Spain's Gas System Enagas EFG 09.pdf
Transcript of Spain's Gas System Enagas EFG 09.pdf
Spain’s Gas Industry ithi th EUwithin the EU
Juan Pons. i l d i l ió
June 2009
Director General de Estrategia y Regulación
1. ENAGAS Overview2 S i ´ N t l G I d t “C t Sit ti ”2. Spain´s Natural Gas Industry “Current Situation”3. Spain´s Natural Gas Industry “Future Developments”4. Liberalization of the Spanish Gas Industryp y5. European Union Security of Supply6. European Energy Third package
1
ENAGASENAGASOverviewOverview
2
Enagas Key Investment Highlights: Focused Strategy
RegulatedAssets
Sp as rtat
ion
Spain Gas
Tran
spor
t
Pivotal Role in ► Owner of 90% transport network, main player in regasification
Fully Regulated ► Revenues with no volume or commodity exposure, collected through settlement system handled by the regulator
Pivotal Role inSpanish Gas Sector
► Owner of 90% transport network, main player in regasification /storage and national system operator
Spanish InfrastructurePlan
► Investments follow mandatory Government plan; all capex brings new additional regulated revenues
Strong CreditProfile
► Commitment to maintain its strong credit rating (AA-/A2) through conservative financing policies
Track Record ofDelivery ► Consistently meeting investment, growth and financial targets
Supportive 5% d b S i h St t d li it ti t k i d
Profile through conservative financing policies
3
Supportive Ownership Oversight
► 5% owned by Spanish State and limitations on stake size and voting rights for other shareholders
Activities at 01-01-2009
Enagas: Main Magnitudes and Activities
TRANSPORTATION8,438 Km of pipelines
Activities at 01 01 2009UNDERGROUND GAS STORAGE
Operation of two storage facilities
Operating Volume: 0.7 Mm3 (Serrablo)Cap. Extraction /Injection: 6.8/3.8 (Mm3(n)/day)
Enagás: Leading Gas
Transport Company in
Spain and System
REGASIFICATIÓN
Regasification capacity: 4,350 (Km3(n)/h)
LNG tanks capacity: 1.4 (Mm3)
SYSTEM TECHNICAL MANAGER
Technical Manager
Activity: Fully Regulated and System Technical Manager
Financial Basic Information Shareholding Structure
Focus on Spain and Portugal
Others37%
United States30%
SEPI5%
Bancaja Inversiones
5%
REN1%
Market Cap(1)
Net Debt 2008
EBITDA 2008
3,106 mill €
2,351 mill €
636 mill € 37%
United Kingdom24%
Free float69%
BBK5%
Cajastur5%
O Oil H ldi
Sagane Inversiones
5%
EBITDA 2008 636 mill €
Capex 900 mill €
Net Income 2008 259 mill €
Targets 2009
4
Spain9%
24%Oman Oil Holdings5%
p
(1) As of 10th June 2009, €13.01 per share.
Assets put into into operation 900 mill €
Enagas Investment Plan breakdown 2007-2012
Activity
10,9008,100Pipelines(Km)
•2012•Infrastructure
+42%
2008 %
518,400327,700Compression Stations (kW)
(Km)
+93%
Transportation(60%)
Regasification
2.31.4LNG
tanks capacity (Mm
3)
+80%
(25%)
5,6004,350Regasificatio
n capacity(Km
3(n)/h)
+33%
Underground Storage
(15%)
46.86.9Extraction (Mm3(n)/day)
3.00.7Operating
Volume (Mm
3(n))
+588%
+328%
5
Enagas’s Committed Investment plan
Enagas: Infrastructure Operator
ifi tiregasificationBarcelona: 1 650 000 m3(n)/h ; (6 TK´s: 540 000 m3 LNG)Barcelona: 1.650.000 m3(n)/h ; (6 TK s: 540.000 m3 LNG)Cartagena: 1.350.000 m3(n)/h ; (4 TK´s: 440.000 m3)Huelva : 1.350.000 m3(n)/h ; (4 TK´s: 460.000 m3)
transmission>8.000 km of high pressure pipelines (72-80 bar) (>90% of total)International links to Morocco, France & Portugal (x2)
storagestorage“Serrablo” underground storage facility (Total capacity: 9.6 TWh)
6
Enagas business takes place in a 100% regulated area It Enagas business takes place in a 100% regulated area It
Enagas: Main Magnitudes and Activities
Enagas business takes place in a 100% regulated area. It mitigates the impact of market fluctuations
Enagas business takes place in a 100% regulated area. It mitigates the impact of market fluctuations
REGANOSAMUSEL BILBAO
REGANOSAMUSEL BILBAO
REGANOSAMUSEL BILBAO
6.000
≈ 2.800 M€≈ 2.800 M€
Total investment foreseen 2007-2012 ≈ 5.000 M€
REGANOSA
CASTOR
GAVIOTA LARRAU
YELA
BARCELONA
SERRABLO
REUS
CARDONA
DORADA
REGANOSA
CASTOR
GAVIOTA LARRAU
YELA
BARCELONA
SERRABLO
REUS
CARDONA
DORADA
REGANOSA
CASTOR
GAVIOTA LARRAU
YELA
BARCELONA
SERRABLO
REUS
CARDONA
DORADA
2.000
3.000
4.000
5.000
777 M€777 M€
≈ 900 M€≈ 900 M€
≈ 2.800 M€
CARTAGENA
SAGUNTO
CASTOR
LAS BARRERASEL RUEDO
LAS BARRERASEL RUEDO
CARTAGENA
SAGUNTO
CASTOR
LAS BARRERASEL RUEDO
LAS BARRERASEL RUEDO
CARTAGENA
SAGUNTO
CASTOR
LAS BARRERASEL RUEDO
LAS BARRERASEL RUEDO
0
1.000
2007 2008 2009 periodo 2010-2012
501 M€501 M€
777 M€777 M€
HUELVA
TARIFA
ALMERÍA
CARTAGENA
MARISMASPOSEIDÓN
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
Incorporación INFRAESTRUCTURASen operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2007-2016 – Categoría APlanificación Obligatoria 2007-2016 – Categoría B
Incorporación INFRAESTRUCTURASen operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2007-2016 – Categoría APlanificación Obligatoria 2007-2016 – Categoría B
Planificación Obligatoria 2008-2016
Planificación Obligatoria 2008-2016
D. PLANIFICACIÓN
Incorporación INFRAESTRUCTUR ASen operación a 31-dic-2007aprobadas en la Rev isión 2005-2011 de la Planif icación Obligatoria 2002-2011Planif icación Obligatoria 2008-2016 – Categoría APlanif icación Obligatoria 2008-2016 – Categoría B
HUELVA
TARIFA
ALMERÍA
CARTAGENA
MARISMASPOSEIDÓN
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
Incorporación INFRAESTRUCTURASen operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2007-2016 – Categoría APlanificación Obligatoria 2007-2016 – Categoría B
Incorporación INFRAESTRUCTURASen operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2007-2016 – Categoría APlanificación Obligatoria 2007-2016 – Categoría B
Planificación Obligatoria 2008-2016
Planificación Obligatoria 2008-2016
D. PLANIFICACIÓN
HUELVA
TARIFA
ALMERÍA
CARTAGENA
MARISMASPOSEIDÓN
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
Incorporación INFRAESTRUCTURASen operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2007-2016 – Categoría APlanificación Obligatoria 2007-2016 – Categoría B
Incorporación INFRAESTRUCTURASen operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2007-2016 – Categoría APlanificación Obligatoria 2007-2016 – Categoría B
Planificación Obligatoria 2008-2016
Planificación Obligatoria 2008-2016
D. PLANIFICACIÓN
Incorporación INFRAESTRUCTUR ASen operación a 31-dic-2007aprobadas en la Rev isión 2005-2011 de la Planif icación Obligatoria 2002-2011Planif icación Obligatoria 2008-2016 – Categoría APlanif icación Obligatoria 2008-2016 – Categoría B
Incorporación INFRAESTRUCTUR ASen operación a 31-dic-2007aprobadas en la Rev isión 2005-2011 de la Planif icación Obligatoria 2002-2011Planif icación Obligatoria 2008-2016 – Categoría APlanif icación Obligatoria 2008-2016 – Categoría B Investments related to peak demand.
Natural Gas is the backup of Renewable Energies in electricity generation.
Remuneration by Tolls and Fees for the use of Transmission, Regasification and Storage Infrastructures.
Investment Retribution depends on the Asset Base, is independent from demand fluctuations and
7
Investment Retribution depends on the Asset Base, is independent from demand fluctuations andOperation and Maintenance costs, according to a standard values.
SPAIN’S NATURAL SPAIN’S NATURAL GAS INDUSTRYGAS INDUSTRY“Current Situation”“Current Situation”“Current Situation”“Current Situation”
8
Natural gas sales evolution
Natural Gas Demand
380 000400.000420.000440.000460.000
Unidad: GWh/año
Natural gas sales evolution
280 000300.000320.000340.000360.000380.000 Sector eléctrico ATR
ATR Internacional
Convencional ATR
180 000200.000220.000240.000260.000280.000 Sector eléctrico a tarifa
Convencional a tarifa
100.000120.000140.000160.000180.000
020.00040.00060.00080.000
1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2004 2006 2008198226.635+10%
198425.831
-5%
198632.379+8%
198845.985+27%
199066.340+11%
199277.918+6%
199482.874+9%
1996108.031+13%
1998152.319
+7%
2000200.407+13%
2002248.139+15%
2004320.172+14%
2006397.358
+6%
2008451.535+10%
At the end of 2008 there were 54 groups of natural gas combined le into ope tion ith tot l p it of 20 951 MW
Power Generation Natural Gas Demand
nº CTCC CT GWh nº CTCC CT GWhAES 3 0 8 219
· CTCC· CT convencionales
(Utilización 52%)184.6052 863
GWhGWh
Anual a fecha 31-12-2008
Gas sector eléctrico 187.468 GWh por compañía propietaria de la instalación
cycle into operation, with a total capacity of 20.951 MW.
AES 3 0 8.219mapa correspondiente al último día del periodo solicitado BBE 2 0 9.456
Electrabel 2 0 7.514Endesa 6 5 28.069Esbi 2 0 6.290GNCom 10 0 36.028
· CT convencionales 2.863 GWh
HC 3 0 8.227Iberdrola 14 3 42.064U. Fenosa 10 0 37.744Viesgo/EON 2 0 3.858
nº CTCC CT GWh nº CTCC CT GWhAndalucía 12 1 43.428 País Vasco 5 1 18.095Aragón 5 1 12.855 Valencia 7 0 21.363Asturias 1 0 1.620Castilla Mancha 2 2 9 580
ubicación por CCAA
Castilla-Mancha 2 2 9.580Cataluña 6 3 25.205Galicia 3 0 9.959La Rioja 2 0 7.162Murcia 8 0 29.834Navarra 3 0 8.368
Potencia instalada en CTCC: 20.951 MW
Power Generation Natural Gas Demand
1%
Year 2008
Natural gas combined cycle16%
1%
WindOther renewalsHydro20%
%32%
Nuclear
Coal
Fueloil11%
13%7% Fueloil13%
11
Supplies to Spanish natural gas system in 2008
Natural Gas Supply
Unidad : GWh GWh % GWh %real 2007 real 2008
Supplies to Spanish natural gas system in 2008
Argelia GN 102.243 103.691
Argelia GNL 50.178 56.814
Qatar GNL 50.445 12% 53.611 12%
Omán GNL 2.704 1% 7.820 2%
35%37% GNL72%
GNNigeria GNL 96.871 24% 86.676 19%
Egipto GNL 46.960 11% 56.986 12%
Noruega GN 25.257 20.807
Noruega GNL - 11.478 6% 7%
OmánQ
T&T10,9%
Noruega7,0%
GN28%
Francia GN 1.049 0,3% 1.489 0,3%
Libia GNL 8.760 2% 6.090 1%
T&T GNL 24.440 6% 50.053 11%
Guinea Ecuatorial GNL - 945 0,2%
1,7%
Egipto12,4%
Qatar11,7%
,
...
,
Otros GNL - 1.107 0,2%
Nacional GN 1.040 0,3% 1.334 0,3%
TOTAL 409.947 100% 458.901 100%
,
Nigeria18,9%
Argelia 35,0%
2002-20082008
Natural Gas Supply
72%72%
80%
90%
100%
Nacional0 3%
2008
58%50%
60%
70%0,3%
LNG
42%
20%
30%
40%Importación
99,7%
28%28%
0%
10%
2002 2003 2004 2005 2006 2007 2008
GN GNL
Pipe
GN GNL
LNG imports have been 72%, confirming the LNG strong share in supply.
LNG/NG Share will partially equilibrate with Medgaz pipeline operation in late2009.
13
SPAIN’S NATURALSPAIN’S NATURALGAS INDUSTRYGAS INDUSTRY“Future developments”“Future developments”“Future developments”“Future developments”
14
Growth prospects in Spanish gas sector...
N t l G D d P k D dNatural Gas Demand Peak Demand(bcm) (GWh/day)
+5.4%CAGR = 5.6%
x 1.3
1 9CAGR = 11.4%
x 1.546
2,866
1 135
1,532CAGR = 11.6%
x 1.9+12.1%
22.922.4
29
18.2
35.138.6
1,6621,863
,866
573 7281,334
1,0891,135
Winter Peak '06/07 Winter Peak '07/08 Winter Peak '11/12
1.1 12.2 16.2 1717.1
2001 2007 2008 2012E(1)
• 10.1% demand growth in 2008; Expected 46 bcm in 2012• Growth in projected peak demand higher than in total demand
Winter Peak 06/07 Winter Peak 07/08 Winter Peak 11/12
GenerationConventional Demand GenerationConventional Demand
• Strong increase in gas demand for generation: +27% in 2008, accounting for 42% of total gas demand and 25% of electricity generation
• Enagás capex plan based on long-term view on demand and peak demand; independently of short-term demand fluctuations
15
Enagás’ focus is on enabling infrastructure for peak demand.(1) Source: National Infrastructure Plan 2008-2016.
Highlights of Spanish Electricity Sector
CCGT i O ti R bl i O tiCCGTs in Operation Renewables in Operation
CAGR 2008-16 = 20.5%CAGR
2008-16 = 5.4%
(MW) (MW)
10 680
39,680
CAGR 2001-07 = 20.5%
CAGR 2004-07 = 38.7%
2008 16 5.4%
29 0004,442
10,680
35 000
+4.2%
14,313
20,214
+41%
2,7678,507
12,791 15,772
29,000
2001 2004 2007 20080
8,285
22,107 23,054
35,000
2001 2004 2007 2008 2016E(1) 2016E(1)
3,144
9,298
• CCGT is the highest growing thermal generation source in Spain • Spain has made a strong effort to increase the weight of renewables in the Spanish
2001 2004 2007 20082001 2004 2007 2008 2016E
Other renewablesWind
2016E
p g g pgeneration mix, both in the past and for the foreseeable future
• Renewable generation is volatile and therefore needs appropriate back-up through CCGT which in turn makes additional infrastructure capacity necessary
Profile of natural gas increasingly relevant in Spanish electricity sector
16
Profile of natural gas increasingly relevant in Spanish electricity sectorfor its own merits and through renewables growth.
(1) Source: National Infrastructure Plan 2008-2016.
Wind Power & CCGTs in Spain
Fl ibilit i Flexibility is Paramount!
Current 21 GW
Installed Capacity
Current 21 GWFuture (2016) 34 GW
CCGTs
Wind Power
Current 14 GWFuture (2016) 28 GWPower Future (2016) 28 GW
Wind Power generation means high electrical fluctuations. Wi d P ti b k d b CCGT
17
Wind Power generation are backed-up by CCGTs.CCGTs are backed-up by LNG (mainly) and storage.
Main gas infrastructures included in mandatory planning 2008-2016
Spanish GAS INFRASTRUCTURES
REGANOSA MUSEL
GAVIOTA IRÚN
BILBAO
LARRAU
REGANOSA MUSEL
GAVIOTA IRÚN
BILBAO
LARRAU
825.600 Nm3/h
1.000.000 Nm3/h1.200.000 Nm3/h
BARCELONA
SERRABLO
BARCELONA
SERRABLO
SAGUNTO
CASTORYELA
SAGUNTO
CASTORYELA
1.950.000 Nm3/h
1.400.000 Nm3/h
LAS BARRERASEL RUEDO
LAS BARRERASEL RUEDO
LAS BARRERASEL RUEDO 1.350.000 Nm3/h
HUELVA
TARIFA
ALMERÍA
CARTAGENA
MARISMASPOSEIDÓN
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
Incorporación INFRAESTRUCTURAS
LAS BARRERAS
HUELVA
TARIFA
ALMERÍA
CARTAGENA
MARISMASPOSEIDÓN
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
Incorporación INFRAESTRUCTURASIncorporación INFRAESTRUCTURAS
LAS BARRERASLAS BARRERAS
1.650.000 Nm3/h
18
TARIFA en operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2008-2016 – Categoría APlanificación Obligatoria 2008-2016 – Categoría B
TARIFA en operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2008-2016 – Categoría APlanificación Obligatoria 2008-2016 – Categoría B
en operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2008-2016 – Categoría APlanificación Obligatoria 2008-2016 – Categoría B
Spain: LNG Terminals to 2016
Barcelona - ENAGÁS1969
(6) 540.000 (5) 680.0001.650.000 1.950.000
1Bilbao - BBG
2003(2) 300.000
800.000(4) 600.000
1.400.000
4
1.200.000
Gijón(2011e.M.P.)
(4) 600.000
9
REGANOSA MUSEL
GAVIOTA IRÚN
SERRABLO
BILBAO
LARRAU
REGANOSA MUSEL
GAVIOTA IRÚN
SERRABLO
BILBAO
LARRAU
1.200.000
Sagunto - SAGGAS2006 5Ferrol - REGANOSA
20076
SAGUNTO
CASTORYELA
BARCELONA
SERRABLO
SAGUNTO
CASTORYELA
BARCELONA
SERRABLO
Huelva - ENAGÁS2 Cartagena - ENAGÁS3
(4) 750.0001.600.000
(2) 300.0001.000.000825.000
(2) 300.000(2) 300.000410.000
HUELVA
TARIFA
ALMERÍA
CARTAGENA
MARISMASPOSEIDÓN
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
Incorporación INFRAESTRUCTURASen operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2008-2016 – Categoría APlanificación Obligatoria 2008-2016 – Categoría B
LAS BARRERASEL RUEDO
HUELVA
TARIFA
ALMERÍA
CARTAGENA
MARISMASPOSEIDÓN
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
GasoductoEstación de compresiónTanque de GNLAlmacenamiento subterráneo
Incorporación INFRAESTRUCTURASen operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2008-2016 – Categoría APlanificación Obligatoria 2008-2016 – Categoría B
Incorporación INFRAESTRUCTURASen operación a 31-dic-2007aprobadas en la Revisión 2005-2011 de la Planificación Obligatoria 2002-2011Planificación Obligatoria 2008-2016 – Categoría APlanificación Obligatoria 2008-2016 – Categoría B
LAS BARRERASEL RUEDO
LAS BARRERASEL RUEDO
(1)
(1)
Huelva - ENAGÁS1988
(4) 460.000 (5) 760.0001.350.000 1.800.000
2 Cartagena ENAGÁS1989
(4) 440.000 (5) 590.0001.350.000 1.650.000
3
G.Canaria - GASCAN(2012 e.M.P.)
7Tenerife - GASCAN
(2011 e M P )8
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operationLNG plant -Owner/Operator
/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
-Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operationLNG plant -Owner/Operator
/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
-Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operationLNG plant -Owner/Operator
/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
LNG plant -
Starting operation
Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operationLNG plant -Owner/Operator
/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/OperatorLNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operationLNG plant -Owner/Operator
/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
-Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operationLNG plant -Owner/Operator
/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
-Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operationLNG plant -Owner/Operator
/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
LNG plant -
Starting operation
Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operationLNG plant -Owner/Operator
/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/OperatorLNG plant -
Starting operation
Owner/Operator/Promotor
(Actual/Mandatory planing)
LNG plant -
Starting operation
Owner/Operator/Promotor
(Real/ Mandatory planing )
- /
19
150.000(1) 150.000
(2011 e.M.P.)
(1) 150.000150.000
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage 2005 (m3)Send out 2005 (m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
Current(nº tk.) LNG Storage (m 3)Current Send out(m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage 2005 (m3)Send out 2005 (m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
tk3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
Current (nº tk.) LNG 3
Current Send out(m
3(n)h)
Storage (m )(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage 2005 (m3)Send out 2005 (m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
tk3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
Current(nº tk.) LNG Storage (m 3)Current Send out(m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m 3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m 3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage 2005 (m3)Send out 2005 (m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m 3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send 2002 (m3)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
tk3)
3out 2011
32002
tk tk3)
out 3
3
3
tk3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m 3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send 2002 (m3)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk
out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
Current (nº tk.) LNG 3
Current Send out(m
3(n)h)
Storage (m ) 66
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage 2005 (m3)Send out 2005 (m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
Current(nº tk.) LNG Storage (m 3)Current Send out(m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage 2005 (m3)Send out 2005 (m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
tk3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
Current (nº tk.) LNG 3
Current Send out(m
3(n)h)
Storage (m )(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage 2005 (m3)Send out 2005 (m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
tk3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
Current(nº tk.) LNG Storage (m 3)Current Send out(m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m 3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m 3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage 2005 (m3)Send out 2005 (m
3(n)h)
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m 3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send 2002 (m3)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
tk3)
3out 2011
32002
tk tk3)
out 3
3
3
tk3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
(nº tk.) LNG Storage
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk(nº tk.) LNG
Storage 2011 (m3)Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m 3)
3out 2011
32002
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk tk
3)out
(nº tk.) LNG Storage 2011 (m3)
Send 2002 (m3)
tk tk3)
out
(nº tk.) LNG Storage 2011 (m3)
Send out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk
out (m3(n)/h)
Send out 2011 (m3(n)/h)
2002 (m3)tk
3)
3out 2011
32002
tk tk3)
out 3
out 2011 3
3) 3
3
Current (nº tk.) LNG 3
Current Send out(m
3(n)h)
Storage (m ) 66
Spain: LNG Infrastructure to 2016
R ifi ti C it [M 3( )/h]Regasification Capacity [Mm3(n)/h]
6
8
1012
2
4
6
Storage Capacity (Mm3 LNG) N mber of Tanks
2002 2004 2006 2008 2010 2012 2014 2016
Barcelona Cartagena Huelva Bilbao Sagunto El Ferrol Musel Tenerife Gran Canaria
Storage Capacity (Mm3 LNG)
2.5
3.5
4.5 Number of Tanks
20
30
40
0.5
1.5
2002 2004 2006 2008 2010 2012 2014 2016
10
20
2002 2004 2006 2008 2010 2012 2014 2016
20
2002 2004 2006 2008 2010 2012 2014 2016
Barcelona Cartagena Huelva Bilbao Sagunto El Ferrol Musel Tenerife Gran CanariaBarcelona Cartagena Huelva Bilbao Sagunto El Ferrol Musel Tenerife Gran Canaria
Infrastructures reinforcing the Transmission Network
Spain: Pipeline network development to 2016
Infrastructures reinforcing the Transmission Network
7.800 km 2007
2009
2008 en servicio
nuevos años anteriores
nuevos en el año
New pipelines attending demand in their local areaNetwork development 2008-2016
9.700 km 2011
2010
2014
2013
2012
1.926 kmTotal: +3.555 km
11.600 km 2016
2015
0
1 629 k
21
0 1.500 3.000 4.500 6.000 7.500 9.000 10.500 12.000 13.500 15.000
kilométros gasoductos red básica
1.629 kmprimarios secundarios
Spain: Capacity Evolution
6,2
8,09,7
8
10
12
n)/h +21%
7
x 1,63,5
4,4
3,03,54,04,55,0
Mm
3 GN
L
+20%32 TKs enoperación
x 2,0
Regasification LNG Storage tanks
2,3
0
2
4
6
Mm
3 (n
+176%
+29%x 2,7
0,6
2,2
0 00,51,01,52,02,5
Cap
acid
ad M
Baja de 3tanques
en la planta de Barcelona+293%
+61%
8 TKs en operación
19 TKs enoperación
26 TKs enoperación
x 3,7
2002 2007 2011 20160,0
2002 2007 2011 2016
700.000Km Pipelines Compressor Stations
6 4007.800
9.700
11.600
8.000
10.000
12.000
Km
+24%
+20%
x 1,2
x 1,5
282 700
479.400
577.900
400.000
500.000
600.000
cia
kW+21%
x 2,2
p p
6.400
2.000
4.000
6.000
Long
itud
+22%
+24%
102.200
282.700
0
100.000
200.000
300.000
Pote
n
+177%
+70%
x 1,8
22
02002 2007 2011 2016
02002 2007 2011 2016
Evolution CCGT vs. REGASIFICATION Capacity
30,000
35,000
Installed Power (MWe)
12
14
16
Regasification Capacity(MNm³/h)
6
7
8
LNG Storage Capacity (Mm3)
30,000
35,000
Installed Power (MWe)
12
14
16
Regasification Capacity(MNm³/h)
15,000
20,000
25,000
6
8
10
12
3
4
5
6
15,000
20,000
25,000
6
8
10
12
2002 2005 2007 2011 20160
5,000
10,000
2002 2005 2007 2011 20160
2
4
0
1
2
0
5,000
10,000
0
2
4
6
2002 2005 2007 2011 2016
CCGT
2002 2005 2007 2011 2016
Regasification Capacity (MNm3/h) CCGT WindCCGTRegasification Capacity (MNm3/h) CCGT Wind LNG Storage Capacity
Coherent planned development:
23
Wind Power - CCGT - Regasification Plants - and …… and LNG Storage Capacity
Liberalization of the Liberalization of the Spanish Gas IndustrySpanish Gas Industry
24
Development of the Natural Gas Industry
Spanish Gas System: HISTORY
►1972: Creation of Enagás.►1975: Enagás signs Algerian LNG contract►1983: National Energy Plan
Development of the Natural Gas Industry99--
1996
1996
gy►1991: Agreement to build Europe-Maghreb Pipeline►1994: 90% Enagás sold to a group of LCD
The liberalizations Process Starts
1969
1969
►1997: First TPA provisions►1998: Hydrocarbons Act /First EU directive/Remaining 10% Enagás sold to a group
of LCD
The liberalizations Process Starts
--200
220
02
►
►1999-2002: Basic Regulatory Framework Development►2001: Spin-Off of Enagás►2002 Enagas IPO
1997
1997
►2003: Full eligibility since 01.01.2003►2005: System Code (for all infrastructures: transmission, distribution, LNG terminals & UGS)
The Liberalisation Process is Completed
77--20
0220
02
25
►2008: Integral Basic Tariff disappears. 100% market supply by the TPA market.
1997
1997
Active Shippers in Spain
26
LNG Supplies to the LNG Market
TWh
300
350
200
250
300
75 %75 %
100
150
200 75 %75 %
0
50
100
25 %25 %
New entrantsIncumbent Integral Regulated Tariff Market TPA market:
2001 2002 2003 2004 2005 2006 2007 2008
27
European Union European Union ppSecurity of SupplySecurity of Supply
28
Supply cuts of Russian E
Europe´s security and diversification of supply couldEurope´s security and diversification of supply could
Security of Supply in Europe
gas to Europe, consequence of the gas crisis between Rusia and Ukraine in January 2009 resulted in several
u ope s secu ty a d d e s cat o o supp y cou dbe increased connecting its main Central Europeanmarkets with the African producer countries throughhigh capacity interconnections via Spain.
u ope s secu ty a d d e s cat o o supp y cou dbe increased connecting its main Central Europeanmarkets with the African producer countries throughhigh capacity interconnections via Spain.
2009, resulted in several european countries not being able to cover the 100% of their demand.
S i h G S i h G
País Importa de Rusia
Bulgaria 100%Macedonia 100%
EUROPEAN DEPENDENCE ON RUSSIAN GAS
XX Spanish Gas System: Entry point of gas at the South
Spanish Gas System: Entry point of gas at the South acedo a 00%
Bosnia 100%Serbia 100%Moldavia 100%Eslovaquia 100%Grecia 93%Croacia 88%
at the South of Europe
at the South of Europe
Development of MEDGAZ
Open Season FRANCE-SPAIN for development of Interconection capacity:
2013 Development of the existing interconnection point
Development of MEDGAZ
Open Season FRANCE-SPAIN for development of Interconection capacity:
2013 Development of the existing interconnection point
R. Checa 79%Hungría 75%Austria 74%Polonia 70%Rumania 52%Eslovenia 51%
29
2013 Development of the existing interconnection point LARRAU and BIRIATOU
2015 Development of a new interconnection point MIDCAT
2013 Development of the existing interconnection point LARRAU and BIRIATOU
2015 Development of a new interconnection point MIDCAT
Alemania 44%Italia 32%Francia 15%
Source: Gas Coordination Group UE (9.01.2009)
MEDGAZ Project- Connection to Spanish System
The following infrastructures are being
built by Enagas in order to integrate the
gas flows coming from the new Medgaz
GasoductoEstación de compresiónAlmacenamiento subterráneo
GasoductoEstación de compresiónAlmacenamiento subterráneo
GasoductoEstación de compresiónAlmacenamiento subterráneo
GasoductoEstación de compresiónAlmacenamiento subterráneo
GasoductoEstación de compresiónAlmacenamiento subterráneo
GasoductoEstación de compresiónAlmacenamiento subterráneo
g g g
pipeline in the Spanish Gas System.
Almería–Lorca pipeline: 126 km & 42’’p p
Lorca–Chinchilla pipeline: 170 km & 42’’
Chinchilla CS: 48.000 kW
Spanish projectSpanish project
Chinchilla CS: 48.000 kW
ALMERÍAALMERÍAALMERÍAALMERÍA
MEDGAZMEDGAZAlgerian projectAlgerian project
370 Millones €≈
30
CAPACITY: Initial flow will be 913.000 m³(n)/h (8 bcm year)
MEDGAZ – Full integration in the Spanish system
Reinforcements in the core of Spanish Gas System allowingMedgaz integration
Transmission trough Almería Chinchilla pipeline will divert to Madrid andTransmission trough Almería-Chinchilla pipeline will divert to Madrid andValencia areas.
GAVIOTAMUSEL
REGANOSA GAVIOTAMUSEL
REGANOSA GAVIOTAMUSEL
REGANOSA GAVIOTAMUSEL
REGANOSA
The fully integration with the Spanish system also requires the next pipelines:
Tivissa-Paterna GAVIOTABILBAOREGANOSA
BARCELONA
LARRAU
SERRABLO
GAVIOTABILBAOREGANOSA
BARCELONA
LARRAU
SERRABLO
GAVIOTABILBAOREGANOSA
BARCELONA
LARRAU
SERRABLO
GAVIOTABILBAOREGANOSA
BARCELONA
LARRAU
SERRABLO
Tivissa-Paterna
Tivissa-Castelnou
Zarza de Tajo-Villar de Arnedo
SAGUNTO
CASTOR
SAGUNTO
CASTOR
SAGUNTO
CASTOR
SAGUNTO
CASTOR
CARTAGENAHUELVA
ALMERÍAMARISMASPOSEIDÓN
NoroesteCentro-SurPaís VascoValle del EbroLevanteCataluña
CARTAGENAHUELVA
ALMERÍAMARISMASPOSEIDÓN
NoroesteCentro-SurPaís VascoValle del EbroLevanteCataluña
NoroesteCentro-SurPaís VascoValle del EbroLevanteCataluña
CARTAGENAHUELVA
ALMERÍAMARISMASPOSEIDÓN
NoroesteCentro-SurPaís VascoValle del EbroLevanteCataluña
CARTAGENAHUELVA
ALMERÍAMARISMASPOSEIDÓN
NoroesteCentro-SurPaís VascoValle del EbroLevanteCataluña
NoroesteCentro-SurPaís VascoValle del EbroLevanteCataluña
31
CataluñaCataluñaCataluña
MEDGAZMEDGAZ
Infraestructuras en operación y aprobadas en Planificación Obligatoria 2005-2011 (año horizonte)
CataluñaCataluñaCataluña
MEDGAZMEDGAZ
Infraestructuras en operación y aprobadas en Planificación Obligatoria 2005-2011 (año horizonte)
REINFORCEMENTES IN THE CORE OF SPANISH TRANSMISSION SYSTEM
Spanish Gas System – Full integration in Europe
Infrastructures that directly increase the interconnection
capacity:
REGANOSA MUSELGAVIOTA
LARRAU
SERRABLO
BILBAO
REINFORCEMENTES IN THE CORE OF SPANISH TRANSMISSION SYSTEM
capacity:
CASTOR
YELA
BARCELONA
TUY
Already IN OPERATION 42 M€
Under CONSTRUCTION 286 M€
Already IN OPERATION 42 M€
Under CONSTRUCTION 286 M€
SAGUNTO
CASTOR
BADAJOZ
Pending ADM. PROCEDURES 929 M€
Binded to OPEN SEASON 120 M€
TOTAL M€1.377
Pending ADM. PROCEDURES 929 M€
Binded to OPEN SEASON 120 M€
TOTAL M€1.377
HUELVAALMERÍA
CARTAGENA
MARIS MASPOSEIDÓ N
EL RUEDOLAS BA RRE RAS
MAIN TRANSMISION AXES
TARIFA
ALMERÍA
MEDGAZ
GME
32
Under operation sep-2008Pprojects included in Mandatory Planning, under Construction or under Administrative Procedures
To fully integrate Medgaz in the EU system it is necessary to develop
MEDGAZ – Full integration in the European System
y g g y y p
international pipeline connections: reinforcement of Core of FrenchGas System.
EUROPA
Open Season FRANCE-SPAIN 2009:
D l t f i t ti EUROPA
FRANCIA
Development of interconnectionsbetween France and Spain in orderto increase market fluidity andsecurity of supply.
ESPAÑA
security of supply.
33
ALMERÍA
GasoductoEstación de compresiónAlmacenamiento subterráneo
ALMERÍA
GasoductoEstación de compresiónAlmacenamiento subterráneo
GasoductoEstación de compresiónAlmacenamiento subterráneo
ALMERÍA
GasoductoEstación de compresiónAlmacenamiento subterráneo
ALMERÍA
GasoductoEstación de compresiónAlmacenamiento subterráneo
GasoductoEstación de compresiónAlmacenamiento subterráneo
ARGELIA
Trans Saharan Project
34
EU LNG Consumption (bcm/year)
2000 20082000 2008
23 b23 bcm 53 bcm
35
Spain France Belgium Portugal Italy UK Greece
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
EU: Entry Capacity from LNG Terminals
MNm³/day 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018TOTAL UE 461 473 494 558 573 592 592 600 600 600
Spain 157 169 169 189 204 223 223 231 231 231
% Spain s/Total 34% 36% 34% 34% 36% 38% 38% 38% 38% 38%
36
Source: GTE+ Capacity Development Report 2008
European natural gas grid (2008)
The European Natural Gas Grid 2008The European Natural Gas Grid 2008
37
European Energy European Energy p gyp gyThird packageThird package
38
Aproved by the European Parliment (22/04/2009) and
Regulatory developments in the European Union
Aproved by the European Parliment (22/04/2009) and pending of its aproval by the European Council and signature
and adoption by the EU President:
3rd Directive3 DirectiveENTSOG creationACER creation ACER creation Different Models of Separation of Activities to warrant the INDEPENDENCE of the TSO
ISOISO
ITOITO
Ownership Ownership Ownership UnbundlingOwnership Unbundling
The Spanish Gas System, with the approval of the RD 6/2009, appointing ENAGAS as exclusive TSO of the Main
Transmission Core Network, goes forward on the
39
, gOwnership Unbundling Model.
Basic timeline based on
Regulatory developments in the European Union
Basic timeline based on Gas Regulation
6 Months
A ENTSOG
12 Months 3 Months
ACER
CO
MITO
EC requests ACER to submit
Agency prepares Framework Guidelines
ENTSOG prepares network codes
EC requests ENTSOG to
submit
ACER approves network codes
LOG
Y
ENTSOG submits
network code 3rd Directive
EC defines priorities
for network
framework guidelines
network code to ACERACER submits network code to EC when satisfied,
recommending approval via
ENTSOG tasks will include the development of:an annual work programme
3GIE Annual Conference, 6/7 May 2009, Groningen
codes Comitology
– an annual work programme– network codes – a 10-year network development statement
annual winter outlooks
40
– annual winter outlooks– an annual report,…
Spain’s Gas Industry ithi th EUwithin the EU
Juan Pons. i l d i l ió
June 2009
Director General de Estrategia y Regulación