South Maple Street Sanitary & Storm Sewer System Improvements Project

14
South Maple Street South Maple Street Sanitary & Storm Sewer System Sanitary & Storm Sewer System Improvements Project Improvements Project October 14, 2014

description

South Maple Street Sanitary & Storm Sewer System Improvements Project. October 14, 2014. Project Area. 400 block South Maple Street 12 & 24 College Street 200 block Boone Avenue (east side of Boone) 101 & 117 Belmont Avenue. Project Area…. Project Area…. Area Impact. - PowerPoint PPT Presentation

Transcript of South Maple Street Sanitary & Storm Sewer System Improvements Project

South Maple Street South Maple Street

Sanitary & Storm Sewer System Sanitary & Storm Sewer System

Improvements ProjectImprovements Project

October 14, 2014

Project Area. . .Project Area. . .

400 block South Maple Street400 block South Maple Street

12 & 24 College Street12 & 24 College Street

200 block Boone Avenue (east side of Boone)200 block Boone Avenue (east side of Boone)

101 & 117 Belmont Avenue101 & 117 Belmont Avenue

Project Area…..Project Area…..

Project Area…..Project Area…..

Area Impact . . .Area Impact . . .

• 27 +/- Residences and Properties27 +/- Residences and Properties

Project Disruptions….

• Road Closures / DetoursRoad Closures / Detours

• Noise Noise

• DustDust

• No expected customer sewer service No expected customer sewer service impactsimpacts

• Construction in back yardsConstruction in back yards

• Closure of alley way during construction Closure of alley way during construction periodperiod

Project Purpose…Project Purpose…

• US EPA Consent Decree (Not a defined project)US EPA Consent Decree (Not a defined project)

• Inflow / Infiltration ReductionInflow / Infiltration Reduction

• Eliminates any combined sewer connections Eliminates any combined sewer connections

• Eliminates “Private” Sanitary Sewer Service Eliminates “Private” Sanitary Sewer Service connections; Publicly owned and maintainedconnections; Publicly owned and maintained

• Reduces Public Health RisksReduces Public Health Risks

• Reduces amount and time period of Storm Reduces amount and time period of Storm Water in back yards and alley*Water in back yards and alley*

Scope of Work for Maple Street Scope of Work for Maple Street Project…Project…

741 ft. of 8-inch sanitary sewer741 ft. of 8-inch sanitary sewer 750750 ft. of 6-inch sanitary sewerft. of 6-inch sanitary sewer Six (6) sanitary sewer manholesSix (6) sanitary sewer manholes 1,7401,740 ft. of storm sewer pipe 24” - 12”ft. of storm sewer pipe 24” - 12” 13 storm sewer boxes and other structures13 storm sewer boxes and other structures Other necessary construction activitiesOther necessary construction activities

Maple Street Project Maple Street Project Costs . . . Costs . . . • DesignDesign $100,000$100,000

• Construction Construction (Preliminary Cost (Preliminary Cost Estimate) Estimate) $562,000$562,000

• Construction Admin./Inspection Construction Admin./Inspection $50,000$50,000

• Additional Site Restoration Additional Site Restoration (Estimated) (Estimated) $50,000$50,000

Total Project Cost (Total Project Cost (EstimatedEstimated)) $762,000$762,000

Maple Street Project Maple Street Project Funding…Funding…

• Winchester Municipal Utilities Winchester Municipal Utilities Private Sewer and Main Private Sewer and Main Replacement Funds Replacement Funds - Sanitary Sewer Portion of Work- Sanitary Sewer Portion of Work

• City of Winchester General FundCity of Winchester General Fund - Storm Sewer Portion of Work- Storm Sewer Portion of Work

Maple Street Project Schedule Maple Street Project Schedule (Anticipated)(Anticipated)

• Advertisement DateAdvertisement Date November 2, November 2,

20142014

• Bid OpeningBid Opening November 22, November 22,

20142014

• Bid Award Bid Award (Estimated; bid (Estimated; bid

amounts)amounts)

December 2, December 2,

20142014

• Construction StartConstruction Start

• Construction TimeConstruction Time

• Estimated Completion Estimated Completion

January 2, 2015January 2, 2015

6 months 6 months

July 31, 2015July 31, 2015

Easements…Easements…

• Temporary and Permanent Easements Temporary and Permanent Easements

RequiredRequired

New easement – Not in flood plain – $4.00/ft.New easement – Not in flood plain – $4.00/ft.

New easement – In the flood plain – $3.00/ft.New easement – In the flood plain – $3.00/ft.

Existing easement (Increase width) – $2.00/ft.Existing easement (Increase width) – $2.00/ft.

Temporary (all) – $1.00/ft. Temporary (all) – $1.00/ft.

Summary…Summary…

• Eliminate combined sanitary sewer and Eliminate combined sanitary sewer and storm connections (if any) storm connections (if any)

• Eliminate “Private” sanitary sewer Eliminate “Private” sanitary sewer connectionsconnections

• Reduce amount and time period of storm Reduce amount and time period of storm water on private propertywater on private property

• Reduce public health risks Reduce public health risks

Key Contacts….

Mike Flynn/Duke Mike Flynn/Duke DrydenDryden

Matt Belcher/Joe Matt Belcher/Joe TincherTincher

WMUWMU

City of WinchesterCity of Winchester

Winchester Municipal Utilities City of Winchester150 North Main Street 32 Wall StreetPO Box 4177 PO Box 40Winchester, KY 40392-4177 Winchester, KY 40392-0040

Phone: (859) 744-5434 (859) 744-2821Fax: (859) 745-4146 (859) 745-4590