 

 globconsand 

stomer Pownotif

Use Case

s event p

tinely send on and alertfar in E@h to UPS and swer loss detty.

cription  p

tinary suption a 

ac

bal sumption alert 

ca

wer loss fication  a

es

hase

consumptiots. Immediathis role is isends an SMtection coul

parameters

 actual consumption

 consumptionalert 

consumptioalert 

on data to thately after thimplemente

MS to the cud be perform

Acknow(if any)  

n    Ack not

  Ack not

n  Ack not 

he CEMS. Ahe power loed by the Smustomer. med by an e

ledgment m

t needed 

t needed 

needed 

46 / 66

Also ss, the

mart

external

message 

Page 47: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

End of pSequence

DescriptioAt the end power lossbreaker. Thstate they woccurred bebreaker tripbefore pow Message e

ID message

power lodiagram

on of the phof the pow

s (ex post anhe loads reswere when before the evenp) and send

wer loss .Th

exchange

e  From

smartmeteSmart 

CEMS

ss event

hase er loss even

nalysis) andstart followiblack out ocnt, and calcu

ds to the cushe user can e

  to 

t r/ tInfo   CEM

 

S  HAN

t phase

nt , the custocan make a

ing their owccurred. Th

ulate the duratomer a rep

eventually c

d

MS at

N Devices  T

Use Case

omer has toappropriate

wn procedurhe CEMS reation and ty

port containichoose to do

description

alert before the event 

Power loss Terminated

es

o be informechoices to a

res. Smart Astarts, recei

ype of the eving also homo something

paramete

    alert  

Type of ePreviousConsumphome anconsumpthe event 

ed about theavoid e.g. a

Appliances wives from thvent (blackome and applg to reduce t

ers 

event 

ption: d appliancesption before t, alerts 

e type and ca new trip ofwill restart ihe SmartInfoout on the gliances conthe loads.

Acknowlmessage

  Ack not

s Possible feedback 

47 / 66

ause of the f the circuitin the same

fo the alert grid/circuit sumption

ledgment e (if any)  

t needed 

some k from user

t

Page 48: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

11 Dev The Energdevices to Furthermorand energyAppliance This chaptuser directfunctionalicontrolled cycle or th The new uextension c

vices mo

gy@home sexchange inre, the spey coordinatiRegulation

ter describet managemeities. For a can be the e Temperat

use cases wicould be req

Washing

onitorin

specificationnformation ecification dion. Some e

n.

es 2 new usent of the c white gooOFF/RUNN

ture for a co

ill leverage quired.

g machine m

ng and c

n provides related to th

describes thexamples o

se cases notconnected dod, for examNING/ENDooking cycle

on the exis

monitoring a

Use Case

control

an entire he energy ahe potential of these use

t related to devices in omple, some

D status of the.

sting set of

and control

es

set of comand to others

use cases e cases are t

the energyorder to moe functionalhe applianc

commands

interface, ex

mmands als functionalfocused on the Custom

y managemenitor and clities that c

ce or the Spi

that E@h h

xample

llowing thel properties.

the energymer Awaren

ent but concontrol theircan be monin value for

have define

48 / 66

e connected. y awarenessess and the

cerning ther status andnitored andr a washing

ed but some

d

s e

e d d g

e

Page 49: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

11.1 S Title Description

Connected

The device capabilities interface na The device and sends itrequested

Scenario

n

device

is able to proin term of u

avigation

prepares thet to the CEM

1: Devic

ovide its user

Init Data M when

ce initializ

1. Dev

Before startiuser interfacremote interfand options between cycAn example appliance to navigation c

Av Av

temval

Avext

Coallo

Besides thesselected prog

It acts as a tuforwarding tfrom the remand sending the device to

Depending osolution, thesimple tunneand the Remimplement sthe data rece

Use Case

zation

vice initializa

ing any monice must knowrface implemand of relati

cle and optionof the gener

the remote ucould be: vailable progrvailable regulmperature milues) vailable optiotrarinse min

ompatibility bowed with ec

se general infgrams can be

R

CEMS

unneling devthe request In

mote GUI to back the res

o the remote

on the adoptee CEMS can el between th

mote GUI or csome type of eived.

es

ation

itoring and cw which are t

ments in termsonship betwens or betweeral informatiouser interface

rams lations with rin 20°C max

ons with rang0 max 1 between regucomode)

formation, ote exchanged

Roles

vice nit Data the device

sponse from GUI

ed technical act as a

he device can

f parsing of

controlling acthe capabilitis of number een them (i.e

en 2 options) on to be retrie to enable a

range and ste90°C, step 5

ge and steps,

ulations (e.g.

thers informa.

Remo

It providesnumeric, tvisualizatistatus, eve When the remote intCEMS thedevice Init After recedata, the reapplies thederived fro

ctivities, the ies that the land type of pe. compatibil . ieved from th

a complete re

ep, for exam5°C (or list o

for example

. extrarinse n

ation related

ote GUI/Bac

s to the userstextual and gion of the deents, alarms

remote user terface, it sene request for tialization D

eived the Initremote user ie rules of navom the init d

49 / 66

remote local programs lity

he emote

mple of possible

e

not

d to a

ckend

s a graphical vice

opens the nds to the the

Data

ialization nterface vigation

data.

Page 50: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

11.1.1 Descriptio When the rthe CEM. Tspecial eve Message e

Message 

Init Data Request 

Init Data Response 

Cycle Data Request 

Cycle Data Response 

Initializ

on

remote GUIThis phase ent (for exam

exchange

From 

Remote GUI/BackE

Appliance 

Remote GUI/BackE

Appliance 

zation de

I is opened,can be also mple power

to 

nd Applia

RemoGUI/Bd

nd Applia

RemoGUI/Bd

scription

it requests repeated pe

r on reset).

de

ance  Bareinto

te BackEn

AreInre

ance Bareinfocyap

te BackEn

AreInresp

Use Case

n

the initializeriodically,

escription ackEnd

equests nitialization do the applianc

Appliance esponds to thnitialization dequest

ackEnd equests nitialization dor the specifiycle to the ppliance

Appliance esponds to thnitialization dequest for thepecific cycle

es

zation data tafter an upd

param

data ce

none  

he data

Availab Availab Availab Comparegulat

data c

Cycle i

he data e

Optionrange/lselecte

to the connedate of the d

eters 

ble programs

ble regulatio

ble options

atibility betwtions

id

ns/functions limitation insd cycle

ected devicedevice or af

A(i

An

s

ons

ween

An

An

side the An

50 / 66

e through fter some

Ack messageif any)  

Ack not needed 

Ack not needed 

Ack not needed 

Ack not needed 

 

Page 51: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Sequence In the follo

Appliance

In

In

Cy

Cyc

Diagram

owing seque

e

HAN

nit Data Reques

it Data Respons

ycle Data Requ

cle Data Respo

ence diagram

Gateway

Int

Init Da

st

Init Dat

se

Cycle D

est

Cycle D

onse

m the messa

BackEn

ternet

ata Request

ta Response

Data Request

ata Response

Use Case

age exchang

nd Server

Init Data R

Init Data Re

Cycle Data

Cycle Data R

es

ge is reporte

Remote GU

Con

Request

esponse

Ini

Cy

Request

Response

Cyc

ed for the In

UI Re

PC/tablet

nnect to applian

t Data Respons

ycle Data Reque

cle Data Respon

nitialization

emote User

nce

se

est

nse

51 / 66

n phase.

Page 52: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

11.2 S Title Description

Con The device information(device statu The device informs the status chang The status cfrom:

- the user

- the the ove

Scenario

n

nnected devi

is able to pron about his cous)

spontaneousCEMS abou

ge.

change can re

interaction r with the denormal evolfunctional p

er the time

2: Devic

j

ice

ovide onditions

sly ut any

esult

of the evice lution of phases

ce monito

2. Dev

The user canPC/mobile thappliances, t

Some inform

the the

Spin the the

spec the

Furthermorethe user of spjust finishedheating temp

For every sualarm systemsome basic iprogram/opt

It collects thevents, alarmover the HA

It receives frthe request tdevice statusRemote GUI

It sends the dnotification twhen the staand after anyreceived fromreceives the Remote GUI

Use Case

oring

vice Monitori

n receive remhe status of hthe lighting s

mation to mo

current statucurrent phasn, …) selected proselected opticial functionremaining ti

e some eventpecial events

d, the fridge dperature, som

ubsystem to bm ,…) the avinformation ation selected,

Roles CEMS

he status notims sent from

AN

rom the Remto start or to s notificationI.

device statusto the Remoart request isy status notifm the devicestop requestI.

es

ing

motely (insidhis devices tosystem, the H

onitor e.g. for

us (Running, se (e.g. for a

gram ions (temper

ns (prewash, eme to end th

t/alert can bes that occurredoor remaineme faults occ

be monitoredvailable inforare always ap, the alarm/e

fication , m the devices

mote GUI stop the n toward the

s te GUI s received fication e , until it t from the

de or outside o let him mo

HVAC sytem

r an applianc

End, Pause, washing mac

rature, duratioextrarinse, su

he cycle

defined anded (e.g. the wed open, the ourred on the

d (lighting symation mustpplicable (thvent notifica

Remo It providesthe user to It providesnumeric, tvisualizatistatus, eve It sends torequest fordevices ormonitoring It can addson the devonline, use

home) on hionitoring the m, the alarm s

ce can be:

Delay, …) chine Heatin

on, spin, …)uperfreeze, …

d monitored twashing macoven has rea dish washer

ystem, HVACt be defined ehe on/off statuation…).

ote GUI/Bac

s the secure o the monitor

s to the userstextual and gion of the deents, alarms

o the CEMS tr monitoringr to stop the g phase.

s reacher infvice usage, her guide onli

52 / 66

is

system.

ng, Rinse,

) and …)

to inform chine has ached the r)

C sytem, even if us, the

ckend

access of ring page

s a graphical vice

the g the

formation help ine.

Page 53: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

- the occ

Note: the derespond on-

The use cafollowing t

Id Phase

1 Monit

2 Monit

11.2.1 DescriptioIn this phaforward it tstandard innotificate i Message e

Message 

Status Notification

alarm/event currence

evice is also -demnad on h

ase can be dtable.

e Name

toring disable

toring enable

Phase

on of the phse the devicto the remo

ntended actiit remotely.

exchange

From 

n Device 

able to his status

escribed thr

ed

ed

1: Monito

hase ces and the ote GUI. Theivities (exec

to 

CEMS 

Depending osolution, thesimple tunneand the Remimplement sthe data rece

rough a cou

Descriptio

In this phasstatus of th

In this phasthe device t

oring disa

CEMS share CEMS kncute alghorit

descriptioThe devicespontaneoinforms thCEMS abany status change 

Use Case

on the adoptee CEMS can el between th

mote GUI or csome type of eived.

uple of diffe

on

se the remotehe device, so

se the remoteto monitor th

abled

re the informnows the uptms, log the

on  parame

ously he bout

The stinformconditapplian

es

ed technical act as a

he device can

f parsing of

erent phases

e GUI doesnno monitorin

e GUI requeshe current co

mation overdated statuse data on a d

meters atus packet i

mation relatedion of the dence can be:

Running, EDelay, …)Heating, Rselected prtemperaturspin, … prewash, esuperfreez

that are de

’t request theng is occurrin

sts the notificondition of th

r the HAN bs of the devidatabase, …

includes all thd to the evice, e.g. for

End, Pause, ) Rinse, Spin, …rogram re, duration,

extrarinse, e, …

scribed in th

e notificationing.

cation of thehe device

but the CEMices, uses it

…) but doesn

Acknomessa

the

r an

Ack no

53 / 66

he

n of the

e status of

MS doesn’t t for the n’t

owledgmentage (if any) 

ot needed 

Page 54: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

11.2.2 DescriptioIn this phaforwards itand ended Message e

ID message

Start StatusNotification Request 

Status Notification 

Stop StatusNotification Request 

Phase

on of the phse the devict to the remoby the remo

exchange

e  From 

s  Remote GUI 

CEMS 

s  Remote GUI 

2: Monito

hase ces and the ote GUI to ote GUI the

to  d

CEMS  Taoo

Remote GUI 

TmSsoCttdte

CEMS  Tacfd

oring ena

CEMS sharlet the user

e asks to con

descriptionThe Remote asks the CEMopen the forwof the deviceThis packet imirroring of Status Notificsent by the deover the HANCEMS has athe update vathe status sindispatching fthe device is enabled.

The Remote asks the gatewclose the forwarding odevices statu

Use Case

 

abled

re the informmonitor the

nnect or dis

parGUI

MS to warding es status

-  

is the the cation evice N. The always alue for nce the from always

Theinfoconan

GUI way to

of the us

-  

es

remaining cycle

mation overe status of tsconnect to t

rameters 

e status packformation relandition of theappliance ca

RunninDelay,

Heating selected tempera

spin, … prewas

superfr remaini

the cyc

time to end

r the HAN athe devices.the devices.

ket includes aated to the e device, e.g.an be:

ng, End, Paus…) g, Rinse, Spid program ature, duratio

… h, extrarinseeeze, … ing time to ele

the

and the CE. This phase.

Acknnt many) 

Ack n

all the

. for

se,

in, …

on,

e,

end

Ack n

Ack n

54 / 66

MS e is started

nowledgmeessage (if  

not needed

not needed

not needed

Page 55: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

1

1

2

Sequence In the follodisabled ph

Diagram

owing sequehase (phase

ence diagram 1) and the

m the messamonitoring

Use Case

age exchang enabled ph

es

ge is reportehase (phase

ed, both for2)

r the monito

55 / 66

oring

Page 56: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

11.3 S Title Description

Con The device status condiaccording wdispatched band accordiconstraints (e.g. remote The device informs the status chang The status cfrom:

- the userbothrem

- the the ove

- the

Scenario

n

nnected devi

is able to moitions (device

with the commby the remotng with the selected by te control ena

spontaneousCEMS abou

ge.

change can re

interaction r with the deh locally and

motely normal evolfunctional p

er the time alarm/event

3: Devic

ice

odify his e status) mands te GUI

the user abled)

sly ut any

esult

of the evice, d

lution of phases

ce Contro

3. Dev

The user canhis devices uthe appliancesystem.

Some param

ON/ Req Req

dura Req

supe Star

For every sualarm systemsome basic iprogram/opt

It collects thevents, alarmover the HA

It receives frthe request tthe devices (cycle, ON/Ostart/stop com

It sends the mthe devices o

It sends the dnotification t

Depending osolution, thesimple tunneand the Remimplement sthe data rece

Use Case

ol

vice Control

n control remusing his PC/es, the lighti

meters to cont

N/OFF status quired cyclequired washination quired optioner cooling, …rt, Stop, Paus

ubsystem to bm ,…) the avinformation ation selection

Roles CEMS

he status notims sent from

AN

rom the Remto modify the(e.g. selectio

OFF of the demmands)

modificationover the HAN

device statusto the Remo

on the adoptee CEMS canel between th

mote GUI or csome type of eived.

es

motely (insid/mobile, setng system, th

trol e.g. for a

of the applia

ng/cooking/f

ns and functio…) se command

be controlledvailable inforare always apn, …).

fication , m the devices

mote GUI e status of

on of a evice,

n request to N

s te GUI

ed technical n act as a he device can

f parsing of

de or outside ting the requhe HVAC sy

an appliance

ance

freezing temp

ons (superw

ds

d (lighting symation mustpplicable (th

Remo It providesthe user to It providesnumeric, tvisualizatistatus, eve It sends torequest fortheir status It can addson the devonline, use

home) the stuired functionytem, the alar

can be:

perature, spi

wash, rapid w

ystem, HVACt be defined ehe on/off statu

ote GUI/Bac

s the secure o the monitor

s to the userstextual and gion of the deents, alarms

o the CEMS r the modifi

us

s reacher infvice usage, her guide onli

56 / 66

tatus of nalities on rm

n speed,

wash,

C sytem, even if us, the

ckend

access of ring page

s a graphical vice

the ication of

formation help ine.

Page 57: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

occ The use cafollowing t

Id Phase

1 Setup

2 Comm

11.3.1 DescriptioIn this phaTo avoid gCEMS – dconfirmatioconfirmatio(as describ Message e

Message 

Select a cycle 

Change oneparameter 

11.3.2 DescriptioIn this phaappliance cappliance mGUI about

currence

ase can be dtable.

e Name

mand

Phase

on of the phse the remo

generating uevice), the son is given on can be a

bed in the se

exchange

From 

Remote GUI 

e  Remote GUI 

Phase

on of the phse the remoconfiguratiomodifies hist his updated

escribed thr

1: Setup

hase ote user seleunnecessarysystem coulby the userdirect conf

equence diag

to 

Backend 

Backend 

2: Comm

hase ote user has on is dispatcs status accod status.

rough a cou

Descriptio

In this phasoptions/cyc

In this phasthe control

ects the requy data trafficld border th. This is onl

firmation orgram) until

descriptiThe Rembackend on the deThe Rembackend paramete

mand

given the cched from thording with

Use Case

uple of diffe

on

se the remotecle/status bef

se the remotecommands a

uired status c over the c

he communily a technic

r a periodicaa direct com

ion mote GUI ask

to set the reqevice  

mote GUI askto set the req

er  

confirmationhe backend

h the remote

es

erent phases

e user is selefore confirm

e user confirmare dispatche

(cycle, temcomplete coication on thcal and implal automaticmmand is g

ks the quired cycle

ks the quired

n to the requd to the CEMe commands

that are de

cting the reqing the selec

ms the selected to the CEM

perature, dummunicatiohe backend lementationc confirmatiiven (turn O

parameteType/numof cycle  Type/valuparameter  

uired changMS and thens and inform

scribed in th

quired cted configur

ted configurEMS.

uration, …)on chain (baside until s

n choice andion (e.g. eacON, start, …

ers Acknomessa

mber Ack no

ue of r

Ack no

ge so the comn to the applms the backe

57 / 66

he

ration.

ation so

. ackend – ome

d the ch 10 “) or

…)

owledgmentage (if any) 

ot needed 

ot needed 

mplete liance. The end/remote

Page 58: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Message e

ID message

Send all data & Set start cycle 

Status Notification

exchange

e  From 

Remote GUI 

n Applianc

to 

Backendthen 

CEMS then applianc

e  CEMS then backend

descriptio

ce 

Once the confirms options wcommandcycle (or confirmator after a time basisinformatithe requirconfiguradispatchebackend tand from the applia

After the executed request, sthe updatdispatchenetwork

Use Case

on Remote GUthe selected

with a direct d such as Stawith a directtion commanperiodical s), all the ion releated tred applianceation is ed from the to the CEMSthe CEMS

ance appliance the remote

status changeted status is ed over the

es

parameUI

art t nd

to e

S to

Type/nuType/vaType ofexecute 

e ,

The statincludesinformathe conddevice, applianc

remaininthe cycl

ters umber of cycalue of paramf command to

tus packet s all the ation related tdition of the e.g. for an ce can be:

Running, EnPause, Delay…) Heating, RinSpin, … selected program temperatureduration, spi… prewash, extrarinse, superfreeze,ng time to ene

Acknomessa

cle meter o

Ack no

to

nd, ay,

nse,

e, in,

, … nd

Ack no

58 / 66

owledgmentage (if any) 

ot needed 

ot needed 

Page 59: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

1

2

Sequence In the follothe Comma

Diagram

owing sequeand phase

ence diagram

m the messa

Use Case

age exchang

es

ge is reporteed, both forr the Setup p

59 / 66

phase and

Page 60: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

12 Ene In order toMAINTAIguarantee tdevices con In case of coordinatounavailabilincluding tprovides th

12.1.1 The user bsimplest hinterconneIf the HANadmission allows the activated foIn case thewhich shal

12.1.2 In case of customer i

12.1.3 If the custocould presHAN but communicIf the CEM

13 Rev Data 03/07/2013

03/07/2013

rgy@Ho

o enable thIN the appthe customennected to t

f a ZigBee or of this netlity of the Cthe connecthe Smart Inf

Add abuys a Smarhuman intection of theN was prevprocedure,new Smart

for the Smare CEMS is nll provide us

Remof both joinins provided w

Maintomer experent the statunot respon

ation probleMS is not av

visions

3

3

ome pro

he scenariopliances in er the desirthe HAN.

network, thtwork. It is CEMS, anotion to the fo data and

a new devrt Applianceeraction poe Smart Infoviously acti, identifies t Appliance rt Info. not availablser with a u

ove a devng of not dwith this pr

tenance rienced somus of the Hnding ), etems.

vailable, this

Revision1

2

ovision

s above dethe HAN.

ed level of

he admissioassumed th

other deviceInternet. Thsome of the

vice e and wouldssible. The

o, Smart Appivated by th

the new Zto join the

le, the admiuser-friendly

ice desired devocedure. Th

me problemsHAN includi

tc. Also

s functional

n

Use Case

ing and

escribed it Access to

security in

on of any nhat the CEMe in the HAhis device e CEMS fun

d like to stae admissionpliances anhe CEMS, ZigBee dev

Energy@H

ission procey interface.

vice to the he user expe

s with Enering the deviWarning a

ity is critica

AuthNew – EneAssocNew

es

d mainte

is requiredo those thr

order to pr

new device MS could plaAN should p

shall be, bynctionalities

art it up in tn procedur

nd CEMS owthrough a w

vice checkinHome soluti

edure shoul

HAN and erience cou

rgy@Home ices list, theand Alarm

al to be prov

hor Use Cases G

ergy@homeciation Use Cases G

enance

to ACTIVee function

revent unaut

into the Hay the coord

provide a suy instance, s.

he Energy@re is requiwned by theweb interfang manufacon. The sam

ld be manag

replacemenld be simila

a Web appe devices st

could be

vided.

NoGroup e

FirpreMe

Group Mo

VATE, REMnalities is rthorized co

HAN is chadinator role

ubset of its a smart m

@Home HAired to guae same custoace, the usecturer and me procedu

ged by anot

nt of brokenar to ADD o

plication ontatus (i.e. joactivated

ote rst release, esented at Geeting, Cataodification

60 / 66

MOVE andrequired tontrol of the

rged to thee. In case ofcapabilitieseter, which

AN with thearantee theomer. er starts themodel and

ure could be

ther device,

n ones, theone.

the CEMSoined to thein case of

General ania

d o e

e f s h

e e

e d e

,

e

S e f

Page 61: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

10/09/2013

16/09/2013

27/03/2014

3

3

4

3

4

5

Use Case

– EneAssocNew – EneAssocNew– EneAssocNew – EneAssoc

es

ergy@homeciation Use Cases G

ergy@homeciation Use Cases G

ergy@homeciation Use Cases G

ergy@homeciation

e proBia

Group e

MoproSig

Group e

ChDis

Group e

Iniadd

oposed by Lanchi odification oposed by Mgna heck by Enestribuzione

itialization sded on Chap

61 / 66

Lucio

Marco

el

scenario pter 5

Page 62: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

14 Glos Term AG

Aggregato

Active dem

AD servic

ApplianceProfile

Blackout

CEMS

ssary

or

mand

ce

e Power

DescripSee HG

Aggregamany smas a whosuch as: • Power l• Peak cl• Peak shActive Din the podifferent

AD servimaintainan incentof the pro

The Appabout thecycles) ashedding

The totalthe operaportion o

Customecommunand the Wenergy cgrid, conperformasent to anhome/budedicated

ption

tor is a playmall clients a

le. The Agg

limitation wlipping hifting

Demand (ADower system

power syst

ice is a requn a certain potive (€ as a ogram.

pliance Powe energy conand some othg its usage.

l absence ofator (the legof the nation

er Energy Mnication funcWAN (e.g. ionsumption

nsumer’s setance standarnd received

uilding sectod load and g

Use Case

yer in the enand to operagregator sha

within a give

D): it is the m markets antem particip

uest sent froower level ifunction of

wer Profile isnsumption oher useful i

f voltage in gal person wnal electricit

Manager Sysctionalities,internet). Thn and or prottings and crds. The Cu

d from conneor has to be generation m

es

nergy markeate into the all reply to m

en geograph

active partind in the propants by par

om the aggrein a period

f kW actuall

s a data struof an applianformation

the electricwho is assignty grid).

stem. The C it is the gathe CEM is

oduction basontracts, an

ustomer Eneected devicmentioned.

managemen

et. It has theenergy marmarket need

hical region

cipation of ovision of flticipating in

egator to thof time. Thely consumed

ucture contaance (load pfor load sh

c distributionned the man

CEMS is CEteway betwa logical funsed on signand devices mergy Manages; especial. It can handnt command

e mission torket presentds offering

n and tempo

residential flexibility ton AD servic

he consumere aggregatod) for the fu

aining informprofile relatehifting or loa

n grid mananagement o

EM integrateween the HAunction optimals receivedminimum ger collects mlly the in-dle general ds and then

62 / 66

o aggregate ing them services

oral slot

consumers o the ce.

rs to or will give ulfillment

mation ed to its ad

aged by of the local

ed with AN, the HN mising d from the

messages

or forwards

Page 63: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Customer

Demand SManagem

DSO

Energy CoAlgorithm

Energy ReAlgorithm

Energy Re

HAN

Interfaces

Side ent

ost m

egulation m

etailer

these to tthe “gridcombine

An appliremote, mIt could bcompone(connectpages or Demand quantity such as aenergy-sshifting a

In electrithat carridistributi

Algorithmfrom 08:Retailer. complexCost AlgestimatedEnergy Rfor coordconsumpof the syAppliancinvolvedsheddingCompani(energy)

A home usually ccommunplugs, smnetwork often ref

the connectd / market”. d in the CE

ance or Smmore verbosbe a physicaent, which ced in the HAcustom sofside managor patterns

actions targeupply systeand load she

ical power bies and delivion lines.

m, to obtain00 to 19:00The Energy, and, in any

gorithm shald, and all thRegulation adinating Smption or coststem, usingces Power Pd in the Energ . ies that partto the end u

area/automacharacterizenication betwmart thermo(e.g. ZigBe

ferred to as P

Use Case

ted devices. Note that m

EM to be mu

mart Info Usese, portableal device orcan be visuaAN or HN)ftware writtegement (DS(load profileting reduct

ems are consedding.

business a Dvers electric

n the price o0) replicatiny Cost Algoy case, definll receive as

he needed malgorithm is

mart Appliant optimizati

g as inputs thProfile and trgy Regulat

ticipate in thuser.

ation netwoed by low thween deviceostats and hoee) or wiredPAN (Perso

es

It providesmultiple loadutually contr

er Interfacee, remote, usr, more comalized by a P. Typical imen for each

SM) entails ale) of use oftion of peakstrained. No

Distributioncity to the c

of energy atg the conditorithm to gened by eachs inputs a Po

metering dats any procednces behavioon and to ghe global entheir status. tion algorith

he retail ene

ork is a residhroughput. Ies within thousehold ap

d (e.g. Poweonal area ne

vice versa ds/generatiorolled.

extension. ser friendly,

mmonly, it isPDA, a pc omplementati

of these devactions that f energy conk demand duoticeably tec

System Opconsumer fr

t a given timtions applieet the price ch Energy Reower Profilea. dure which or, in order uarantee thenergy consuMain contr

hm are load

ergy market

dential localt is typicallye home such

ppliances. It r Line Com

etwork)

informationon resource

Its goal is h, configurabs only a logor a Smart Pions are throvices. t influence tnsumed by uring periodchniques ar

perator is anrom the TSO

me (e.g. € peed by the Encould be quetailer. The e, either act

defines theto reach ene overall pe

umption, itsrol techniqu

d shifting an

t providing

al area netwoly used for ch as sensorst can be a W

mmunication

63 / 66

n towards s can be

having a ble device. ical

Phone ough Web

the end users, ds when re load

n operator O's

er kWh nergy uite

Energy tual or

strategy nergy erformance

cost, ues nd

a service

ork,

s, smart Wireless n). This is

Page 64: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

HG

Home Dom

Home DomOverload

Home EneMonitor

HN

Load Prof

Load Shed

main

main

ergy

file

dding

Home GaWAN (eInterfaceHN (ZigB(usually to collectand publIt identif(HAN anInfo and

Conditiopower limaccordincountriespower (eprocess ithresholdthe MeteIn other chome equoverloadA Home conveniealso dispreal timeits displahouse, cowired (e.A home nby high ttypicallygatewaysEthernet)

Load prospecific dused by t

Energy usystem bgeographelectric lthose (thsheddingutility co

ateway: it i.g. internet)

es through thBee, WiFi, via a standat energy datish them in

fies a boundnd HN), covCEMS. Th

on which takmitation. Pog to the regs, domestic eg. 3kW). Nis managed d exceedinger will open countries, thuipment and

d. Energy Mo

ent feedbackplay cost of e consumptiay is remoteommunicati.g. power linnetwork is athroughput.

y deployed is. The home).

ofile is the vdefinition isthe load.

utilities' metby temporarihical areas; oads in the us altering t

g are rollingompany in o

Use Case

is the gatew). It is able the communetc.) and to

ard ADSL cta, from the the HN and

dary of the wvering Smarhis boundary

kes place whower limitatgulation in p

connectionNote that ma

by the Metg and to perf

the breakerhe limitatiod apposite s

onitor is a dk on electricenergy, estion of some

e from the ming with thene communa residentia It is used fo

in the homee network c

variation in s the Power

thod of reduily rationingthis can be grid or by rtheir load p

g blackouts, order to avo

es

way betweento interface nication proto provide a bconnection)e Smart Infod WAN. wired/wirelert Appliancey is usually

hen aggregation can be

place. For exns are subjecaximum coner, which isform neededr immediaten is imposesafety devic

device provical (or otherimates of grelectrical lo

measuremene sensor/Homnications) oral local area for commun, usually pe

can be wirel

the electricr Profile, wh

ucing demang distributiodone by for

reducing theprofile). The

the last resid a total bl

n the HAN, Smart Apptocol(s) usebroadband c. Moreover,

o and from t

ess communes, Customethe custome

ated home ldeterminedxample, in Sct to a maximntractual pows the only acd action. In ely, without ed by physicces are insta

ding the conr) energy usreenhouse goads inside

nt point andme Electricr wireless mnetwork, ty

nication betwersonal compess (e.g.Wi

al load vershich takes in

nd on the enon of energyrcing the swe power cone most drastort measureackout of th

the HN andpliances anded in the HAconnection , the Gatewthe user’s ap

nication syser Interfaceer’s House.

load exceedd by differenSouth Europmum contrawer limitatictor entitledsome circu

t emitting ancal limitatioalled to prev

nsumer a prse. These degas emission

the house. d portable incity Meter umethodologyypically chaween digital

mputers, prini-Fi) or wire

sus time. A nto account

nergy genery to differen

witch off of nsumption otic kind of loe used by anhe power sy

64 / 66

d the d Customer AN and to internet

way is able ppliances,

stem s, Smart

ds a given nt causes pe actual ion d to sense umstances, ny alarm. on of the vent the

rompt and evices may ns, near Usually

nside the using a y. aracterized l devices

nters, ed (e.g.

more the power

ration nt some

of some of oad n electric ystem.

Page 65: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Load Shift

Overload i

Peak DemLoad

Power Pro

SI

SimplifiedProfile

fting

interruption

mand or Peak

ofile

d Tariff

Smart Apmeasurescould be consumpaction imGrid to thalso a sevnoticeablDemand Load Shithe patterthe peak Managemeach singcommoncomplex the neede

n Trip of th

k Peak demdescribinfor a sustPeak demyearly cy

Power prversus timaccordincommercAppliancis used. Smart Ininformatavailablea proxy o

It is a simEnergy Rof time sthe correthat provaccount atime or d

ppliances cos, reducing performed

ption profilemplies an infhe Smart Apverity levelly affected bSide Mana

ifting is an ern of energyhours to of

ment techniqgle electric l

nly, the oversequence o

ed performahe circuit br

mand or peang a period itained perio

mand fluctuycles.

rofile is the me, thus speg to customcial and induces context,

nfo: is the elion into the

e inside the of the meter

mplified struRetailer. Thlots for a co

espondent prvides the Simall the relev

differences b

Use Case

ould signifitemporarilyby the appl

e (load profiformation c

Appliance in . Their perfby the load

agement techelectric loady use of a dff-peak hourques. In theload of the rall workingof activationance of the reaker due t

ak load are tin which el

od at a signiuations may

variation oecifying the

mer type (typdustrial), tem

the more sp

lement, prove HAN. PubHome Elecr

ucture of the content ofonfigurable rice (in euromplified Tavant factors between wo

es

cantly help y their poweliance contrile) during icoming from

order to to formances sshedding o

hniques. d managem

device (load rs of the daye Smart Appappliance o

g cycle of thn of those simachine). to unhealed

terms used iectrical powificantly higoccur on da

f power cone [[Load Propical exampmperature anpecific conc

vided by theblished data ctricity Mete

e energy tarf the Simpliamount of

os per kWhariff Profile

that influenorking and h

to avoid theer consumptrol logic itseits working

m the Utilitysignal the nhould not bperation. It

ment techniquprofile), mo

y. It belongspliance contor, more genhe applianceingle loads,

overload

in Demand wer is expecgher than availy, monthl

nsumption oofile]] concples include nd holiday scept of App

e DSO, whiare a sub-se

er, hence the

riff offered ified Tariff time (e.g. th) for each tishall autono

nce the tarifholiday days

hese last resotions: load self changingoperations

y through thneed, carryibe greatly or

belongs to

que that aimmoving dema

s to the Demtext, the loanerally and e (which coin order to

Side Manacted to be prverage supply, seasonal

of an electriept. It will v

e residentialseasons. In

pliance Pow

ich provideset of those ae Smart Inf

to the clienProfile is a he next 24 hime slot. Thomously tak

ff, such as cuys.

65 / 66

ort shedding g its power . This

he Smart ng usually r the

s to shift and from mand Side ad could be

nsists of a achieve

gement rovided ly level. l and

ical load vary , the Smart

wer Profile

s energy already fo acts like

nt by the sequence

hours) and he actor ke into urrent

Page 66: Specifications... · 2014-05-16 · Table of 1 INTRO 2 SCOP 3 SYSTE 4 USE C 5 CUST 5.1.1 5.1.2 5.1.3 5.1.4 6 APPLI 6.1.1 6.1.2 6.1.3 6.1.4 7 ENER 7.1 SCE 7.1.1 7.1.2 Foreca 7.1.3

Smart App

Smart Plug

TSO

WAN

pliance

g

It is an apintelligennew servawarenesthe homewhishes technoloSmart Apoutside thlogic (insDevice ppower mconnecteremotely

Transmistransmisspower frooperators

Wide areany netwThis is d(LANs) wrespectiv

ppliance conce to coopevices to the css, demand e system comand alwaysgies imply sppliance (thhe Home Dside and/or

provided witmeter able toed load and y power on/o

ssion Systemsion systemom generatis (DSO).

ea Network:work whose

ifferent thanwhich are uvely.

Use Case

onnected in terate with tconsumer, lresponse. Tmplying wis assuring itsome inform

hus a commDomain) and

outside the th a HAN in

o calculate this typically off the load

m Operatorm operator (T

ion plants to

: it is a comcommunican personal a

usually limit

es

the HAN anhe other holike for instThe Smart Aith the systets best perfomation trans

munication chd an additioappliance).

nterface (e.ghe power/Eprovided w

d.

. In electricTSO) is an oo regional o

mputer netwoations links area networted to a room

nd equippedme actors inance energy

Appliance plem policies, ormance. Msfer from thhannel with

onal control . g. ZigBee) tnergy consu

with a Relay

al power buoperator thaor local elec

ork that covcross metro

rk (PANs), Lm, building

d with somen order to py consumptlays an acti satisfying t

Most of thesehe Smart Grhin the HAN

and superv

that typicalumption of

y that can be

usiness, a at transmitsctricity distr

vers a broadopolitan bouLocal area n

g, campus

66 / 66

e provide ion ve role in the user e rids to the N and vision

ly has a the

e used to

electrical ribution

d area (i.e., undaries) network