1
Questions? Contact us: 24/7 phone: 403-212-0565 [email protected] SWCRRproject.com Southwest Calgary Ring Road 2019 Construction Update Segment 1: Highway 8 from Lott Creek Boulevard / Clearwater Drive to 69 th Street SW Lott Creek Boulevard / Clearwater Drive Realign eastbound and westbound traffic on Highway 8 onto new road 101 st Street • Close access to 101 st Street south of Highway 8 » Becomes gated emergency access » Local residents to use Discovery Ridge Boulevard Complete Highway 8 bridge across the Elbow River Realign eastbound and westbound traffic on Highway 8 onto new road and bridge 85 th Street • Temporary closures at 85 th Street and Lower Springbank Road for intersection upgrades 69 th Street Realign eastbound and westbound traffic on Highway 8 onto new road Project Corridor Remove existing portions of Highway 8 and start upgrades Haul truck and equipment traffic Speed reduction along Highway 8 N Tsuut’ina Nation Lott Creek Blvd Clearwater Dr Highway 8 101 st St SW Lower Springbank Rd 85 th St SW Discovery Ridge Blvd SW 69 th St SW 1 1 2 2 4 4 Transportation Utility Corridor Elbow River Cullen Creek Clearwater Park (by City of Calgary) Pond Pond Pond For discussion purposes only subject to change Gated Emergency Access Haul Road Approximate location of proposed noise mitigation Location of drilled pile Stormwater Ponds Transportation Utility Corridor # Number of lanes and direction of travel SWCRR Roads & Ramps Existing Roads SWCRR Bridges Pedestrian Access Route

Transcript of Southwest Southwest Calgary Ring Road Calgary Ring Road Segment 1: Highway … · 2019. 9. 4. ·...

Page 1: Southwest Southwest Calgary Ring Road Calgary Ring Road Segment 1: Highway … · 2019. 9. 4. · Questions? Contact us: 24/7 phone: 403-212-0565 info@SWCRRproject.comSWCRRproject.com

Questions? Contact us:24/7 phone: 403-212-0565 [email protected] SWCRRproject.com

Southwest Calgary Ring Road Segment 1: Highway 8 to 69th St SWSouthwest Calgary Ring Road 2019 Construction Update Segment 1: Highway 8 from Lott Creek Boulevard / Clearwater Drive to 69th Street SW

Lott Creek Boulevard / Clearwater Drive• Realign eastbound and westbound traffic on Highway 8 onto

new road

101st Street• Close access to 101st Street south of Highway 8

» Becomes gated emergency access

» Local residents to use Discovery Ridge Boulevard

• Complete Highway 8 bridge across the Elbow River

• Realign eastbound and westbound traffic on Highway 8 onto new road and bridge

85th Street• Temporary closures at 85th Street and Lower Springbank

Road for intersection upgrades

69th Street• Realign eastbound and westbound traffic on Highway 8 onto

new road

Project Corridor• Remove existing portions of Highway 8 and start upgrades

• Haul truck and equipment traffic

• Speed reduction along Highway 8

N Tsuut’ina Nation

Lott

Cre

ek B

lvd

Cle

arw

ater

Dr

Highway 8

101st

St S

W

Lower Springbank Rd

85th

St S

W

Discovery Ridge Blvd SW

69th S

t SW

1 12

2

4

4

Transportation Utility Corridor

Elbow River

Cullen Creek

Clearwater Park (by City of Calgary)

Pond

Pond

Pond

For discussion purposes only – subject to change

Gated Emergency Access

Haul Road

Approximate location of proposed noise mitigation

Location of drilled pile

Stormwater Ponds

Transportation Utility Corridor

# Number of lanes and direction of travel

SWCRR Roads & Ramps

Existing Roads

SWCRR Bridges Pedestrian Access Route